HEALTH, SAFETY & ENVIRONMENTAL MONTHLY REPORT
Enhancing Land Value
CADANGAN KERJA TANAH BAGI TUJUAN SERAH BALIK DAN BERMILIK SEMULA TANAH DI BAWAH SEKSYEN 204B, KANUN TANAH NEGARA DI ATAS LOT PT33010, PT 33019 – PT 33028, MUKIM TANJUNG DUA BELAS, DAERAH KUALA LANGAT, SELANGOR DARUL EHSAN
Sep 2016
ADVANCECON INFRA SDN BHD (Civil & Infrastructure Infrastructure Contractor)
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
HSE MONTHLY REPORT Rev. No.: 5.0
Effective Date: 16/08/2016
Project Site Key Personal Review and Approval Name Prepared by: (HSE Personnel)
Mohd Shafizan bin Nek Mat
Approved by: (Project Manager)
Mr. Vishnu Varthan A/L Marimutoo
Endorsed by: (Client Representative)
Mr. Seah Hown Chin
Signature
Date
Signature
Date
Headquarters (HQ) Acknowledgement Name Review by :
Mr. Aliff Asyraf Bin Hj. Razak
Endorsed by:
Mr. Lim Kok Tiong
Page 1 of 15
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
HSE MONTHLY REPORT Rev. No.: 5.0
Effective Date: 16/08/2016
TABLE OF CONTENTS Page 3-4
1.0
MONTHLY STATICTIC
2.0
HSE MONTHLY MANHOUR’S AND KPI’S GRAPH
5
2.1
HSE Monthly Man-hour’s Man- hour’s Graph
5
2.2
HSE Monthly KPI’s Graph
5
3.0
HSE PLAN TARGET
6-7
4.0
HEALTH, SAFETY & ENVIRONMENT REPORT CLAUSE OHSA 1994 REG. 19(2)
8-12
5.0
LIST OF ATTACHMENTS
5.1
Project HSE Meeting Slide Presentation (Attachment 1)
13
5.2
Silt Trap maintenance inspections summary (Attachment 2)
14
5.3
Fire extinguisher inspections summary (Attachment 3)
15
Page 2 of 15
ADVANCECON INFRA SDN BHD Project Code: TR01
1.0 a)
Item 1.1 1.1.1 1.1.2
1.1.3 1.2 1.2.1 1.2.2 1.2.3 1.3 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7
Document No.: AISB/HMR/TR01/2016-01
1.4 1.4.1
Effective Date: 16/08/2016
Total No. of Accident
Fatality Permanent Total/partial Disability Lost Time Injury Case Restricted Work Case First Aid Cases Medical Treatment Cases Fire/Explosion Property Damage
Security Incident Violation Road Traffic Incident Environmental Near miss Complaint (Public/Client/Authorities) Summon/Notice (Client & 1.3.8 Summon/Notice Authorities) 1.3.9 CAR/NCR (Client) 1.3.10 CAR/NCR (Internal) Total no. of accident (Item 1.1+1.2+1.3)
Item
Rev. No.: 5.0
MONTHLY OCCUPATIONAL SAFETY & HEALTH STATISTIC
Description
b)
HSE MONTHLY REPORT
Cumulative Previous This month Month Lost Time Injuries 0 0 0 0
0 0 Non Lost Time Injuries 0 0 0 0 1 0 Non Injuries Incident 0 0 1 0 0 0 2 0 0 0 0 0 0 0
Total Cumulative
Target/KPI’s
0 0
0 0
0
0
0 0 1
0 0 0
0 1 0 2 0 0 0
0 0 0 0 0 0 0
0
0
0
1 6 10
0 0 0
1 6 10
1:3 1:3 1:3
Total No. Man- hours without LTI
Description
Man-hours worked without LTI Total Cumulative Man-hours Workdays 1.4.2 No of Workdays Workdays 1.4.3 No. of Lost Workdays 1.4.5 LTI Frequency 1.4.6 Total Recordable Frequency
Cumulative Previous This month Month Exposure Hours 579170
234 0
Page 3 of 15
30 0
Total Cumulative
Target/KPI’s
600,000.00 264 0
ADVANCECON INFRA SDN BHD Project Code: TR01
c)
Item
Document No.: AISB/HMR/TR01/2016-01
Description
HSE Induction
1.5.3 1.5.4 1.5.5
HSE Committee Meeting
1.5.6 1.5.7 1.5.8
Walkabout Audit Housekeeping SHASSIC Audit (CIDB Auditor) Emergency Response Exercise / Drill
1.5.9
Effective Date: 16/08/2016
Cumulative Previous Month
This month
Total Cumulative
Target/KPI’s
HSE Activities & Programme
Management To Conduct Safety Awareness Talk HSE Mass Toolbox Talk PPE Individual Inspection
1.5.2
Rev. No.: 5.0
Total No. HSE Activities & Programme
1.5
1.5.1
HSE MONTHLY REPORT
0
0
0
Applicant to all new worker & visitor
0
0
0
Monthly
0 9
0 1
0 10
3
0
3
3 20 TBA
0 20 TBA
3 40 TBA
Weekly Basis Monthly Quarterly Basis Monthly Daily Basis Once Per Year
TBA
TBA
TBA
Once Per Year
Notes: i)
Lost Time Injury (LTI) Frequency
= No. of LTI X 1,000, 000 Man- hours Worked
ii)
Total Recordable (TRC) Frequency
= No. of LTI + Recorded Work Case) X 1,000,000 Man- hours Worked
Page 4 of 15
HSE MONTHLY REPORT
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
Rev. No.: 5.0
2.0
HSE MONTHLY MANHOUR’S AND KPI’S GRAPH
2.1
HSE MONTHLY MANHOUR’S GRAPH Previous Mo Month
This Mo Month
Effective Date: 16/08/2016
Cumulative
700000 600000 500000 400000 300000 200000 100000 0 Total Man-hours
2.2
HSE MONTHLY KPI’S GRAPH Previous Mo Month
This Mo Month
Cumulative
8 6 4 2 0
y r u j n I e m i T t s o L
e s a C y t i l a t a F
t n e m t a e r e s T a l C a c i d e M
e s a C k r o W d e t c i r t s e R
e s a C d i A t s r i F
Page 5 of 15
e g a m a D y t r e p o r P
t n e d i c c A c i f f a r T / d a o R
e s a C l a t n e m n o r i v n E
e s a C n o i t a l o i V y t i r u c e S
s s i M r a e N
HSE MONTHLY REPORT
ADVANCECON INFRA SDN BHD Project Code: TR01
3.0 a)
Document No.: AISB/HMR/TR01/2016-01
Rev. No.: 5.0
Effective Date: 16/08/2016
HSE TARGET PLAN Target for programme and activity Health, Safety And Environmental Plan 2016 (Monthly) Programme & Activity
No
Activity
Action Parties
Target Date
Venue/ Time
Target Date
New worker/staff worker/st aff
Depends on request
Site Office
TBA
1
HSE Induction
2
Management To Conduct Safety Awareness Talk
Monthly basis
Sep 16
Worker quarters
19th Sep 16
3
HSE Toolbox Talk
Staff/Workers/ Subcon
Daily basis
Worker quarters
Daily basis
4
HSE Committee Meeting
HSE Committee Members/Subcon
Quarterly basis
Site office
Dec 16
5
Housekeeping Housekeepin g
General Workers
Daily basis
6
HSE Walkabout Audit
PM/APM/SHO/SSS /Supervisor/Subcon
7 8
PPE Individual Inspection ISO 9001 Internal Audit
b)
Staff/Workers Site Personnel
Monthly basis Monthly basis
Worker quarters Worker quarters Worker quarters
26th Sep 16
TBA
TR 01
TBA
Actual Date
Daily basis
26th Sep 16
Target In House Training Health, Safety And Environmental Plan 2016 In-house Training
No
1 2 3 4
5
Activity
Introduction For OSH Legislation Awareness Awareness Personal Protective Equipment Awareness Schedule Waste Awareness 5S Housekeeping & Physical Arrangement Unsafe Act/ Unsafe Condition Familiarization Training
Action Parties
Target Date
Venue/ Time
Target Date
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Page 6 of 15
Actual Date
HSE MONTHLY REPORT
ADVANCECON INFRA SDN BHD Project Code: TR01
c)
Document No.: AISB/HMR/TR01/2016-01
Rev. No.: 5.0
Effective Date: 16/08/2016
Incentive Programme Health, Safety And Environmental Plan 2016 HSE Incentive Programme
No
1 2 3
Activity
HSE Campaign Days Best HSE Practitioners Workers Banner & Poster Promotion
Action Parties
Target Date
Venue/ Time
Target Date
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Staff/Workers Staff/Wor kers
TBA
TBA
TBA
Page 7 of 15
Actual Date
HSE MONTHLY REPORT
ADVANCECON INFRA SDN BHD Project Code: TR01
4.0 4.1 Item
1.
2.
4.2 Item
1.
Document No.: AISB/HMR/TR01/2016-01
Rev. No.: 5.0
Effective Date: 16/08/2016
HSE MONTHLY REPORT CLAUSE IN OSHA 1994 Reg. 19(2) Action to be taken by employer to comply OSHA / FMA/ EQA/ CIDB ACT & Regulations (Reg,19(2) Sub Clause A) Specification Description Recommendation / Action Reference
Public vehicular traffic
FMA 1967 BOWEC,Reg BOWEC,Reg 18 (1,2-A,B)
Sec 15, OSHA 1994, FMA 1967, BOWECBOWEC Reg 24
PPE on-site
To have proper barricaded and suitable warning sign for public road activity.
All persons who are performing any any work or services in a worksite shall wear safety helmet.
To establish and maintain safety & health working condition (Reg.19(2) Sub Clause B) Specification Description Recommendation / Action Reference .
Machinery/vehicle/tool/equipment inspection
Sec 15, OSHA 1994
Page 8 of 15
To have regularly inspection for machinery/vehicle/tools and equipment’s. To ensure all in good condition.
HSE MONTHLY REPORT
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
Rev. No.: 5.0
Sect 15, OSHA 1994 2.
Environmental Impact Assessment
Effective Date: 16/08/2016
To have regularly de silting and maintenance works for silt trap. To took reading on monthly basis for turbidity and Total suspended Solid (TSS) for legal requirements
De silting works activity
4.3 Item
1. 2. 3. 4. 5. 4.4 Item
Type of Cases Accident/Incident
Accident / Incident occurred at workplace (Reg.19(2) Sub Clause C) Quantity Recommendation / Action 0
Dangerous Occurrences
0
Occupational Occupatio nal Disease
0
Occupational Poisoning
0
Near miss
0
Machinery, Plant, Equipment & Process which have potential to cause injury (Reg.19(2) Sub Clause D) Specification Description Recommendation / Action Reference
Sec 15, OSHA 1994
1.
To have regularly maintenance /cleanliness of the public road. To ensure the access free from dust/earth/material/tools. To prevent accident that would be involved public.
Public road cleanliness cleanliness ‘
Page 9 of 15
HSE MONTHLY REPORT
ADVANCECON INFRA SDN BHD Project Code: TR01
2.
4.5 Item
Document No.: AISB/HMR/TR01/2016-01
Management to conduct safety awareness talk/ Toolbox briefing
Rev. No.: 5.0
Sec 15, OSHA 1994
Effective Date: 16/08/2016
Conducted on daily basis. Project manager shall attend and talk on monthly basis.
Machinery, Plant, Equipment appliance of PPE required to minimised risk
Description
(Reg.19(2) Sub Clause E) Specification Reference
Followed PPE requirements requirements inside the Advancecon Advancecon Infra sdn bhd HSE Management Plan
Sec 15, OSHA 1994 HSE Management Plan
Recommendation / Action
To ensure PPE requirements (safety helmet) followed the colour coding, such as : White : Executive and above Blue : Surveyors and Supervisors Brown : Operators/driver/workers Red : HSE Personnel Yellow : Subcontractor’s
4.6 Item
1.
Recommendation to the structure or arrangement to the workplace to improve Safety & Health (Reg.19(2) Sub Clause Clause F) Specification Description Recommendation / Action Reference
Water browser at site
Sec 15, OSHA 1994
Page 10 of 15
To have regularly water browser at site. To reduce a heavy dust.
HSE MONTHLY REPORT
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
Rev. No.: 5.0
Effective Date: 16/08/2016
2. Sec 15, OSHA 1994 EQA 1967, Schedule Waste Order 1989
4.7 Item
Description
Schedule waste storage need to have regularly maintenance, i.e signage, oil spillage, labelling. To prevent oil spillage spillage directed on the ground that would be an Environmental pollution.
Safety Promotion / Training / Audit / Meeting (Reg.19(2) Sub Clause G) Person involved Recommendation / Date
1.
Daily toolbox talk
PM/APM/Manager s/Supervisor/HSE
Briefed on a safe work method regarding on the site activity.
2.
Fire Extinguisher inspections
HSE Personnel
Conducted on monthly basis. To ensure ensure all in good condition
3.
Silt Trap maintenance maintenance inspections
HSE personnel
Conducted on monthly basis. To ensure ensure condition of the silt trap, inlet/outlet and water reading sample took. Turbidity and TSS.
4.8 Item
Outstanding matter arising from previous report (Reg.19(2) Sub Clause H) Recommendation/ Outstanding issues Deadline Action
Page 11 of 15
ADVANCECON INFRA SDN BHD Project Code: TR01
4.9 Item
Document No.: AISB/HMR/TR01/2016-01
c)
Effective Date: 16/08/2016
Attachment (Reg.19(2) Sub Clause J) Description
b)
Rev. No.: 5.0
Other matters related to Safety & Health of person working in the workplace (Reg.19(2) Sub Clause I) Description Specification
4.10
a)
HSE MONTHLY REPORT
Specification
Project HSE Meeting Slide Presentation
Attachment Attachment 1
Silt Trap maintenance maintenance inspections inspections summary summary
Attachment Attachment 2
Fire Extinguisher inspections summary
Attachment Attachment 3
Page 12 of 15
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
HSE MONTHLY REPORT Rev. No.: 5.0
Effective Date: 16/08/2016
ATTACHMENT 1 PROJECT HSE MEETING PRESENTATION SLIDE
Page 13 of 15
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
HSE MONTHLY REPORT Rev. No.: 5.0
Effective Date: 16/08/2016
ATTACHMENT 2 SILT TRAP MAINTENANCE INSPECTIONS SUMMARY
Page 14 of 15
ADVANCECON INFRA SDN BHD Project Code: TR01
Document No.: AISB/HMR/TR01/2016-01
HSE MONTHLY REPORT Rev. No.: 5.0
Effective Date: 16/08/2016
ATTACHMENT 3 FIRE EXTINGUISHER INSPECTIONS SUMMARY
Page 15 of 15