INSPECTION AND TESTING PLAN ( ITP )
2/28
ITP FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS
CONTRACTOR'S VERIFICATION STAMP PURSUANT TO SPECIAL CONDITION 6, WE SKY ORYX JOINT VENTURE, VERIFY THAT THIS SUBMITTAL SATISFIES ALL REQUIREMENTS OF THE CONTRACT, WITH THE EXCEPTION OF THE FOLLOWING CLARIFICATIONS/ PROPOSALS ACCEPTED BY THE ENGINEER; CONTRACTOR'S PROJECT MANAGER;
M. HORIKAWA PRINT NAME
SIGNATURE
DATE DOCUMENT REVIEW STATUS
STATUS 1: WORK MAY PROCEED. STATUS 2: REVISE & RESUBMIT.WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS INDICATED . STATUS 3: REVISE & RESUBMIT. WORK MAY PROCEED. STATUS 4: REVIEW NOT REQUIRED. WORK MAY PROCEED. PERMISSION TO PROCEED SHALL NOT CONSTITUTE ACCEPTANCE OR APPROVAL OF DESIGN DETAILS, CALCULATIONS, ANALYSES, TEST METHODS, OR MATERIALS DEVELOPED OR SELECTED BY CONTRACTOR AND SHALL NOT RELIEVE CONTRACTOR FROM FULL COMPLIANCE WITH THE CONTRACT TECHNICAL SPECIFICATIONS AND DRAWINGS.
Overseas Bechtel, Inc.
Date
Document No:25045-A1126-18-ITP-S-027
Rev.No 02
Prepared Date
Description
QA/QC Syed Kausar
Checked QA/QC Struct Engg Cond.Mgr. Mgr.
FET Mgr.
Approved Project Manager
3/29
NDIA New Doha International Airpoet Project
INSPECTION AND TEST PLAN FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS Contract No.:
Contract Title: Passenger Terminal Complex CCP-18 Reference Procedure/Method Statements/Specs. : Spec. 05120, 05060.
25045-000FC1-maht-00018
Discipline: Structural Steel Activity
Controlling
Activity Description
No.:
1.2
2 2.1
Issue date:09-02-2009
QAP No.25145-A1000-18-GQA-S-001 Rev.2,
Acceptance Criteria
Document
1.0 1.1
Frequency
ITP No.
Rev. no : 2
25045-A1126-18-ITP-S-027
Page: 1 of 6
Verifying Documents
Inspection* SOJV
OBI
TPIA (BOI)
H
H
H
R
H
H
H
R
SSI/C
TPIA (NDT)
Document Review • • • • • • •
Project Quality Assurance Plan (PQP) Method Statement Inspection and TestMethod Statement Plan (ITP) Shop drawings Material Submittals WPS, PQR&WQT NDT (TPIA) Procedures
• Fabrication Drawings
Meterials-Steel Framing (ASTM A572, ASTM A36) Paint Material Inspection
• Primer Paint
Inspection H-Hold Point : Written notification required. Contractor may not proceed beyond this point without written confirmation of the Engineer
• Project Specifications • Exhibit-F • Exhibit-B
• Project Specifications
• • • •
Before Work Commencement
Before Work Commencement
Spec-05120/Clause 2.1 Spec-05120 Each Supplier submittal Delivery Manufacturer product data, Safety Data & application procedure
W - Witness : Written notification required but Contractor may not proceed if OBI do not attend
As oer OBI Status code 1, 2 and 4
Fabrication Drawing acceptance to SOJV
ASTM, drawings, 05120
SOJV-QP-10-02/X-01
SOJV-QP-10-02/X-01
MRR, Drawings
H
H
R
R
D.O. (SOJVMRR-014-01 rev 1 & x-004) H
S - Surveillance : No notification required but activity may be subjected to OBI Surveillance/ Monitoring
H
R
R - Review : Record/ Document review
SR
4/29
NDIA New Doha International Airpoet Project
INSPECTION AND TEST PLAN FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS Contract No.:
Contract Title: Passenger Terminal Complex CCP-18 Reference Procedure/Method Statements/Specs. : Spec 05120, 05060.
25045-000FC1-maht-00018
Discipline: Structural Activity
Activity Description
No.: 2.2
3 3.1
4 4.1
Controlling
ITP No.
Issue date ;
QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Frequency
Acceptance Criteria
Document Welding Consumables
• SMAN • FCAW • SAW Calibration • Equipments Calibration • Measuring Instrument • NDT Testing Equipments
Rev. no : 2
25045-A1126-18-ITP-S-027
Verifying Documents
• Spec-05120 Part2.1, • 05060, part 2.1 • Supplier submittal
Each Delivery
• Calibration Procedure
As per manufacturer/ calibration agency recommendations.
ASME Section ll, Part C/ AWS D 1.1, Section 5.3
Page: 2 of 6
D.O & Batch Certificate / Electrode log Register
• ISO10012-1:1992, Part 1 - Metrological conformation system for measuring equipment. • For NDT Awa D1.1 & ASME BPVC Section V
• Calibration certificates • Equipments Calibrationlog
Dimensions tolerance shall be as per • AISC Specification for Structural steel Building Part 16, Chapter M,M2,2 • Fabrication Tolerances ± 6 mm. for AESS. • Fabrication Tolerances are as per AISC for Non- AESS.
Material identification and tracesbility / Inspection Request (25045-A1000-18-ITRS-002& 001)
Inspection* SSI/C
TPIA (NDT)
H
H
H
SOJV
OBI
TPIA (BOI)
H
R
SR
H
S/R
W
W
S
SR
Fabrication Marking and Cutting
Inspection H-Hold Point : Written notification required. Contractor may not proceed beyond this point without written confirmation of the Engineer
• Spec-05120 Part2.1,2.5c, 2.5.A.2, 2.5 I • Approved shop Drawings
100%
W - Witness : Written notification required but Contractor may not proceed if OBI do not attend
S - Surveillance : No notification required but activity may be subjected to OBI Surveillance/ Monitoring
H
R - Review : Record/ Document review
5/28
NDIA New Doha International Airpoet Project
INSPECTION AND TEST PLAN FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS Contract No.:
Contract Title: Passenger Terminal Complex CCP-18 Reference Procedure/Method Statements/Specs. : Spec 05120, 05060.
25045-000FC1-maht-00018
Discipline: Structural Activity
Activity Description
No.:
4.2
4.3
4.4
Controlling
Frequency
ITP No.
Issue date ;
QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Acceptance Criteria
Document
Fit-up
Welding Process
Welding Repair
• Spec -05120, Part 2.6.B • Approved shop Drawings
• Spec-05120, Part 2.6 & 05060 Part 3.5 • Production Drawings
100%
• Production Drawings
• Repairs local surface imperfection depth below 1/16 inch or less • Repair by welding where required • Test on repair portion
Inspection H-Hold Point : Written notification required. Contractor may not proceed beyond this point without written confirmation of the Engineer
Page: 3 of 6 Verifying Documents
100%
W - Witness : Written notification required but Contractor may not proceed if OBI do not attend
Rev. no : 2
25045-A1126-18-ITP-S-027
• AWS code for Weld joint preparation • Marking the high strength steel as per ASTM A/A6 M. • Camber if requied by IFC • AWS D1.1 • Complicance to production Drawing
• Approved WPS & PQR • AWS D1.1 • APProved TPIA to review and certify weld procedures and all welder qualifications • By grinding to smooth contour with a curvature of less than 1/2 inch (13 mm) in either direction. • To ensure that defects have been temoved prior to depositing any weld metal, examine prepared areas by DPT.
Weld Visual Inspection Report / Inspection Request (25045-A1000-18ITR-S-003&001) Weld Visual Inspection Report / Inspection Request (25045-A1000-18-ITRS-003&001) Report/ Inspection Report (25045-A1000-18ITR-S-003&001) (NDT TPIA- Reports)
S - Surveillance : No notification required but activity may be subjected to OBI Surveillance/ Monitoring
Inspection* SOJV
OBI
TPIA (BOI)
H
H
S
SR
H
H
S
SR
W
S
SR
SSI/C
H
TPIA (NDT)
H
R - Review : Record/ Document review
6/29
NDIA New Doha International Airpoet Project
INSPECTION AND TEST PLAN FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS Contract No.:
Contract Title: Passenger Terminal Complex CCP-18 Reference Procedure/Method Statements/Specs. : Spec 05120, 05060.
25045-000FC1-maht-00018
Discipline: Structural Activity
Activity Description
No.: WELDING TESTING Visual inspection of Welding
5.2
Liquid Penetration test for Back gauging of CP Welds
5.4
Frequency
Issue date ;
• UT on CP Welds • UT on 38 mm and thicker plate subject throung thickness weld shrinkage strain. • MPI on Fillet Welds • MPI on Partial penetration Welds
Inspection H-Hold Point : Written notification required. Contractor may not proceed beyond this point without written confirmation of the Engineer
• Spec -05060 Part 3.2 C • Drawings
Spec -05120, Part 2.9
• Spec-05060, Part 3.2,3.5 & 05120 part 2.9 • Drawings
• Spec-05060, Part 3.5J • Drawings
Weld Visual for Surface holes, cracks, Undercut, Confirming to AWS D 1.1 2004 Section (6.9), Table 6.1
Page: 4 of 6
Verifying
Acceptance Criteria
Documents
100%
Rev. no : 2
QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Document
5 5.1
5.3
Controlling
ITP No. 25045-A1126-18-ITP-S-027
Weld Visual Inspection Report (25045-A1000-18ITR-S-004) (ITPA Endorsement on Report)
Inspection* SSI/C
TPIA (NDT)
SOJV
OBI
TPIA (BOI)
H
W
W
S
SR
H
H
W
S
SR
• AWS D1.1 - 2004 Section (6.10)
Visual
• AWS D1.1 - 2004 • Section (6.13) • ASTM E 164
UT Report (TPIA -Report) & Weld map
H
H
W
S
SR
• Web- Flange • AWS D1.1 - 2004 connection 10%,ii) 10% Section (6.10) Beam and Girder • ASTM E 709 connection where they connection using a clip angle, otherwise 100% • All other connection s-100%
MPI Report (TPIA-Report) & Weld map
H
H
W
S
SR
As needed
100%
W - Witness : Written notification required but Contractor may not proceed if OBI do not attend
S - Surveillance : No notification required but activity may be subjected to OBI Surveillance/ Monitoring
R - Review : Record/ Document review
7/28
NDIA New Doha International Airpoet Project
INSPECTION AND TEST PLAN FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS Contract No.:
Contract Title: Passenger Terminal Complex CCP-18 Reference Procedure/Method Statements/Specs. : Spec 05120, 05060.
25045-000FC1-maht-00018
Discipline: Structural Activity
Activity Description
No.: 5.5
6.0 6.1
7.0 7.1
Controlling
Frequency
ITP No.
Issue date ;
QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Acceptance Criteria
Document • RT on CP Welds
Final Inspection (Fabrication) • Final Inspection • Visual Inspection • Dimensional check
Sand blasting and Primer Painting Surface Preparation by Shot / Grit Blasting
Inspection H-Hold Point : Written notification required. Contractor may not proceed beyond this point without written confirmation of the Engineer
• Spec-05120 part 2.9 E • Drawings • NDT Procedure • Spec-05060 Part 3.2 & 3.2, 05120 Part 2.5, 2.6.B • Approved shop Drawings
• Spec-05120, part 2.7 • For AESS-Spec-09805 part 3.2.A.1
Before Painting
Each Fabricated component inspection
W - Witness : Written notification required but Contractor may not proceed if OBI do not attend
Rt Re[prt (TPIA-Report & Weld) map
Check for dimension, tolerance, orientation, depth, camber, holes positions, distortion, straightness, Erection marks, etc & confirming to AISC "Code of Standards Practice for steel Buildings Section 6,6.4. Weld visual for surface holes, cracks, Undercut, Confirming to AWS D 1.12004 Section 6.9, Table 6.1 • As per SSpc-sp 14/ NACE No.8 • For AESS confirming with SSPC SP-6
Page: 5 of 6
Verifying Documents
25%
Rev. no : 2
25045-A1126-18-ITP-S-027
Inspection* SSI/C
TPIA (NDT)
SOJV
OBI
TPIA (BOI)
H
H
W
S
SR
Dimension Reports (25045-A1000-18ITR-S-005) (TPIA Endorsement on all fabrication Records)
H
H
S
SR
Paint Report (25045-A1000-18ITR-S-006)
H
W
S
SR
S - Surveillance : No notification required but activity may be subjected to OBI Surveillance/ Monitoring
R - Review : Record/ Document review
8/28
NDIA New Doha International Airpoet Project
INSPECTION AND TEST PLAN FOR FABRICATION OF MISCELLANEOUS STRUCTURAL STEEL WORKS Contract No.:
Contract Title: Passenger Terminal Complex CCP-18 Reference Procedure/Method Statements/Specs. : Spec 05120, 05060.
25045-000FC1-maht-00018
Discipline: Structural Activity
Activity Description
No.: 7.2
8.0
Controlling
Frequency
ITP No.
Issue date ;
QAP No.25145-A1000-18-GQA-S-001 Rev.0,
Acceptance Criteria
Document Primer Paint Application & Inspection
• Spec-05120, part 2.3,2.7 • For AESS-Spec-09805 part 2.3
Check for Surface cleaning, Atmosphere conditions (Temperatures & Humidity), recommended maerials, Dry Film Thickness (DFT not less than 38μ) and confirming with Manufacturer's recommendations. • For AESS primer DFT (76μ ± 12.7 μ) • Keep steel members off ground and spaced using pallets, dunnage, or other supports and spacers.
Page: 6 of 6
Verifying Documents
Each Batch random inspection
Rev. no : 2
25045-A1126-18-ITP-S-027
Inspection* SSI/C
TPIA (NDT)
SOJV
OBI
TPIA (BOI)
W
S
SR
Paint report (DFT) (25045-A1000-18ITR-S-006)
H
Final Inspection (Before Packing )
Inspection H-Hold Point : Written notification required. Contractor may not proceed beyond this point without written confirmation of the Engineer
W - Witness : Written notification required but Contractor may not proceed if OBI do not attend
S - Surveillance : No notification required but activity may be subjected to OBI Surveillance/ Monitoring
R - Review : Record/ Document review
9/28
INSPECTION REQUEST INSPECTION REQUEST NUMBER:
DATE:
CONTRACT NO:
REPORT NO:
CONTRACTOR NAME:
DRAWING NO:
AREA / LOCATION / SUBJECT :
TYPE OF INSPECTION MATERIAL
FIT UP
WELDING
NDT
PAINTING
SURVEY
FINAL INSPECTION
OTHER
DATE & TIME INSPECTION REQUIRED: CONTRATOR :
DATE & TIME :
RECEVIED BY :
DATE & TIME :
REPLY
Approved
Approved as noted
Not Approved
SUB CON QC REP:
DATE: ( PRINT NAME AND SIGN )
SUB CONTRACTOR QC REP:
DATE: ( PRINT NAME AND SIGN )
OBI REP:
DATE: WITNESS & REVIEW
ONLY REVIEW
( PRINT NAME AND SIGN )
Document No: 25045-A1126-18-ITR-S-001
10/28
Material Receiving Report
11/28
MATERIAL RECEIVING REPORT (RAW STEEL MATERIALS) CONTRACT NO. CP - 18 CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC. PROJECT : NEW DOHA INTERNATIONAL AIRPORT AREA : LOCATION : SIAM STEEL BANGNA FACTORY STORAGE AREA : SIAM STEEL BANGNA FACTORY YARD Weight Material Item No. Qty. Manufacturer Heat No. (kgs.) Specification Description
DATE : REPORT NO. : SHEET NO. : Mill Test Date Certificate No. Received
Delivery Order No.
REMARKS : CONTRACTOR QC REPRESENTATIVE :
DATE :
________________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
________________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
__________________________________________________ (PRINT NAME AND SIGN)
WITHNESS & REVIEW
ONLY REVIEW Document No. : 25045-A1126-18-ITR-S-001,ForM a
12/28
Marking, Cutting and Drilling (Material Identification and Traceability)
13/28
MATERIAL IDENTIFICATION AND TRACEABILITY REPORT INSPECTION REQUEST NO.:
DATE :
REPORT NO. :
CONTRACT NO. CP - 18
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK : Item Part No./Mark No.
STRUCTURE TYPE : Material Specification
Description
Qty.
DRAWING NO.: Heat No.
Mill Test Certificate No.
CONTRACTOR QC REPRESENTATIVE :
DATE :
_________________________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
_________________________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
_________________________________________________________ (PRINT NAME AND SIGN)
WITHNESS & REVIEW
ONLY REVIEW Document No. : 25045-18-ITR-S-002
Marking/ Cutting
14/28
Fit-Up Inspection
15/28
FIT- UP INSPECTION REPORT (WELD GROOVE) INSPECTION REQUESTNO.:
DATE :
CONTRACT NO. CP - 18
REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
PIECE MARK :
LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE :
DRAWING NO. :
WELD JOINT KEYPLAN :
(SEE ATTACHED SHEETS)
LEGEND: F = FILLTE WELD
Joint No. Root Gap
Root Face
Groove Angle
P = PARTIAL PENETRATION WELD
Remark
Joint No.
Root Gap
C = COMPLETE PENETRATION WELD
Root Face
CONTRACTOR QC REPRESENTATIVE :
Groove Angle
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
______________________________ (PRINT NAME AND SIGN)
WITNESS &REVIEW
ONLY REVIEW Document No. :25045-A1126-18-ITR-S-003
Remark
16/28
FIT- UP INSPECTION REPORT (WELD GROOVE) INSPECTION REQUESTNO.:
DATE :
CONTRACT NO. CP - 18
REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
PIECE MARK :
LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE :
DRAWING NO.
WELD JOINT KEYPLAN :
(SEE ATTACHED SHEETS)
LEGEND: F = FILLTE WELD
PIECE MARK
DRAWING NO.
P = PARTIAL PENETRATION WELD
REV.
Joint No.
Root Gap
C = COMPLETE PENETRATION WELD
Root Face
CONTRACTOR QC REPRESENTATIVE :
Groove Angle
Remark
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
______________________________ (PRINT NAME AND SIGN)
WITNESS &REVIEW
ONLY REVIEW Document No. :25045-A1126-18-ITR-S-003,Form b
17/28
Weld Visual Inspection (VT)
18/28
19/28
E
20/28
WELD VISUAL INSPECTION REPORT INSPECTION REQUESTNO.:
DATE :
CONTRACT NO. CP - 18
REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
PIECE MARK :
LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE :
MATERIAL SPECIFICATION:
DRAWING NO. : Joint No.
WPS No.
Welding Process
Welder Id No.
Marking / Cutting Report No.
Fit-Up Report No.
Visual
VASUAL INSPECTION SUMMARY (As per AWS D1.1/D1.1M:2006 Sectuib 6.9, Tavle 6.1): Item No.
Inspection Category
Result
Item No.
Inspection Category
Result
OTHER REMARKS (IF ANY): Refer to attached weld joint keyplan
CONTRACTOR QC REPRESENTATIVE :
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
______________________________ (PRINT NAME AND SIGN)
WITNESS &REVIEW
ONLY REVIEW Document No. : 25045-A1126-18-ITR-S-004
21/28
Final Inspection
22/28
FINAL INSPECTION REPORT (VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS) INSPECTION REQUEST NO.:
DATE :
CONTRACT NO.: CP-18
REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
PIECE MARK :
LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE:
DRAWING No.:
MATERIAL SPECIFICATION: ASTM A572 Grade 50
INSPECTION REPORTS SUMMARY
Description
ITP Activity No.
Inspection Report No.
INSPECTION RESULT:
OTHER REMARKS (IF ANY):
CONTRACTOR QC REPRESENTATIVE :
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
TPIA REPRESENTATIVE
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
__________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
______________________________ (PRINT NAME AND SIGN)
WITNESS &REVIEW
ONLY REVIEW Document No. : 25045-A1126-18-ITR-S-005
23/28
FINAL INSPECTION REPORT (VISUAL INSPECTION & SUMMARY OF INSPECTION REPORTS) INSPECTION REQUEST NO.:
DATE :
CONTRACT NO.: CP-18
REPORT NO. :
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
PIECE MARK :
LOCATION : SIAM STEEL BANGNA FACTORY
STRUCTURE TYPE:
DRAWING No.:
MATERIAL SPECIFICATION: ASTM A572 Grade 50
Non-Destructive Examination (NDE) Report Summary Ultrasonic Testing (UT)
Radiographic Testing (RT)
Magnetic Particle Testing (MT)
Document No. : 25045-A1126-18-ITR-S-005, form b
24/28
Dimensional Inspection (Pre-Fit up)
25/28
DIMENSIONAL INSPECTION REPORT (SINGLE PRODUCT) INSPECTION REQUEST NO.:
DATE :
CONTRACT NO. CP - 18
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
REPORT NO. :
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
SHEET NO. :
STRUCTURE TYPE:
DRAWING NO.: L1
PIEXE MARK
L2
L3
LOCATION : SIAM STEEL BANGNA FACTORY
L4
L5
H1
H2
H3
H4
e1
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
e2
B1
B2
B3
B4
B5
B6
B7
B8
B9
B10
B11
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
4-6ARCH1
B12
B13
B14
B15
B16
B17
B18
B19
B20
B21
B22
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
B24
B25
B26
B27
B28
B29
B30
B31
B32
B33
DD
B23 E
DD
B34
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
DD
E
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
(mm)
E
(mm) (mm) (mm)
DD
B35 E
DD
(mm) (mm) (mm)
LEGEND:
SUBCONTRACTOR QC REPRESENTATIVE
DATE :
_________________________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
_________________________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
________________________________________________________________ (PRINT NAME AND SIGN)
WITHNESS & REVIEW
(mm)
ONLY REVIEW Document No. : 25045-A1126-18-ITR-S-005,Form C
E (mm)
26/28
Painting Inspection
27/28
PAINTING INSPECTION REPORT INSPECTION REQUEST NO.:
DATE :
REPORT NO.:
CONTRACT NO. CP - 18
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO.:
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK :
STRUCTURE TYPE :
Surface Preparation: Sa 2.5
No. of Coats:
Paint Specification: 25045-a1100-18-ssd-s-xxxx
Required DFT: 76 microns
Paint Material:
Spot No.
Primer Coat DFT (microns) Gage Readings Average 1st 2nd 3rd
Spot No.
DRAWING NO.: Blasting & Painting Date: ๐ Ambient Te,perature ( C)
Relative Humidity (%): Primer Coat DFT (microns) Gage Readings Average 1st 2nd 3rd
Weather : ๐ Steel Temperature ( C)
Spot No. 1st
Dew Point (๐C) Primer Coat DFT (microns) Gage Readings 2nd 3rd
OTHER REMARKS (IF ANY): Note: Refer to Sheet 3 of 3 for DFT Spot Measuring Keyplan.
CONTRACTOR QC REPRESENTATIVE :
DATE :
____________________________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
_____________________________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
________________________________________________________________ WITHNESS & (PRINT NAME AND SIGN)
REVIEW
ONLY REVIEW Document No. : 25045-A1126-18-ITR-S-006
Average
28/28
PAINTING INSPECTION REPORT INSPECTION REQUEST NO.:
DATE :
REPORT NO.:
CONTRACT NO. CP - 18
CONTRACTOR NAME : SIAM STEEL INTERNATIONAL PLC.
SHEET NO.:
PROJECT : NEW DOHA INTERNATIONAL AIRPORT
AREA :
LOCATION : SIAM STEEL BANGNA FACTORY
PIECE MARK :
STRUCTURE TYPE :
Surface Preparation: Sa 2.5
No. of Coats: One (1)
Paint Specification: 25045-a1100-18-ssd-s-xxx
Required DFT: 76 microns
Paint Material:
Item No.
Drawing No.
Piece Mark
Rev.
DRAWING NO.: Blasting & Painting Date: Ambient Te,perature (๐C)
Weather : Steel Temperature (๐C)
Relative Humidity (%): Primer Coat DFT (microns) Gage Readings Spot No. Average 1st 2nd 3rd
CONTRACTOR QC REPRESENTATIVE :
Dew Point (๐C) Average DFT (microns)
Inspection Result
DATE :
____________________________________________________________________________ (PRINT NAME AND SIGN)
SOJV QC REPRESENTATIVE :
DATE :
_____________________________________________________________________________ (PRINT NAME AND SIGN)
OBI REPRESENTATIVE :
DATE :
________________________________________________________________ (PRINT NAME AND SIGN)
WITHNESS & REVIEW
ONLY REVIEW Document No. : 25045-A1126-18-ITR-S-006,form b