Indus Basin Irrigation System 1.History: The Indus Valley has been the host to one of the most ancient civilization of human history, the Indus Valley Civilization. After the extinction of the Indus Civilization, new settlements especially in doabs grew slow sl owly. ly. New irrigation sys tems tems start s tarted ed to evolve. Inundati Inundati on canals and small dams were constructed and population grew all around this area. In order to reduce the occurrence of low irrigation water supply the British authorities, towards the middle of the last century, started modernizing and expanding the irrigation system of the Indus Basin. The Almighty Allah has gifted Pakistan with abundant water resources with water flowing down the Himalayas Himalaya s and Karrakurram heig heights hts from the the world's largest l argest glaciers glacie rs , a free and unique unique bounty of nature for this land of alluvial plains. As a result of this natural resource, today we have the worlds marvelous and the largest contiguous irrigation system that currently irrigates over 16 million hectares of land, out of 34 million hectares of cultivable lands available. This land lies within the plains formed by river Indus and its tributaries. Britishers started the barrage irrigation system during 1930s. However, before that the residents of Punjab, Sindh, and Frontier had constructed a number of inundation canals to irrigate their lands. In the Punjab, 38 such canals had been taken out of Sutlej, Indus, and Chenab rivers to irrigate areas around Bari Doab Multan, Muzaffargarh, and Dera Ghazi Khan. In Sindh, water level of the Indus during summer had always been higher than the surrounding lands, thus, 16 inundation canals in this area had conveniently carried out the irrigation water during past century. However, However, Britis h Army Engineers Engineers undertook undertook construction and improvement of several irrigation canals in the sub- continent. Subsequently, remodeling/construction work on Bari Doab Canal; Sidhnai Canal, Lower Sohag, Ramnagar Canal, Lower Jhelum Canal, Kabul Canal, and Lower Sawat were completed by the end of l9th century. However, at the time of independence country had 29 canals to provide regulated supply to an area of about 11 million hectares, beside an area of about 3.2 million hectares irrigated through inundation canals leading from Indus and its tributaries. These main inundation canals included Upper Sutlej, Lower Sutlej, Shahpur, and Chenab in Punjab; whereas, Rohri, Fuleli, Pinyari, and Kalri in Sindh. However, after the the construction of barrages these canals canals are no mor more e inundation i nundation canals canal s but get regulated regulated water supply and some of them have become perennial while few are nonperennial.

2.Water Ability of the IBIS There are three main sources of water availability in the Indus Basin: 2.A .Surface Water. The average annual flow of Western Rivers of Indus Basin is approximately 142 million acre feet (MAF). About 105 MAF of this water is diverted for irrigation purposes and about 32 million acre feet outflows to the Arabian Sea.

M.Safdar, 2007-civil-48

Page 1

U.E.Tl Irrigation  Engineering

2. B. Rain Water: Another source of water is the rain fall. Irrigated areas of Indus Basin receive on average 40 million acres feet of water annually. annually. 2.C. Ground Water: The third source of water is the ground water. It provides approximately 40 percent of crop water requirements of the country.

3.Schematic Diagram of IBIS:

M.Safdar, 2007-civil-48

Page 2

U.E.Tl Irrigation  Engineering

3.1 KEY FACTS AND FIGURES/ SALIENT FEATURES: 1. No. major reservoirs: 3 (Chashma, Mangla, and Tarbela) 2. No. of Barrages:  16 (Sulemanki, Islam, Balloki, Marala, Trimmu, Punjnad, Sukkur, Kotri, Taunsa, Guddu, Chashma,Jinnah , Sidhnai, Sidhnai, Rasul, Qadirab Qa dirabad, ad, and Marala) 3. No. of Headwork’s: 2 (Mangla & Khanki Headwork’s)

4. No. of of Interlink Canal: Ca nal: 12 5. No. of Canal Irrigation System: 44 6. Water Diverted to Canals: 105 MAF 7. Water extracted from Ground: 42 MAF 8. Average Average escapage to sea: 32 MAF MAF 9. No. of waterc waterc ourses: 107,000 10. Length of Canals: 585000 Km 11. No. of Tube wells: >700000 12. Canal Irrigated Area: 36 million Acre

4.Barrages 4.Barrages in Pakistan An artifici artificial al bar or obstruction placed in a river or water course to increase the depth of water so that water can be diverted to canals is called barrage.

M.Safdar, 2007-civil-48

Page 3

U.E.Tl Irrigation  Engineering

M.Safdar, 2007-civil-48

Page 4

U.E.Tl Irrigation  Engineering

Key Data/ Salient Features: 4.1JINNAH 4.1JINNAH BARRAGE Year of Completion Completion Location & River on which its co nstructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1946 Kalabagh, Indus river 950,000 cusecs 1 3781 ft 42 1 678.0 .P.D

4.2 GH GHAZI AZI BARRAGE Year of Completion Completion Location & River on which its co nstructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

2002 Ghazi, Indus river 500,000 cusecs 1 20 1 332.2 m

4.3 CHASHMA BARRAGE Year of Completion Completion Location & River on which its co nstructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

M.Safdar, 2007-civil-48

1971 Chashma Mianwali Mianwali,, Indus river 1.1 million cusecs 1 1 3556 ft 52 2 622.0 .P.D

Page 5

U.E.Tl Irrigation  Engineering

4.4 TAUNSA BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1959 Near Taunsa Sharif, Indus Indus river 750000 cusecs 2 2 4346 ft 53 2 428.0 .P.D

4.5 GUDDU BARRAGE BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1962 Kashmore, Indus river 1.2 million cusecs cus ecs 2 3 4445 ft 64 2 236.0 .P.D

4.6 SUKKUR BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

M.Safdar, 2007-civil-48

1932 Near Sukkur, Indus river 1.5 million cusecs cus ecs 4 3 4725 ft 66 2 177.0 S.P.D

Page 6

U.E.Tl Irrigation  Engineering

4.7 KOTRI BARRAGE (GHULAM MUHAMMAD MUHAMMAD BARRAGE) Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1955 Near Hydraabad Indus river 875000 cusecs 3 1 2984 ft 44 2 48.0 .P.D

4.8 MARRALA BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1968 Sialkot, Chenab river 1.1 million cusecs 2 4472.33 ft 66 1 800.0 .P.D

4.9 QUADIRABAD QUADIRABAD BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level M.Safdar, 2007-civil-48

1967 Hafizabad, Chen C henab ab river 900,000 cusecs 1 3373 ft 50 1 684.50 .P.D Page 7

U.E.Tl Irrigation  Engineering

4.10 TRIMMU BARRAGE BA RRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1939 Near Jhang, Chenab river 645000 cusecs 2 1 3025 ft 37 2 477.50 .P.D

4.11 PUNJNAD BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1932 Muzafffargarh, Chenab River 700000 cusecs 2 3400 ft 47 1 325.0 .P.D

4.12 RASUL BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level M.Safdar, 2007-civil-48

1967 Jhelum river 850000 cusecs 2 3209 ft 42 1 703.0 .P.D Page 8

U.E.Tl Irrigation  Engineering

4.13 SULAIM SULA IMAN ANKI KI BARRAGE BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1926 Sutlej river 325000 cusecs 2 1 2223 ft 24 2 560.0 .P.D

4.14 ISLAM BARRAGE BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1927 Hasilpur,Sutlej Hasilpur,Sutlej river 300000 cusecs 2 1621 ft 29 1 435.50 – 441.00 S.P.D

4.15BALLOKI 4.15 BALLOKI BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

M.Safdar, 2007-civil-48

1965 Ravi river 225000 cusecs 2 1646.5 ft 35 1 624.50 .P.D

Page 9

U.E.Tl Irrigation  Engineering

4.16 SIDHNAI BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1965 Ravi river 150000 cusecs 2 712 ft 15 1 454.0 .P.D

4.17 MAILSI BARRAGE Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

1964 Near Mailsi, Sutluj river 429000 cusecs 2 1601 ft 24 1 415.50 S.P.D

4.18 KHANKI HEAD WORKS Year of Completion Completion Location & River on which its constructed Design Discharge Left  No. off Taking Canals Right  Length No. of bays No. of under Sluices Crest level

M.Safdar, 2007-civil-48

1891 Near Mailsi, Sutluj river 800000 cusecs 1 4600 ft 6 1 726.5 – 727.0 S.P.D

Page 10

U.E.Tl Irrigation  Engineering

5.Salient 5.Salient Feature of offof f- taking canals from f rom barrages 5.1BA 5.1BALLOK LLOKII SULMANKI LINK CANAL (BS (B S LINK CANAL) CANAL) Year of Completion

1951

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

18500 cusecs Left bank canal (Balloki Barrage) Ravi to Sutluj District pakpat p akpattan,Depalpur tan,Depalpur etc

5.2LOWER 5.2LOWER BARI DOAB CANAL (LBDC CANAL) Year of Completion

Design Discharge Length Off taking taking Location L ocation Area to be irrigated irrigated Location Location of area –

1859 7000 cusecs 804.6 CM Left bank canal (Balloki Barrage) 659000acres 0.27 mHa Sahiwal, Multan Distt Distt

5.3SIDHNAI 5.3SIDHNAI CANAL Year of Completion

Design Discharge Length Off-taking Location Area to be irrigated irrigated Location Location of area

M.Safdar, 2007-civil-48

1886 4005 cusecs 36.4CM Left bank canal (sidhnai Barrage) Barrage) 1017000acres 1017000acres 0.41 mHa Multan, Vehari Distt.

Page 11

U.E.Tl Irrigation  Engineering

5.4SIDHNAI 5.4SIDHNAI MAILSI MAILS I BAHAWAL LINK CAN CANAL AL Year of Completion

1965

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

10100cusecs 60CM Left bank canal (sidhnai Barrage) Barrage) Ravi to Sutluj District Bahawalpu Bah awalpur,Lo r,Lodharan dharan

5.5 UPPER CHENAB CANAL (UCC) Year of Completion

1912

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

16500cusecs 42.8CM Left bank canal (Marala Barrage) 1441000acres 1441000acres 0.58 mHa Sialkot, Gujranwala, Gujranwala, Shei Sh eikhupura khupura Distt.

5.6MARALA 5.6MARALA RAVI LINK CANAL (MR LINK CANNAL) Year of Completion

1956

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

22000cusecs 189.9CM Left bank canal (Marala Barrage) Chenab to Ravi Sialkot,Narowall, Lahore etc

5.7LOWER 5.7LOWER CHENAB CANAL (LCC) Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

M.Safdar, 2007-civil-48

1892 11727 cusecs 155.9CM 155.9CM (canal (can al mile) Left bank canal canal (Khanki headworks) 3054000 acres 1.24 mHa Gujranwala, Sheikhupura, Faisalabad Distt.

Page 12

U.E.Tl Irrigation  Engineering

5.8QUADIRABAD 5.8QUADIRABAD BALLOKI LINK CANAL (QB LINK CANAL) Year of Completion

1967

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

18600cusecs 104CM Left bank b ank canal canal (Quadira (Qu adirabad bad Barrage) Barr age) Chenab to Ravi Gujranwala, Sheikhupura, Faisalabad Distt.

5.9TRIMMU 5.9TRIMMU SIDHNAI LINK CANAL (TS LINK LIN K CANAL) CANAL) Year of Completion

1965

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

11000 cusecs 44CM Left bank canal (Trimmu Barrage) Chenab to Ravi Muzaffargarh, Jhang, Multan Distt.

5.10 HAVALI CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1939 5242cusecs 36.4CM Left bank canal (Trimmu Barrage) 1166000acres 1166000acres 0.47 mHa Muzaffargarh, Jhang, Multan Distt.

5.11 RANGPUR CANAL Year of Completion

1939

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

2710 cusecs 138.2CM Righ t bank canal canal (Trimmu Barrage) 345000acres 0.14 mHa Muzaffargarh, Jhang, Multan Distt

M.Safdar, 2007-civil-48

Page 13

U.E.Tl Irrigation  Engineering

5.12 PUNJNAD CANAL Year of Completion

1929

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

9567 cusecs 57.2 CM Left bank canal (Punjnad (Punjnad Barrage) Barrage) 1355000acres 0.55mHa Bahawalnagar, Rahim Yar Khan Districts

5.13ABBASIA 5.13 ABBASIA  CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1929 1064cusecs 25.7 CM Left bank canal (Trimmu Barrage) 154000acres 62323 Ha Rahim yar y ar khan,sadiqa khan,sadiqa abad

5.14ESTERAN 5.14 ESTERAN SIADIQIA CANAL Year of Completion

1926

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

4917 cusecs 49 CM Left bank canal (Sulmanki Barrage) 1052000acres 1052000acres 0.43 mHa Bahawalnager, Multan, Sahiwal Districts

5.15 FORDW F ORDWAH AH CANAL Year of Completion

1927

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

3366 cusecs 9.2 CM Left bank b ank canal canal (Sulmanki Barrage) 428000acres 0.17 mHa Bahawalpur, Multan, Sahiwal Districts

M.Safdar, 2007-civil-48

Page 14

U.E.Tl Irrigation  Engineering

5.16 PAKP PA KPATTAN ATTAN CANAL Year of Completion

1927

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

6950 cusecs 183.1CM Right ba b ank canal (Sulmanki Barrage) 1049000acres 1049000acres 0.42 mHa Bahawalpur, Multan, Sahiwal Districts

5.16QAIM 5.16 QAIM CANAL Year of Completion

1927

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

538 cusecs 33CM Left bank canal (Islam Barrage) 1036000acres 1036000acres 0.42 mHa Bahawalpur, Bahawalpur, Mailsi and Vehari Districts

5.17BAHAWAL 5.17 BAHAWAL CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1927 5400cusecs 17.9CM Left ba b ank canal (Islam Barrage) 730000acres 0.30 mHa Mailsi and Vehari Districts

5.18UPPER 5.18 UPPER JEHLAM CANAL CANAL (UJC) Year of Completion

1915

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

7800cusecs 88CM Left bank canal (Mangla headworks) 544000 acres 0.22 mHa Gujrat, Gujrat, Jehlum Jehlu m Distt. Dis tt.

M.Safdar, 2007-civil-48

Page 15

U.E.Tl Irrigation  Engineering

5.19RAS 5.19 RASUL UL QUADIRABAD QUADIRABAD LINK CANAL (RQ Link Canal) Year of Completion

1967

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

19000cusecs 30CM Left ba b ank canal (Rasul Barrage) Jehlum to chenab Sargodha, Gujrat Distt

5.20LOWER 5.20 LOWER JEHLUM CANAL (LJC) Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1901 6600cusecs 39.4CM Left ba b ank canal (Rasul Barrage) 1518000acres 1518000acres 0.61 mHa Sargodha, Sargodha, Gujrat Dis tt

5.21GHAZI 5.21 GHAZI BROTHA BROTHA POWER POWER CANAL Year of Completion

2002

Design Discharge Length Off-taking Off-taking location Location Location of area

75000cusecs 52km Left bank canal canal (Ghazi (Gh azi Barrage) Barrage) Ghazi

5.22THAL 5.22 THAL CANAL Year of Completion

1947

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated

8500cusecs 31.5CM Left bank canal (Jinnah Barrage) 1912000acres 1912000acres 0.77 mHa Mianwali, Muzaffargarh, Khushab, Bhakkar, Leiah Distt.

Location Location of area

M.Safdar, 2007-civil-48

Page 16

U.E.Tl Irrigation  Engineering

5.23CHASHMA 5.23 CHASHMA JEHLAM LINK CANAL (CJ LINK CANAL) Year of Completion

1970

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

21700cusecs 63CM Left bank b ank canal canal (Chashma Barrage) Indus to Jehlam D. I. Khan, Provide water for Jehlum river.

5.24CHASHMA 5.24 CHASHMA RIGHT BANK CANAL Year of Completion

1990

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

5000 cusecs 90CM Right bank canal (Chashma Barrage) 0.23 mHa D. G. Khan .

5.25KACHHI 5.25 KACHHI CANAL Year of Completion

Under construction construction

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

6000 cusecs 313CM Right bank canal (Taunsa Barrage) 0.29mHa 713000acres Balochishtian

5.26MUZAFFARGA 5.26 MUZAFFARGARH RH CANAL Year of Completion

1958

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

8301cusecs 74.2CM Left  bank canal (Taunsa Barrage) Barrage) 820000acres 0.33 mHa Muzaffargarh Distt

M.Safdar, 2007-civil-48

Page 17

U.E.Tl Irrigation  Engineering

5.27TAUNSA 5.27 TAUNSA PUNJNAD LINK CANAL (TP LINK CANAL) Year of Completion

1959

Design Discharge Length Off-taking Off-taking location Link  Location Location of area

14000 cusecs 38CM Left  bank  b ank canal (Taunsa Barrage) Barrage) Indus to Chenab Chenab Muzaffargarh Distt

5.28 DERA GHAZI KHAN CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1958 8790 cusecs 69CM Right bank canal (Taunsa Barrage) 906000acres 0.37 mHa Muzaffargarh Distt

5.29PAT 5.29 PAT FEEDER/CANA FEEDER/CANALL Year of Completion

1962

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated

3176 cusecs 106CM Left bank b ank canal canal (Guddu Barrage) 380827acres 0.15mHa Nasirabad and Jafarabad districts of  Balochistan

Location Location of area

.

5.30DESERT 5.30 DESERT FEEDER/CANAL Year of Completion

1962

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

12945 cusecs

M.Safdar, 2007-civil-48

Right bank b ank canal (Guddu Barrage) Sukkar, Sukkar, Mirpur, Rohri, Rohri, Kalat Distt. Di stt.

Page 18

U.E.Tl Irrigation  Engineering

5.31BEGARI 5.31 BEGARI SINDH FEEDER Year of Completion

1962

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

15494 cusecs Right bank b ank canal (Guddu Barrage) 958857acres 0.39mHa Sukkar, Sukkar, Mirpur, Rohri, Rohri, Kalat Distt. Di stt.

5.32GHOTKI 5.32 GHOTKI FEEDER/CANAL Year of Completion

1962

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

8490 cusecs Left bank canal (Guddu Barrage) 855231acres 0.35mHa Sukkar, Sukkar, Mirpur, Rohri, Rohri, Kalat Distt. Di stt.

5.33EAST 5.33 EAST NARA CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1932 13649cusecs 226CM Left bank b ank canal canal (Sukkur Barrage) 2240186acres 0.91mHa Hyderabad, Sanghar Distt.

5.34 EAST KHAIRPUR CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

M.Safdar, 2007-civil-48

1932 2096cusecs 10CM Left bank b ank canal canal (Sukkur Barrage) Barr age) 369596acres 0.15mHa Hyderabad, Sanghar Distt.

Page 19

U.E.Tl Irrigation  Engineering

5.35 ROHRI CANAL Year of Completion

1932

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

10883cusecs Left bank canal (Sukkur Barrage) 26001213acres 1.1mHa Hyderabad, Sanghar Distt.

5.36DADU 5.36 DADU CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1932 3150cusecs 131.1CM Right ba b ank canal (Sukkur Barrage) Barrage) 550963acres 0.22mHa Hyderabad, Sanghar Distt.

5.37 RICE CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1932 10658cusecs 81CM Right ba b ank canal (Sukkur Barrage) Barrage) 519660acres 0.21mHa Hyderabad, Sanghar Distt.

5.38WEST 5.38 WEST  KHAIRPUR CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

M.Safdar, 2007-civil-48

1932 1940cusecs 24CM Left bank canal (Sukkur Barrage) 322000acres 0.13mHa Hyderabad, Sanghar Distt.

Page 20

U.E.Tl Irrigation  Engineering

5.39NORTH 5.39 NORTH WEST CANAL Year of Completion

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated Location Location of area

1932 5152cusecs 36CM Right ba b ank canal (Sukkur Barrage) Barrage) 940014acres 0.38mHa Hyderabad, Sanghar Distt.

5.40KALRI 5.40 KALRI BAGHAR BAGHAR CANAL (FEEDER) Year of Completion

1955

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated

9075 cusecs 5761m Right bank canal (Kotri Barrage) 603741acres 0.24mHa Hyderabad, Sanghar, Nawabshah, Badin, Mirpur Distt.

Location Location of area

5.41PHUELLELI 5.41 PHUELLELI CANAL (FEEDER) (FEEDER) Year of Completion

1955

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated

14350cusecs

Location Location of area

Left bank canal canal (Kotri Barrage) 929358acres 0.38mHa Hyderabad, Sanghar, Nawabshah, Badin, Mirpur Distt.

5.42PINYARI 5.42 PINYARI CANAL (FEEDER) Year of Completion

1955

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated

13000 cusecs

Location Location of area

M.Safdar, 2007-civil-48

Left bank canal canal (Kotri Barrage) 786353acres 0.32mHa Hyderabad, Sanghar, Nawabshah, Badin, Mirpur Distt. Page 21

U.E.Tl Irrigation  Engineering

5.43AKRAM 5.43 AKRAM WAH CANAL (FEEDER) Year of Completion

1955

Design Discharge Length Off-taking Off-taking location Area to be irrigated irrigated

4100cusecs

Location Location of area

M.Safdar, 2007-civil-48

Left bank canal (Kotri Barrage) 487347acres 0.20mHa Hyderabad, Sanghar, Nawabshah, Badin, Mirpur Distt.

Page 22

U.E.Tl Irrigation  Engineering

References: I.

Barrages & Dams in Pakistan By DR. Izharul Haq (Secretary (Secretary Pak. Engg. Congress)

II.

www.southasianmedia.net

III.

www.scribd.com/doc/2 www.scribd.com/doc/25280380/Irrigation-Engineering-Part 5280380/Irrigation-Engineering-Part-3 -3

IV.

www.pakistaniat.com/2006/10/30/punjab-link-canal-irrigation/

V.

www.magazine.com www.magazine.com.pk/travel/pakistan.php .pk/travel/pakistan.php?ss=&page= ?ss=&page=irrigation irrigation

VI.

www.sida.or www.sida.org.pk/areawaterboard g.pk/areawaterboard/default.asp /default.asp

VII.

www.rohri.net/sukkur-barrage.htm

M.Safdar, 2007-civil-48

Page 23