How to fill the ATP Document RTN 600 (Acceptance Test Data) (Bagaimana pengisian ATP docement RTN 600)

1. Visual Check IDU serial number: - please check on physical IDU interface on top of the equipment (cek di perangkat IDU bagian atas dari perangkat) Contoh serial number IDU 98088067772-034 ODU serial number:- check on software or on physical ODU (cek di software atau langsung pada ODU) Contoh: 21524113286c9B00164

Hybrid Serial number: - please check on physical Hybrid (cek fisik di perangkat Hybrid) Antenna Serial number : - please check on physical antenna (cek fisik di perangkat antenna) Antenna Antenna Station:A ___________________ Station: B ___________________

Diameter (M)

Height (M)

Polarization □Vertical □Horizontal □Vertical □Horizontal

Fill the site ID and site name correctly

(isi site ID dan site name dengan benar) Make sure diameter, antenna high and polarization have correct installation according to link budged (pastikan installasi antenna sesuai dengan link budged dari sisi diameter, antenna high dan polarisasi)

3

Item Check Check the physical Out-door installation.

OK □

NOK □

) 4

(pastikan instalasi outdorr sudah sesuai standard) Check the Radio indoor equipment installation.





) 5

(pastikan instalasi indoor sudah sesuai standard) Indoor Cable rack and structure installation





) 6

(pastikan instalasi kabel dan rak sesuai drawing standard) Labeling.





) 7

(patikan label terpasang sesuai standard) Grounding cable installation





)

(pastikan grounding outdoor dan indoor terpasang dengan baik)

2. Configuration Check Station A Set-Up Transmitted frequency Received frequency Frequency Plan (*) Sub Band Transmitted power requested

Channel 1 (MHz) (MHz) (MHz)

Channel 2 (MHz) (MHz) (MHz)

dBm

dBm

Please check frequency, and power transmit in software LCT and make sure is already match with Link budged (pastikan frekuensi dan power sesuai dengan link budged) Sub band : Check frequency and find sub band in data from TNP (sesuaikan frequensi dan data sub band dari TNP) 3. Loop back Test (local and remote) Tributary Check Station A

Local Tributary [ ] OK [ ] NOK

Station B

Local Tributary [ ] OK [ ] NOK

First enable 1 E1 for test local loop, and make loop tributary in one side physically

and test loop use BER test (buat enable 1 E1 untuk test local loop, dan buat loop di tributary di satu sisi secara fisik lalu lakukan BER test pada E1 tersebut) 4. Receive Power level Result Station A ODU 1

Station B

ODU 2 (**)

ODU 1

ODU 2 (**)

Rx level in link budget (data dari link budged)

dBm

dBm

dBm

dBm

Rx Level (actual)

dBm

dBm

dBm

dBm

Tx Power (actual)

dBm

dBm

dBm

dBm

Tx power

Data Rx level (actual)

5. Protection switching test System Type : □ 1+1HSB □ 1+1FD □ 1+1SD Result Station A

[ ] OK [ ] NO [ ]NA(*)

Station B

[ ] OK [ ] NO [ ]NA(*)

only for 1+1 configuration (Hanya jika konfigurasi 1+1) check switching ODU 1 and ODU 2 (cek switching antara ODU 1 dan ODU 2) 6. Interference Check Station A (Tx Off on B) ODU 1

ODU 2 (**)

Station B (Tx Off on A) ODU 1

ODU 2 (**)

Receive Level (*) (*) Receive power level