HVAC Calculation (Base On ASHRAE)

Tag No.

Unit

Equipment Description

SNO-C-8002A

UNIT 86

SNO-C-9062A

TBA

NITROGEN SYSTEM - AIR COMPRESSOR A

SNO-C-9062B

TBA

NITROGEN SYSTEM - AIR COMPRESSOR B

SNO-P-6003A

UNIT 16

CONDENSATE TRANSFER PUMP A

SNO-P-6003B

UNIT 16

SNO-C-8072A

UNIT 61

CONDENSATE TRANSFER PUMP B INSTRUMENT AIR COMPRESSOR PACKAGE : INSTRUMENT AIR COMPRESSOR A LUBE OIL PUMP FOR INSTRUMENT AIR COMPRESSOR A INSTRUMENT AIR COMPRESSOR PACKAGE : INSTRUMENT AIR COMP. COOLERS A

SNO-C-8072A-LO1 SNO-E-8074A

TBA UNIT 61

INSTRUMENT AIR INJECTION PACKAGE : AIR COMPRESSOR A

Operating duty (JOB)

Operating duty (TSC)

C/I/S

C/I/S

I

C

I

C

I

C

I

C

S

S

I

C

I

C

I

C

1

2 3 4

TSC will develop load list schedule base on HMB normal case As per Bid Bulletin no. 10/Errata electrical design basis

For Normal Load, based on HMB normal cases, Electrical Load Schedule is calculate with considering adding 30% Inte For the peak load (based on HMB design cases), Electrical only considering Electrical Normal Load which is only consid STG shall be included to Power Generated System and shown in overall single line diagram If STG shutdown, it should be shotdown all WSA system, no Acid Gas removal Unit is shotdown. TSC shall be immadiatelly send Overall Single Line Diagram.

onsidering adding 30% Intermitten and 10 % Standby load and 10% design margin. mal Load which is only considering 30% intermittent Load.