!INDX_SAEP

August 2, 2017 | Author: Jay Bonganay Bonito | Category: Nondestructive Testing, Pipe (Fluid Conveyance), Welding, Steel, Engineering
Share Embed Donate


Short Description

Download !INDX_SAEP...

Description

Saudi Aramco Engineering Procedures (Index of Active SAEPs) September 2006 Document About SAEPs SAEP-12 SAEP-13 SAEP-14 SAEP-15 SAEP-16 SAEP-20 SAEP-21 SAEP-22 SAEP-25 SAEP-31 SAEP-32 SAEP-50 SAEP-103 SAEP-110 SAEP-119 SAEP-120 SAEP-121 SAEP-122 SAEP-125 SAEP-127 SAEP-133 SAEP-134 SAEP-135 SAEP-136 SAEP-140 SAEP-201 SAEP-301 SAEP-302 SAEP-303 SAEP-305 SAEP-306

Title Saudi Aramco Engineering Procedures Project Execution Plan Project Environmental Impact Assessments Project Proposal Preparation of Restricted Vendor Lists for Process Automation Systems Project Execution Guide for Process Automation Systems Equipment Inspection Schedule Royalty/Custody Metering Facilities Execution Guide Tank Calibration Requirements Estimate Preparation Guidelines Corporate Equipment and Spare Parts Data Requirements Environmental Performance Assessment (EPA) Program Project Execution Requirements for Third Party Royalty/Custody Metering Systems Metric Units of Weights and Measures Saudi Aramco Standard Drawings Saudi Aramco Materials System Specifications Saudi Aramco Security Drawings Operating Instructions for New Facilities Project Records Preparation of Saudi Aramco Engineering Standards Security and Control of Saudi Aramco Engineering Data Instructions for the Development of "Regulated Vendors List" Engineering Standards Saudi Aramco Engineering Procedure Preparations Saudi Aramco Process Automation System (PAS) Obsolescence Program Saudi Aramco Management of Electric Equipment Obsolescence Program Project Training Impact Assessment Saudi Aramco Engineering Reports Instructions for Establishing and Maintaining Mandatory Saudi Aramco Engineering Requirements Instructions for Obtaining a Waiver of a Mandatory Saudi Aramco Engineering Requirement Engineering Reviews of Project Proposal and Detail Design Documentation Saudi Aramco Library Drawings Evaluating the Remaining Strength of Corroded Pipelines

Index of Active SAEPs

5/31/2003 8/31/2004 6/29/2005 9/20/2006 6/30/2003 5/31/2003 9/28/2005 5/3/12004 4/4/2006 8/15/2006 9/30/2003 6/30/2003 7/30/2003 4/30/2005 3/31/2004 4/30/2005 3/31/2004 8/31/2002 7/31/2005 5/31/2003 6/30/2004 1/4/2006 4/30/2003 7/30/2003 6/30/2004 5/31/2004 3/31/2004

2/26/2003 5/31/2000 6/30/2003 8/15/2006 4/28/1999 5/29/2002 1/29/2003 4/30/2003 New New 8/31/1998 2/26/2003 12/1/1996 12/1/1996 6/30/2002 5/31/2003 11/30/1999 1/27/1998 2/29/2004 3/31/2003 12/31/2002 6/29/2005 New New New New 1/31/2001

Next Planned Update 3/1/2008 9/1/2009 7/1/2010 8/15/2011 71/2008 6/1/2008 10/1/2010 6/1/2009 4/4/2011 8/15/2011 10/1/2008 3/1/2008 8/1/2008 5/1/2010 4/1/2009 6/1/2008 4/1/2009 9/1/2007 3/1/2009 4/1/2008 1/1/2008 7/1/2010 5/1/2008 8/1/2006 7/1/2009 6/1/2009 4/1/2009

11/13/2005

6/29/2005

5/1/2007

10/12/2005

01/31/05

7/1/2007

7/31/2002 3/31/2004 6/29/2005

12/31/1996 11/30/1999 3/29/2000

8/1/2007 4/1/2009 7/1/2010

Current Issue

Previous Issue

page 1 of 5

Saudi Aramco Engineering Procedures (Index of Active SAEPs) September 2006 Document SAEP-308 SAEP-309 SAEP-310 SAEP-311 SAEP-312 SAEP-313 SAEP-314 SAEP-316 SAEP-317 SAEP-318 SAEP-319 SAEP-321 SAEP-322 SAEP-323 SAEP-324 SAEP-325 SAEP-327 SAEP-329 SAEP-332 SAEP-333 SAEP-334 SAEP-335 SAEP-339 SAEP-340 SAEP-341 SAEP-342 SAEP-343 SAEP-347 SAEP-348 SAEP-349 SAEP-350 SAEP-351 SAEP-352

Title Plant Inspection Unit Reviews Inspection of Community and Operations Support Facilities Pipeline Repair and Maintenance Installation of Hot Tapped and Stopple Connections PLIDCO Weld+Ends Couplings PLIDCO Split Sleeves Use of PLIDCO Smith Pipeline Repair Clamps Performance Qualification of Coating Personnel Testing and Inspection (T&I) of Shell and Tube Heat Exchangers Pressure Relief Valve Program Authorization for Installation, Deletion and Changes Pressure Relief Valves – Routine Test, Inspection, Quality Assurance and Regulation Performance Qualification Testing and Certification of Saudi Aramco Welders Performance Qualification Testing and Certification of Saudi Aramco Brazers Performance Qualification Testing of Contract Welders and Brazers Certification Review and Registration of Project Welders and Brazers Inspection Requirements for Pressurized Equipment Disposal of Wastewater from Cleaning, Flushing, and Dewatering Pipelines and Vessels Project Close-Out Report Cathodic Protection Commissioning Cathodic Protection Monitoring Retrieval, Certification and Submittal of Saudi Aramco Engineering & Vendor Drawings Boiler Condition Assessment Marine Dredging and Landfilling Approval and Permitting Air Quality Impact Analysis and Assessment Equipment Life Cycle Cost Procedure Engineering Drawings Emergency Delivery Plan Risk-Based Inspection (RBI) for In-Plant Static Equipment Supplying Material from Stockists Chemical Cleaning, Disinfection, Post Treatment and Storage of Reverse Osmosis Membranes Advanced Process Control (APC) Systems Regular Maintenance and Testing for Industrial Stationary Batteries Bolted Flange Joints Assembly Welding Procedures Review and Approval

Index of Active SAEPs

Current Issue

Previous Issue

5/31/2004 6/30/2004 11/30/2005 12/28/2005 01/31/05 01/31/05 01/31/05 11/13/2010 7/30/2003 10/31/2004 10/31/2004 6/30/2003 6/30/2003 6/30/2003 6/30/2003 6/30/2004 5/31/2003 11/23/2005 5/31/2005 7/31/2004 1/4/2006 2/28/2005 12/29/2004 12/21/2005 3/15/2006 3/31/2004 12/14/2005 10/31/2004

7/30/2003 4/30/2000 1/29/2003 11/13/2005 1/29/2003 1/29/2003 1/29/2003 7/30/2003 3/29/2000 3/31/2003 10/30/2002 1/31/2000 1/31/2000 1/31/2000 1/31/2000 3/31/2001 8/30/2000 3/31/2001 9/30/2002 11/28/2001 9/29/2004 1/28/2004 12/31/2000 1/30/2002 6/30/2001 1/29/2003 2/28/2005 7/31/2004

Next Planned Update 6/1/2009 7/1/2009 4/1/2006 12/1/2010 2/1/2010 2/1/2010 2/1/2010 8/1/2008 8/1/2008 11/1/2009 11/1/2009 7/1/2008 7/1/2008 7/1/2008 7/1/2008 7/1/2009 6/1/2006 12/1/2010 6/1/2010 8/1/2009 1/1/2009 6/1/2009 1/1/2008 1/1/2011 3/15/2009 2/1/2008 1/1/2007 8/1/2006

7/31/2004

New

8/1/2009

11/30/2004 5/31/2004 4/30/2003 5/31/2003

New New New New

12/1/2007 6/1/2009 5/1/2006 6/1/2008 page 2 of 5

Saudi Aramco Engineering Procedures (Index of Active SAEPs) September 2006 Document SAEP-354 SAEP-355 SAEP-357 SAEP-358 SAEP-360 SAEP-361 SAEP-362 SAEP-363 SAEP-364 SAEP-1020 SAEP-1021 SAEP-1024 SAEP-1025 SAEP-1026 SAEP-1027 SAEP-1028 SAEP-1050 SAEP-1101 SAEP-1102 SAEP-1103 SAEP-1104 SAEP-1105 SAEP-1106 SAEP-1107 SAEP-1108 SAEP-1109 SAEP-1110 SAEP-1111 SAEP-1112 SAEP-1113 SAEP-1114 SAEP-1115 SAEP-1116

Title High Integrity Protective Systems Design Requirements Field Metallography and Hardness Testing Fiber Reinforced Plastic Grating Installation Guide Management of Technologically Enhanced Naturally Occurring Radioactive Material (NORM) Project Planning Guidelines Storage, Handling and Installation of Weight-Coated Pipe Hand-Applied Tape Wrapping of Buried Pipe Pipeline Simulation Model Development and Support Process Simulation Model Development and Support Capital Program Planning Surveying Services Division Project Control Chemical Cleaning of New Steam Generating Equipment1 Chemical Cleaning of Boilers Boilers Lay-Up Procedures Pressure Relief Valve Conventional and Balanced Types Chemical Cleaning and Flushing of Lube/Seal Oil and Fluid Power Systems Guideline for Disaster Recovery Plan Development for Decision Support System Welding Test Supplement S01 SMAW, Carbon and Low Alloy Steel Pipe, Uphill Welding Test Supplement S02 for SMAW, Carbon and Low Alloy Steel Pipe, Downhill Welding Test Supplement S03 for SMAW, Stainless Steel, Single Sided Welding Test Supplement S04 for SMAW, Stainless Steel/Nickel, Backing Welding Test Supplement S05 for SMAW, Nickel, Single Sided Welding Test Supplement S06 for GTAW, Aluminum with Backing Welding Test Supplement S07 for GTAW, Carbon, Low Alloy and Stainless Steel Pipe Welding Test Supplement S08 for GTAW, Nickel Welding Test Supplement S09 for GTAW, Aluminum, Single Sided Welding Test Supplement S10 for SAW, Carbon and Low Alloy Steel Pipe Welding Test Supplement S11 for SAW, Overlay, Carbon and Low Alloy Steel Pipe Welding Test Supplement S12 for SMAW, Carbon Steel, Small Diameter Welding Test Supplement S13 for FCAW, Carbon Steel Welding Test Supplement S14 for SMAW, Carbon and Low Alloy Steel Plate Welding Test Supplement S15 for SMAW, Stainless Steel Lap Welding Test Supplement S16 for SMAW Nickel Lap

Index of Active SAEPs

10/29/2003 2/29/2003 2/28/2005 3/30/2005

8/31/2003 New New New

Next Planned Update 9/1/2008 3/1/2009 3/1/2010 5/1/2010

1/31/2006 5/31/2005 5/31/2005 1/25/2006 1/25/2006 6/30/2004 11/23/2005 7/31/2005 2/28/2005 2/28/2005 7/31/2002 1/28/2004 10/26/2005 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003 10/29/2003

New New New New New 2/28/2001 12/31/2002 1/28/2004 1/28/2004 1/28/2004 1/31/2001 3/31/2003 7/31/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 4/30/2000 8/31/2002 4/30/2000 4/30/2000 8/31/2002

1/31/2011 6/1/2010 6/1/2010 1/25/2009 1/25/2009 7/1/2009 12/1/2006 8/1/2010 11/1/2009 3/1/2010 8/1/2007 4/1/2008 11/1/2010 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008 11/1/2008

Current Issue

Previous Issue

page 3 of 5

Saudi Aramco Engineering Procedures (Index of Active SAEPs) September 2006 Document SAEP-1117 SAEP-1125 SAEP-1131 SAEP-1132 SAEP-1133 SAEP-1134 SAEP-1135 SAEP-1140 SAEP-1141 SAEP-1142 SAEP-1143 SAEP-1144 SAEP-1145 SAEP-1146 SAEP-1150 SAEP-1152 SAEP-1154 SAEP-1160 SAEP-1350 SAEP-1510 SAEP-1610 SAEP-1622 SAEP-1624 SAEP-1626 SAEP-1628 SAEP-1630 SAEP-1634 SAEP-1636 SAEP-1638 SAEP-1640 SAEP-1642 SAEP-1661 SAEP-1662 SAEP-3101

Title Welding Test Supplement S17 for SMAW, Wet Welding Brazing Test Supplement S25 with TB, Copper and Copper Alloy Tubing Pressure Relief Valve Program Use of Form 3099A-ENG, RV Authorization Instructions for Using the Relief Valve Test Stand Form 3750-ENG, Pressure Relieving Device Test Report Relief Valve Technician Certification On-Stream Inspection Administration Qualification of Saudi Aramco NDT Personnel Radiation Protection for Industrial Radiography Qualification of Non-Saudi Aramco NDT Personnel Radiographic Examination Magnetic Particle Examination Liquid Penetrant Examination Manual Ultrasonic Thickness Testing Inspection Coverage on Projects Approval Procedure for Ready-Mixed Concrete Mix Design Guidelines for Contractor's Quality Plan Process Controls for Capital Projects Design Basis Scoping Paper (DBSP) Preparation and Revision Procedure RVL – Products Management Procedure Preparation of Functional Specification Documents Preparation of Technical Bid Evaluation Plan Document for Process Automation Systems Preparation of System Design Documents Configuration and Graphics Guidelines Preparation of Integration Specifications Document Preparation of Integration Test Procedure Document Factory Acceptance Test Installation and Checkout Plan Site Acceptance Test Plan Operating Instructions for Process Automation Systems Maintenance Manual for Process Automation Systems Waste Minimization Opportunity Assessments Cleaning of Heat Exchangers and Unfired Plant Equipment Equipment and Spare Parts Data Requirements for Contractor Procured Equipment

Index of Active SAEPs

Current Issue

Previous Issue

10/29/2003 10/29/2003 10/31/2004 8/31/2002 11/13/2005 7/31/2004 2/29/2004 2/15/2006 6/29/2005 2/29/2004 5/29/2002 10/12/2005 10/12/2005 8/31/2004 6/30/2004 3/30/2005 3/31/2004 6/7/2006 3/20/2006 4/30/2003 2/28/2005 4/11/2006 2/28/2005 2/28/2005 2/28/2005 2/28/2005 2/28/2005 2/28/2005 4/30/2002 2/28/2005 2/28/2005 1/31/05 1/31/05 9/30/2003

12/31/2000 4/30/2000 6/30/2002 4/30/2000 7/31/2002 4/30/2000 8/31/1999 7/31/2004 12/31/1996 9/30/2000 9/30/1998 9/30/2001 9/30/2001 5/30/2001 5/31/2004 3/31/2002 New New 11/30/2005 3/31/1999 1/30/2002 2/28/2005 1/30/2002 1/30/2002 1/30/2002 4/30/2002 4/30/2002 1/30/2002 6/28/2000 1/30/2002 1/30/2002 11/30/2002 1/28/2004 8/31/1998

Next Planned Update 11/1/2008 11/1/2008 11/1/2009 9/1/2007 12/1/2008 8/1/2007 3/1/2009 2/15/2011 7/1/2010 3/1/2009 6/1/2007 11/1/2010 11/1/2010 9/1/2007 6/1/2007 4/1/2008 4/1/2005 6/7/2011 4/1/2010 5/1/2006 2/1/2007 4/11/2011 2/1/2007 2/1/2007 2/1/2007 2/1/2007 2/1/2007 2/1/2007 5/1/2007 2/1/2007 2/1/2007 2/1/2010 2/1/2010 10/1/2008 page 4 of 5

Saudi Aramco Engineering Procedures (Index of Active SAEPs) September 2006 Document SAEP-3102 SAEP-3103

Title Equipment and Spare Parts Data Requirements for SAPMT Originated Requisitions Equipment and Spare Parts Data Requirements for Proponent/MRO Originated Requisitions

Index of Active SAEPs

Current Issue

Previous Issue

9/30/2003

8/31/1998

Next Planned Update 10/1/2008

9/30/2003

8/31/1998

10/1/2008

page 5 of 5

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF