PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT

INSPECTION REPORT FORM NO:: EQP-001 Equipment Item No. Equipment Name Date

: …………………….. : …………………….. : ……………………..

Job No Client

: ………………………………. : ……………………………….

1. Type of Inspection Item Inspection/Test/Examination/Check

2. Inspection Item

3. Inspection Result

4. Remark

Prepare by : HAP

( ______________________ )

Inspected by : SUAR ALAM ENGINEERING

( _________________________ )

Witnessed/Approved by : ASC

( __________________ )

Date :

Date :

Date :

PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT

PADDING REPORT Equipment Tag No. Eq. Description Date

: …………………….. : …………………….. : …………………….. FORM NO: EQP-002

Sketch of padd positions :

ELEVATION Measuring Location 1 2 3 4 5 6

Actual (mm)

Design (mm)

7 8 9 10 Remarks : 1. Elevation shall be within 3 mm from design. 2. Pad position under jack bolt or as per design.

Prepare by : HAP

( ______________________ ) Date :

Inspected by : SUAR ALAM ENGINEERING

( _________________________ ) Date :

Witnessed/Approved by : ASC

( _______________________ ) Date :

PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT

ELEVATION / LEVELING RECORD (HORIZONTAL VESSEL AND HEAT EXCHANGER) FORM NO: Equipment Item No.

:…………………………….

Date

:……………………….

Equipment Name

:…………………………….

Job. No.

:……………………….

Design Elevation

:…………………………….

Client

:……………………….

Sketch

:

Elevation A B C D

Prepared by ;

A

B

C

D

Elevation

B

A

B

C

D

Design

Actual

Inspected by :

A

Deviation

Remarks

Witnessed/reviewed by :

(________________) HAP

(____________________) SUAR ALAM ENGINEERING

(____________________) ASC

Date : ...........................

Date : ...........................

Date : ...........................

FORM NO:

C D

Remarks

/reviewed by :

STC-001

____________)

PIPING CONSTRUCTION AND MECHANICAL EQUIPMENT INSTALLATION WORK FOR COOLING WATER SYSTEM OF PH-6 PROJECT

FINAL CLOSING AUTHORIZATION ( For Static Equipment )

FORM NO:

Item No.

:………………………………………..

Equipment Name

:………………………………………..

Location

:………………………………………..

Client

:………………………………………..

STC-011

The above equipment has been erected in accordance with the applicable drawing , specification and manufacturer's standards, and is hereby certfied to be mechanically acceptable. Vessel has been inspected for cleanlines and free of all debris. Authorization is hereby granted to effect final closing or sealing of this equipment.

Prepared by :

Inspected by :

(__________________) (_________________) HAP SUAR ALAM ENGINEERING Date :………………….. Date :…………………

Witnessed/Reviewed by:

(____________________) ASC Date :…………………….