Huawei SingleDAS Solution Overview 2013_03(20130325)

April 1, 2017 | Author: Tinh Dong | Category: N/A
Share Embed Donate


Short Description

Download Huawei SingleDAS Solution Overview 2013_03(20130325)...

Description

Huawei SingleDAS Solution Overview Multi-Band/Multi-Network/Multi-Vendor/Multi-Operator In-building Solution Author : Fengfuan 00179441 Version: V02(20130325)

HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

Content • IBS Requirements In MBB Era • Huawei SingleDAS Solution • Cases

Indoor Coverage Transfer from “Nice to Have” to “Must Have” ~70% mobile traffic occurred in indoor

80% complaints come from indoor

Outdoor 30.30% Indoor 69.70%

Voice Services

Source: Softbank

Outdoor 10%

Indoor 90%



Drop Call



Weak Signal



Poor Call Quality



Low Download Speed

Data Services

Source: NTT DoCoMo

Customers complaint

Indoor coverage is vital for business success HUAWEI TECHNOLOGIES CO., LTD.

Page 3

TCO Pressure Drives Operators Sharing DAS Multi-operator and multi-system sharing is the effect way to improve the resource utilization Europe, the site rental cost is 57.99% of TCO BSC software upgrade 0.6%

Transmission 0.01% BTS Equipment 23%

Maintenance 2%

System share is the main trend of large scenes • In order to reduce the investment, many operator choose DAS share in large scenes Burj Dubai ET&du share

Stadium of Brazil world cup Vivo/OI/TIM/Claro/Nextel

Beijing airport T3 China Unicom& China Telecom

Spain subway

Train station of Shenzhen CMCC/Unicom/Telecom

Venice hotel of Macao 5 operators sharing

I&C 2.3% De-installation 0.3% Power consumption 12%

CAPEX OPEX 27% 73%

Fiber 0.6%

Transportation 0.2%

Site rental 57.99%

HUAWEI TECHNOLOGIES CO., LTD.

Telefonica/VDF/Orange

BSC 1%

• Some scenarios don’t have enough installation space, operators much share the DAS system Subway/tunnel

Page 4

Airport

Content • IBS Requirements In MBB Era •Huawei SingleDAS Solution •Cases

SingleDAS: New Generation IBS Solution for Multi-Band/Network/Vendor/Operator Camouflage

The Optimal IBS Sharing Solution

Camouflage

• Full-digital, full-band, multi-

DRH DRH

operator/ system/vendor • No dedicated equipment rooms to reduce CAPEX

Operator A

Operator C

GSM BTS

UMTS NodeB

GSM BTS

Slave DCU1

UMTS NodeB

• Unified RAN & DAS management to reduce OPEX

Slave DCU2

Operator B LTE eNodeB

GSM BTS

UMTS NodeB

LTE eNodeB

Master DCU

LTE eNodeB

Optical fiber

Stadium

Airport

Subway/Tunnel

Skyscraper

IP network

M2000 Core Network

HUAWEI TECHNOLOGIES CO., LTD.

Page 6

Huawei SingleDAS Portfolio SingleDAS

Tunnel Optical fiber

 DCU+DRH: :

DRH

 DCU: Distributed Control Unit,

DRH

Leaked cable

Master Unit  DRH: Distributed Remote Head , Remote Unit  POI(Point Of Interface): :

RFU/RRU

Equipment room

GSM

Platform RX

Operator A UMTS

POI

LTE

Antenna

 High performance multi-network sharing unit

DCU

TX

GSM Operator B UMTS LTE

HUAWEI TECHNOLOGIES CO., LTD.

RF Signal Coupler

Page 7

SingleDAS Highlights Excellent Performance

Flexible Deployment

• Advance platform

• Different site sharing

• Low power consumption

• Electronic-adjustable POI

• Low noise floor

• Easy installation & maintenance

• High reliability

Smooth Expansion & Evolution

Unified Management

• Smooth expansion new band

• Unified RAN and DAS O&M

• Software for cell splitting

• Remote interference precise

• 2T2R for MIMO

location

• Smooth re-farming

HUAWEI TECHNOLOGIES CO., LTD.

Page 8

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

DBS3900 IBS: Advanced Digital Platform Ensure Product High Performance DCU Specification

DRH Specification

• Frequency band: DD800/900/1800/2100/2600MHz(Now)



• Output power: 40W /20W • Power Consumption: 660W Vs traditional 1600W

700/850/1900/AWS(Planning)

(Triple band@40W output)

• Supports 6 bands/sectors • Electronic-adjustable POI: Each RFC supports 4 operators and

• Noise Figure: 3 dB Vs traditional 5dB • MTBF

input power remote configuration

>100,000h Vs traditional 50000h

• DCU 1:3 star networking

• 2T2R for LTE MIMO

• Support 72 DRHs

• Natural cooling

RFC:

DPC

Master DCU

12 digital port to DRHs or Slave DCU

RF interface to BTS (6~+16dBm)

Single-band

Dual band

Triple band

…… Up to six band

DC-48V power supply

Power Module

DRH Slave DCU1

Slave DCU2

Slave DCU3

RFC : Radio Frequency Card DPC : Digital Processing Card

HUAWEI TECHNOLOGIES CO., LTD.

Power Supply

… 1

2

6

cascade to 6

Page 9

(220V to -48V)

Excellent Performance

Flexible deployment

Smooth expansion & evolution

POI3401: Full-band/High Performance Sharing Unit Modularized Design, Easy Evolution • Frequency: 800/900/1800/2100/2600MHz • Full bandwidth : 30M@800MHz/ 35M@900MHz/ 75M@1800MHz/60M@2100MHz/ 70M@2600Mhz

• High performance ensure network quality: PIM>-160dBc, Isolation(inter-band)>30dB, Isolation(out-band)>80dB

• Each band support 4 operators sharing

HUAWEI TECHNOLOGIES CO., LTD.

Page 10

Unified management

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Green Site Saves Power Consumption by 54% Advanced linearity technology ensure PA high efficiency

12% Traditional FFPA

25%

30%

DPD+Doherty

DPD+A DHT

Power consumption save by 54%

DAS3401

Reduce

Test@10dB PAR

54%

1600W High integrated design with low power consumption

Power consumption 660W (Triple band @40W) Traditional repeater: Multi-chip

DAS3401: Single chip

New duplexer with less insertion loss Traditional Repeater Traditional repeater: Metal duplexer

HUAWEI TECHNOLOGIES CO., LTD.

DAS3401: Dielectric duplexer

Page 11

DBS3900 IBS

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Multi DRHs Uplink Noise Floor Is Not Superimposed to Ensure Network Quality Traditional Solution

DBS3900 IBS Solution

• Noise floor will increase in multi RU scenario

Slot 0

Slot 4

• Signal pre-demodulation, close the no user slot channel to ensure no noise floor superposition

Slot 7

Carrier 1 RU1

Slot 0

Slot 4

Carrier 1 DRH1 Uplink noise floor

Uplink noise floor

Carrier 1 DRH2

Carrier 1 RU2

……

……

Uplink noise floor

Uplink noise floor

Carrier 1 DRH6

Carrier 1 RU6

Uplink noise floor

Uplink noise floor

Total uplink noise floor

Total uplink noise floor Slot 0

Slot 7

Slot 4

Noise floor superposition

HUAWEI TECHNOLOGIES CO., LTD.

Slot 7

Slot 0

Slot 4

Slot 7

No noise floor superposition

Page 12

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

High Reliability Ensure Network High Performance Network

High Performance

Sharing the high quality

Strict quality control

Full series of simulation

DNA of Huawei RRU

processes

environment test

Incoming control QC Power capacity test

ROHS test

PIM test

100% initial test MTBF

100% retest

Salt spray test

Vibration test

Rain test

Inventory sampling test Packaging drop test

HUAWEI TECHNOLOGIES CO., LTD.

Page 13

High/low temperature test

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Different Site Sharing Minimize CAPEX Traditional Solution

No dedicated site reduce the high rental cost of new site

RU

BTS Slave DCU1

site A BTS

New site

DRH Slave DCU2

site B M U

BTS

New site

Master DCU

site C

MU

• High CAPEX for new site BTS A

BTS B

BTS C

• Long construction period HUAWEI TECHNOLOGIES CO., LTD.

Reuse outdoor macro site

Busy carrier Idle carrier

Page 14

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Electronic-adjustable POI Make Installation & Configuration Easier Traditional Solution

DBS3900 IBS Solution • RFC embedded electronic-adjustable POI:

Configuration complexity

 No need external combiner & attenuator

RU

 Input power remote configuration by M2000, no

RU

RFU/RRU

need to work on site RU

Operator A

DRH Operator B

RU DRH

Operator C

RFU/RRU

Attenuator

Operator D Coupler

Load/POI

RF cable

DRH

Operator A

MU Combiner

• Installation is difficult • On-site configure input power with spectrum analyzer

HUAWEI TECHNOLOGIES CO., LTD.

DRH Operator B

M2000

Operator C Operator D Coupler

Load/POI

RFC

Page 15

DCU

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Modularized Open Architecture Easy Installation & Maintenance Fast Installation Each band can be installed one by one

Easy Maintenance Separated OM for each band

5 minutes for triple band DRH installation 900

2100 900 900

HUAWEI TECHNOLOGIES CO., LTD.

Page 16

2100

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Software Cell Splitting for Capacity Expansion Traditional Solution • Add a new MU

DBS3900 IBS Solution • Add a new RFC DRH

• Optical fiber redeployment

RU

•Cell assignment by M2000

for cell assignment

DRH

RU DRH RU

DCU

New RFC DRH

RU

MU U2100 Sector1 F2

MU1 G900 TRx1 F1



Footprint is limited



High CAPEX for new MU

U2100 Sector2 F2

G900 TRx1 F1

U2100 Sector1 F2

U2100 Sector2 F2

Reduce equipment & engineering investment HUAWEI TECHNOLOGIES CO., LTD.

Page 17

Unified management

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Modularized Open Architecture Easy Expansion New Band GSM900 RFC 900

Base station

LTE1800 Base station

Step 1:Insert a new RFC & new cell in DCU .

DRH

RFC 1800

RFC

Step 2: Add a new DRH

DCU DRH

DRH

1800Mhz

Step 3:Software configuration by M2000

900Mhz DRH

DRH

Expansion new band don’t need to replace the equipment HUAWEI TECHNOLOGIES CO., LTD.

Page 18

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

2T2R for MIMO Reduce 50% Quantity of Equipments & Transmission Traditional Solution

DBS3900 IBS Solution

MU1 RFC1 RF cable

MU2

Optical fiber

RFC2 RF cable

TRX1

TRX2

RU1

RU2

TRX1

TRX2

eNodeB

eNodeB

Optical fiber

SISO & MIMO throughput

Antenna

150000

20M 2T2R&1T1R DL THP 2T2R 1T1R

100000

• MU: 2 • Optical fiber: 2 • RU: 2

HUAWEI TECHNOLOGIES CO., LTD.

TRX2

TRX1

• DCU: 1 • Optical fiber :1 • DRH :1

50000 0 Near point

Page 19

Middle point

Far point

Antenna

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Smooth Evolution for Re-farming Without Hardware Expansion Assume scenario :GSM1800 re-farming to LTE

GSM

GSM

LTE

LTE OR

1800MHz

1800MHz

1800MHz

Step1:Add LTE source

Step2: Customized output power of different system via M2000

Satisfy diversified coverage requirement for multi-system without hardware expansion HUAWEI TECHNOLOGIES CO., LTD.

Page 20

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

One OSS Saves Hardware Investment Traditional Solution

SingleDAS Solution



Separate Network

• One OSS: One OSS server



Two OSS

saves 50% hardware with less footprint and power consumption

RAN

“2”  “ 1” ”

Co-OM Link

DAS REMS

RAN M2000

RU

RAN OSS BTS/ DBS

MU

RAN

RU RU

DRH HW BTS/ DBS RAN

DAS

HUAWEI TECHNOLOGIES CO., LTD.

Page 21

DCU

DRH

DRH DRH

DRH

DAS DRH

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Unified Management Improves O&M Efficiency Unified Management By M2000

 One surveillance view(alarm/device panel ……), improves O&M efficiency

Domain

Alarm Name

NE

Relative BTS

RAN

Output low power

RRU1

/

DAS

Output low power

DRH1

RRU1

M2000

 One maintenance experience & One configuration, reduce maintenance skill requirement RAN

DAS

HUAWEI TECHNOLOGIES CO., LTD.

Page 22

Excellent Performance

Flexible deployment

Smooth expansion & evolution

Unified management

Fast Remote Precise Interference Location Saves OPEX Traditional Solution

DBS3900 IBS Solution DRH supports Spectrum scanning RTWP

RU

Abnormal DRH

Abnormal RU

dBm

DRH

RTWP: -83.5dBm

-80 -100

Frequency

-120

DRH

RU

1900

1920

1940 1960 MHz

1980

DRH

• Found uplink noise interference from DRH • Found intermodulation interference from passive DAS

RU DRH

RU

DCU

MU

OM Link

M2000

BTS

BTS

RTWP abnormal

RTWP abnormal

• Work on site, low OM efficiency

• Fast remote troubleshooting

• High OPEX for troubleshooting

• Low OPEX

HUAWEI TECHNOLOGIES CO., LTD.

Page 23

DRH level RTWP remote detect by M2000

Content • IBS Requirements In MBB Era • Huawei SingleDAS Solution • Cases

SingleDAS Help Azercell Enhance Brand in Crystal Hall Backgroud

Crystal Hall

Crystal Hall , the biggest theater in Azerbaijan, Total seats are 25000 . There are many VIP mobile customers. •

Azercell mobile market share: 60%, 3G subscriber rate:90%, but have no coverage in Crystal Hall



High complaint rate

Challenge •

Equipment footprint is limited ,difficult to deploy E// Marco BTS equipment



1800MHz LTE evolution demand, but it is too hard to get the authorization to rebuild system.

HUAWEI TECHNOLOGIES CO., LTD.

Page 25

SingleDAS Help Azercell Enhance Brand in Crystal Hall SingleDAS solution • 7 DCU+ 15 tri-band DRH

E// RFU

RF cable

Equipment room

GSM900

• 14 sectors access

: 14sector,4 carrier/sector 1800MHz: 14sector,4 carrier/sector 2100MHz: 14sector,3 carrier/sector

DCS1800

 900MHz  

UMTS2100 Coupler

Load

DCU

Benefit •

One set of equipment support multi-system ,fast deployment



High output power(40W per band) make less equipment, easy deployment



One deployment support capacity flexible scheduling and LTE evolution ,reduce CAPEX



Excellent coverage (RSCP>–95dBm : 100%, Ec/Io>–7dB : 99%), reduce subscriber rate

HUAWEI TECHNOLOGIES CO., LTD.

Page 26

France SFR: POI3401 Replaced Traditional POI In Paris Subway Background SFR deployed UMTS and LTE over all RATP transport network in Paris, and shared with BYG/LotB/Orange. The network is composed of 295 stations and 319 radio sites.

Challenges •

5 bands and 4 operators sharing, Inter-modulation rejection is the biggest challenge



Tradition solution do not support evolution from 2G to UMTS and LTE



Installation space is narrow, traditional solution is hard to update new band

HUAWEI TECHNOLOGIES CO., LTD.

Page 27

France SFR: POI3401 Replaced Traditional POI In Paris Subway Huawei Value

2600

OP1

OP2

OP3

OP4

OP1

OP2

OP3

OP4

OP1

OP2

OP3

OP4

OP4

• Low PIM(-160dBc) and high isolation(in-band:

2100

30dB; out-band:80dB) reduced interference,

1800

protect investment

900

OP1

OP2

OP3

DD800

OP1

OP2

OP3

• Modularized design, new module is added on

BTS

the top to update LTE, no need redundant space • Idler wheel design makes installation easy and fast, improves efficiency • One system support 5 bands and 4 operators

POI

2600 DD800 Idler wheel

900/ 1800/ 2100 Smooth expansion to LTE

HUAWEI TECHNOLOGIES CO., LTD.

DAS

Page 28

Easy for installation

Summary 1. Huawei innovative SingleDAS fully meet multi-band, multi-network, multi-vendor ,multi-operator requirements. 2. Advanced digital platform ensure network high performance 3. Flexible deployment for multi-operator IBS sharing, reduce deployment cost. 4. Easy expansion and smooth evolution, reduce network cost. 5. Unified optimization and management for DAS/RAN, guarantee indoor user experience and improve OM efficiency.

HUAWEI TECHNOLOGIES CO., LTD.

Page 29

Thank you www.huawei.com Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF