PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT
INSPECTION REPORT FORM NO:: EQP-001 Equipment Item No. Equipment Name Date
: …………………….. : …………………….. : ……………………..
Job No Client
: ………………………………. : ……………………………….
1. Type of Inspection Item Inspection/Test/Examination/Check
2. Inspection Item
3. Inspection Result
4. Remark
Prepare by : HAP
( ______________________ )
Inspected by : SUAR ALAM ENGINEERING
( _________________________ )
Witnessed/Approved by : ASC
( __________________ )
Date :
Date :
Date :
PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT
PADDING REPORT Equipment Tag No. Eq. Description Date
: …………………….. : …………………….. : …………………….. FORM NO: EQP-002
Sketch of padd positions :
ELEVATION Measuring Location 1 2 3 4 5 6
Actual (mm)
Design (mm)
7 8 9 10 Remarks : 1. Elevation shall be within 3 mm from design. 2. Pad position under jack bolt or as per design.
Prepare by : HAP
( ______________________ ) Date :
Inspected by : SUAR ALAM ENGINEERING
( _________________________ ) Date :
Witnessed/Approved by : ASC
( _______________________ ) Date :
PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT
ELEVATION / LEVELING RECORD (HORIZONTAL VESSEL AND HEAT EXCHANGER) FORM NO: Equipment Item No.
:…………………………….
Date
:……………………….
Equipment Name
:…………………………….
Job. No.
:……………………….
Design Elevation
:…………………………….
Client
:……………………….
Sketch
:
Elevation A B C D
Prepared by ;
A
B
C
D
Elevation
B
A
B
C
D
Design
Actual
Inspected by :
A
Deviation
Remarks
Witnessed/reviewed by :
(________________) HAP
(____________________) SUAR ALAM ENGINEERING
(____________________) ASC
Date : ...........................
Date : ...........................
Date : ...........................
FORM NO:
C D
Remarks
/reviewed by :
STC-001
____________)
PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT
FINAL CLOSING AUTHORIZATION ( For Static Equipment )
FORM NO:
Item No.
:………………………………………..
Equipment Name
:………………………………………..
Location
:………………………………………..
Client
:………………………………………..
STC-011
The above equipment has been erected in accordance with the applicable drawing , specification and manufacturer's standards, and is hereby certfied to be mechanically acceptable. Vessel has been inspected for cleanlines and free of all debris. Authorization is hereby granted to effect final closing or sealing of this equipment.
Prepared by :
Inspected by :
(__________________) (_________________) HAP SUAR ALAM ENGINEERING Date :………………….. Date :…………………
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.