IBS Resume

November 19, 2018 | Author: Satish Jadav | Category: Gsm, Microsoft Office, Telecommunications, Radio Technology, Telecommunications Engineering
Share Embed Donate


Short Description

Download IBS Resume...

Description

SATISH JADAV

I-59, NAVGRAH CO-OP SOCIETY, FLAT N0:203,2nd FLOOR, POONAM SAGAR COMPLEX MIRAROAD (E), Mumbai-401107. +919167671378 Email:[email protected]

Objective

Seeking a challenging environment that encourage continuous learning and creativity, provides exposure to new ideas, and stimulates personal and professional growth.

Professional experience

Total Experience: 9years. Of rich exp. In GSM 2G / UMTS /CDMA 2000 / (RF Indoor  Planning & Optimization 800/900 /1800/2100Mhz TRI band/ Dual band) Indoor Planning and Optimization Optimization & Physical Optimization Optimization of field experience of 9 years of  combined experience in, network , implementation, and Network optimization phases with specia speciall emphas emphasis is on Projec Projectt Plan Plan develo developme pment, nt, Resour Resource ce planni planning, ng, cost cost and budget budget control, quality control, time management and project reporting. Expertise in 2G/3G Drive test and Post processing in NOKIA/Ericsson/Motorola Equipments. Intermediate in using RF planning tools like), Asset 5.0, Tems, and Post processing & Optimization drive tools, Tems Investigation 9.3, , MapInfo, Actix GSM Analysis, Agilent, Agilent, Nect Act. Feb 2006 –Dec2010 RF Optimization Lead Lead Engineer: Qatar Telecom Ltd Dept: Indoor Planning and Optimization Preparing the nominal cell plan for the building. ♣ Conducting initial RF survey of the building from design point of view. ♣ Preparing RF design/technical proposal for In-building Solutions. ♣ Preparing RF BOQ for the site designed. ♣ Preparing DAS (Distributed Antenna System) Solution for In building Coverage. Calculating the Link Budget/EIRP table and designing of the schematic♣ diagram for IBC solutions and deciding the cable routing. Designing the Schematic Diagram and deciding the cable routing. ♣ Preparing the RF Technical Proposal. ♣ Preparing the RF BOQ. Meetings withVendor Team to discuss the technical aspects for implementation of the design according to the requirements that they need to be fulfilled. Checking existing coverage using TEMS Investigation GSM. Preparing RF design/technical proposal for In-building Solutions Analyzing the post installation coverage, spillage, and Handover tests using TEMS Investigation Light. ♣ Optimization of the design, by implementing necessary changes in design to meet the KPIs.. Managed the regional Site Acquisition teams, Civil and Implementation teams for sites. Managed Site Audits. Managing the Regional O&M Team.. Team Management.

Providing technical support to teams. iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4) RF Designing in IBS Site, Inspection at the Implementation of IBS site. using iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4). RF Designing in IBS Site, Inspection at the Implementation of IBS site.

Oct-2004 to Feb 2006: Global Telecom Ltd: Mumbai (India). IBS Planning and Design -Engineer . Preparing the nominal cell plan for the building. ♣ Conducting initial RF survey of the building from design point of view. ♣ Preparing RF design/technical proposal for In-building Solutions. ♣ Preparing RF BOQ for the site designed. ♣ Preparing DAS (Distributed Antenna System) Solution for In building Coverage. Calculating the Link Budget/EIRP table and designing of the schematic♣ diagram for IBC solutions and deciding the cable routing. Designing the Schematic Diagram and deciding the cable routing. ♣ Preparing the RF Technical Proposal. ♣ Preparing the RF BOQ. Meetings withVendor Team to discuss the technical aspects for implementation of the design according to the requirements that they need to be fulfilled. Checking existing coverage using TEMS Investigation GSM. Preparing RF design/technical proposal for In-building Solutions Analyzing the post installation coverage, spillage, and Handover tests using TEMS Investigation Light. ♣ Optimization of the design, by implementing necessary changes in design to meet the KPIs.. Managed the regional Site Acquisition teams, Civil and Implementation teams for sites. Managed Site Audits. Managing the Regional O&M Team.. Team Management. Managing the Regional O&M Team.. Team Management. Providing technical support to teams. iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4). RF Designing in IBS Site, Inspection at the Implementation of IBS site. using iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4). RF Designing in IBS Site, Inspection at the Implementation of IBS site.

Overseas Project: 1Worked on an International Project as a Optimization Engineer for  Motorola in Bangladesh, 2 Done also Technical Site Survey for Siemens for Microwave Transmission in Bangladesh, also done RF Survey for Motorola in Bangladesh 3. Worked for Alcatel in Doha (Qatar) as Drive Test Engineer for outdoor as well as Indoor Sites, Also involved in the Planning of Indoor Sites for Alcatel. 4.Also done IBS Planning, Survey for Motorola in Dubai, Sharjah and Abu Dhabi 5. Worked as the Core Team Member in Optimization Team of Leading Operator in Srilanka (Dialog) Through Erricson, Responsible for Physical, and Hardware as well as Optimization in the network, Nawras (Oman).

May2003 to Oct 2004: Reliance Infocomm Ltd: Mumbai (India). IBS Engineer . Lucent Technologies-Client)(CDMA2000) . ( Preliminary surveys of the identified buildings using an engineering handset and opting for the appropriate solution i.e. .RF repeater, optical repeater or a micro cell.  Design Survey of the building which includes putting up distribution antenna systems (DAS) i.e. fixing up the positions of yagi antenna,omni directional and patch panel antennas as per requirement.  Implementation of the system as per design survey. Preparing the nominal cell plan for the building. ♣ Conducting initial RF survey of the building from design point of view. ♣ Preparing RF design/technical proposal for In-building Solutions. ♣ Preparing RF BOQ for the site designed. ♣ Preparing DAS (Distributed Antenna System) Solution for In building Coverage. Calculating the Link Budget/EIRP table and designing of the schematic♣ diagram for IBC solutions and deciding the cable routing. Designing the Schematic Diagram and deciding the cable routing. ♣ Preparing the RF Technical Proposal. ♣ Preparing the RF BOQ. Meetings withVendor Team to discuss the technical aspects for implementation of the design according to the requirements that they need to be fulfilled. Checking existing coverage using TEMS Investigation GSM. Preparing RF design/technical proposal for In-building Solutions Analyzing the post installation coverage, spillage, and Handover tests using TEMS Investigation Light. ♣ Optimization of the design, by implementing necessary changes in design to meet the KPIs.. Managed the regional Site Acquisition teams, Civil and Implementation teams for sites. Managed Site Audits. Managing the Regional O&M Team.. Team Management. Managing the Regional O&M Team.. Team Management. Providing technical support to teams. iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4) RF Designing in IBS Site, Inspection at the Implementation of IBS site. using iBwave The Standard for In-Building Design RF-vu Software(v 4.2.4). RF Designing in IBS Site, Inspection at the Implementation of IBS site 

.

Sept2000– May 2003 Indoor Implementation Engineer  Microqual Techno Pvt Ltd .        

   

  

Tools Handled

Ibs survey. Antenna planning. Implementation of the the planned sites as per the design Walk test for In-building sites Drive test using Pen Tablet investigation tool Optimization Check the load bearing capacity of foundation, ducting, cable routing as per the design requirement To plan for Cable Routing of the design sites and to get the work done from the contractor as per the design, Check for any damage of the cable after the completion of the work. VSWR Measurements& Azimuth Calculation & Power Measurement Drive Test Performed for Call Origination, Call Termination, Handoff Test& Markov Test, Functionality Test Designing of Losses, Link Budget etc. Carrying out site maintenance checks. ♣ Providing support and assistance to customers. ♣ Installation and configuration of NMS for the network. ♣ Loading and swapping traffic Project handled: Done Projects for In Building Solutions for Airtel, BPL, Orange, BSNL, and MTNL, Tata Indicom etc. Outdoor and Indoor drive test on Agilent E6474A (NITRO).CAIT Lucent Drive test tool.

GIS Tools: • • •

MapInfo Google Earth Street and Trips Planning Tools: Asset Drive test Tools • •

Tems Investigation-6.1, 8.1, 9.1



Radient(Tools Propriety to Motorola(Bangladesh)



Agilent E6474A



A954WD(Alcatel) Post processing Tool Actix

A954P(Alcatel) Ran opt (Aircom) Performance Monitoring A9156 Net act Mars

Training

         

Achievements

Qualification

Training given on 1xEVDO at GTL Mumbai, India. Training given on CDMA Basics and drive test using CAIT by Eric Guzman (Senior RF Engineer- Lucent) at Reliance Infocomm Ltd. Mumbai, India. Training Given by Alcatel Qatar for Optimization (A9156). Training Given by Motorola (Bangladesh) for RF Planning as well as optimization. Training given on Planet EV in GTL Ltd. Tems 6.1 Data and Route Analysis (QATAR TELECOM) Attended Training for SYS 2(Motorola) in Qatar telecom Ltd UMTS Core Network Training in Qatar Telecom Ltd. BSS Overview Training for Nokia Siemens in Qatar  Ran opt and Advantage Training from Aircom in Qatar.

Responsible for the optimization for North Part (Alcatel) of Doha Area which Includes prime area like Corniche and Emir (The King Route), also Playing Key Role in the optimization of  Forthcoming Asian Games Venue to be held in December 2006. Awards: Received Appreciation award for participating in Asian Games. Received Appreciation Award for Installing Repeater Solution for H.H Emir Palace.

Bachelor of Engineering  –Mumbai university DIPLOMA: Bhausaheb Vartak College- Mumbai

Computer  Fundamentals

Microsoft office: Excel (Expertise) , Word , Powerpoint OPERATING SYSTEMS : Windows 2000 Professional PACKAGES : Office 97, 2000, 2003 & 2007

Date of Birth

11.6.1974

Passport Status

Available

References

Will be provided as per the request

I

I hereby declare that all the particulars mentioned above are true to the best of my knowledge and information. Satish Jadav

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF