DOCUMENT REVIEW AND COVER SHEET Construction Contractor:

Company:

Engineering Contractor:

Engineering and Technical Services:

Review:

Revision :

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT CODE

DOCUMENT TYPE

DICIPLINE CODE

SEQUENCE NUMBER

A1

PROJECT

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project Bashkortostan, Russian Federation

CONTRACT NO

88621 - December, 2012

DOCUMENT TITLE

Batteries, Battery Chargers & UPS

DOCUMENT NUMBER DOCUMENT DESCRIPTION Status

RSA - IT - QA E P Inspection and Test Plan (ITP)

Status

1



2



3



4



5

Revieved Engineer:

A1

Code Description

Code



REV.

APPROVED WITHOUT COMMENT REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECT TO INCORPORATON OF CHANGES INDICATED. REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY NOT PROCEED INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY PROCEED CANCELLED/SUPERSEDED

NAME

SIGN

DATE

Remarks or Comments:

Revision :

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT CODE

DOCUMENT TYPE

DICIPLINE CODE

SEQUENCE NUMBER

A1

A1

Issued for Approval

Rev.

Amendment

Prepared

Checked

Approved

Date

Company:

Construction Contractor:

Engineering Contractor:

Engineering and Technical Services:

Project Title:

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project Bashkortostan, Russian Federation Document Title:

Inspection and Test Plan Batteries, Battery Chargers & UPS

Revision :

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT CODE

DOCUMENT TYPE

DICIPLINE CODE

SEQUENCE NUMBER

A1

REVISION SHEET Revisio n A1

Description of changes

Page

First Issued For approval

Revision :

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT CODE

DOCUMENT TYPE

DICIPLINE CODE

SEQUENCE NUMBER

A1

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project

Inspection and Test Plan BATTERIES, BATTERY CHARGERS & UPS Issue Date:

No

01/06/2014

Doc. Number:

DESCRIPTION OF ACTIVITY

Revisio n:

RSAE-ITP-QA-

CONTROL DOCUMENT

ACCEPTANCE CRITERIA

A1

VERIFICATION DOCUMENT

Page:

1 of 2

INVOLVEMENTS OWN RC MHI ER

1 General 1.1 Check substation/CCR is ready for installation of Batteries, Battery Chargers and UPS CCR/SS arrangement DWG DWG: 3935 E471-00100 3935 E471-00200 3935 E474-00100 3935 E474-00120 Vendor DWG DWG: 3935 E323-00700 3935 E323-00800 (1) Clean condition (2) No water in the the room (3) Panel foundation is available (4) Temperature control as per Vendor's manual Vendor instruction manual DWG:AC UPS: 3935 E423- 00800 DC Charger: 3935 E423-00700 And Good Condition of substation, CCR W W S 1.2 Verify that equipment is properly grounded in accordance with the grounding notes, symbols, and details DWG: 3935 E463-00100 3935 E463-00200 As per drawing RSAE-FRM-205 LEGEND RC: Renaissance Construction,

MHI: Mitsubishi Heavy Industries,,

OWNER: Gasprom Neftehim Salavat,

W: Witness ,

R: Review ,

H: Mandatory Hold Point ,

S: Surveillance (Random Check)

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project

Inspection and Test Plan BATTERIES, BATTERY CHARGERS & UPS Issue Date:

No

01/06/2014

Doc. Number:

DESCRIPTION OF ACTIVITY

Revisio n:

RSAE-ITP-QA-

CONTROL DOCUMENT

ACCEPTANCE CRITERIA

A1

VERIFICATION DOCUMENT

Page:

2 of 2

INVOLVEMENTS OWN RC MHI ER

W W S 1.3 Verify that all power cables and distribution buses have been inspected and tested DWG: 3935 E461-00100 3935 E461-00200 ITP for cable Inspection Record for the cable W W S

LEGEND RC: Renaissance Construction,

MHI: Mitsubishi Heavy Industries,,

OWNER: Gasprom Neftehim Salavat,

W: Witness ,

R: Review ,

H: Mandatory Hold Point ,

S: Surveillance (Random Check)

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project

Inspection and Test Plan BATTERIES, BATTERY CHARGERS & UPS Issue Date:

No

2

01/06/2014

Doc. Number:

Revisio n:

RSAE-ITP-QA-

CONTROL DOCUMENT

ACCEPTANCE CRITERIA

DWG: AC UPS:3935 E323-00600 3935 E423- 00800 DC Charger: 3935 E323-00700 3935 E423-00700

Vendor drawing and vendor's manual instruction

DESCRIPTION OF ACTIVITY

A1

VERIFICATION DOCUMENT

Page:

3 of 2

INVOLVEMENTS OWN RC MHI ER

General

2.1

Check Battery Installation

2.2

Check Battery Chargers Installation

DWG:

3935 E323-00700 3935 E423-00700

Vendor drawing and vendor's manual instruction

2.3

Check UPS Installation

DWG:

3935 E323-00600 3935 E423-00800

2,4

Vendor's Test (1) Function Test (2) Electrical Test

Vendor's drawing

RSAE-EFRM-206 W

W

S

RSAE-EFRM-205

W

W

S

Vendor drawing and vendor's manual instruction

RSAE-EFRM-207

W

W

S

As per Vendor's drawing

Vendor's record

W

W

S

Attachment 1: RSAE-FRM-XXX Rev.0 INSPECTION CHECK LIST FOR BATTERY INSTALLATION.xlsx Attachment 2: RSAE-FRM-XXX Rev.0 INSPECTION CHECK LIST FOR BATTERY CHARGER INSTALLATION.xlsx Attachment 3: RSAE-FRM-XXX Rev.0 INSPECTION CHECK LIST FOR UPS INSTALLATION.xlsx

LEGEND RC: Renaissance Construction,

MHI: Mitsubishi Heavy Industries,,

OWNER: Gasprom Neftehim Salavat,

W: Witness ,

R: Review ,

H: Mandatory Hold Point ,

S: Surveillance (Random Check)