Hydrotest Risk Assessment new
Short Description
Hydrotest Risk Assessment new...
Description
Risk Assessment Tables (Guidance for assessing risk)
Risk Tolerability/Acceptance Table Likelihood of Occurrence Regular occurrence within the area of operations to which it refers, with the possibility of being realised once per day/shift. High Likelihood Moderate Likelihood Occasional occurrence with the possibility of being realised once per job/project/contract/month. Unlikely to occur but known to have occurred in the relevant industry/operation/type of work it refers to. Low Likelihood Severity (injury) High Severity Moderate Severity Low Severity
Major Injury/Disablement/Fatality (e.g. amputation, major fracture, poisoning, multiple injuries, occupational cancer or other severe life shortening diseases, acute fatal diseases). Lost Time Injury (off work for more than 3 working days)-(lacerations, burns, concussions, serious sprains, minor fractures, deafness, dermatitis, asthma, work related upper limb disorders, ill health leading to permanent minor disability). First Aid Injury, Medical Aid Treatment Injury (return to work after loss of 1-2 shifts/working days)-(e.g. superficial injuries, minor cuts/bruises, eye irritation, headaches, temporary discomfort.
Risk Rating & Rating Number 5 Intolerable Risk
Work shall not be started or continued until the risk has been reduced. If it is not possible to reduce the risk even with unlimited resources, work shall remain prohibited.
4 Substantial Risk
Work shall not be started until the risk has been reduced. Considerable resources may be required to do this. Where the risk involves work in progress, urgent action shall be taken.
3 Moderate Risk
Severity (property/equipment) Property/Equipment Damage costs exceeding $50,000. High Severity Moderate Severity Low Severity
Property/Equipment Damage costs (direct and indirect) between $50,000 and $5,000. Property/Equipment Damage costs (direct and indirect) not exceeding $5,000.
2 Tolerable Risk
Severity (environmental) Environmental damage is catastrophic and/or involves prosecution, severe damage to company image and substantial costs. High Severity Moderate Severity Environmental damage external to local area and/or damage to company image and profits. Environmental damage is local and has minimal external impact. Low Severity Risk Rating & Rating Number Table High Likelihood Moderate Likelihood
1 Low Risk
Work may proceed but efforts should be made to reduce the risk below this level. The resources/costs required for prevention should be carefully measured and limited. Risk reduction measures and remedial action shall be implemented as soon as practicable and within one month as a maximum. Where the moderate risk (level 3) involves high severity consequences, further assessment may be necessary to establish the likelihood more precisely and determine the need for improved control measures. No additional costs are required. Consideration may be given to more cost effective remedial actions or improvements that involve no additional resources/cost burden. Monitoring is required to ensure that controls are maintained and in place. Risk Acceptable. No action required. Document findings.
Notes: Low Likelihood
High Severity
5 Intolerable risk
4 Substantial risk
3 Moderate risk
Moderate Severity
4 Substantial risk
3 Moderate risk
2 Tolerable risk
3 Moderate risk
2 Tolerable risk
1 Low risk
Low Severity
Remedial Action and Timescale
For each hazard: - 1) Estimate Likelihood of Occurrence. 2) Estimate Severity of potential injury, property damage or environmental damage. 3) Combine estimates to allocate Initial Risk Rating. 4) Assess Risk Tolerability or Acceptance. 5) Introduce Control Measures to reduce risk. 6) Reassess revised estimates of Likelihood and Severity after controls implemented and allocate new risk rating. 7) Reassess Risk Tolerability and if acceptable, enter Residual Risk Rating and associated Likelihood and Severity levels. If not repeat stages 5-7.
Page 1 of 6
Risk Assessment Form
Base/Area/Dept/Project: Dubai/MEAP/Operations/Azeri Baku Pipelines Project Activity/Operation/Job: Pre-commissioning/Hydrotesting/MEPPS Task/Job Steps
Hazard Hazard Description and Effect for each Task. Note: Additional hazards may arise from interaction with other work.
Initial Risk
Assessed by: Date: Controls
Residual Risk
Personnel / Equipment / Hazard Likelihood of Risk List and describe fully all Controls Required. Cross-refers Hazard Likelihood of Risk Environment at Risk Severity Occurrence Rating to any other relevant assessment (PPE, COSHH, Manual Severity Occurrence Rating No. No. Handling, LOLER etc).
Prepare detailed test procedure
Nominate wrong test pressure Over pressure system
Damage to client system
Mod
Mod
3
Procedure/job card will be prepared, checked and approved by 3 separate BJ & client personnel.
Mod
Low
2
Prepare detailed test procedure
Nominate wrong test limits Over pressure system
Damage to client system
Mod
Mod
3
Procedure/job card will be prepared, checked and approved by 3 separate BJ & client personnel.
Mod
Low
2
Prepare detailed test procedure
Failure to identify NRV’s and valves Damage to to be mechanically opened within client system the test limits Trapped pressure in system
Mod
Mod
3
Procedure/job card will be prepared, checked and approved by 3 separate BJ & client personnel.
Mod
Low
2
Prepare system for flooding
Failure of permit to work system Ongoing conflicting work on the same system
Personal injury and BJ equipment damage
Mod
Mod
3
Permit to work system is adhered to rigidly and shortcomings/potential conflicts reported to PTW office immediately.
Mod
Low
2
Prepare system for flooding
Rig up all flooding equipment Muscle / back strain from moving heavy equipment
Personal injury
Mod
Mod
3
Follow all guidelines laid out during safety induction and BJ HSE manual. Personnel trained in manual handling techniques. Items over 40 Kgs to be lifted by 2 or more people.
Low
Low
1
Prepare system for flooding
Install incorrectly rated temporary hose / blinds / spades Overpressure of temporary equipment
BJ equipment damage
Mod
Mod
3
Adhere at all times to procedure, all temporary equipment to be certified and pre-tested.
Mod
Low
2
Prepare system for flooding
Use of hand Tools Trapped / cut injured body parts
Personnel injury Mod
Mod
3
Follow all guidelines laid out during safety induction and BJ HSE manual
Mod
Low
2
Prepare system for flooding
Working at height Fall from high levels
Personnel injury High
Mod
4
Only use approved scaffolding, wear correct harness above 2m from floor.
Mod
Approved by (Name): Signature:
Approved by (Title): Date:
Low
Page 2 of 6
2
Task/Job Steps
Hazard Hazard Description and Effect for each Task. Note: Additional hazards may arise from interaction with other work.
Initial Risk
Controls
Residual Risk
Personnel / Equipment / Hazard Likelihood of Risk List and describe fully all Controls Required. Cross-refers Hazard Likelihood of Environment at Risk Severity Occurrence Rating to any other relevant assessment (PPE, COSHH, Manual Severity Occurrence No. Handling, LOLER etc).
Risk Rating No.
Flood system
Draining water Soaking adjacent working personnel
Personnel injury Low
Mod
2
When draining water warn as many people as possible and monitor the drainage path of the water. Cover all electrical equipment.
Low
Low
1
Flood system
Splashed by high velocity water Eye injury
Personnel injury High
Low
3
Use of correct PPE advised during induction and in HSE manual.
Low
Low
1
Prepare for hydrotest
Working at height Fall from high levels
Personnel injury High
Mod
4
Only use approved scaffolding, wear correct harness above 2m from floor.
Mod
Low
2
Prepare for hydrotest
Failure of permit to work system Ongoing conflicting work on the same system
Equipment and plant damage
High
Mod
4
Permit to work system is adhered to rigidly and shortcomings/potential conflicts reported to PTW office immediately.
Mod
Low
2
Prepare for hydrotest
Rig up all Hydrotesting equipment Muscle / back /strain from moving heavy equipment
Personnel injury Mod
Mod
3
Follow all guidelines laid out during safety induction and BJ HSE manual
Low
Low
1
Prepare for hydrotest
Install incorrectly rated temporary pipework / hoses / blinds / spades Overpressure of temporary equipment Use of hand Tools Trapped injured body parts
BJ equipment and personnel injury
Mod
High
4
Adhere at all times to procedure. All Mod temporary equipment to be pre-tested prior to hook up to clients system.
Low
2
Personnel injury Mod
Mod
3
Follow all guidelines laid out during safety induction and BJ HSE manual
Mod
Low
2
Prepare for hydrotest Hydrotest system
Over pressurise system Client system Critical failure / rupture of pipework
High
Mod
4
Utilise system over pressure protection device fitted upstream of test gauge on hydrotest injection manifold.
Mod
Low
2
Hydrotest system
Non testing personnel working on systems under pressure Critical failure
All personnel in test area
High
Mod
4
Mod
Low
2
Depressurise / drain
Trapped Pressure in system
Personnel injury Mod
Mod
3
Follow all guidelines on Permit to work. Adhere to barriers / signs recommended in procedure. No unauthorised personnel in test area. Follow all guidelines on Permit to
Mod
Low
2
Approved by (Name): Signature:
Approved by (Title): Date:
Page 3 of 6
Task/Job Steps
Hazard Hazard Description and Effect for each Task. Note: Additional hazards may arise from interaction with other work.
Initial Risk
Controls
Residual Risk
Personnel / Equipment / Hazard Likelihood of Risk List and describe fully all Controls Required. Cross-refers Hazard Likelihood of Environment at Risk Severity Occurrence Rating to any other relevant assessment (PPE, COSHH, Manual Severity Occurrence No. Handling, LOLER etc).
Risk Rating No.
system
Future release of pressurised fluid critical failure
Depressurise / drain system
Draining water Soaking adjacent working personnel
Personnel injury Low
Mod
2
When draining water warn as many people as possible and monitor the drainage path of the water. Cover all electrical equipment.
Low
Low
1
Re-instate system
De-rig of Hydrotesting equipment Personnel injury Mod Muscle / back / strain from moving heavy equipment
Mod
3
Follow all guidelines laid out during safety induction and BJ HSE manual
Low
Low
1
Re-instate system
Use of hand Tools Trapped injured body parts
Personnel Injury Mod
Mod
3
Follow all guidelines laid out during safety induction and BJ HSE manual
Mod
Low
2
Re-instate system
Working at height Fall from high levels
Personnel Injury High
Mod
4
Only use approved scaffolding, wear correct harness above 2m from floor.
Mod
Low
2
Re-instate system
Install equipment incorrectly Future failure of process system
Client system
High
Mod
4
Completion of Reinstatement Check sheet by BJ and client.
Mod
Low
2
Re-instate system
Use of hydraulic bolt tensioning and Personnel injury Mod torquing equipment Muscle / back / strain from moving heavy equipment
Mod
3
Trained and qualified personnel on Mod site to carry out bolt tensioning works. Assistance given when handling heavy objects. Two man lifting.
Low
2
Re-instate system
Use of hydraulic bolt tensioning and Client system equipment Incorrect tensioning, loose bolts
Mod
4
Bolt tensioning procedures followed, Mod fully trained personnel to carry out the bolt tensioning operations.
Low
2
Approved by (Name): Signature:
work. Adhere to barriers / signs recommended in procedure.
High
Approved by (Title): Date:
Page 4 of 6
Risk Assessment – Job Site Review Form Page No: Assessment No:
5
Job No/Project No:
Work Scope: Location: Note: If Procedure Change Control provisions apply during the job this form shall be used for the required assessment review.
Hazards / Risks on General Risk Assessment which are not applicable for this Work Scope: (Identify by no. and description).
Use continuation sheet if out of space.
Hazards / Risks which have not been identified in General Risk Assessments which are applicable for this Work Scope :(Brief description of Hazards / Risks identified).
Use continuation sheet if out of space.
Control Measures to be utilised to minimise these additional Hazards / Risks: (Full Description of Control Measures to be implemented).
Use continuation sheet if out of space.
I confirm that I have read the General Risk Assessment provided for this Work Scope and have surveyed the work site, where the additional risks have been identified. They are listed above and control measures suggested.
Job Site Review Performed by:
Date:
I confirm that I have read and understood both the General Risk Assessment and this Job Site Assessment Review, which are provided for this Work Scope. (To be signed by all personnel involved in this Work Scope i.e. all BJ and Client/Third Party as appropriate). (Use reverse if not enough space below for signatures).
Name (Printed)
Signature
Name (Printed)
Signature
Risk Assessment – Job Site Review Form Continuation Sheet Assessment No:
Page No:
6
Job No/Project No:
Work Scope: Location: Note: If Procedure Change Control provisions apply during the job this form shall be used for the required assessment review.
Hazards / Risks on General Risk Assessment which are not applicable for this Work Scope: (Identify by no. and description).
Use continuation sheet if out of space.
Hazards / Risks which have not been identified in General Risk Assessments which are applicable for this Work Scope :(Brief description of Hazards / Risks identified).
Use continuation sheet if out of space.
Control Measures to be utilised to minimise these additional Hazards / Risks: (Full Description of Control Measures to be implemented).
Use continuation sheet if out of space.