INSPECTION AND TEST PLAN Date:

Consultant: Tabanlioglu

Project: Al Fattan Crystal Towers Item

Activity/Description Material Reinforcement Bar

Tensile Strength

Concrete

Compressive strength RCP Water Absorption Water Permeability ISAT

A

B

C

D

E

Parameter to be verified

Reinforcement work

Shuttering Material

Shuttering Works

Surfaces Preparation before Concreting

Inspection Frequency

Acceptance Criteria

Every batch

As per Structural Specification

One Time during Trial Mix

As per Each Grade 2000 Coul. 2.5 % 0.30 Ml/M2/S

Lab Reports

Page No: 1 of 1

Control Method / Reference

Format/ Records

Mill Test Certificate

MIR Mix Design Approval

Diameters & No. of Bars

Each Section

As per Structural Drawings

Structural Drawings

Spacing

Each Section

± 25mm

Structural Drawings

Lap Length / Anchorage Length

Each Section

Min. 50 dia.

Structural Drawings

Cover

Each Section

Min. 2 no. Cover blocks per m2

Structural Specification

Surface Finish

Each Section

-

Structural Specification

-

MEP Fixtures

Each Section

-

Approved Shop Drawings

IR

Dimensions

Each Section

± 3mm

Structural Drawings/ Specification

Verticality

Each Section

± 3mm

Structural Drawings/ Specification

Level

Each Section

± 3mm

Structural Drawings

Stability

Each Section

Rigid

Approved Shop Drawings

Cleanliness

Each Section

Free from waste / foreign materials

-

IR

IR

-

Inspection Authority SECL

TA

INSPECTION AND TEST PLAN Date:

Consultant: Tabanlioglu

Project: Al Fattan Crystal Towers Item

F

Activity/Description

Parameter to be verified

Inspection Frequency

Acceptance Criteria

Mix Proportion (Concrete Grade)

Each truck on Arrival

Workability (Slump test) Temperature

Control Method / Reference

Format/ Records

As per Specification

Structural Specification

Delivery Order

Each truck on Arrival

As per Approved Mix Design

Structural Specification

-

Each truck on Arrival

Max. 32°C

Structural Specification

-

Each location

Not less than the specified values

Structural Specification

Cube test results

Each truck

Delivery less than 2 hours from batching time

As per Approved Method Statement

Delivery Tickets

Compaction

Each Section

Usage of vibrator in all areas

Structural Specification

-

Finish Level

Each Section

Uniform & ± 4mm

Structural Specification

-

Protection from direct sunlight

Each Section

Fully covered with hessian cloth and polythene

Structural Specification

-

Curing

Each Section

Watering for 7 days or use of approved curing compound

Structural Specification

-

Concrete

Compression Strength (Cube test at 7 & 28 days) Concrete Duration

G

Placing

LEGEND :

Page No: 1 of 1

LA - LOCAL AUTHORITY

H - HOLD

W- WITNESS INSPECTION

S - SURVEILLANCE INSPECTION

R - REVIEW

A - PPROVAL

Inspection Authority SECL

TA