CRONOGRAMA DE EJECUCION DE OBRA "CONSTRUCCION DEL CERCO PERIMETRICO DEL ESTADIO CON MALLA OLIMPICA DEL DISTRITO DE CHACAPALPA - YAULI - JUNIN"

Id

Nombre de tarea

Duración Comienzo

Fin

 junio 19/05

1

"CONSTRUCCION DEL CERCO PERIMETRICO DEL ESTADIO CON 30 d MALLA OLIMPICA DEL DISTRITO DE CHACAPALPA - YAULI - JUNIN".

20 m ay

Inicio

0d

20 may

20 may

3

OBRA S PROVISIONAL ES

1d

20 m ay

20 m ay

1d 1d

20 may 20 may

20 may 20 may

6 7 8 9 10 11 12 13 14 15 16

SEGURIDA D Y SAL UD

 E  EQ QUIPOS DE PROTECCION INDIVIDUAL  E  EQ QUIPOS DE PROTECCION COLECTIVA  S  SE E ALIZACION TEMPORAL DE SEGURIDAD TRA BA J OS PREL IMINA RES

 L  LIIMPIEZA DE TERRENO MANUAL  T  TR RAZO, NIVELACION Y REPLANTEO MOVIMIENTO DE TIERRAS

 C  CO ORTE DE TERRENO CON MAQUINARIA  E  EX XCAVACION EN MATERIAL SUELTO  E  EL LIMINACION MATERIAL EXCEDENTE HASTA 30.00 M

17 18

OBRA S CONCRETO SIMPL E

19

OBRA S DE CONCRETO A RMADO

20 21 22 23 24 25 26 27 28 29 30 31 32 33

 SOLADOPARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON

 C  CO ONCRETO EN ZAPATAS F'C 210 KG/CM2  A  AC CERO PARA ZAPATAS  ENCOFRADOY DESENCOFRADOPARA DESENCOFRADO PARA DADOS DE ZAPATA (DADOSSUPERIORES) CARPINTERIA META L ICA

 POSTES CON TUB. DE FIERROGALVANIZADO P/CERCO PERIMETRICOD=2.5" PERIMETRICO D=2.5"  C  CE ERCO DE TUBO CON MALLA OLIMPICA  PUERTA METALICA SEGÚN DISE O- SUMINISTROE INSTALACION PINTURA

2d

20 m ay

21 m ay

2d 2d 2d

20 may 20 may 20 may

21 may 21 may 21 may

2d

21 m ay

22 m ay

1d 1d

21 may 22 may

21 may 22 may

5d

23 m ay

27 m ay

2d 5d 5d

23 may 23 may 23 may

24 may 27 may 27 may

1d

28 m ay

28 m ay

1d

28 may

7d

29 m ay

04 j u n

7d 7d 7d

29 may 29 may 29 may

04 jun 04 jun 04 jun

19 d

29 m ay

16 j u n

7d

29 may

04 jun

15 d 3d

30 may 14 jun

13 jun 16 jun 17 j u n

3d

15 j u n

15 jun

17 jun

VA RIOS, L IMPIEZA, J A RDINERIA

30 d

20 m ay

18 j u n

 F  FL LETE TERRESTRE  P  PL LACA RECORDATORIA  L  LIIMPIEZA FINAL DE OBRA FIN

3d 1d 1d 0d

20 may 18 jun 18 jun 18 jun

28 may 18 jun 18 jun 18 jun

Proyecto: CRONOGRAMA GAN Fecha: 10 may

16/06

20/05

05

21/05

05

21/05

23/05

27/05

28 may

3d

 P  PIINTADO DE DADOS CONCRETO

09/06

20/05

05

 C  CA ARTEL DE OBRA 3.00 X 5.00 M UNA CARA  A  AL LMACEN Y OFICINA DE OBRAS

02/06

18 j u n

2

4 5

26/05

05

29/05

04/06

29/05

04/06

28/05

18/06

Tarea

Tarea inactiva

Informe de resumen manual

Hito externo

División

Hito inactivo

Resumen manual

Fecha límite

Hito

Resumen inactivo

solo el comienzo

Tareas críticas

Resumen

Tarea manual

solo fin

División crítica

Resumen del proyecto

solo duración

Tareas externas

Progreso

- VAMEGA INGENIEROS CONTRATISTAS SAC -