TSC will develop load list schedule base on HMB normal case As per Bid Bulletin no. 10/Errata electrical design basis
For Normal Load, based on HMB normal cases, Electrical Load Schedule is calculate with considering adding 30% Inte For the peak load (based on HMB design cases), Electrical only considering Electrical Normal Load which is only consid STG shall be included to Power Generated System and shown in overall single line diagram If STG shutdown, it should be shotdown all WSA system, no Acid Gas removal Unit is shotdown. TSC shall be immadiatelly send Overall Single Line Diagram.
onsidering adding 30% Intermitten and 10 % Standby load and 10% design margin. mal Load which is only considering 30% intermittent Load.