0

21.Mar.2014

Issue for Construction

J. G. Kim

H.W.Chung

M.K. Kim

A

08.Jan.2014

Issue for Approval

J. G. Kim

H.W.Chung

M.K. Kim

REV.

DATE

DESCRIPTION

DESIGNED

CHECKED

APPROVED

OWNER

PROJECT

SHUQAIQ STEAM POWER PLANT ENGINEER

CONTRACTOR

SUBCONTRACTOR

VENDOR INTERNAL DOC.NO XXXX-XXXX-XXXX

THIS DOCUMENT IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIAL UNTIL CERTIFIED AND DATED.THE CONTRACTOR HHI CONFIRMS FULLY COMPLIANCE WITH THE O/E’S COMMENTS. NO OTHER CHANGES HAD BEEN MADE ON THE DOCUMENT. THE CONTRACTOR MAY SUBMIT THE DOCUMENTS AS “FOR CONSTRUCTION”

APPROVAL/CERTIFICATION INFORMATION DOC. NO : POY-HHI-T-00397 REV. NO : A DATE : 26. FEB. 2014 STATUS : Code 2, Approved with Comments

DOCUMENT TITLE

INSPECTION AND TEST PLAN (ITP) FOR ELECTRICAL CONTRACT NO.

DOCUMENT NO

NO. OF PAGES

REV.

31221097/00

S-00-TAA-Q-43-036-001

38

0

Doc. No. : S-00-TAA-Q-43-036-001 Rev. No. : 0

Table of Contents 1. S-00-TAA-Q-43-036-001 : ITP for Electrical…….……………………………..1 to 2 2. S-00-TAA-Q-43-036-002 : Cable and Tray & Conduit(Ele)....…….. ………….3 to 6 3. S-00-TAA-Q-43-036-003 : LV MV SWGR………. …………………………...7 to 8 4. S-00-TAA-Q-43-036-004 : Motor Control Center……………………..…........9 to 10 5. S-00-TAA-Q-43-036-005 : Transformer …………………………….……......11 to 12 6. S-00-TAA-Q-43-036-006 : AC / DC UPS System…………………………....13 to 14 7. S-00-TAA-Q-43-036-007 : BUS DUCT……………….……………………...15 to 16 8. S-00-TAA-Q-43-036-008 : Distribution Board(Incl UPS AC/DC Board)…….17 to 18 9. S-00-TAA-Q-43-036-009 : Motor…….……………………………………….19 to 20 10. S-00-TAA-Q-43-036-010 : Cathodic..……………………………………..….21 to 22 11.S-00-TAA-Q-43-036-011 : Earthing and Bonding…………………………….23 to 24 12.S-00-TAA-Q-43-036-012 : Lighting System…….…………………………….25 to 26 13.S-00-TAA-Q-43-036-013 : Lightning Protection….…..……………………….27 to 27 14. S-00-TAA-Q-43-036-014 : Receptacle, Junction Box, RCU….…………..….28 to 29 15. S-00-TAA-Q-43-036-015 : Cable and Tray & Conduit(Telecom).………..….30 to 32 16. S-00-TAA-Q-43-036-016 : CCTV………………………………..……….….33 to 34 17. S-00-TAA-Q-43-036-017 : PA BX……………………………..………….…35 to 36 19. S-00-TAA-Q-43-036-018 : Junction Box(Telecom)…………..………….…..37 to 38

2 of 38

Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

No

Activity Description

1

Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Cable / Tray / Conduit

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. : Page

S-00-TAA-Q-43-036-002 Rev. 0

:

Reporting Format

HSFP-ST-01

3

of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Drawing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008001

2

Installation Cable Tray, Ladder and Conduit Installation.

100%

Approved drawing. Vender Drawing

clear of the soil.

- Check tag numbers are correct. - Verify Cable tray and tray installed as per

HSFP-EL028

W

W

M

construction drawing. - Check alignment as overlapped of trays. - Check bonding jumpers installed at tray joint connections and tight.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Item

: Cable / Tray / Conduit

No

2

Electrical

Activity Description

Installation Cable Tray, Ladder and Conduit Installation.

Frequency

100% Installation All Route

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec.

Approved drawing. Vender Drawing

Inspection Method / Acceptance Criteria

- Check hold down clamp and brackets are installed. - Check cable ladder properly supported.

ITP No. : Page

S-00-TAA-Q-43-036-002 Rev. 0

:

Reporting Format

HSFP-EL028

4

of

38

Inspection By SubSEC/ HHI Con OE W

W

M

W

W

M

- Check cover installed(to be installed after all the cables are tested and properly terminated) - Check junction box supports independent from conduit and tray. - Check conduit supports within the specified interval according to approved drawing. - Check touch up of galvanizing performed (if required) - No sharp edges. - No obstructions. - Check tray Labelling

3

Excavation, backfilling(Civil), Duct, Sand bed & Sand fill

100% Installation All Route

Approved drawing.

- Check the cable trench and dimension and elevation of bottom of trench as approved drawings. - Check rigid PVC location and size as per drawing, (if required) - Check the tiles installed as per approved drawing

HSFP-EL029

Remarks

Client

:

Disc

:

Item

:

No

3

SEC, Kingdom of Saudi Arabia Electrical

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Cable / Tray / Conduit

Activity Description

Excavation, backfilling(Civil), Duct, Sand bed & Sand fill

Frequency

100% Installation All Route

Procedure / Spec.

Approved drawing

Inspection Method / Acceptance Criteria

- Check using of clean sand without stone for sand bedding

and sand filling with appropriate depth

ITP No. : Page

S-00-TAA-Q-43-036-002 Rev.0

:

Reporting Format

HSFP-EL029

5

of

38

Inspection By SubSEC/ HHI Con OE W

W

M

- Check the Trench route marker and symbol (after cable testing and complete backfill)

4

Cable Installation - Installation & Visual Check. - Insulation resistance Test

All Cable

Approved vender Drawing Approved drawing

- Check and confirm cable shall be meggered before Installation(on reel test/Only Power cable : If required) - Verify cable type & configuration. - Damaged cables shall be replaced before Sand filling - Check and confirm cable shall be meggered before And after installation, record of testing shall be available. - Check proper arrangement, segregation and layer Of cable, bending radius as per vender data, and allowable Slack. - Check the barrier between the HV/LV cable (if required) - Check cable fix to cable tray and ladder properly.

HSFP-EL001

W

W

M

Remarks

Client

:

Disc

:

Item

:

No

Activity Description

4

SEC, Kingdom of Saudi Arabia Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Cable / Tray / Conduit

Cable Installation - Installation & Visual Check. - Insulation resistance test

INSPECTION & TEST PLAN (ITP)

Frequency

All Cable

Procedure / Spec. Approved vender Drawing Approved drawing

Inspection Method / Acceptance Criteria

- Check cable tags correct. - Check cable caps for protection of cable ends Shall be properly protected after installation.

ITP No. : Page

S-00-TAA-Q-43-036-002 Rev. 0

:

Reporting Format HSFP-EL001/01B

6

of

38

Inspection By SubSEC/ HHI Con OE W

W

M

Remarks

1Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

MV / LV SWGR

No

Activity Description

1

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-003 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

7

of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Dra wing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Pr ocedure: S-00-TAA -Q-43-008-001

2

MV/LV SWGR -Installation & Visual Check. -Busbar conductivity Check. -Insulation resistance test.

Each Unit

clear of the soil. - Check Shock indicator (if required)

- Approved vender Drawing

- Check installation method as per installation

- Approved drawing

- Check doors and panels to ensure proper

-Technical specification(SEC)

drawing.

W

W

W

HSFP-EL006

opening and closure. - Check paint damage, tag plate, warning label , visual damage etc.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

Item

:

Item

:

No

Activity Description

2

SEC, Kingdom of Saudi Arabia Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

MV / LV SWGR

MV/LV SWGR -Installation & Visual Check. -Busbar conductivity Check. -Insulation resistance test

INSPECTION & TEST PLAN (ITP)

Frequency

Each Unit

Procedure / Spec. - Approved vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check fuse rating, main parts rating / type. - CT/VT ratios shall be visualy checked against drawing. - Check operation of safety shutter. - Check busbars are installed at correct location. - Check busbars connection tight ness and correct phasing. - Torque check of busbar connection as per manufacturer recommendation. - Check busbars conductivity (end to end) - Check the condition of earthing bar and connections, measure continuity of switchboard to main earth. -Check insulation resistance values of busbars

ITP No. : Page

S-00-TAA-Q-43-036-003 Rev. 0

:

Reporting Format HSFP-EL006

8

of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

Motor Control Center

No

Activity Description

1

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. : Page

S-00-TAA-Q-43-036-004 Rev. 0

:

Reporting Format

HSFP-ST-01

9

of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Drawing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008-001

2

Motor Control Center -Installation & Visual Check. -Busbar conductivity Check. -Insulation resistance test.

Each Unit

clear of the soil.

- Approved vender Drawing

- Check installation method as per installation

- Approved drawing

- Check doors and panels to ensure proper

-Technical specification(SEC)

drawing.

HSFP-EL005

W

W

W

opening and closure. - Check paint damage, tag plate, warning label , visual damage etc.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

Item

:

Item

:

No

Activity Description

3

SEC, Kingdom of Saudi Arabia Electrical Motor Control Center

Motor Control Center. -Installation & Visual Check. -Busbar conductivity Check. -Insulation resistance test

Frequency

Each Unit

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec. - Approved vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check fuse rating, main parts rating / type. - Check operation of safety shutter. - Check busbars are installed at correct location. - Check busbars connection tight ness and correct phasing. - Torque check of busbar connection as per manufacturer recommendation. - Check busbars conductivity. - Check the condition of earthing bar and connections, measure continuity of switchboard to main earth. -Check insulation resistance values of busbars

ITP No. : Page

S-00-TAA-Q-43-036-004 Rev. 0

:

Reporting Format

HSFP-EL005

10 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

Transformer

No

Activity Description

1

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

Each Delivery

Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. : Page

S-00-TAA-Q-43-036-005 Rev. 0

:

Reporting Format HSFP-ST-01

11 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Drawing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008-001

2

Transformer -Installation & Visual Check. -Insulation resistance test -Oil level & dielectric Check

Each Unit

Approved vender Drawing Approved drawing Technical specification(SEC)

clear of the soil. - Check Shock indicator or Shock record (if required)

- Check installation method as per installation

HSFP-EL-011

W

W

M

drawing. - Check paint damage, tag plate, warning label, visual damage etc. -Check insulation resistance for HV-earth / LV-earth - Check explicit all porcelain & other bushings For damages on the surface

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

Transformer

No

Activity Description

2

Transformer -Installation & Visual Check. -Insulation resistance test -Oil level & dielectric Check

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

Each Unit

Procedure / Spec.

Inspection Method / Acceptance Criteria

Approved vender Drawing

- Check no-load tap changer for proper

Approved drawing

- Check continuity on all tap position.

Technical specification(SEC)

- Check oil colour and smell.

movement.

- Check connection as approved drawing. - Check neutral earthing connection. - Measure neutral earthing, equipment earthing continuity. - Check oil level and pressure level. -

ITP No. : Page

S-00-TAA-Q-43-036-005 Rev. 0

:

Reporting Format

HSFP-EL-011

12 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

AC / DC UPS System

No

Activity Description

1

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. : Page

S-00-TAA-Q-43-036-006 Rev. 0

:

Reporting Format

HSFP-ST-01

13 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Drawing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008-001

2

AC / DC UPS System -Installation & Visual Check.

Each Set

clear of the soil.

- Approved vender Drawing

- Check installation method as per installation drawing.

HSFP-EL003

- Approved drawing

- Check paint damage, tag plate, warning label, visual damage etc. - Check installation of inter-connection cabling as

HSFP-EL004

-Technical specification(SEC)

W

W

W

per approved drawing.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

Item

:

Item

:

No

Activity Description

2

SEC, Kingdom of Saudi Arabia Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

AC / DC UPS System

AC / DC UPS System -Installation & Visual Check.

INSPECTION & TEST PLAN (ITP)

Frequency

Each Set

Procedure / Spec. - Approved vender Drawing

Inspection Method / Acceptance Criteria

- Check main parts rating / type as per relevant

Page

- Check isolation switch Open / Close. - Check earthing for system cubicle. - Check battery type. -

S-00-TAA-Q-43-036-006 Rev. 0

:

Reporting Format HSFP-EL003

drawing.

- Approved drawing - Technical specification(SEC)

ITP No. :

HSFP-EL004

14 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

BUS DUCT

No

Activity Description

1

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. : Page

S-00-TAA-Q-43-036-007 Rev. 0

:

Reporting Format

HSFP-ST-01

15 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Drawing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008-001

clear of the soil. - Check the group Identification number of BUS DUCT (If required)

2

BUS DUCT -Installation & Visual Check. -Busbar conductivity Check. -Insulation resistance test.

Each Set

- Approved vender Drawing - Approved drawing -Technical specification(SEC)

- Check the position of equipment to be connected with regard to the layout drawing.

HSFP-EL010

W

W

W

- Check assemble & install support as detail - Check paint damage, tag plate, warning label, visual damage etc. - Torque check of busbar connection per vendor Recommendation.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Item

:

Electrical

Item

:

BUS DUCT

No

Activity Description

Frequency

2

BUS DUCT -Installation & Visual Check. -Busbar conductivity Check.

Each Set

-Insulation resistance test

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec.

ITP No. : Page

:

Inspection Method / Acceptance Criteria

Reporting Format

- Approved vender

- Check the phase sequence of the connection.

HSFP-EL-

Drawing

- Check the connection of switchboard bus duct

010

- Approved drawing

section.

- Technical

- Check busbars are installed at correct location.

specification(SEC)

- Check busbar conductivity test. - Check insulation resistance of busbar - Check the instrument air condition.

S-00-TAA-Q-43-036-007 Rev. 0 16 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

Electrical Distribution Board(Incl UPS AC/DC Board.

No

1

Activity Description

Material Verification Receiving Inspection

Frequency

100%

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

ITP No. : Page

S-00-TAA-Q-43-036-008 Rev. 0

:

Procedure / Spec.

Inspection Method / Acceptance Criteria

Reporting Format

Related POS/ Material Spec.,

As per Specified in Applicable Specification and

HSFP-ST-01

17 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Drawi ng

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Proc edure: S-00-TAA-Q43-008-001

2

Distribution Board -Installation & Visual Check. .

* Legend

:

Each Unit

clear of the soil.

- Approved vender Drawing

- Check installation method as per installation

- Approved drawing

- Check assemble & install supports as drawing.

-Technical specification(SEC)

- Check paint damage, tag plate, warning label

drawing.

HSFP-EL007

W

W

W

, visual damage etc.

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remark s

Client

: SEC, Kingdom of Saudi Arabia

Item Item

: Electrical : Distribution Board(Incl UPS AC/DC Board.

No

2

Activity Description

Distribution Board -Installation & Visual Check.

Frequency

Each Unit

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec. - Approved vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check MCB rating, main parts rating / type. - Check the condition of earthing bar and connections, measure continuity of switchboard to main earth.

ITP No. : Page

S-00-TAA-Q-43-036-008 Rev. 0

:

Reporting Format HSFP-EL007

18 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

Motor

No

Activity Description

1

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-009 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

19 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Dra wing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Pr ocedure: S-00-TAA -Q-43-008-001

2

Motor -Installation & Visual Check. -Insulation Check.

Each Unit

clear of the soil.

- Approved vender Drawing

- Check orientation of installation correct as per drawing.

- Approved drawing

- Check motor name plate, visual damage etc.

-Technical specification(SEC)

HSFP-EL002

W

W

W

- Check insulation resistance values of motor. - Check insulation resistance values of motor space heater and temperature detector. - Check motor earthing connection.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Item

:

Electrical

Item

:

Motor

No

Activity Description

2

Motor -Installation & Visual Check. -Insulation Check.

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

Each Unit

Procedure / Spec. - Approved vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check power / control / space heater cable are connected correctly. - Check the correct condition(Gland /Foundation Level)

ITP No. : Page

S-00-TAA-Q-43-036-009 Rev. 0

:

Reporting Format HSFP-EL002

20 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

No

Activity Description

1

Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Cathodic

Material Verification Receiving Inspection

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-010 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

21 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing

- Raw Material

General Ass’y Dra wing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Pr ocedure: S-00-TAA -Q-43-008-001

2

Cathodic -Installation & Visual Check. -Insulation resistance test. -Installation Check of anode

Each Set

clear of the soil.

1. Common check point

- Approved vender Drawing

- Check assemble & install supports as drawing.

- Approved drawing

- Check paint damage, tag plate, warning label,

-Technical specification(SEC)

HSFP-EL022

W

W

W

visual damage etc. - Check fuse rating , main parts rating / type. - Check & verify the thermit weld condition. - Check fuse rating, main parts rating / type.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Item

:

Item

:

No

Activity Description

2

Electrical

-Installation & Visual Check. -Insulation resistance test. -Installation Check of anode

Frequen cy

Each Set

Procedure / Spec. - Approved vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check mechanical integrity of cable connection. - Check epoxy encapsulation of weld. - Measure the cable resistance to pipe. - Check location as per requirement and approved drawing. - Check anode length,size, and physical damages. - Check the reference electrode had been soaked. - Check access point installed beneath isolation joint. 2, Installation Check & Testing (Sacrificial Anode) - Check no physical damages, sand bedded and soaked prior install. - Check Mg, anode are installed at correct location - Check anode installed horizontally and paralled to the pipe per vendor recommendation. 3, Installation Check & Testing (MMO

Anode)

- Check if any damages of MMO canistered anode - Check anode length,size, and physical damages - Check correct location, depth according to the approved drawing.

ITP No. : Page

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Cathodic

Cathodic

INSPECTION & TEST PLAN (ITP)

S-00-TAA-Q-43-036-010 Rev. 0

:

Reporting Format HSFP-EL022

22 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

No

Activity Description

1

Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Earthing and Bonding

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-011 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

23 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Dr awing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008-00 1

2

Earthing and Bonding -Earthing electrode /Cable Route / Cable connection. -Inspection earth pit check. -Electrical system earthing test

Each unit & Equipment

Approved vender Drawing

clear of the soil.

- Verify the marking points for installation rod

W

W

W

As per construction drawing.

Approved drawing Technical specification(SEC )

HSFP-EL018

- Check and verify the installation of earthing rod

HSFP-EL019

As per project specification. - Verify the completed section of depth of the Cable as per specification and construction -

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Item

: Earthing and Bonding

No

Activity Description

2

Electrical

Earthing and Bonding -Earthing electrode /Cable Route / Cable connection. -Inspection earth pit check. -Electrical system earthing test

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

Each unit & Equipment

Procedure / Spec. Approved vender Drawing Approved drawing Technical specification(SEC)

ITP No. : Page

:

Inspection Method / Acceptance Criteria

Reporting Format

- Verify cable kicker pipes or protection pipes are

HSFP-EL018

adequately - Check cable size and connection. - Check cable protection. - Compression type splice or thermo-weld connection, wrapped with insulation tape. - Check inspection earth pit according to the construction drawing. - Check earth bar according to the construction Drawing. Check individual electrode resistance value. - Check group or plant earth resistance value - Check earth connection between the electrode and the supply neutral and plant earth loop continuity. - Check connection of clean earth to plant earth.

S-00-TAA-Q-43-036-011 Rev. 0

HSFP-EL019

24 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

No

Activity Description

1

Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Lighting System

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-012 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

25 of

38

Inspection By SubSEC/ HHI Con OE

Drawing General Ass’y Dra wing

W

- No Damage, Corrosion & Deformation

W

R

- Shall be properly laid out on wooden supports Receiving Insp. Pr ocedure: S-00-TAA -Q-43-008-001

2

Lighting System. -Installation & Visual Check. -Insulation Resistance test.

Each unit & Equipment

Approved vender Drawing Approved drawing Technical specification(SEC)

clear of the soil.

- Check installation method as per installation

HSFP-EL012

W

W

W

drawing. - Check paint damage, tag plate, warning label , visual damage etc. - Check cable size and connection. - Check lighting model and type with lamp type. - Fixtures tag number.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

1Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

No

Activity Description

2

Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Lighting System

Lighting System. -Installation & Visual Check. -Insulation Resistance test.

INSPECTION & TEST PLAN (ITP)

Frequency

Each unit & Equipment

Procedure / Spec.

Approved vender Drawing Approved drawing Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check type of Ex-Protection. - Check spare hole / cover to seal and cover tightened. - Check the earthing wire connection properly. - Verify continuity and insulation resistance. - Check the light cable condition (rigid or flexible conduits, cable glands)

ITP No. : Page

S-00-TAA-Q-43-036-012 Rev. 0

:

Reporting Format

HSFP-EL012

26 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

No

1

Electrical

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Lightning Protection

Activity Description

Material Verification Receiving Inspection - Raw Material

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Pr ocedure: S-00-TAA -Q-43-008-001

2

Lightning Protection. -Installation & Visual Check.

Each unit & Equipment

Approved vender Drawing Approved drawing Technical specification(SEC)

Page

S-00-TAA-Q-43-036-013 Rev. 0

:

Reporting Format

27 of

38

Inspection By SubSEC/ HHI Con OE

As per Specified in Applicable Specification and Drawing

General Ass’y Dra wing

ITP No. :

Mill Certificate & HSFP-ST-01

W

W

R

clear of the soil.

- Check installation method as per installation

HSFP-EL-030

W

W

W

drawing. - Check tag plate, visual damage etc. - Check cable size and connection. - Check lightning model and type. - Fixtures tag number. - Check the earthing wire connection properly. - Verify continuity and insulation resistance.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

: Receptacle, Junction Box,RCU

No

Activity Description

1

Electrical

Material Verification Receiving Inspection - Raw Material

Frequency

100%

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. : Page

S-00-TAA-Q-43-036-014 Rev. 0

:

Reporting Format

HSFP-ST-01

28 of

38

Inspection By SubSEC/ HHI Con OE

W

W

R

Drawing General Ass’y Dr awing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008-00 1

2

Receptacle & Junction Box. RCU. -Installation & Visual Check. -Insulation Resistance test

Each unit & Equipment

Approved vender Drawing Approved drawing Technical specification(SEC )

clear of the soil.

- Check installation method as per installation drawing. - Check paint damage, name plate, warning label , visual damage etc. incl (IP protection class) - Check adequate protection for fittings and cable Against corrosion weather etc. - Check earthing bonding correct.

* Legend

:

HSFP-EL009

W

W

W

HSFP-EL013 HSFP-EL014 HSFP-EL021

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

1Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

: Receptacle, Junction Box,RCU

No

Activity Description

Frequency

2

Receptacle & Junction Box.

Each unit & Equipment

Electrical

RCU -Installation & Visual Check. -Insulation Resistance test

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec.

Approved vender Drawing Approved drawing Technical specification(SEC

Inspection Method / Acceptance Criteria

ITP No. : Page

:

Reporting Format

- Check type of IP protection class & Ex-Protection.

HSFP-EL009

- Check spare hole / cover to seal and cover tightened.

HSFP-EL013

- Inspect wiring inside the junction boxes for Correct wiring method and wire splicing.

HSFP-EL014

- Verify continuity and insulation resistance. - Check zone applicable safety code.

HSFP-EL021

- Check that the appropriate cover is installed for each type of receptacle. - Verify the position of switch according to the specification.

S-00-TAA-Q-43-036-014 Rev. 0

HSFP-EL021

29 of

38

Inspection By SubSEC/ HHI Con OE

W

W

W

Remarks

1Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

: Cable / Tray / Conduit (Telecom)

No

Activity Description

1

Material Verification Receiving Inspection - Raw Material

Frequency

100%

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-015 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

30 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing General Ass’y Dr awing

- No Damage, Corrosion & Deformation - Shall be properly laid out on wooden supports

Receiving Insp. Procedure: S-00TAA-Q-43-008-00 1

2

Installation Cable Tray, Ladder and Conduit Installation.

100%

Approved drawing. Vender Drawing

clear of the soil.

- Check tag numbers are correct. - Verify Cable tray and tray installed as per

HSFP-TE001

W

W

M

construction drawing. - Check alignment as overlapped of trays. - Check bonding jumpers installed at tray joint connections and tight.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client Disc

: SEC, Kingdom of Saudi Arabia :

Electrical

Item

: Cable / Tray / Conduit(Telecom)

No

Activity Description

2

Installation Cable Tray, Ladder and Conduit Installation.

Frequency

100% Installation All Route

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec. Approved drawing. Vender Drawing

Inspection Method / Acceptance Criteria

- Check hold down clamp and brackets are installed. - Check cable fix to cable tray and ladder properly.

ITP No. : Page

S-00-TAA-Q-43-036-015 Rev. 0

:

Reporting Format

31 of

38

Inspection By SubSEC/ HHI Con OE

HSFP-TE001

W

W

M

HSFP-TE001

W

W

M

- Check cable ladder properly supported. - Check cover installed(to be installed after all the cables are tested and properly terminated) - Check junction box supports independent from conduit and tray. - Check conduit supports within the specified interval according to approved drawing. - Check touch up of galvanizing performed (if required) - No sharp edges. - No obstructions.

3 Cable Installation - Installation & Visual Check. - Insulation resistance Test

All Cable

Approved vender Drawing Approved drawing

- Check megger test on the reel (For the construction : If required) - Verify cable type & configuration.

Remarks

Client

: SEC, Kingdom of Saudi Arabia

Disc

:

Item

: Cable / Tray / Conduit(Telecom)

No

3

Electrical

Activity Description

Cable Installation - Installation & Visual Check. - Insulation resistance Test

Frequency

All Cable

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec.

Approved vender Drawing Approved drawing

Inspection Method / Acceptance Criteria - Check and confirm cable shall be meggered before And after installation, record of testing shall be

ITP No. : Page

S-00-TAA-Q-43-036-015 Rev. 0

:

Reporting Format

HSFP-TE001

32 of

38

Inspection By SubSEC/ HHI Con OE W

W

M

available. - Check proper arrangement, segregation and layer Of cable, bending radius as per vendor data, and allowable Slack.

4

Cable Installation - Installation & Visual Check. - Insulation resistance test

All Cable

Approved vender Drawing Approved drawing

- Check cable tags correct. - Check cable caps for protection of cable ends Shall be properly protected after installation.

HSFP-TE001

W

W

M

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

CCTV

No

Activity Description

1

Material Verification Receiving Inspection

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-016 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

33 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing

- Raw Material

General Ass’y Dra wing

- No Damage, type, specification, etc

Receiving Insp. Pr ocedure: S-00-TAA -Q-43-008-001

2

CCTV Installation -Installation & Visual Check.

Each Unit

- Approved Vender Drawing - Approved drawing - Technical specification(SEC)

- Check name plate, tag No,

HSFP-IN-004

W

W

W

- Check the camera’s are mounted on correct location as per drawing. - Check the correct lighting is provided for camera - Check power & signal cables are fixed properly with appropriate cable marking & The cable length is ample for movement of camera.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Item

:

Electrical

Item

:

CCTV

No

Activity Description

2

CCTV Installation -Installation & Visual Check.

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

Each Unit

Procedure / Spec. - Approved Vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check the accessibility and facilities maintenance. - Check No damage. - Check earthing connection.

ITP No. : Page

S-00-TAA-Q-43-036-016 Rev. 0

:

Reporting Format

HSFP-IN-004

34 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Electrical

Item

:

PABX

No

Activity Description

1

Material Verification Receiving Inspection

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

ITP No. : Page

S-00-TAA-Q-43-036-017 Rev. 0

:

Inspection Method / Acceptance Criteria

Reporting Format

As per Specified in Applicable Specification and

HSFP-ST-01

35 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing

- Raw Material

General Ass’y Dra wing

- No Damage, type, specification, etc

Receiving Insp. Pr ocedure: S-00-TAA -Q-43-008-001

2

PABX

Installation

-Installation & Visual Check.

Each Unit

- Approved Vender Drawing - Approved drawing - Technical specification(SEC)

- Check name plate, tag No, - Check the wiring as per construction drawing. - Check the structured cabling cabinet are installed as per drawing and orientation.

HSFP-TE002

W

W

W

HSFP-TE003

- Check the earthing and arresters for telecom cabinet(if applicable).

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

Item

: Telecommunication

Item

:

No

Activity Description

2

PABX

SEC, Kingdom of Saudi Arabia

Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

PABX Installation

Installation

-Installation & Visual Check.

INSPECTION & TEST PLAN (ITP)

Frequency

100%

Procedure / Spec.

- Approved Vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

- Check No damage. - Verify the Explosion proof telephones are mounted on easy accessible area.

ITP No. : Page

S-00-TAA-Q-43-036-017 Rev. 0

:

Reporting Format

HSFP-TE002 HSFP-TE003

36 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Disc

:

Item

:

No

Activity Description

1

Electrical

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00

Junction Box(Telecom)

Material Verification Receiving Inspection

Frequency

100%

Procedure / Spec. Related POS/ Material Spec.,

Inspection Method / Acceptance Criteria

As per Specified in Applicable Specification and

ITP No. : Page

S-00-TAA-Q-43-036-018 Rev. 0

:

Reporting Format

HSFP-ST-01

37 of

38

Inspection By SubSEC/ HHI Con OE W

W

R

Drawing

- Raw Material

General Ass’y Drawing

- No Damage, type, specification, etc

Receiving Insp. Procedure: S-00TAA-Q-43-008-001

2

Junction Box Installation. -Installation & Visual Check.

Each Unit

- Approved Vender Drawing - Approved drawing - Technical specification(SEC)

- Verify the junction box identification number. - Check the junction box specification(cable gland

HSFP-TE005

W

W

W

hole size and quantities and terminal block arrangement etc.). - Check earthing connection - Check the junction box location.

* Legend

:

R (Review Point) : To determine subject matter has achieved objectives. M (Monitoring) : Periodic and systematic check (does not imply any action will be taken) W (Witness Point) : Observation of an activity to ensure work is progressing as per requirements. H (Hold Point) : A point beyond which an activity must not proceed without the approval of a designated organization or authority, SEC/OE’s Inspector.

Remarks

Client

:

SEC, Kingdom of Saudi Arabia

Item

:

Electrical

Item

: Junction Box(Telecom)

No

Activity Description

2

Junction Box Installation. -Installation & Visual Check.

Frequency

Each Unit

INSPECTION & TEST PLAN (ITP) Construction of Shuqaiq Steam Power Plant Contract No. : 31221097/00 Procedure / Spec.

- Approved Vender Drawing - Approved drawing - Technical specification(SEC)

Inspection Method / Acceptance Criteria

-- Check No damage. - Check the insulation material between HDG and stainless steel. - Check the tightness. - Check the support welding and touch up paint Condition. - Check the cable installed and terminated as per approved drawing.

ITP No. : Page

S-00-TAA-Q-43-036-018 Rev. 0

:

Reporting Format HSFP-TE005

38 of

38

Inspection By SubSEC/ HHI Con OE W

W

W

Remarks