Chennai Plant
ISO 14001:2004 Training on Methodology to calculate the Aspect /Impact Analysis
Presented by M.A.Karthi Sivam Date:15.12.2010
AGEN
Methodology to identify
the
DA Significant Impact
Significant Aspect
Calculation
Grade/Rating
Methodology for 2 2
Significant Impacts
Significant Impact Methods: To To identify the Significant Impact Following Fol lowing is an overview of how this process takes place
Start No
Yes
International Issues Yes
p mi
Local issues/Interested parties t
No Yes
Legal and Other requirements
n ig S
No Yes
Environmental consequences No
Non-Significant Aspects 3
fi
ci
n a
ct a
Significant Aspect Calculation Multiplication: Multiplica tion: B x C x D x E x F Where: B – Legal Requirement C – Severity/ Effects on Environment D – Frequency of Occurrence E – Present Control F – Detection Time
4
Evaluation method: Grade /Rating methodology for Significant Impact.
Gr Grad ade e (A) (A)
Le Lega gall Requ Requir irem emen entt (B) 1Comply
Frequency of occurrence (D)
Present Control (E)
Detection/Ti me (F)
Negligible
Rarely
Automatic/ON line
Within 1Hr8 Hrs
2
--------
Low (Nuisances)
Yearly-Once
Alarming High Control/Alarming/ Within one Day by Resetting
3
--------
Moderate/Medium Damages to Tree
Mon ontthly-once
Moderate Control Medium by manual Within One
4
--------
5Violence of Requirement
5
Severity/Effects on Environment ( C )
High Damages to human/plant /Tree/Flora-Fauna
Weekly-Once
Severe/Damages to Permanent Damage/Death
Daily/Hourly
Control
Week
Required to modify
Within One Month
--------
More than One Month
Format of Environmental Aspect & Impact Summary
Department
Process
Activity
Aspect
Impact
Condition
Critical Score Legal Requirement
Severity/Effects On Environmental
Frequency of occurrence
Control Significant
6
EMP No.
WI(OCP)
present control
Detection/Time
Total
Aspe ct : 1.Us age : Power 1.Usage Powe r ,Water,Air ,Water,Air,Raw ,Raw Material Mater ial,pape ,paper r,gas,Oil ,gas ,Oil etc….. 2.Leakage : Air ,water,Oil,Gas ,water,Oil,Gas etc…. 3.Disposal : Solid W Waste, aste, Solvent Solvent Containers, Containers, test test samples
7
Paint Containers
Impa ct : RU-Resource Usage RW-Resource RWResource Wastage AP-Air Pollution LC-Land Contamination
Condition Normal / Abnormal
8
Legal Requirement 1974 - Water Act 1981 - Air Act 1989 - Hazardous waste Management Act 2000 - Batteries Act
9
Cont rol 1. Significant : S/NS 2. EMP No: Energy: EMP-01 Water : EMP-02 Paper : EMP-03 3.OCP – Operation Control Procedure Room A/C –NIIPL-EOP –NIIPL-EOP-01,02,03,04,05,06 -01,02,03,04,05,06 etc Printer F ax Xerox Fork Lift DG Softener
10
Blank Format
Microsoft Excel Worksheet
11
Reference work Sheet
Microsoft Excel Worksheet