Hydro6 operation manual.pdf

February 10, 2018 | Author: Jucrisyoe Castro | Category: Screw, Piston, Lock (Security Device), Pressure, Mechanical Engineering
Share Embed Donate


Short Description

Download Hydro6 operation manual.pdf...

Description

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

Pt. No. A2034-072-27000

OPERATING MANUAL

Operating Manual

1

Schlumberger Private

7 in x 2-7/8 in Hydro-6 Hydraulic Set Retrievable Packer

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

The following supplemental manuals are required for complete documentation of this product: • SM-001 Handling & Storage Practices For copies of these manuals, contact your local Schlumberger representative.

Operating Manual

2

Schlumberger Private

REQUIRED SUPPLEMENTAL MANUALS:

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

Description The ‘Hydro-6’ is a compact, economical, single string hydraulic set retrievable packer ideal for use in deviated wells, multiple packer completions and applications where the packer(s) is to be set after the well is flanged up. Since no mandrel movement occurs during setting, the Hydro-6 may be used in single packer installations, or as the lower packer in multiple zone dual completions. It is also ideal for multiple packer single string completions. The Hydro-6 is available in a wireline controlled selective set version if required. The Hydro-6 design features a unique system that allows debris to be circulated from above the packer when releasing.

Features and Benefits •

No tubing movement required to set the packer.



Compact design is ideal for highly deviated wells.



Multi-durometer three-piece element system.



Easily adjusted releasing shear system.



Built-in equalizing and circulating system to ensure safe and easy releasing.



Optional rotational release.

Operating Manual

3

Schlumberger Private

Normally, the Hydro-6 is released with a straight pick-up shear system that is fully adjustable. An optional secondary rotational release is also available on most sizes. The secondary rotational release version can be released by either tension or rotation.

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

1.0 Engineering Data

Dimensional and Engineering Data

Materials

Connecting Thread - Lower Connecting Thread – Upper Casing Size Casing Weight Range O.D. Max – Gauge Ring O.D. Max - Element Overall Length Setting Piston Area I.D. Min. I.D. Drift

Body Parts Center Element End Elements O-Ring(s) Flow Wetted Back-Ups

2.875 – 6.5 ppf, EUE Pin 2.875 – 6.5 ppf, EUE Box 7.000 in. 26 – 29 ppf 5.968 in. 5.765 in. 60.200 in. 8.84 sq. in. 2.422 in. 2.347 in.

No. of Shear Screws 1 2 3 4 5 6 7 8 9 10 11 12

Operating Manual

7” Size Setting Shear Pressure (psi) 225 450 670 900 1,130 1,350 1,575 1,800 2,030 2,255 2,480 2,705

Minimum Differential Pressure Required for Packoff (psi)

3,500

3,500

4

Schlumberger Private

Table ‘A’

4140 (P-110) 70 Duro Nitrile 80 Duro Nitrile Nitrile 4140 (P-110) Teflon

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

2.0 Assembly Drawing & Reference Dimensions

OD1

1

ID1 L1 ID2

2

Length

31

L1 L2 L3 L4 L5

3 31

OD2 7

OD3

4 6 28

Outside Diameter

10

L2

11 32 14 32 14 32

L5

17

9 29

Inside Diameter ID1 ID2 ID3

15 34 16 34 8 18

7

23 33

L4

19

3 21 22 24 26

OD4

OD5

30

27

ID3

Operating Manual

3.719 in 5.656 in 5.968 in 5.968 in 3.531 in

5

2.426 in 2.426 in 2.422 in

Schlumberger Private

OD1 OD2 OD3 OD4 OD5

9 11

L3

15.037 in 8.020 in 35.821 in 4.752 in 60.074 in

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

3.0 Bill of Materials

Operating Manual

Piece Part # AP527-558-00001 AP514-034-00001 AP890-234-00001 AP514-035-00001 AP514-036-00001 AP100-029-00001 AP514-037-00001 AP513-842-00001 AP513-841-00001 AP510-839-00001 AP890-344-00001 AP100-357-00001 AP890-351-00001 AP514-038-00001 AP514-039-00001 AP100-030-00001 AP100-200-00001 AP511-102-00001 AP519-507-00001 AP514-041-00001 AP100-381-00001 AP100-503-00001 AP516-510-00001 AP510-757-00001 AP514-044-00001 AP822-234-00001 AP822-344-00001 AP823-234-00001 AP823-351-00001

Qty 1 1 2 1 1 24 1 2 1 2 2 1 1 1 1 10 5 5 1 1 10 1 1 1 1 2 4 2 2

Description 2 7/8 EUE BOX X 2 7/8 NUE BOX (P110, 7" LG) MAIN MANDREL (P110) O-RING (90 DURO NITRILE) TOP CAP (1026) LOCK MANDREL (P110) SHEAR SCREW(2000)5/16-24 UNF X 5/16 PACKING ELEMENT MANDREL (P110) END ELEMENT (BPR-700-EO, 80 DURO NITRILE) CENTER ELEMENT (BPR-700-CO, 70 DURO, NITRILE) SPACER RING (FLAT, 5.968 OD., 1018) O-RING (90 DURO NITRILE) SNAP RING (TRUARC 5100-387 H) O-RING (90 DURO NITRILE) PISTON (P110) LOCK RING (P110) RETAINING SCREW 5/8-18 UNF X 1/2 LG. SLIP SPRING (X-750) SLIP (8620) SLIP CAGE (1026, 5.875 OD) LOWER CONE (P110) SHEAR SCREW BOTTOM SUB (2 7/8 NUE BOX X 2 7/8 EUE PIN, P110) UPPER GAGE RING (5.968 OD., 1018) GAUGE RING (5.968 OD., 1018) GUIDE RING (5.968 OD., 1018) PARBAK RING (TEFLON-FLAT-UNCUT) PARBAK RING (TEFLON-FLAT-UNCUT) PARBAK RING (TEFLON-FLAT-CUT) PARBAK RING (TEFLON-FLAT-CUT)

6

Schlumberger Private

Item 1 2 3 4 6 7 8 9 10 11 14 15 16 17 18 19 21 22 23 24 26 27 28 29 30 32 32 33 34

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

4.0 Handling, Storage & Make-Up Guidelines

5.0 Running Instructions

shear screws for a maximum tension to release of 50,000 pounds. Install a tubing plugging device as specified in the well program. This could be a pumpout plug or wireline nipple with a plug or any other device used to plug the tubing string. The shear value of a pump-out plug must be greater than the minimum differential pressure required to achieve minimum pack-off as shown in Table A.

Prior to running the tool(s) in the hole, determine:

Warning:

4.0 Handling, Storage & Make-Up Guidelines Detailed handling instructions applicable to all Schlumberger Completion Systems products are found in the required supplemental manual Handling, Storage & Make-Up Guidelines, manual number SM001.

a. Setting Shear Pressure (psi) b. Tension to Release

Warning:

The packer is designed to set in response to tubing to annulus pressure differential. When setting in low fluid level wells, do not fill the tubing while running in the hole, the differential hydrostatic pressure may prematurely set the tool.

The ‘tension to release’ is the amount of tension in pounds that must be pulled on the tubing to shear the shear screws (26) (5,000 pounds each) in-stalled in the lower cone and release the tool. This amount of tension is based on well conditions and operating parameters. Make certain the amount of tension to release does not exceed the strength of the tubing string. The packers can be dressed with up to 10 Operating Manual

6.0 To Release Packer To release the packer, simply pick up until the preset tension to release value is exceeded. The mandrel is pressure balanced to annulus pressure above the tool, (with the same size tubing) so annulus pressure will not affect release force. After shear screws release the mandrel, the mandrel moves up exposing circulation/equalization ports that may be used for circulation before coming out of the hole. Pull the first stand slowly to allow the elements and slips to properly relax. After the packer is fully released, tool may be tripped out of the hole. Note: In order to prevent accidental release, the correct number of shear screws (26) should be installed even if the rotational release is to be used. 7.0 Disassembly Procedures 1. Place tool in vise gripping on lower portion of the main mandrel (2) above the bottom coupling (27). Note: As the tool is disassembled, remove and discard all o-rings. 2. Remove top coupling (1). 3. Remove set screws (19) from slip cage (23). 4. Remove shear screws (26) from lower cone (24).

7

Schlumberger Private

The shear setting pressure is the amount of differential pressure in favor of the tubing at the setting depth of the tool(s) that is required to shear the shear screws (7) (2,000 pounds shear value each) installed in the top gauge cap and piston/upper cone and begin the setting process. The shear setting pressure is determined by the downhole conditions and the operating parameters of the well. It is recommended that there always be one more shear screw installed in the top gauge cap than is installed in the piston/upper cone. This will insure that the slips are engaged before the packing elements begin to extrude. The packer mandrel may be pressure tested up to 70% of the setting shear pressure from Table A without risk of shearing the shear screws (7), installed in the piston/upper cone.

Ensure that the pressure required to shear the screws in the top gauge cap is not greater than the pressure rating of the tubing or greater than the pressure required to shear the pumpout plug.

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

7.0 Disassembly Procedures 5. Disengage lower cone (24) from lock mandrel (6). Drive lower cone (along with the complete outer shell of the packer) downward with a soft metal bar until it releases from the collet. 6. Slide the packer body subassembly (complete assembly from top gauge cap to collet) off the top of the main mandrel (2). Set aside. 7. Remove bottom coupling (27) from main mandrel (2). Take main mandrel (2) out of vise and remove lower cone (24) from main mandrel (2). 8. Remove slip cage (23) with slips (22) and slip springs (21) from piston/upper cone (17).

10. Loosen upper gauge ring (28) to expose shear screws (7). (This step applies to 6-5/8” and larger sizes only.) 11. Remove brass shear screws (7) from top gauge cap (4). 12. Remove top gauge cap (4) from lock mandrel (6). 13. Pull spacer ring (11), end packing element (9), and center packing element (10) off of packing element mandrel (8). 14. Place backup wrench on ratchet cylinder (12) as close as possible to the gauge ring. Place wrench jaws over shear screw groove in the packing element mandrel (8) and un-thread the packing element mandrel (8) . 15. Place backup on piston/upper cone (17). Remove packing element mandrel (8) by unthreading off of the lock ring (18). 16. Remove snap ring (15). 17. Using spreader pliers, remove lock ring (18). The lock ring should be inspected for damage such as pulled threads, scaring, corrosion, etc.

20. Move in vise to make certain vise jaws are griping on lock mandrel (6) and not on the lock mandrel (6). Place wrench jaws on lock mandrel (6), just above slots and remove from lock mandrel (6). 8.0 Assembly Procedures 1. Install all o-rings in the respective grooves except the outer o-ring (16) for the piston/upper cone (17). Use ample grease when assembling the tool. Place lock mandrel (6) in vise. Thread on lock mandrel (6) and tighten. 3. Slide piston/upper cone (17) onto lock mandrel (6) until the piston/upper cone is past the snap ring groove on the lock mandrel. 4. Install snap ring (15) onto lock mandrel (6). This locks the piston/upper cone (17) in place on the lock mandrel (6). 5. Slide piston/upper cone (17) upward until it shoulders on snap ring (15). Line up shear screw holes in piston/upper cone (17) with shear screw groove in lock mandrel (6) and install brass shear screws (7). 6. Using spreader pliers install lock ring (18) onto piston/upper cone (17). Blank end of lock ring (18) shoulders against the edge of the upper cone. 7. Install outer o-ring (16) in o-ring groove on piston/upper cone (17). 8. Coat the fine threads on the piston/upper cone (17) with ample grease. Slide packing element mandrel (8) onto piston/upper cone (17) and thread ratchet cylinder onto the lock ring. Make

18. Remove the brass shear screws (7) from piston/upper cone (17).

Operating Manual

8

Schlumberger Private

9. Place the packer body subassembly in the vise, clamping the vise jaws on the lock mandrel (6) as close as possible to the piston/upper cone (17).

19. Remove piston/upper cone (17) from lock mandrel (6).

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

8.0 Assembly Procedures certain the lock ring does not move or begin to ratchet as the ratchet cylinder is threaded. Friction from the o-ring can cause the lock ring to ratchet as the ratchet cylinder is threaded. Gently tap the end of the ratchet cylinder with a rubber hammer while threading the ratchet cylinder onto the lock ring. Thread ratchet cylinder onto lock ring until all threads on the lock ring are covered by the ratchet cylinder.

15. Tighten guide ring (30) onto lower cone (24).(This step applies to 6-5/8” and larger sizes only.)

9. Thread lower gauge ring (29) onto packing element mandrel (8) and tighten. (This step applies to 6-5/8” and larger sizes only.)

18. Slide the packer body subassembly onto the main mandrel (2), lock mandrel (6) first. Push the subassembly onto the main mandrel until it shoulders. In this position you can see the bypass holes in the main mandrel above the top gauge cap.

11. Tighten top gauge cap (4) onto lock mandrel (6) and install shear screws (7). When top gauge cap is tight, the shear screw holes in the top gauge cap will line up with shear screw groove in the packing element mandrel (8). If the holes do not line up, the alignment of the lock ring is wrong and must be redone. Note: For 6-5/8” and larger sizes, thread upper gauge ring (28) onto top gauge cap (4). Leave upper gauge ring (28) loose until shear screws (7) have been installed in top gauge cap. 12. Remove this assembly (packer body subassembly) from the vise and stand upright on top gauge cap (4). 13. Insert slip (22) with slip spring (21) into window in slip cage (23). Insert 10-24 UNF screw through hole in slip cage and thread into the hole in the center of slip. The 10-24 screw will hold the slip and slip spring in place in the window of the slip cage. Repeat until all slips and slip springs are installed. 14. Slide the slip cage (23) with slips and slip springs over the lock mandrel (6). Align slots in the slip cage with the screw holes in the piston/upper cone (17) and install set screws (19). Operating Manual

17. Grease entire main mandrel.

19. Snap the lower cone (24) over the lock mandrel (6) with enough force to engage the fingers of the collet into the lower cone. Slide the lower cone and the packer body subassembly upward until the lower cone shoulders on the main mandrel. The shear screw holes in the lower cone will line up with spot-faced holes on the main mandrel. If collet and lower cone are properly engaged, the lower cone will spin freely and the top gauge cap will cover the bypass holes in the main mandrel. 20. Install retaining screws (19) through slots in slip cage (23) into holes in lower cone (24). Remove 10-24 UNF screws holding slips in place. 21. Line up shear screw holes in lower cone (24) with spot faced holes in main mandrel (2) and install shear screws (26). Note: For tools with 'secondary rotational release', align shear screw holes in lower cone (24) with spot faced holes in shear sleeve (26). 22. Install top coupling #1. Tighten through top coupling to make up both top coupling and bottom coupling (27) onto the main mandrel (2).

9

Schlumberger Private

10. Slide end element (9) onto packing element mandrel (8), followed by spacer ring (11), center element (10), spacer ring (11) with the bevel towards the end element, and end element (11).

16. Slide lower cone (24) onto main mandrel (2). The lower cone will shoulder. Thread bottom coupling (27) onto main mandrel (2). Place lower end of main mandrel (by the bottom coupling) in vise.

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

9.0 Instructions to Change Setting Shear Value on the Hydro-6 Packer 9.0 Instructions to Change Setting Shear Value on the Hydro-6 Packer 1. Determine appropriate number of shear screws from Table A. 2. Secure top or bottom connection in vise. 3. Loosen upper gauge ring (28) from top cap (4). (This step applies to 6-5/8” and larger sizes only). 4. Remove or add shear screws (7) as required. Slightly loosen remaining shear screws without disengaging screws from shear groove. Schlumberger Private

5. Remove retaining screws (19) from top of slip cage (23) and slide slip cage down as far as possible. 6. Rotate packing element mandrel (8) and lock ring (18) together to access shear screws (7) through split in lock ring (18). Note: It is critical to rotate 'cylinder' portion of element mandrel and locking ring together to prevent 'binding' of lock ring. (Packing element mandrel, elements and top gauge cap will all rotate together and upper shear screws must remain in the groove to maintain orientation of lock ring. 7. Remove or add shear screws (7) as required. 8. Install retaining screws (19) in slip cage (23). Tighten shear screws (7) in top gauge cap (4). 9. Tighten upper gauge ring (28). (This step applies to 6-5/8” and larger sizes only).

Operating Manual

10

Pt. No. A2034-072-27000

7 in x 2-7/8 in Hydro 6 Hydraulic Set Retrievable Packer

Revision Level AA Revision No. 01 Document 08 AUG 2003

Schlumberger Private Schlumberger has made every effort to manufacture a safe product of the very highest quality and design. This manual is designed to provide operating personnel with the information necessary to assemble and disassemble, service and maintain this product. The content of this manual should not be construed as a fixed rule without regard to sound engineering judgement, nor is it intended to supersede or override any state, federal or local regulations where applicable. Schlumberger recommends reading the complete procedure before beginning any operation. Be sure to note the areas of caution.

Operating Manual

11

Schlumberger Private

LONG-TERM QUALITY AND PERFORMANCE MONITORING Schlumberger Completion Systems maintains a long-term quality and performance monitoring system for all completion products. In the event of any service difficulty or malfunction, please contact your local Schlumberger representative for the appropriate reporting form. Send the form and all pertinent information to the following address:

Q.A. Department, Schlumberger -- P.O. Box 14484 -- Houston, Texas 77221 P. O. Box 14484 • Houston, Texas 77221 • Telephone: (713) 747-4000 • Fax: (713) 747-6751 • www.slb.com Rev. Hydro-6 #01A Copyright © 2002 Schlumberger * Mark of Schlumberger

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF