How to Test Distance Relay 7SA522
Short Description
Download How to Test Distance Relay 7SA522...
Description
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
1. General Information about the Relay: Panel
No.
CT Ratio
1200 / 1 A
Relay Type
7SA522
Secondary Rated Current ( In )
1 A
Manufacturer
SIEMENS
PT Ratio
110 / 0.1 KV
Secondary Rated Voltage ( Un ) ( PH –PH )
100 V Not Connected
SERIAL NO MLFB - No.
7SA522-4DB00-4QN4
U4
Software Version
4.61
DC. Auxiliary . Voltage
110- 125 DCV
Test Equipment
OMICRON – CMC 156
Frequency
60 Hz
Voltage Transformer is
Fn
2 . Mechanical Check and Visual Inspection Item
Description
Remarks
1 2 3
Check the name plate data according to the drawings and specifications Check for transportation damage and correct positioning Verify tightness of all connections
3. Electrical Checks Item 1 2 3 4 5 6 7
Description
Remarks
All connections checked according to the wiring diagram Auxiliary power supply checked for rating and polarity CT shorting checked Indications checked Casing earthing checked Contact earthing checked Contact resistance of tripping and alarm checked
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 1 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
4. General Functions in the Relay : Function
Selected
Phase Distance Protection Earth Distance Protection Power Swing Detection Teleprotection For Distance Protection DTT Direct Transfer Trip Instantaneous High Speed SOTF Over Current Week Infeed ( Trip & / Or Echo ) Back Up Over Current Protection Earth Fault Over Current Protection Teleprotection For Earth Fault Over Current Auto – Reclose Function Synchronism & Voltage Check Fault Locator
Quadrilateral Quadrilateral Enabled PUTT ( Z1B acceleration )/ POTT / BLOCKING / Un BLOCKING Disabled Enabled Enabled Time Over Current Curve IEC Time Over Current Curve IEC Disabled Not Applicable in this type Not Applicable in this type Enabled
5. Power System Data : OHL / UG Cable
Under Ground Cable Line
CT Star Point
Towards Line
System Star point
Solid Earthed
Line Length
Km ْ
Line Angle
85
X ∕ = Line Reactance( Ω / Km ) Zero Sequence Compensation Factors
RE / RL XE / XL
Z1 = Z2----- Z5 = Z1 = Z2----- Z5 =
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 2 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
6. Secondary Injection Measurements : Setting: * 1201=Distance *
Protection = OFF.
We should insure that: 1 – CT. & VT. Ratios are as setting in Power System Data 1 , Address ( 0203 ---0206 ) 2 –From Setting Group A : Power System Data 2 , insure the value of % in : Address (1103 ) Measurement : Full Scale Voltage ( 100 % ) (1104 ) Measurement : Full Scale Current ( 100 % ) 3 –The Direction of the Earthing is as per approved Drawings & as setting in Power System Data 1
( i ) If the direction of the Earthing is Towards the line ( Cable ): The Current is Lagging the Voltage by 45° ( As shown below )
V1 I1
= 57.73 V ∟0° = 1A
∟- 45°
V2 I2
= 57.73 V ∟-120° = 1A
∟-165°
V3 I3
= 57.73 V ∟+120° =
1A
∟+75°
( ii ) If the direction of the Earthing is Towards the Bus Bar: The Current is Leading the Voltage by 135° ( As shown below )
V1 = 57.73 V ∟0° I 1 = 1 A ∟+135°
V2 I2
= 57.73 V ∟-120° = 1A
∟+15°
V3 I3
= 57.73 V ∟+120° =
1A
∟-105°
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 3 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
90° 135° I
V
0° 180°
I
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 4 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
-45° 270°
Injected quantities: *
Inject 3 Phases Currents & Voltages.
( i ) The angle between I & V is ( 0° ) Phase - L1 57.73 V ∟0° 1 A ∟0°
Phase -L2 57.73 V ∟-120° 1A ∟-120°
Phase -L3 57.73 V ∟+120° 1A ∟+120°
( ii ) The angle between I & V is (- 45° ) L1 57.73 V ∟0° 1 A ∟-45°
L2
L3
57.73 V ∟-120° 1A ∟-165°
57.73 V ∟+120° 1A ∟+75°
( iii ) The angle between I & V is ( +135° ) L1 57.73 V ∟0° 1 A ∟+135°
L2
L3
57.73 V ∟-120° 1 A ∟ +15°
57.73 V ∟+120° 1A ∟-105°
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 5 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Note : Print out from the Relay is Attached ( Primary & Secondary & % values )
Measured Values In The Relay
Parameters
At angle ∟ 00 primary
Current Current Current
secondary
% values
At angle ∟ - 45o primary
secondary
At angle ∟+ 135
% values
primary
secondary
% values
IL1 IL2 IL3 3I0
I1 - positive Sequence I2 - Negative Sequence Voltage UL1E Voltage UL2E Voltage UL3E Voltage UL12 Voltage UL21 Voltage UL31 3U0 U1 - positive Sequence U2 - Negative Sequence Apparent power(S) Active power(P) siemens Reactive power(Q) Name:Frequency Power Factor
Signature: Date:
CSD – DAR ENGINEERING – AL FANAR
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Signature: Date: Page 6 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
7. Impedance Secondary Measurements :
Note : Before starting this test , for easy calculation & to get correct readings In the relay configuration , Setting Group A , power system data 2 Address (1116-1119) : setting for Zero Sequence Compensation Factors RE / RL =0 & XE / XL = 0 ,
Also Zero Sequence Compensation Factors in the Tester setting should be Zero
► ( I ) Inject the impedance ( Z ) = 6 Ω Calculate :
with angle Φ = 60 o ( in Forward Side )
R= Z x COS Φ
,
X= Z x SIN Φ
Then measure the impedance ( Z )
( Primary & Secondary )
► ( II ) Inject the impedance ( Z ) = 6 Ω with angle Φ = 240 o ( in Reverse Side ) Calculate :
R= Z x COS Φ
Then measure the impedance
, ( Z )
X= Z x SIN Φ
( Primary & Secondary )
Note : [
C.T ratio = 1200 / 1
]
&
[
V.T ratio = 110 / 0.1 K.V
= 1200
]
= 1100
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 7 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
Contract No.:
110 / 13.8 K.V S/S The Primary measured values = Secondary measured values X [ V.T ratio / :
AL- BAWADI
C.T ratio ] = 0.92
Phase L1 - N L2 - N L3 - N L1 – L2 L2 – L3 L3 – L1
Impedance RL1 XL1 RL2 XL2 RL3 XL3 RL12 XL12 RL23 XL23 RL31 XL31
Calculated
Z
Φ = 60o Measured Z Primary
Calculated
Secondary
3 5.196 3 5.196 3 5.196 3 5.196 3 5.196 3 5.196
Φ = 240o Measured Z
Z
Primary
Secondary
-3 -5.196 -3 -5.196 -3 -5.196 -3 -5.196 -3 -5.196 -3 -5.196
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 8 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
8- Distance protection pick up threshold ( Fault Detection Test ): 8.1- Phase Fault Current Threshold Detection ( I ph >
) Test
Address : ( 1202 )
*1201 : Distance Protection is = ON *1202 : Phase Current Threshold ( I ph > ) for Distance Measurement= 0.2A *1203 : 3Io Threshold for Neutral Current PickUp = 0.1A Note:* 3Io Earth Fault setting should be < I ph Phase Fault setting. *You must inject voltage more than the setting voltage at Address ( 2913A ) : Maximum Voltage Threshold U < ( 3 Phase ) = 5V
Or ( 2915 ) & &
: Voltage Failure supervision : Fuse Failure Monitoring : Measurement Supervision
( 2910 ) ( 2901 )
= OFF = OFF = OFF
Then *Inject Phase - Phase Current more than the setting at Address ( 1202 ) & Zero Voltage. ∟0°
∟180°
Also Note
:- Address No. ( 1209 ) : Criterion of Earth Fault Recognition Not important if it is
Phase
Phase Fault I ph > Setting (Address:1202)
L1∟0° – L2 ∟180° L2∟0° – L3 ∟180° L3∟0° – L1 ∟180°
0.2 A
inject voltage
>
(3I0 OR 3U0) / (3I0 AND 3U0)
Measurement (A) Pick Up (A) Drop Off (A)
the setting voltage at Address ( 2913A ) Or Fuse Failure=Off ( The Volt
&
=0 )
I ph > Trip
Inject Phase - Phase Current more than the setting at Address ( 1202 )
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 9 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
8.2-Earth fault detection Test:
( 3Io ) Detection
8.2.1- Earth Fault Current Threshold *1201 *1202 *1203 *1209 *1204 Note:-
Address : ( 1202 )
: Distance Protection is = ON : Phase Current Threshold ( I ph > ) for Distance Measurement= 0.1A : 3Io Threshold for Neutral Current ( Earth Fault ) PickUp = 0.4A : Criterion of Earth Fault Recognition should be selected as = ( 3I0 OR 3U0 )
=5V
: ( 3 VO )Threshold Zero Sequence Voltage pick up
1 - ( 3Io ) Threshold for Neutral Current ( earth fault ) PickUp setting ( Address:1203A ) should be above the phase fault setting (Address: 1202) 2 –You must inject voltage more than the setting voltage at Address ( 2913A ): Maximum Voltage Threshold U < ( 3 Phase ) = 5V Or ( 2915 ) : Voltage Failure supervision = OFF & ( 2910 ) : Fuse Failure Monitoring = OFF & ( 2901 ) : Measurement Supervision = OFF •
Note :
Then , Inject Phase – Earth Fault Current (single phase current ) more than the setting at Address ( 1202 ) & more than the setting at Address ( 1203 ) & Zero Voltage.
Phase
Earth Fault 3Io > (Neutral Current ) Setting (Address:1203)
L1 - N L2 - N L3 - N
0.4A
Measurement (A) Pick up (A)
Drop off (A)
I ph > will operate ( Pick Up ) first, because the setting is less , but the Trip will be with 3Io value.
inject voltage
>
the setting voltage at Address ( 2913A ) Or Fuse Failure=Off ( The Volt =0 )
3Io &
Trip
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 10 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Inject Phase - Earth Current more than the setting at Address ( 1203 )
8.1.2- Zero Sequence Voltage Threshold Check { 3 VO Detection }(Address 1204 ) * 1204 *1209A *1202
=5V
: (3 VO )Threshold Zero Sequence Voltage pick up
: Criterion of Earth Fault Recognition should be selected as = ( 3I0 AND 3U0 )
: Phase Current Threshold ( I ph > ) for Distance Measurement = 0.1A
*1203
: 3Io Threshold for Neutral Current ( Earth Fault ) PickUp Note : ( 2915 ) : Voltage Failure supervision & ( 2910 ) : Fuse Failure Monitoring & ( 2901 ) : Measurement Supervision Then 1 - Inject Phase – Earth Fault Current (Single Phase Current ) more than ( 3I0 (Address 1203 ) and also more than Phase Current
{
= 0.4A = OFF = OFF = OFF ) Setting
( I ph > ) Setting (Address 1202
Inject 3-Phase Current = Rated Current = 1 A
)
}
2 - Inject 3 VO Zero Sequence Voltage V L1–N = 6v, V L2–N =10V, V L3 –N =10V, Reduce slowly V L1–N voltage till relay E/F element operates, then:
take the pick up value of the relay by switching On & Off of fault & check the pick up value of distance relay.
Setting value of 3Vo (V)
Measured Pick Up value (V)
5
make Unbalance in 3
VO , Reduce slowly V L1–N &
Inject 3-Phase Current = Rated Current = 1 A
3 VO
Trip
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 11 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
9- Zones reach & Time Testing (
110 / 13.8 K.V
S/S
Manual Check )
To test the ZONE Reach & Time , we adjust the ZONES from the relay Settings as following: Settings Device configuration : 0112 Phase Distance Quadrilateral 0113 Earth Distance Quadrilateral From Setting Group A : 0013 Distance zones (Quadrilateral ) Zone-Z1
1301 1302 1303 1304 1305 1306
Operating Mode Zone-1 R ( Z1 ) , Resistance for Ph- Ph Faults X ( Z1 ) , Reactance RE( Z1 ) , Resistance for Ph- E Faults T1-1 Phase , delay for single phase faults T1-multi Ph , delay for single phase faults
Forward 1.0 Ω 2.5 Ω 1.0 Ω 0.0 Sec. 0.0 Sec.
Zone-Z1B
1351 1352 1353 1354 1355 1356
Operating Mode Z1B( OverReach Zone ) R (Z1B ) , Resistance for Ph- Ph Faults X (Z1B) , Reactance RE(Z1B) , Resistance for Ph- E Faults T1B-1 Phase , delay for single phase faults T1B-multi Ph , delay for single phase faults
Forward 1.3 Ω 3.5 Ω 1.3 Ω 0.3 Sec. 0.3 Sec.
Zone-Z2
1311 1312 1313 1314 1315 1316
Operating Mode Zone-2 R ( Z2 ) , Resistance for Ph- Ph Faults X ( Z2 ) , Reactance RE( Z2 ) , Resistance for Ph- E Faults T2-1 Phase , delay for single phase faults T2-multi Ph , delay for single phase faults
Forward 2.0 Ω 5.0 Ω 2.0 Ω 0.5 Sec. 0.5 Sec.
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 12 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
1321 1322 1323 1324 1325
Operating Mode Zone-3 R ( Z3 ) , Resistance for Ph- Ph Faults X ( Z3 ) , Reactance RE( Z3 ) , Resistance for Ph- E Faults T3 delay
Reverse
Zone-Z4
1331 1332 1333 1334 1335
Operating Mode Zone-4 R ( Z4 ) , Resistance for Ph- Ph Faults X ( Z4 ) , Reactance RE( Z4 ) , Resistance for Ph- E Faults T4 delay
Forward 5.0 Ω 10.0 Ω 5.0 Ω 1.5 Sec.
Zone-Z5
1341 1342 1343 1344 1345
Operating Mode Zone-5 Non-Directional R ( Z5 ) , Resistance for Ph- Ph Faults 7.0 Ω X ( Z5 ) +, Reactance for Forward direction 12.0 Ω RE( Z5 ), Resistance for Ph- E Faults 7.0 Ω T5 delay 2.5 Sec.
1346
X ( Z5 ) -, Reactance for Reverse
Zone-Z3
3.0 6.0 3.0 1.0
Ω Ω Ω Sec.
direction 12.0 Ω
Note : In Reverse Zone , we can inject by the same angle of Forward , but Inverse the Earthing in the Relay Or Inverse the direction of injection.
Test Procedure with OMCRON : 1- Distance Advanced Distance 2- Choose “Shot Test “. 3- Put the Points 4- Choose “Add To “ 5 –Choose “ ALL “ , Then OK.
We should insure from the Parameter
that the Earthing is as the actual.
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 13 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
Axis
Time
Time L1 - N
L1 - N
L1 - N
L1 – L2
L1 – L2
L1 – L2
L1 L2 L3
(m Sec. )
Non Directional
Z5 Forward Z4 Reverse Z3 Forward Z2 Forward Z1B Forward
Z1
Z
Zones
Fault Types
Impedance
Settings
S/S
1 0
2.5 1.3
0.3
5 3
1
6 5
1.5
2.5
R∟0° X∟90°
3.5 2
0.5
R∟0° X∟90°
10 7 12 -7 -12
R∟0° X∟90° R∟180° X∟270° R∟0° X∟90° R∟0° X∟90° R∟180° X∟270°
Note : Zones reach & Time Testing (
Auto Check )
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 14 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
Contract No.:
AL- BAWADI 110 / 13.8 K.V See the Attached Print out from the Relay :
S/S
10- Distance directionality check : Note :1- If any Zone is adjusted to be Non-Directional , you must reverse it ( or adjusted it to be Inactive ) to be able to determine the Undefined Areas. 2 - You must Configure LEDs for Distance Pick Up Forward and Distance Pick Up Reverse. Settings Device configuration : 0112 Phase Distance 0113 Earth Distance
Quadrilateral Quadrilateral
From Setting Group A : 0013 Distance zones (Quadrilateral ) Zone-Z5 1341 Operating Mode Zone-5 Inactive From Masking I / O ( Configuration Matrix ) : LED13 = 3719 = Distance FORWARD LED14 = 3720 = Distance REVERSE
3 - The 3-Phase Fault Injection , 1- Phase Fault Injection & Ph-Ph Fault Injection Must Be same For All Types Of Faults.
Test Procedure with OMCRON : Apply a constant value of the Impedance Z , and change the angle, Select the zone operating time as sufficiently long ( e.g. 22 Sec. ) so that the relay should not trip while rotating / changing the angle. 1- Distance Advanced Distance 2- Choose “ Check Test “. siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 15 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Contract No.:
AL- BAWADI 110 / 13.8 K.V S/S 3- Apply a constant value of the Impedance Z 4- Choose “Sequence “ 5 –Determine the Range you want to test & Determine the increment in the Angle.
Substation
:
Angels
Direction Forward
Expected Angels From To 338° ( - 22° )
120°
120°
150°
150°
300° ( - 60° )
300°( - 60° )
338°
Un-defined Reverse Un-defined
Measured Angels From To
158°
120° Undefiened
FORWARD
150°
REVERSE
338° Undefiened
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 16 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S 300°
11- Distance Teleprotection Schemes : 11.1. Permissive Under Reach ( Send Logics ( CS ) Z1 Fault
Trip Logic
( Local ) S / S Location of Fault
Z1B
Instantaneous Trip with Z1 Time + CS
Z1B Fault + CR Z1B Fault
Z1
PUTT ) (Z1B Acceleration)
w/ o CR
CR
Z1 Z1B W/O
CR
Z2 , Z3, Z4, Z5
Trip with Z2 Time w/ o CS ( Remote ) S / S Location of Fault
Relay action Inst. Trip with Z1B Time
Z1 Z1
Inst. Trip with Z1 Time + CS
Z1B
Trip with Z2 Time
Z3(reverse) W/O
Inst. Trip with Z1 Time + CS +
Instantaneous Trip with Z1B Time w/ o CS
+No CS
Trip with each Zone Time +No CS
Relay action Inst. Trip with Z1 Time + CS Inst. Trip with Z1 Time + CS
+ CR
Inst. Trip with Z1B Time
CR Trip with Z3(reverse) Time Z3(reverse) W/O CR Trip with each Zone Time
Settings: Specify the followings Address No: 3850 BO for Distance Trip Z1B With Teleprotection Scheme 4006
BI for Distance Teleprotection Carrier reception channel 1 ( Carrier Receive )
4054
LED 13 = Distance Teleprotection Carrier reception Signal
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 17 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
4056
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
( Carrier Receive ) LED 14 = Distance Teleprotection Carrier Send Signal ( Carrier Send )
1 - From DIGSI Program : Settings Device Configuration , Choose the Scheme “ PUTT “. Address No: 0121 : Teleprotection for Distance protection PUTT (Z1B Acceleration) 2 - Setting Group A : Address No: 0021 : Teleprotection for Distance protection 3 – Choose “ Export “ , then OK 4 – Save the File by any Name ( Rio File )
Test Procedure with OMCRON : 1- Distance Advanced Distance 2- Open “Setting “ , then Choose “ Extended Zones Active “ to show ( Active ) Z1B. 3- Open the Saved File : From ( Parameters : Choose “ Test Object “ , then Inport )
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 18 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
11.2
Contract No.:
AL- BAWADI
110 / 13.8 K.V
Permissive Over Reach ( POTT )
Send Logics ( CS )
Trip Logic
( Local ) S / S Location of Fault
Z1
Z1 Fault
Instantaneous Trip with Z1
Z1B Fault + CR
Instantaneous Trip with Z1B Time + CS
Z1B Fault
Trip with Z2 Time
+ CS
Instantaneous Trip with Z1B Time
+ CS
w/ o CR
Z1B Fault + CR
+ CR
Z1 Z1B W/O
CR
( Remote ) S / S Location of Fault
Relay action Inst. Trip with Z1B Time + CS
Z1 Z1
Inst. Trip with Z1 Time
Z1B
Inst. Trip with Z1 Time
Z1B
S/S
Trip with Z2 Time
+ CS + CS
+ CS
Time
+ CS
Relay action Inst. Trip with Z1 Time + CS Inst. Trip with Z1 Time + CS
+ CR
Inst. Trip with Z1B Time + CS
Z3(reverse) + CR
Trip with Z3(reverse) Time
Trip with Z2 Time
Z3(reverse) + CR
Trip with Z3(reverse) Time
Z1B W/O
CR
Z2 , Z3, Z4, Z5
Trip with each Zone Time +No CS
Z3(reverse) W/O
CR
+ CS
Trip with each Zone Time
Note: If the Fault is in Z3 ( Reverse Zone ): 1- Z3 Fault ( Reverse ) + CR , &
the Time is ‹ the Time at Address : 2109A:
Transient Block: Duration external fault = 400 m Sec.,
The Trip will be Instantaneous . With Z1B Time
2- Z3 Fault ( Reverse ) W/O CR , & the Time is ‹ the Time at Address : 2109A: Transient Block: Duration external fault = 400 m Sec.,
The Trip will be with Z3( Reverse) Time. 3- Z3 Fault ( Reverse ) + CR , & the Time is ›the Time at Address : 2109A: Transient Block: Duration external fault = 400 m Sec., siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 19 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
The Trip will be with the Time at Address : 2110A : Transient Block: Block Transient after external fault = 500 m Sec.
Settings Address No: 3850 BO for Distance Trip Z1B With Tele Protection Scheme 4006 4054
4056 4246
BI for Distance Teleprotection Carrier reception channel 1 ( Carrier Received ) LED 13 = Distance Teleprotection Carrier Signal Received ( Carrier Received ) { LED 14 = Distance Teleprotection Carrier Send Signal ( Carrier Send ) { LED 14 = ECHO Send Signal
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 20 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
11.2.1.
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Weak Infeed Function ( with POTT Scheme )
( ECHO only / ECHO And Trip ) Address No: 2501 11. 2.1.1.
Echo only
Settings : Configure Address No: 00379 CB Auxiliary Contact 3 Pole Closed [CB. Close ] ( Binary Input ) 00380 CB Auxiliary Contact 3 Pole Open [CB. Open ] ( Binary Input )
Status
Relay action should be
C.B off ( Open ) + Carrier Receive ( Z1B Fault )
Echo Signal Send Immediately ( CS ) Echo Signal Send (CS ) after time delay Address No: (2502A) : ( 40 m Sec.) Trip / Echo Delay After Carrier Receipt.
C.B on ( Closed ) + Carrier Receive ( Z1B Fault )
11. 2.1.2.
Relay action
( Echo & Trip )
Status
Relay action should be
C.B off ( Open ) + Carrier Receive ( Z1B Fault )
Echo Signal Send Immediately ( CS ) Without Local Trip
C.B on ( Closed ) + Carrier Receive ( Z1B Fault )
Local Trip & Echo Signal Send ( CS )
Relay action
after time delay Address No: (2502A) : ( 40 m Sec.)
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 21 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V S/S Trip / Echo Delay After Carrier Receipt.
11. 2.1.3. Under Voltage Pick Up for Local Trip ( Weak Infeed Voltage ) Settings: Address No: ( 2502A ) : Trip / Echo Delay After Carrier Receipt. = 5 Sec. ( 2505 ) : Under Voltage ( Phase – Earth ) = 25.0 V ( 1130A ) : Pole Open Current Threshold = 0.1 A
If we apply one Phase Voltage ‹ Setting in Address No: (2505 ) : Under Voltage ( Phase – Earth ) and we apply the other two Phases Voltage by Normal value and inject one phase
› Setting in Address No: ( 1130A ) : Pole Open Current Threshold = 0.1 A and the other two phases by Normal value. current
All this with Carrier Receive then the relay will send an Echo and weak in feed Local Trip after the time of Address No: ( 2502A ) But if the one phase voltage is more than the Address No: ( 2505 ) the relay will send Echo Only after time of Address No: ( 2502A ) : Trip / Echo Delay After Carrier Receipt. = 5 Sec. Under Voltage ( Ph–E)
Setting Value = 25 V
Trip Time Delay for Local Trip
Setting Value = 5 Sec.
( V )
( Sec. )
Pole Open Current Threshold ( A )
Measured Voltage =
V
Address No: ( 2505)
Measured Time =
Sec.
Address No: ( 2502A)
Measured Current = Setting Value = 0.1 A Address No: ( 1130A)
A
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 22 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
11.2.2. Current Reversal Logic
S/S
( with POTT Scheme )
0021
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 23 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
11.3. Blocking Scheme Send Logics ( CS )
110 / 13.8 K.V
:
Z3 Fault ( Reverse ) Or ( Undefined Zones ) Z1B Fault + CR
Trip Logic
( Local ) S / S Location of Fault
Z1
+ CR
Z1 Z1B W/O
CR
Z3(reverse)
w/o
CR
Z2 , Z3, Z4, Z5
Instantaneous Trip with Z1B Time
( Remote ) S / S Location of Fault
Relay action Inst. Trip with Z1B Time + CS
Z1 Z1
Inst. Trip with Z1 Time
Z1B
Trip with Z2 Time
Instantaneous Trip with Z1B Time + CS Block , Trip with Z2 Time
Z1B Fault W/O CR
Inst. Trip with Z1 Time
Z1B
S/S
+ CS + CS
+ CS
Relay action Inst. Trip with Z1 Time + CS Inst. Trip with Z1 Time + CS
Z3(reverse)
+ CR w/o CR
Inst. Trip with Z1B Time
Z1B W/O
Trip with each Zone Time +No CS
Z3(reverse) W/O
Inst. Trip with Z1B Time + CS Inst. Trip with Z1B Time
Trip with Z2 Time
CR
CR
+ CS
Trip with each Zone Time
Note: If the Fault is in Z3 ( Reverse Zone ): 1- Z3 Fault ( Reverse ) W/O CR , &
the Time is ‹ the Time at Address : 2109A:
Transient Block: Duration external fault = 400 m Sec.,
The Trip will be Instantaneous . With Z1B Time
2- Z3 Fault ( Reverse ) + CR , & the Time is ‹ the Time at Address : 2109A: Transient Block: Duration external fault = 400 m Sec.,
The Trip will be with Z3( Reverse) Time. 3- Z3 Fault ( Reverse ) W/O CR , & the Time is ›the Time at Address : 2109A: Transient Block: Duration external fault = 400 m Sec.& ‹ Z3 time siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 24 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
The Trip will be with the Time at Address : 2110A : Transient Block: Block Transient after external fault = 500 m Sec.
Settings Address No: 3850 BO for Distance Trip Z1B With Tele Protection Scheme 4006 4054
4056
BI for Distance Teleprotection Carrier reception channel 1 ( Carrier Received ) LED 13 = Distance Teleprotection Carrier Signal Received ( Carrier Received ) { LED 14 = Distance Teleprotection Carrier Send Signal ( Carrier Send )
# 0021Current reversal logic WITH BLOCKING SCHEME: -
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 25 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
11.4. Unblocking Scheme
110 / 13.8 K.V
S/S
:
This Scheme is not related to any CR , Z1B is Active only with Binary Input ( From : Masking I / O ( Configuration Matrix )), use the Address No: 4030 Distance Teleprotection Unblocking :UNBLOCK Channel 1 Send Logics ( CS ) A
Trip Logic
Z1 Fault
Instantaneous Trip with Z1 Time + CS
Z1B Fault + CR
Block , Trip with Z2 Time
Z2-----Z5 W/O CR Z1B Fault W/O CR
Trip with each Zone Time W/O CS Instantaneous Trip with Z1B Time
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 26 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
11.5. Direct
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Transfer Trip ( DDT )
Send Logics ( CS )
Z1 Fault
Instantaneous Trip with Z1 Time + CS
Trip Logic
Z1B Fault + CR
Trip with Z1B Time
From DIGSI Program : Settings Device Configuration , Choose the Scheme Address No: 0121 : Teleprotection for Distance protection Disabled
0122 : DDT Direct Transfer Trip Enabled Setting Group A : 0022 : DDT Direct Transfer Trip Address No: 2201 : Direct Transfer Trip ( DDT ) ON 2202 : Trip Time Delay Sec.
0.01
From : Masking I / O ( Configuration Matrix ) , Configure the following:
Address No: 4417 4435
: Direct Transfer Trip INPUT 3 Ph - L123 ( Binary Input Carrier Received) : DDT Trip Command L123 ( Binary Output Trip )
Also PUTT Scheme To Be Selected To SEND Signal In ZONE - 1.
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 27 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
12. Power Swing Detection
110 / 13.8 K.V
S/S
Address No:0120
Enabled
Setting Group A : 0020 : Power Swing
Address No:2007 :Trip Delay after Power Swing Blocking 5 Sec. ( Raise the Time Setting of Trip Delay after Power Swing Blocking Address No:2007 to more than the longest time of the Distance Zones )
Power Swing Operating Mode Address No:2002 All zones Blocked
Relay Action No trip with Trip with No trip with Trip with No trip with Trip with
Z1 , Z1B , Z2 Blocked Z1 , Z1B Blocked Z2 to Z5 Blocked
** When the Fault comes to the line , the Voltage will decrease Or the Current increase , then the Impedance will decrease in very short time , then the relay will trip according to the setting of the fault case. ** In the Power Swing case , the Impedance will decrease but in very short time , it will be decrease related with proper time for that decreasing, so the Power Swing depend on changing the Impedance with Time ( dZ / dt ). However , the time has to be proper with this changing ( Not very short when the Impedance will decrease ) , then the relay will Block all the Zones ( in case of chosen “All zones Blocked “ in Address No:2002 ) siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 28 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
Test Procedure with OMCRON
S/S
Using ( State Sequencer ):
. Inject Normal Current & Normal Voltage - 1 ,( Then Decrease the Voltage by constant ( d / dt – 2 [ (i.e.) Decrease the Impedance by ( dZ / dt ).] 3 -The Power Swing depend on changing the Impedance with Time( dZ/dt ) 4 -The Power Swing Impedance starts before Z5 by 5Ω 5 –When the Impedance enter the Polygon ,the Timer in Address No: 2007 : :Trip Delay after Power Swing Blocking
5 Sec. , Will Operate .
( i ) If the changing of the Impedance in the Polygon is slowly ,
then the relay will be Blocked by The Power Swing Function. ( ii ) If the changing of the Impedance in the Polygon is fastly and the Impedance is go out from the Polygon , then any Fault will make Trip.
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 29 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
13. Switch On To Fault ( SOTF ) Function Check : 13.1. Instantaneous High Speed SOTF-O/C
[ SOTF Separate Function ]
From Device Configuration :
Address No:0124 Address No:0024
Setting Group A :
Enabled
Address No: 2401: Instantaneous High Speed SOTF-O/C is 2404: Iph››› Pick Up
ON 2.5A
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 30 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Also : Disable the Distance Protection
Address No:1201 Disable Back Up Over Current Protection Address No:2601
Address No: 1201 : Distance Protection is 1232 : Instantaneous Trip after SOTF for Distance 2601 : Operating Mode for BackUp O/C
2615 : Instantaneous Trip after SOTF for O/C I›› 2625 : Instantaneous Trip after SOTF for O/C I› 2671 : Inst. Trip after SOTF for O/C Inverse Type
OFF Inactive OFF NO NO NO
Also , From Setting Group A : Address No:0011 : Power System Data 2 ( Line Status ) Address No:1130 : Pole Open Current Threshold :1131A: Pole Open Voltage Threshold
0.1A 30 V
1132A: Seal –in Time after All Closures
0.05 Sec.
:1133A: Minimal Time for Line Open before SOTF 0.25Sec.
1134 : Recognition of Line Closures with (i)
Manual Close Bi Only
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 31 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
(ii) Current flow OR Manual Close Bi (iii) Current OR Voltage OR Manual Close Bi (iv) CB aux. OR Current OR Manual Close Bi :1135: Reset of Trip Command (i) PickUP Reset
With CB aux. Open & I‹Pole Open Current (iii) With Pole Open Current Threshold Only :1136: Open Pole Detector (i)OFF (ii)
(ii)With CB aux. Open & I‹Pole Open Current (iii)With measurement ( U/I , Trip , PickUp, CB aux.)
1150A: Seal –in Time after Manual Closures
0.30Sec.
For C.B Closure Recognition Address No: (1134) : by Binary Input Manual Close Only Raise the Setting of Address No: ( 1150A ): Seal- in Time after Manual Closures ( This Time Controls the Time for Activation of BI:Manual Close ) Test Procedure : From : Masking I / O ( Configuration Matrix ) , SOTF over current Configure the following:
# Instantaneous High Speed SOTF O/C has a private Trip , siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 32 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
So you must Configure Binary Output and any LED for it. Address No: (4295) :SOTF- O/C Trip Command L123 , # Also you can Configure Binary Output for SOTF-O/C Picked Up Address No: (4281): SOTF- O/C Picked Up for detecting Pick Up value ,but it is not important because the operation of SOTF is instantaneous. # Configure Binary Input for Manual Close Address No:00356 :Manual Close Signal # Configure Binary Input for C.B off Address No:00380:CB. Aux. Contact 3 Pole Open # Case No.( i ): Inject Current more than the Setting in Address No: 2404:
Iph››› Pick Up = 2.5A With activation of the Binary Inputs of C.B off & Manual Close .
» The relay will Trip
Case No.( ii ): Inject Current more than the Setting in Address No: 2404:
Iph››› Pick Up = 2.5A Without activation of the Binary Inputs of C.B off & Manual Close .
» The relay will Not Trip
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 33 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Case No.( iii ): Inject Current Less than the Setting in Address No: 2404:
Iph››› Pick Up = 2.5A With activation of the Binary Inputs of C.B off & Manual Close .
» The relay will Not Trip
Case No.( i ) Case No.( ii ) Case No.( iii )
Setting in Address No: 2404 ( A )
Injected Current ( A )
Measured Trip Time (m Sec)
2.5
2.7
2.5
2.7
No Trip
2.5
2.0
No Trip
Note : Address No: 1130 : Pole Open Current Threshold 1133A: Minimal Time for Line Open before SOTF
1132A: Seal –in Time after All Closures
0.1A 0.25Sec.
2 Sec.
Instead of using Binary Input : CB. Manual Close , we can Inject Current Less Than the Current in Address No: 1130 for a period of time =250 mSec ,
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 34 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
So , the relay will know that the CB. of the Feeder as it is Opened ( OFF ), also the Time in Address No: 1132A , helping in Monitoring the Increase in Current after CB. is Closed ( ON ), If During that time 250 mSec , the Current Increased More than the Current in Address No: 1130 , Then the relay will be Tripe By SOTF Function. Hence , we can make this Test as following : 1134 : Recognition of Line Closures with(Current flow OR Manual Close Bi)
Using State Sequencer in OMICRON as following : ( 1 )1st State , Inject Normal Current (1 A ) & Voltage (57.73 V ) & Voltage Values for a period of time more than 250 mSec. ( 2 ) 2nd State , Inject Normal Current(1 A ) & Voltage (57.73 V ) Values for a period of time less than 2 Sec. ( 3 )3rd State , Inject a Current higher than the Current in Address No:
2404 : Iph››› Pick Up = 2.5A ,
& Normal Voltage Value( 57.73 V ) for a period of time less than 2 Sec. Then »
The relay will Trip by SOTF Function
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 35 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
A 2 ثم نحقن تيار اعلي منs 2 ثم نحقن طبيعي زمن اقل منms 250 *نحقن طبيعي ثم نفصل االحقن زمن اعلي من سوف يفصل بلخاصيه
A 2 ثم نحقن تيار اعلي منs 2 ثم نحقن طبيعي زمن اعلي منms 250 *نحقن طبيعي ثم نفصل االحقن زمن اعلي من سوف ل يفصل بلخاصيه
A 2 ثم نحقن تيار اعلي منs 2 ثم نحقن طبيعي زمن اقل منms 250 *نحقن طبيعي ثم نفصل االحقن زمن اقل من سوف ل يفصل بلخاصيه 9.1- SOTF associated with distance protection B) SOTF WITH DISTANCE PROTECTION: (1232 = ZONE PICK UP )
ADDRESS NO1232 Dis. = ON ADDRESS NO1201 SOTF WITH Dis. = ON SOTF WITH Z1 T W/O SOTF = (Manual close)T WITH SOTF = (Current flow )T WITH SOTF SOTF WITH Z1B T W/O SOTF = (Manual close)T WITH SOTF = (Current flow )T WITH SOTF=
Sec Sec =
Sec
Sec Sec Sec
SOTF WITH Z2 T W/O SOTF = (Manual close)T WITH SOTF = (Current flow )T WITH SOTF=
Sec Sec Sec
SOTF WITH Z3 T W/O SOTF = (Manual close)T WITH SOTF = (Current flow )T WITH SOTF
Sec Sec
SOTF WITH Z4 T W/O SOTF = (Manual close)T WITH SOTF = (Current flow )T WITH SOTF
=
Sec Sec Sec
=
Sec
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 36 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Note:-LED: SOTF P/U. -BI: MANUAL CLOSED -BO: GENERAL TRIP OR SOTF. -MAKE FAULT WITH ALL -NO SOTF TRIP LED WILL GLOW . BUT ZONE TRIP TIME WILL BE BYPASSED) Disable the back up over current protection add ( 2601 ) Disable the instantaneous high speed SOTF O/C add ( 2404 ) According to the specified zone that with instantaneous trip after SOTF is active add (1232 ) For with zone Z1B Inject Z in this zone twice one with the activation of the binary inputs of C.B off and manual close and the other without them
with the activation of the binary inputs of C.B off and manual close without the activation of the binary inputs of C.B off and manual close with the activation of the binary inputs of C.B off and manual close
Applied fault in zone Z1B
measured time (s)
Z1B Z2 Z3 Z4 Z5
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 37 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
9.2- SOTF associated with back up over current 2) SWITCH ON TO FAULT (SOTF) A) SOTF WITH BACKUP O/C:
ADDRESS NO2615 O/C I> = ON ADDRESS NO2625 O/C I>> = ON ADDRESS NO2671 O/C Ip = ON ADDRESS NO2601 SOTF WITH O/C = ON AD 2625
SOTF WITH ( I >>)
I set = ……….
T W/O SOTF =
(Manual close)T WITH SOTF
T set = ……… (Current flow )T WITH SOTF AD 2615
SOTF WITH ( I >)
Sec Sec
T W/O SOTF =
(Manual close)T WITH SOTF
T set = ………
(Current flow )T WITH SOTF =
SOTF WITH ( Ip)
Sec
=
Sec Sec
T W/O SOTF =
I set = ……… (Manual close)T WITH SOTF TMS = ………
=
=
I set = ……….
AD 2617
Sec
=
(Current flow )T WITH SOTF
Sec Sec
=
Sec
Note:-LED: SOTF P/U. -BI: MANUAL CLOSED. -MAKE FAULT WITH ALL TYPE OF O/C. -CHECK THE SEAL-IN TIME SETTING FOR MANUAL CLOSE Disable the distance protection add ( 1201 ) siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 38 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Contract No.:
AL- BAWADI 110 / 13.8 K.V S/S Disable the instantaneous high speed SOTF O/C add ( 2404 ) Inject current more than the setting {Iph >> pick up add ( 2610 )} twice one with the activation of the binary inputs of C.B off and manual close and the other without them. Repeat that with {Iph > pick up add ( 2620)} and {Iph > pick up add ( 2640)}
Substation
:
Setting of all definite stages is 1A and 0.5 sec Setting of inverse stage is 0.5 A and 0.1 sec long inverse address Iph >> pickup add ( 2610) Iph > pick up add ( 2620) Ip > pick up add ( 2640)
Setting (A) with the activation of the binary inputs of C.B off and manual close without the activation of the binary inputs of C.B off and manual close with the activation of the binary inputs of C.B off and manual close without the activation of the binary inputs of C.B off and manual close with the activation of the binary inputs of C.B off and manual close without the activation of the binary inputs of C.B off and manual close
Injected current (A)
1
1.5
1
1.5
1
1.5
1
1.5
1
2
1
2
measured time (msec)
Note : when you test any one of current stages you should raise the pick up setting of the others stages
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 39 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
10- Fuse failure monitoring 9. FUSE FAIL MONITOR:( 2910) .……………
(A)FUSE FAILURE MONITORING FUNCTION (3Io & 3Vo
.…….………
(B)VOLTAGE ABSENT MONITORING FUNCTION (3 phase voltages
..……………
( C)FUSE FAILURE MONITORING FUNCTION (3 phase voltages & Δ I
………..……
D)BROKEN CONDUCTOR
Note:- LED 14 = FUSE FAILURE=169, -LED: DISTANCE BLOCK. -INJECTION VOLTAGE LESS THAN(2913A)-MAX. VOLTAGE THRESHOLD V)>3PHASES) -DISTANCE WILL BLOCK AFTER TIME (2916A) DELAY TIME VOLTAGE FAILURE SUPERVISION. -APPLY FAULT AT ANY ZONE (Z1….Z5)BEFORE TIME (2916A)THE RELAY SHOULD OPERATE. -2916A=0 SECS. -A) 1 PHASE SETTING = 30V, Vrn = 31v,Vyn=Vbn=60V, 3 PHASE CURRENT = 0.5A. SLOWLY DECREASE RN VOLTAGE & CHECK AT WHICH VOLTAGE FUSE FAIL LED APPEARS 406 * موجود صفحه كما يلي. ( نحقق واحد وننتظرالثاني3Vo>(AD2911A ( و3Io 10sec add (169) and distance is blocked add (3652) also you may specify a binary output for V.T fuse failure alarm> 10sec add (169) and distance is blocked add (3652) to be able measuring the time all of that can be done from the Masking in distance general and measurement supervision. 10.1- For balanced load If the current is balanced in the 3 – phase and its amplitude is more than the setting {maximum current threshold I< add (2912A)} and the voltage difference in between any two phases is more than the setting {minimum voltage threshold U> add (2911A)}, the fuse failure monitor FFM will appear instantaneously with distance blocking.
Substation
:
10.1- Fuse failure measurement add (2911A) Injected current in 3- phase = .2 A minimum voltage threshold U> add (2911A) setting
Pick up voltage (V) R S T 57.73 57.73 57.73 57.73 57.73 57.73
30 V
FFM and distance block appear inst.
10-2- For current less than the setting of Maximum current threshold I< add (2912A) and zero voltage appear for more than the setting (add.2911) FFM will appear after 10 sec with distance blocking.
10.3- maximum voltage threshold U< ( 3 phase ) add (2913A)
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 42 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Contract No.:
AL- BAWADI 110 / 13.8 K.V S/S -You can check that with applying the normal voltage 3 – phase and 3- phase current above the setting of {open pole threshold add ( 1130A ) } and the voltage is reduced in the 3- phase to less than the setting { maximum voltage threshold U< ( 3 phase ) add (2913A)} a voltage absent will appear after a time delay setting {delay voltage failure supervision add (2916A)}. Injected current = .2 A
Substation
:
10.4 When VT mcb is off distance is blocked 8. ZONE 1:
VT MCB TRIP :(00361) power syst.Data2:WITH OUT VT MCB TRIP
: Distance trip
………….
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 43 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI WITH VT MCB TRIP
110 / 13.8 K.V S/S : Distance blocked (O/C trip)
…..………
ZONE 1B
WITH OUT VT MCB TRIP WITH VT MCB TRIP
: Distance trip : Distance blocked (O/C trip)
…………. …..………
ZONE 2:
WITH OUT VT MCB TRIP WITH VT MCB TRIP
: Distance trip : Distance blocked (O/C trip)
…………. …..………
ZONE 3:
WITH OUT VT MCB TRIP WITH VT MCB TRIP
: Distance trip : Distance blocked (O/C trip)
…………. …..………
ZONE 4:
WITH OUT VT MCB TRIP WITH VT MCB TRIP
: Distance trip : Distance blocked (O/C trip)
…………. …..………
ZONE 5:
WITH OUT VT MCB TRIP WITH VT MCB TRIP
: Distance trip : Distance blocked (O/C trip)
…………. …..………
Note:-LED: FAILURE FEEDER VT MCB TRIP.(AD3615) -BI: FAILURE FEEDER VT MCB TRIP.(AD3615) -LED: Distance Blook (AD3652) - MAKE FAULT WITH ALL ZONES WITH AND WITHOUT (BI) -DISTANCE PROTECTION WILL BLOCK. - MAKE O/C = ON
11- Fault locator Line length = 6 Km Injected impedance
Q=900
x = 0.1526 Ω / km R-N 1.526
Y-N 1.526
B-N 1.526
R-Y 1.526
Y-B 1.526
B-R 1.526
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 44 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI km
Relay reading (Km)
110 / 13.8 K.V S/S km km
km
km
km
12- Memory test 12.1 Memory time measurement test Sequence-1
Sequence-2
Time =2sec
Sequence-3
Time was changed
Time =0.5sec
Va
Vb
Vc
Ia
Ib
Ic
Va
Vb
Vc
Ia
Ib
Ic
Va
Vb
Vc
Ia
Ib
Ic
57.73
57.73
57.73
0.2
0.2
0.2
0
0
0
0
0
0
0
0
0
1
1
1
180
60
300
0
-120
12 0
---
----
--
--
--
---
---
---
---
0
-120
120
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 45 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Contract No.:
Substation : AL- BAWADI Memory time measurement = sec
110 / 13.8 K.V
S/S
12.2 Memory voltage measurement test Sequence-1
Sequence-2
Voltage for this fault was changed
Sequence-3
Time =1sec
Time =0.5sec
Va
Vb
Vc
Ia
Ib
Ic
Va
Vb
Vc
Ia
Ib
Ic
Va
Vb
Vc
Ia
Ib
Ic
57.73
57.73
57.73
0.2
0.2
0.2
0
0
0
0
0
0
0
0
0
1
1
1
180
60
300
0
-120
12 0
---
----
--
--
--
---
---
---
---
0
-120
120
Memory voltage measurement =
V
8- Back Up Over Current Protection: (Emergency) Note: while testing any stage of over current you have to raise the setting of the other stages. 8.1- Inverse over current 8.1.1- For IEC curve add (2660) is normal curve siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 46 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Setting:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Ip > pick up add (2640) = 0.5 A
Time Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A Measured time sec Inj. Current = 6 Ip = 3 A Measured time sec
R-Y
Y-B
B-R
1A
1A
1A
2
A
3 A
2
A
2
A
3 A
3 A
R-N
Y-N
B-N
1A
1A
1A
Calculated time ( sec ) 2.0 sec for T= 0.2 0.5 sec for T= 0.1 0.2 sec for T= 0.05
T = 0.14TP / {( I/IP )0.02 – 1} (SEC), WHERE: T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT
Setting: 3I0p pick up add (2650) = 0.5 A
Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A
2
A
2
A
2
A
Calculated time ( sec ) 2.0 sec for T= 0.2 0.5 sec for
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 47 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Contract No.:
AL- BAWADI 110 / 13.8 K.V S/S Measured time sec Inj. Current = 6 Ip = 3 A 3 A 3 A Measured time sec
Substation
:
3 A
T= 0.1 0.2 sec for T= 0.05
T = 0.14TP / {( I/IP )0.02 – 1} (SEC), WHERE: T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT 8.1.2-For IEC curve add (2660) is very inverse curve Setting:
Ip > pick up add (2640) = 0.5 A R-Y
Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A Measured time sec Inj. Current = 6 Ip = 3 A Measured time sec
1A 2
A
3 A
Y-B
B-R
1A
1A
2
A
2
A
3 A
3 A
Y-N
B-N
1A
1A
Calculated time sec 2.7 sec for T= 0.2 0.43 sec for T= 0.1 0.135 sec for T= 0.05
T = 13.5 TP / {( I/IP ) – 1} (SEC), WHERE: T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT Setting: 3I0p pick up add (2650) = 0.5 A R-N Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A Measured time sec Inj. Current = 6 Ip = 3 A
1A 2
A
3 A
2
A
3 A
2
A
3 A
Calculated time sec 2.7 sec for T= 0.2 0.43 sec for T= 0.1 0.135 sec for
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 48 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Measured time
Contract No.:
AL- BAWADI sec
110 / 13.8 K.V
S/S T= 0.05
T = 13.5 TP / {( I/IP ) – 1} (SEC), WHERE: T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT 8.1.3- For IEC curve add (2660) is extremely curve Setting: Time
Ip > pick up add (2640) = 0.5 A
Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A Measured time sec Inj. Current = 6 Ip = 3 A Measured time sec
R-Y
Y-B
B-R
1A
1A
1A
2
A
3 A
2
A
2
A
3 A
3 A
Y-N
B-N
1A
1A
Calculated time sec 5.3 sec for T= 0.2 0.53 sec for T= 0.1 0.114 sec for T= 0.05
T = 80 TP / {( I/IP )2 – 1} (SEC), WHERE: T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT Setting: 3I0p pick up add (2650) = 0.5 A Time R-N Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A Measured time sec Inj. Current = 6 Ip = 3 A Measured time sec
1A 2
A
3 A
2
A
3 A
2
A
3 A
Calculated time sec 5.3 sec for T= 0.2 0.53 sec for T= 0.1 0.114 sec for T= 0.05
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 49 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
T = 80 TP / {( I/IP )2 – 1} (SEC), WHERE: T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT 8.1.4- For IEC curve add (2660) is long inverse Setting: Ip > pick up add (2640) = 0.5 A Time R-Y Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A Measured time sec Inj. Current = 6 Ip = 3 A Measured time sec
1A 2
A
3 A
Y-B
B-R
1A
1A
2
A
2
A
3 A
3 A
Y-N
B-N
1A
1A
Calculated time sec 24sec for T= 0.2 4 sec for T= 0.1 1.2 sec for T= 0.05
T = 120TP / {( I/IP ) – 1} (SEC), WHERE: T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT Setting: 3I0p pick up add (2650) = 0.5 A Time R-N Inj. Current = 2 Ip = 1A Measured time sec Inj. Current = 4 Ip = 2 A Measured time sec Inj. Current = 6 Ip = 3 A Measured time sec T = 120TP / {( I/IP ) – 1}
1A 2
A
3 A
(SEC),
2
A
3 A
2
A
3 A
Calculated time sec 24sec for T= 0.2 4 sec for T= 0.1 1.2 sec for T= 0.05
WHERE:
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 50 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
T : TRIP TIME TP : SETTING VALUE TIME MULTPLIER IP : SETTING VALUE CURRENT I : FAULT CURRENT
8.2- low set stage I > Setting: Iph > pick up add (2620) = 1 A,
T Iph > time delay add(2621) = 0.5 sec
Iph > Phase R-Y Y-B B-R
Pick Up Setting Measured 1 1 1
Setting : 3I0 > pick up add (2622) = 1 A,
Drop Off Calculated Measured
0.5 T 3I0 > time delay add(2623) = 0.5
Injected current A R-N Name:
B-N
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
1.5 1.5 1.5
sec
Time sec Setting
siemens Y-N
Operating Time (s) for 1.5 A Setting Measured
Measured
Client: SEC - CSD 0.5
Consultant: Saudconsult
Name:
Name:
Signature: Date: Page 51 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
8.3- high set stage I >> Setting:
Iph >> pick up add (2610) = 1 A,
T Iph >> time delay add(2611) = 0.5 sec
Injected current A
Time sec Setting
R-Y Y-B B-R
1.5 1.5 1.5
0.5
Setting : 3I0 >> pick up add (2612) = 1 A,
T 3I0 >> time delay add(2613) = 0.5 sec
Injected current A Setting R-N Y-N B-N
Measured
1.5 1.5 1.5
Time sec Measured
0.5
2.4- I- STUB siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 52 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
Note: you must specify a binary input active low for { Enable I- STUB bus function add (7131)} and binary output and led for { O/C I- STUB TRIP add (7235)}. Setting:
Iph > STUB pick up add (2630) = 1 A,
T Iph time delay add (2631) = 0.5 sec
Injected current A
Time sec Setting
R-Y Y-B B-R
1.5 1.5 1.5
Measured
0.5
Setting : 3I0 > STUB pick up add (2632) = 1 A, T 3I0 STUB time delay add(2633) = 0.5 sec Injected current A
Time sec Setting
R-N Y-N B-N
1.5 1.5 1.5
Measured
0.5
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 53 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
S/S
. Annunciation .1. LEDs
LEDS LED1 LED2 LED3 LED4 LED5 LED6 LED7
Description Pickup Pickup Pickup Pickup
LED8 LED9 LED10 LED11 LED12 LED13 LED14
Distance Distance Distance Distance Zone 1 Trip Zone 1B Trip Zone 2 Trip
Phase L1 ( Phase L2 ( Phase L3 ( Neutral ( ( Forward ) ( Forward ) ( Forward )
Checked
Start ) Start ) Start ) Start )
Zone 3 Trip ( Reverse ) Zone 4 Trip ( Forward ) Zone 5 Trip ( Forward )
5.2. Binary Out Puts Annunciation Contact R1 R2 R3 R4 R5 R6 R7 R8 R9
Description Trip Trip Start Start Trip Trip Trip Start Watchdog
Checked
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 54 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )
ARABIA ELECTRIC LTD. Equipment
Distance Protection Relay Type 7SA522 Installation, Testing and Commissioning Site Report Customer
: SEC – WRB
Consultant
:
Substation
:
Contract No.:
AL- BAWADI
110 / 13.8 K.V
5.3. All Binary Inputs Checked.
S/S
siemens
Client: SEC - CSD
Consultant: Saudconsult
Name:
Name:
Name:
Signature: Date: CSD – DAR ENGINEERING – AL FANAR
Signature: Date: Page 55 of 55
Signature: Date: ENGR. / SAFWAT SAAD AHMED ( 0563683052 )