KAPSARC & COMMUNITY PROJECTS DEPARTMENTS DHAHRAN COMMUNITY HOUSING PROJECTS DIVISION

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

10-01382-0008 EXPAND DHAHRAN RESIDENTIAL COMMUNITY RESIDENTIAL AREA - PACKAGE – 6 DETAILED DESIGN

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

CONSTRUCTION SCOPE OF WORK

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

Prepared by:

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

JANUARY 2016 CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

1 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

YAA

TABLE OF CONTENTS   Page No.  1. 

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

2. 

JO/EWO

10-01382

10-01382

DATE

01/21/16

00

F

REV NO.

4. 

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS

ARCHITECTURAL ................................................................................................................................. 10  STRUCTURAL ...................................................................................................................................... 13  CIVIL SITE DEVELOPMENTS ................................................................................................................ 14  LANDSCAPE ........................................................................................................................................ 16  CIVIL UTILITIES .................................................................................................................................... 19  PIPING ................................................................................................................................................ 22  INSTRUMENTATION ........................................................................................................................... 27  MECHANICAL HVAC ............................................................................................................................ 31  MECHANICAL PLUMBING ................................................................................................................... 34  MECHANICAL FIRE PROTECTION ........................................................................................................ 39  ELECTRICAL ......................................................................................................................................... 41  COMMUNICATION ............................................................................................................................. 49 

PROJECT DESIGN STANDARD CUT‐OFF DATE ........................................................................................... 60  SAFETY ................................................................................................................................................... 60 

5. 

SCOPE EVALUATIONS AND EXECUTIONS ................................................................................................. 60 

6. 

PROJECT STUDIES REQUIREMENTS ......................................................................................................... 61  6.1.  6.2.  6.3.  6.4.  6.5.  6.6.  6.7.  6.8.  6.9. 

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS

INTRODUCTION .................................................................................................................................... 4  PROJECT OBJECTIVE: ............................................................................................................................ 6  PROPOSED FACILITIES: ......................................................................................................................... 6 

SCOPE OF WORK: ..................................................................................................................................... 7  2.1.  2.2.  2.3.  2.4.  2.5.  2.6.  2.7.  2.8.  2.9.  2.10.  2.11.  2.12. 

12/10/15

DESCRIPTION

1.1.  1.2.  1.3. 

3. 

DATE:

PROJECT SUMMARY ................................................................................................................................. 4 

HYDRAULICS (STEADY STATE & TRANSIENT) ANALYSIS ..................................................................... 61  ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .................................................................................. 61  TRAFFIC MANAGEMENT PLAN AND TRAFFIC IMPACT STUDY ............................................................ 62  PROJECT EXECUTION PLANNING WORKSHOP (PEPW) ....................................................................... 62  LESSONS LEARNED IMPLEMENTATION (LLI) WORKSHOP .................................................................. 62  GEOTECHNICAL (SOIL INVESTIGATION) ANALYSIS ............................................................................. 62  TOPOGRAPHIC SURVEY AND ROUTING .............................................................................................. 62  UNDERGROUND RADAR MAPPING .................................................................................................... 63  SITE SURVEY ....................................................................................................................................... 63 

7. 

PROCUREMENT ...................................................................................................................................... 63 

8. 

PROJECT INTERFACES ............................................................................................................................. 64 

ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

8.1.  8.2. 

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

INTERFACES WITH OTHER BIS & EWOS .............................................................................................. 64  PROJECT PHYSICAL INTERFACES ......................................................................................................... 64 

9. 

TIE‐INS ................................................................................................................................................... 64 

10. 

POWER AND WATER SOURCE ................................................................................................................. 65 

11. 

TRENCHING ............................................................................................................................................ 65 

12. 

UTILITY AND OTHER PIPELINE CROSSING ................................................................................................ 66 

13. 

HIGHWAY AND ROAD CROSSING ............................................................................................................ 67  CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

2 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

ASZ

SAUDI ARABIAN OIL COMPANY

LSS

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

CLEAN‐UP ............................................................................................................................................... 67 

15. 

PAINTING AND COATING WORK ............................................................................................................. 68 

16. 

PRE‐COMMISSIONING AND TESTING ACCEPTANCE ................................................................................. 68  16.1.  16.2.  16.3. 

FIELD TEST .......................................................................................................................................... 68  DEWATERING ..................................................................................................................................... 69  DRYING ............................................................................................................................................... 69 

17. 

COMMISSIONING AND START‐UP ASSISTANCE ....................................................................................... 69 

18. 

MECHANICAL COMPLETION .................................................................................................................... 69 

19. 

PERFORMANCE ACCEPTANCE ................................................................................................................. 70 

20. 

PROJECT COMPLETION ........................................................................................................................... 70 

21. 

DOCUMENTATION .................................................................................................................................. 71 

22. 

ABBREVIATIONS AND SYMBOLS ............................................................................................................. 72 

01/21/16

F

00

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

3 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

14. 

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

1.

PROJECT SUMMARY

1.1.

INTRODUCTION The purpose of the facilities proposed under this budget item (BI-10-01382) is to provide adequate and sufficient houses to alleviate the increasing eligibility for residential housing units in Dhahran Camp to support Saudi Aramco’s objective of preparing for their future workforce and attracting and retaining the talent required to support the Saudi Aramco mission. The scope covers Increment II which includes 266 single family residential villas. The proposed site for the new development covered under the scope of this Addendum (Increment II) is located within the Dhahran Hills neighborhood south of Increment I. A. INCREMENT I PACKAGES:

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

1. Package 1 (by others): Under this Package the following work will be performed: 



DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

  

01/21/16

CERTIFIED YAA 01/21/16



DATE: CONSTRUCTION AGENCY YAA



01/21/16 DATE:

Construction of Temporary Facilities which includes: Asphalted Access Road and Construction Roads, Guard Posts, Temporary SAPMT Office, Temporary Proponent Office, Lay down Yard, Site for Contractor’s Office, Temporary Site Utilities (Electrical, Non-Electrical and Communication), Temporary Drain Trench. Demolition Work: Demolition of existing utilities and facilities that are affected by the proposed construction within Packages 1, 2, 3, 4 and 5 limits under Parcels 24, 33 and 34. Relocation Work: Relocation of: SAMSO Warehouse, Ammnet Station. Relocation of Hobby Farm Access Road, Guard Post and toilet including the required utilities such as communication, power, sewer and raw water. Relocation of existing trees along Hobby Farm access road, light poles and irrigation for the relocated trees. Relocation of existing Ground water Monitoring Well, existing Tertiary Irrigation Pipes, existing Raw / Fire Water line, and existing Drinking water line.

OPERATIONS ASZ

2. Package 2 (by others): Utilities Infrastructures and Networks (Electrical, NonElectrical and Communication) including supporting Facilities.

01/21/16

BY:

Package 2 will provide all the necessary infrastructure and utilities including sewer and water (irrigation, raw & fire, drinking) networks, storm water drainage, communication and power, utilities tie-ins, roads, storm drainage system, street lighting, and relocation of existing utility overhead power line.

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

To accommodate the demand of the proposed development, the work also includes a new electrical substation, new sanitary sewer lift stations and expansions to the North Sanitary Treatment Plant (NSTP) and Advanced Water CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

4 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA LSS

ISSUED FOR 90% SUBMITTAL

DESCRIPTION

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

LSS

3. Package 3 (by others): Under this Package the following facilities/ works will be performed: Community support facilities development and related electrical, nonelectrical, communication utilities and Site development within the boundary limit of Packages 3, as well as building Automation System and all associated utilities of these facilities. 4. Package 4 (by others): Residential Housing units, infrastructure & utilities and final development within package 4 boundary limits as detailed in this document.

ISSUED FOR 90% SUBMITTAL

Under this Package the following work will be performed:  Final Site Development and Site Grading for the proposed development within the boundary limit of Package 4.  Construction of 240 villas of seven (7) different types.  Associated Utilities from the nearest interface point to all the villas within the boundary limit of Package 4.  Supply and installation of wireless water meters for each residential unit (Villa) in the inlet drinking water line. 5. Package 5 (by others): Residential Housing units, infrastructure & utilities and final development within package 5 boundary limits.

F

00

01/21/16

Under this Package the following work will be performed:  Final Site Development and Site Grading for the proposed development within the boundary limit of Package 5.  Construction of 380 villas of seven (7) different types.  Associated Utilities from the nearest interface point to all the villas within the boundary limit of Package 5.  Supply and installation of wireless water meters for each residential unit (Villa) in the inlet drinking water line.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

B. INCREMENT II PACKAGES:

CERTIFIED YAA

1. Package 6 : Under this Package the following work will be performed:

01/21/16 DATE: CONSTRUCTION AGENCY YAA

Site Development and Site grading for the proposed development within the boundary limit of Package 6 including the installation of all Main and secondary Roads Network’s & Site Utilities within the boundary limit of Package 6 (Sanitary Sewer System, Drinking Water System, Raw/Fire Water System, Irrigation System, Storm water Drainage System, Electrical System, Fire Alarm and Detection System, Communication System, HVAC System, wireless water meters, street lightings).

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

Construction of 266 single family residential villas of three (3) different types ( Three Bedroom Villa – Front Loaded / Three Bedroom Villa – Rear Loaded /Four Bedroom Villa – Rear Loaded ) Including all related finishing works, Landscaping, additional support facilities (Three stand alone toilets) and required utilities within the boundary limit of Package 6.

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

5 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

YAA

YAA

LSS

YAA

Treatment Plant (AWTP).

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

2. Package 7 (by others):

LSS

Site Development and Site grading for the proposed development within the boundary limit of Package 7 including the installation of all Main and secondary Roads Network’s & Site Utilities within the boundary limit of Package 7 (Sanitary Sewer System, Drinking Water System, Raw/Fire Water System, Irrigation System, Storm water Drainage System, Electrical System, Fire Alarm and Detection System, Communication System, HVAC System, wireless water meters, street lightings). Construction of 13 residential buildings of different types (Family Apartments Buildings3 stories, Mixed Bachelor Buildings-3 stories, Mixed Bachelor Buildings (Town House Style)-2 stories, Female Bachelor Building-3 stories) Including all related finishing works, Landscaping, additional support facilities and required utilities within the boundary limit of Package 7. Construction of Outdoor Recreation Facilities that includes two Stand Alone toilets covered surface parking as well as Playgrounds within the open space of the residential development, and support facilities.

JO/EWO

10-01382

10-01382

DATE

01/21/16

F

00

REV NO.

12/10/15

3. Package 8 (by others): Site Development and Site grading for the proposed areas for the Concrete Security Wall, with all required utilities within the boundary limit of Package 8 (Electrical System, Communication System, ....etc). Replacement of existing Security fence along the western border of approximately 4,600 M of existing community fence. Replacement will include a new concrete security wall with the new wall aligned parallel to the existing chain-link fence route, and it will run from the airbase side.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

1.2.

PROJECT OBJECTIVE: The primary objective and purpose of the facilities proposed under this BI-10-01382 scope is to provide the construction of residential housing units in Dhahran Camp to support the Company’s objective of preparing the workforce for the future and to attract and retain the talent required to support the company’s mission.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

This scope shall include new residential villas and support facilities in Dhahran Camp and associated community facilities to be constructed. These facilities shall be located within the boundaries of the expansion area.

01/21/16 DATE:

OPERATIONS ASZ

In addition, the scope will include provision of site development, electrical and nonelectrical utility systems, parking spaces, road network, and landscaping.

01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

1.3.

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

PROPOSED FACILITIES: Under Package 6, the required major work includes, but not limited to the following: 1)

Site Development and Site grading for the proposed development within the boundary limit of Package 6.

2)

Construction of 266 single family residential villas of three (3) different types:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

6 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

DESCRIPTION

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

01/21/16 DATE: PROJECT ENGINEER LSS 01/21/16

Provide and install of all Site Utilities within the boundary limit of Package 6 which includes: a) Sanitary Sewer System b) Drinking Water System c) Raw/Fire Water System d) Irrigation System e) Storm water Drainage System f) Electrical System g) Fire Alarm and Detection System. h) Communication System i) HVAC System

4)

Provide and install wireless water meters for each villa and facility within the boundary limit of Packages 6 to measure and monitor water consumption or leaks in drinking water lines, and to provide inputs and coordination support to configure all wireless district water meters at existing Central Work Station and Management System (CWSMS) installed by BI-10-01126.

5)

Provide and install all street lightings within the boundary limit of Package 6.

6)

All Main and secondary Roads Network’s for proposed development within the boundary limit of Package 6, including bicycle lanes, curb stones, pedestrian walkway and street signs.

SCOPE OF WORK:

2.

CERTIFIED

3)

YAA

General common requirements for all disciplines:

01/21/16 DATE: CONSTRUCTION AGENCY YAA

The LSTK CONTRACTOR shall:

01/21/16 DATE:

a. Perform design, procure, install, construct, fabricate, manufacture, test, precommission, commissioning assistance, start up assistance and any other items or accessories required for construction, installation, demolition and operation, including shipment and transportation of items to the construction sites.

OPERATIONS ASZ 01/21/16

BY:

b. Perform all detailed design and engineering for all Residential Villas and all other required facilities with all the related electrical, non-electrical, communication utilities and Facilities within the boundary limit of Package 6 under the project, in accordance with the drawings, specifications and standards referenced in the Contract documents, so that the FACILITIES can be constructed, operated and maintained in accordance with FACILITIES performance specifications. LSTK CONTRACTOR shall complete the detailed design engineering to the level that all

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

7 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

DISCIPLINE ENGINEER SH

DATE:

Three Bedroom Villa – Front Loaded Three Bedroom Villa – Rear Loaded Four Bedroom Villa – Rear Loaded

Including all related finishing works, Landscaping, additional support facilities (stand alone toilets,….etc) and required utilities within the boundary limit of Package 6.

LSS

YAA

  

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA LSS

aspects of design, procurement, construction, testing, balancing, commissioning and handover are covered. c. The documents and drawings attached with Project Proposal package along with Mandatory Saudi Aramco Engineering Requirements (MSAER's)" as defined under SAEP-14 (3.2.8.1), SAEP-301 (1.0) and SAEP-302 (1.7) shall be the LSTK CONTRACTOR basis for designing and preparing detailed engineering documents and drawings for all Utilities, Infrastructures, Networks and Facilities. However, as these Project Proposal documents and drawings are based on preliminary engineering, LSTK CONTRACTOR shall review, verify, modify / revise and prepare detailed engineering documents/drawings based on site conditions and other considerations identified during detailed engineering to reflect the intent of the facilities. LSTK CONTRACTOR shall complete the detailed design engineering to the level that all aspects of design, procurement, construction, commissioning, cutover and documentation is implemented. d. The LSTK CONTRACTOR shall Review, revalidate, verify and correct any deficiencies in the “issued for bid Package” deliverables as necessary during the detail design. In addition, the LSTK CONTRACTOR shall verify those bid package deliverables are in full compliance with the referenced Saudi Aramco standards/ Specification requirements and specified international codes and standards. e. Review and incorporate all Project Proposal review pending issues that are labeled to be during detail design/engineering. Refer to 30%, 60% and 90% Project Proposal Comments log Sheets. f.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Refer to the Additional Scope Requirements and Clarifications issued for items and scope not covered by the Project Proposal documentation and includes them as part of the scope and requirements of this project.

g. Prepare and issue equipment technical specifications, data sheets and related documents for the purchase of mechanical equipment by Saudi Aramco or by LSTK CONTRACTOR. The LSTK CONTRACTOR shall also be responsible for subsequent activities such as technical clarifications and bid evaluations.

01/21/16

CERTIFIED YAA 01/21/16

h. Prepare all additional specifications, designs, drawings and other documents required for the design, procurement of materials and construction of all Residential Villas and all the related electrical, non-electrical, communication utilities and Facilities within the boundary limit of Package 6 under the project.

DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ

i.

The LSTK CONTRACTOR shall Construct and conduct final pre-commissioning and testing, inspection and checkout of all Residential Villas and all the related electrical, non-electrical and communication utilities.

j.

The LSTK CONTRACTOR shall provide - for supplied permanent materials and spare parts for all Residential Villas and all the related electrical, non-electrical, communication utilities and Facilities, including but not limited to, procurement, fabrication, inspection, expediting, customs clearance and transportation.

01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

k. The LSTK CONTRACTOR shall provide commissioning and start-up assistance.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

8 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

ASZ

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

m. The LSTK CONTRACTOR shall provide shop drawings for Saudi Aramco review and approval prior to work execution. n. The LSTK CONTRACTOR shall provide "as built" drawings and project record books, all in the English language, to facilitate operation and maintenance of all Residential Villas and all the related electrical, non-electrical, communication utilities and Facilities within the boundary limit of Package 6 under the project.

10-01382 01/21/16

F

00

o. The LSTK CONTRACTOR shall participate in regular WORK progress meetings that will be scheduled by the Company Representative. p. The LSTK CONTRACTOR shall deploy or assign qualified personnel to perform the required loop checking during pre-commissioning stage of the project. As minimum, qualified personnel must be familiar to the site and project scope of work. q. The LSTK CONTRACTOR shall perform exploratory excavation on the location of foundations and underground installation. Exploratory excavation is required to verify and confirm any underground obstruction that might hinder the Building/ equipment foundations or underground installation. r.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

YAA 01/21/16

t.

DATE: CONSTRUCTION AGENCY YAA

01/21/16

OPERATIONS ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

v. The LSTK CONTRACTOR shall be responsible to ensure all highlighted constructability issues during project proposal stage are addressed accordingly.

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

CONTROL NUMBER

DATE: EDSD VERIFICATION

The LSTK CONTRACTOR shall conduct additional Topographic Surveys that are required to support the detailed engineering and design, if required.

u. The LSTK CONTRACTOR shall verify the authenticity of existing Underground Mapping Report and conduct additional exploratory excavations or radar survey as required for underground/ buried installations for design verification prior to construction / installation of facilities.

DATE:

REVISION REVISIONCERTIFICATION CERTIFICATE

The LSTK CONTRACTOR shall notify Saudi Aramco representative about identified utilities which are not reflected in PP design drawings. This type of issue shall be case to case basis and solution shall be LSTK CONTRACTOR’s responsibility without affecting, damaging or utilizing surrounding lands or facilities

s. The LSTK CONTRACTOR shall demolish and remove all debris, portable buildings and equipments which are located within the construction area are under LSTK CONTRACTOR responsibility and should be accomplished in coordination with Saudi Aramco concerned departments.

CERTIFIED

00 THIS INDICATES THAT REV. NO.__________

The LSTK CONTRACTOR shall perform construction management and quality inspection activities in design, engineering, procurement, fabrication/construction, testing and pre-commissioning.

w. LSTK CONTRACTOR shall early coordinate and fully cooperate with Package-7 contractor before the construction of Road no.10B. LSTK CONTRACTOR for Package 6 shall verify that all underground utilities (Electrical and Non-Electrical) have been completed by Package-7 before asphalting the road.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

9 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA

l.

LSS

ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA LSS

2.1.

ARCHITECTURAL

2.1.1.

General This section describes the scope of the architectural design that is included in the LSTK CONTRACTOR scope of work and responsibilities. The basis for designing the architectural building system and preparing detailed engineering documents and drawings is contained in the Project Proposal package completed for this project. However, Project Proposal is preliminary engineering and LSTK CONTRACTOR shall review revalidate and verify information contained in this package based on latest vendor information and other considerations arising during detailed engineering.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:



LSTK CONTRACTOR shall field verify all dimensions, elevations. The LSTK CONTRACTOR shall confirm all dimensions/elevations prior to fabrication and construction.



LSTK CONTRACTOR shall complete the detailed design engineering to the level that all aspects of design, procurement, construction, commissioning and handover are covered.



LSTK CONTRACTOR shall provide a complete detailed design for the Architectural system associated with this project and shall comply with applicable latest Saudi Aramco standards and relevant Industry standards.



LSTK CONTRACTOR shall prepare and submit shop drawings and revision to existing drawings if required for all architectural work to be performed for this project.



LSTK CONTRACTOR shall be responsible to ensure that drawing and document package includes, but not limited to, floor plans, roof plans, building elevations, building sections, reflected ceiling plans, furniture and equipment layout and schedule; signage plans and schedule; wall sections, stair details, doors, windows and finishing schedules, enlarged details, installation details, architectural construction scope of work, architectural material specification and MTO.



LSTK CONTACTOR to guarantee the supply to the proponent of the spare parts of all the construction materials in a percentage not inferior to 5% of the total quantities.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ

2.1.2.

01/21/16

CONTRACTOR`s Overall Responsibilities

BY:



The LSTK CONTRACTOR shall be responsible for all architectural works necessary to provide complete, functional facilities at each installation in accordance with the drawings, codes, standards and specifications to the satisfaction of SAUDI ARAMCO. LSTK CONTRACTOR is responsible for the supply and installation of all materials needed to complete the project.



All works mentioned in this section are to be executed as per the relevant SAUDI ARAMCO Engineering Standards and the Material Specifications.

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

10 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA



Construction shall be in accordance to all the requirements of the contract documents (Schedule A to H and Q, AFC Drawings, SOW and Construction Specifications).



The architectural work shall include but not limited to the following:

10-01382

10-01382 01/21/16

-

F

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

20 villas Three Bedroom Front Loaded (9 Villas are mirrored from the original) 149 villas Three Bedroom Rear Loaded – B (71 villas are mirrored from the original ) 97 villas Four Bedroom Rear Loaded – B (47 villas are mirrored from the original) Stand Alone Toilet (3 Toilets)

The scope of work in this section includes but is not necessarily limited to the provision and installation of the following materials as shown on the drawings.

00

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

-

01/21/16

CERTIFIED YAA



Provide and install non insulated sandblasted pre-cast concrete wall for perimeter wall of the building as shown on the drawings. LSTK CONTARCTOR to present more options and proposals for Aramco approval for the treatment of joints to prevent air leakage.



Provide and install non insulated pre-cast concrete external walls with insulation and 16mm gypsum board from inside as per Aramco standard requirements and as shown on the drawings.



Provide 16 mm. thick, teed types “X” gypsum board on metal stud with 57 mm thick Polyisocyanurate rigid foam insulation



Provide and install furring channel, ceiling channel, and access panel and perimeter angle for gypsum ceiling boards as shown on drawing.



Provide and install moisture resistant gypsum board as shown on drawing.



Provide and install floor, base, wall and ceiling finishes in accordance with the schedule of finishes drawings.

01/21/16 DATE: CONSTRUCTION AGENCY YAA

2.1.2.1.

Three Bedroom Villa – Front Loaded (one and a Half Floors)

01/21/16 DATE:

OPERATIONS



LSTK CONTRACTOR shall construct new (20) Three Bedroom - Front Loaded, villas with an approximate area of 335.00 sq. m as shown in Drawing No HA274040, HA-274041, HA-274042 , HA-274043 , HA-274044 , HA-274045, HA274046, HA-274047, HA-274048, HA-274049, HA-274050, HA-2740451, HA274052, HA-274053 , HA-274054.



For the mirrored plan of the three bedrooms Front Loaded villa , refer to drawing HA-274055 , HA-274056 , HA-274057 and HA-274058.



The new Villas are one and a half story building with a two-car garage accessible directly from the street.

ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

11 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

ASZ

SAUDI ARABIAN OIL COMPANY

LSS

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

2.1.2.2.

10-01382 01/21/16

F

00



The construction shall be in accordance with SAES-M-100, SAES-N-004, SAES-R004, IRC 2009 and the latest applicable Saudi Aramco and industry standards.



LSTK CONTRACTOR shall provide landscaping and hardscaping located within the perimeter of the villas that will have minimal maintenance and low water demand, as shown in Drawing No.HA-273850 , HA-273851, HA-273852, HA273853, HA-273854 , HA-273855 , HA-273856

Three Bedroom Villa – Rear Loaded, 18M Wide Lot, Option B 

LSTK CONTRACTOR shall construct new (149) Three Bedroom - Rear Loaded, Option B villas with an approximate area of 356.00 sqm as shown in Drawing No HA-274535 , to Drawing No HA-274549



For the mirrored plan of the three bedrooms Rear Loaded villa , refer to drawing HA-2740550 , HA-2740551 , HA-2740566 , HA-2740567



The new Villas are a two story building with a two-car garage accessible from a rear alley.



The building design and construction shall be in accordance with SAES-M-100, SAES-N-004 SAES-R-004, IRC 2009 and the latest applicable Saudi Aramco and industry standards.



LSTK CONTRACTOR shall provide landscaping and hardscaping located within the perimeter of the villas that will have minimal maintenance and low water demand, as shown in Drawing No.HA-273850 , HA-273851, HA-273852, HA273853, HA-273854 , HA-273855 , HA-273856

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

2.1.2.3.

01/21/16

Four Bedroom Villa – Rear Loaded Option B 

LSTK CONTRACTOR shall construct new (97) Four-Bedroom - Rear Loaded, Option B villas with an approximate area of 367.00 sq m as shown in Drawing No HA-274620 to Drawing No HA-274634



For the mirrored plan of the Four bedrooms Rear Loaded villa , refer to drawing HA-2740635 , HA-2740636, HA-2740637, HA-2740638



The new Villas are two story building with a two-car garage accessible from a rear alley.



The building design and construction shall be in accordance with SAES-M-100, SAES-N-004, SAES-R-004, IRC 2009 and the latest applicable Saudi Aramco and industry standards.



LSTK CONTRACTOR shall provide landscaping and hardscaping located within the perimeter of the villas that will have minimal maintenance and low water demand, as shown in Drawing Drawing No.HA-273850 , HA-273851, HA-273852, HA-273853, HA-273854 , HA-273855 , HA-273856

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

12 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

2.1.2.4.

LSS



LSTK CONTRACTOR to provide new Stand Alone Toilets with an approximate area of 10 sq. m. as shown in Drawing No. HA-274685 , HA-274686, HA-274687



The new Stand Alone Toilet (3 in total) shall be provided for use of gardeners and residents and shall be spread out to equally serve the entire development. The new Stand Alone Toilet is a single story building and shall be of concrete construction.

2.2.

STRUCTURAL

2.2.1.

General

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Stand Alone Toilets



CONTRACTOR shall design, supply, fabricate, deliver, install, coat, test and document all foundations, cast in place and precast concrete structures & steel framing required for Villas and other structures under this package.



CONTRACTOR shall meet all current SAUDI ARAMCO standards, references, and requirements of the Project Drawings and Documents.



CONTRACTOR shall field verify and confirm all dimensions, elevations and coordinates prior to fabrication and construction.



CONTRACTOR shall prepare as-built drawings for the facilities under this scope of work and existing facilities that impact the scope of work.



CONTRACTOR shall prepare shop drawings for all Roof framing structural steel elements, and precast items including connections.



CONTRACTOR shall demolish all structures, foundations, pavements etc made redundant within the area of the new scope of work.



CONTRACTOR shall provide all excavation including slope protection, dewatering as necessary.



CONTRACTOR shall complete the backfill, compaction, and disposal of all debris and excess soil and materials to Saudi Aramco designated area.



CONTRACTOR shall relocate all underground utilities affected during the construction.



CONTRACTOR to provide all safety requirements such as barricade, signboard etc. during excavation and construction.



Contractor shall verify all equipment foundation size and bolt layout based on final vendor drawing prior to concreting.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

13 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

2.2.2.

LSS

CONTRACTOR shall construct three types of Villas as follows: 20 units of three bedroom villas front loaded, 149 three bedroom villas rear loaded and 97 four bedroom villas rear loaded. Stand alone toilets, lighting poles & miscellaneous equipment foundations. Contractor responsibility include but not limited to supply, deliver and install of all precast framing system and cast in place concrete, foundations, steel trusses and purlins. Also include earthworks, epoxy coated reinforcement, concrete and steel coating, and all associated structural works as per Saudi Aramco Standard and all the referenced codes. 2.2.2.5.

Three Bedroom Villa – Front Loaded (one an Half Floors) CONTRACTOR shall construct, supply, deliver and install the three bedroom front loaded villas as shown in drawing numbers HA-274025 to HA-274034.

2.2.2.6.

Three Bedroom Villa – Rear Loaded, 18M Wide Lot, Option B CONTRACTOR shall construct, supply, deliver and install the three bedroom rear loaded villas as shown in drawing numbers HA-274520 to HA-274530.

2.2.2.7.

Four Bedroom Villa – Rear Loaded Option B CONTRACTOR shall construct, supply, deliver and install the four bedroom rear loaded villas as shown in drawing numbers HA-274605 to HA-274615.

2.2.2.8.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

CONTRACTOR`s Overall Responsibilities.

Stand Alone Toilets CONTRACTOR shall construct, supply, deliver and install the stand alone toilets as per the details that are shown in drawing numbers HA-274680.

2.2.2.9.

01/21/16

Miscellaneous Foundations

CERTIFIED YAA

CONTRACTOR shall construct, supply, deliver and install the lighting pole, water meter foundation and valve box as per drawing number HA-273842.

01/21/16 DATE: CONSTRUCTION AGENCY YAA

2.3.

CIVIL- SITE DEVELOPMENT

2.3.1.

General

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:



LSTK CONTRACTOR shall field verify all dimensions, elevations, coordinates and prepare drawings for the facilities under this scope of work and existing facilities that impact the scope of work. CONSTRUCTION CONTRACTOR shall confirm all dimensions/elevations prior to fabrication and construction.



LSTK CONTRACTOR shall conduct additional topographic surveys that are required to support the detailed engineering and design.



LSTK CONTRACTOR shall prepare and submit to SAUDI ARAMCO all necessary civil calculations required for the design of the utilities and/or facilities.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

14 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)



LSTK CONTRACTOR shall demolish all structures, foundations, pavements, etc. made redundant within the area of the new scope of work.

2.3.2.1.

Site Development

01/21/16 DATE: PROJECT ENGINEER LSS 01/21/16

CERTIFIED



LSTK CONTRACTOR shall design, construct and document all site development and site grading works for the new 266 housing units as per Drawing Nos. HA273915 and HA-273916, respectively. The CONSTRUCTION CONTRACTOR shall meet all current SAUDI ARAMCO standards, references, and requirements of the Project Drawings and Documents.



LSTK CONTRACTOR shall design and construct 25.3m and 18.0m wide asphalt road with 1.5m bicycle lane and parallel parking on both sides of the roads as shown on the Overall Road Layout (Drawing No. HA-273904).



LSTK CONTRACTOR shall design and construct 12.6 meter wide Mushtarak service roads asphalt road with bicycle lane and parallel parking on one side of the road as shown on the Overall Road Layout (Drawing No. HA-273904).



LSTK CONTRACTOR shall design and construct 8.0 meter wide back alley asphalt road as shown on the Site Development drawings.



LSTK CONTRACTOR shall design and construct 6.0 meter wide pedestrian walkway as shown in the Site Development drawings.



LSTK CONTRACTOR shall insure that the detailed design shall cover disabled curb ramps required at the intersection of all crosswalks with sidewalks and at all curb corners. The curbs ramps must be detailed within the detailed design documents and shall comply with ICC A117.1 Section 406. SAES M-100, 2009 IBC Section 1104 and ICC A117.1.



LSTK CONTRACTOR shall design and construct walking surfaces at maximum of 5%. The maximum grade for walkway without steps shall not exceed 5% unless a ramp and handrail is provided.



LSTK CONTRACTOR shall design and construct perimeter boundary wall between each villa as shown in the Site Development drawings.



LSTK CONTRACTOR shall design and construct three (3) stand- alone toilets as shown in the Site Development drawings



LSTK CONTRACTOR shall procure and install all necessary road markings and traffic signage’s required as per DWG. No. HA-273917.

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

15 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA LSS

ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

LSTK CONTRACTOR shall prepare and submit new drawings and revision to existing drawings for all civil works to be performed under this project.

CONTRACTOR`s Overall Responsibilities.

DISCIPLINE ENGINEER SH

DATE:



2.3.2.

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

DESCRIPTION

YAA

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

2.3.2.2.



LSTK CONTRACTOR shall design and construct playgrounds at the open areas as shown in the Site Development drawings and detailed in the Landscape drawings.



LSTK CONTRACTOR shall demolish the temporary construction access road within the Package-6 area only.

Road Networks 

LSTK CONTRACTOR shall develop a road network consisting of streets and alleyways, which provide access between residential lots and collector roads. The road network extent is shown in drawing HA-273904.



The scope of work is concerned with site preparation grading beneath the right of way and road embankments. LSTK CONTRACTOR is also responsible for initial road construction work, including compacted sub-grade, aggregate base, bitumen prime coat and asphalt base course.

10-01382

10-01382 01/21/16

 The minimum sight distance (m) shall be the speed of the road (kph) times 2.1 (or 2.083) to allow for 7.5 seconds of sight distance at intersections with two (2) opposing directions of traffic flow.  If traffic calming devices are used to slow or restrict traffic, they shall be engineered and clearly marked with warning signs to allow vehicles to go over or through them at the designed speed of the road or parking lot section. The use of non-engineered speed bumps is prohibited.

F

00

JO/EWO DATE REV NO.

12/10/15

 Finishing work including bitumen tack coat and surface course shall be provided along with medians, sidewalks, curbs and edging.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED

2.4.

LANDSCAPE

2.4.1.

General

YAA

The works in this scope include but are not limited to the following:

01/21/16 DATE: CONSTRUCTION AGENCY YAA

             

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Cutting the existing trees affected by the construction Re-Routing of the existing utilities affected by the construction Construction of retaining walls In-situ Exposed Aggregate concrete installation Colored Concrete Pavement In-situ broom finished concrete Installing concrete paving units Installing interlock paving units Landscape lighting (Standard, Bollard, Up light) fixtures installation Sub Soil Drainage Soil works Grass installation Shrub & Groundcover Planting Trees & shrubs planting and support

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

16 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

ASZ

SAUDI ARABIAN OIL COMPANY

LSS

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

10-01382

10-01382 01/21/16

F

00

      

Landscape Work

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Streetscaping Installing concrete paving units Children play area with play equipments and Shade structure installation Precast benches and Trash bins installation Gravel/Pebble paving Colored rubber and rubber pavers installation. Edges (Curbstones, Polyethylene edges) installation

01/21/16



The works covered comprises the provision of all materials, labor, landscape drainage, irrigation, supply and spreading of topsoil, planting of trees, shrubs, groundcovers and grass together with consolidation of completed landscape works.



LSTK CONTRACTOR shall be fully familiar with the type of work necessary and should have visited the site to ensure a full understanding of site requirements and therefore the extent of work. Where works are continuous with adjacent existing works, the Contractor is responsible for making the proper junction between the two sections and for making good any damages caused to adjoining works.



LSTK CONTRACTOR shall survey the area of non-electrical utilities affected in this project for re-routing per design.



LSTK CONTRACTOR shall provide landscape (Hardscape and Softscape) inside the individual facilities and within the site limit as shown and detailed in design drawings.



LSTK CONTRACTOR shall ensure all paving patterns shall be designated to reflect the intended way finding strategy of the area.



LSTK CONTRACTOR shall furnish and maintain all landscaping including the preparation of landscaped areas and the supply, planting, protection, and maintenance of trees, shrubs, ground cover, and plants.



LSTK CONTRACTOR shall ensure that all special conditions and requirements within the Specifications regarding palm tree preparation, delivery to Site, protection and planting are carried out in full.



LSTK CONTRACTOR shall maintain the existing trees that are not affected by construction works.



LSTK CONTRACTOR shall only supply plants which are approved by SAUDI ARAMCO Representative.



LSTK CONTRACTOR shall verify areas and required plant quantities on site.



Trees shall not be placed over underground utilities. Such encounters should be informed to SAUDI ARAMCO Representative prior to any action.

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

17 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

LSTK CONTRACTOR to verify the plant types with SAUDI ARAMCO. Any adjustments to the planting plans or schedule shall be coordinate with the SAUDI ARAMCO Representative.



LSTK CONTRACTOR shall provide and construct all steps, access ramps, driveways concrete curbs & gutters within the lots, blocks and the boundary limits as shown and detailed in design drawings.



LSTK CONTRACTOR shall visit the site to determine the extent of grading and trimming required.



LSTK CONTRACTOR shall remove the chopped off trees from the construction area and dispose per standard specifications unless otherwise mentioned.



LSTK CONTRACTOR shall trim and grade the subsoil as required for the works and in conformity with the requirements shown on all Landscape and civil Drawings.



LSTK CONTRACTOR shall take necessary erosion control measures as required, with particular care to prevent soil washing into any swale or storm water system.



LSTK CONTRACTOR shall remove of excess fill, rock and debris in order to conform to finished grades or level with existing elements. Any unsuitable excavated debris is to be removed from site.

Tree Preservation

01/21/16 DATE: PROJECT ENGINEER LSS 01/21/16

CERTIFIED



Identification: Before starting work agree which trees, shrubs, and hedges are to be removed or pruned.



The utmost care must be taken by the Contractor to preserve trees which stand adjacent to the site. A tree protection zone of 3.0-meters radius is to be established prior to commencing works. No equipment, materials, or vehicles are to be placed within this zone; all equipments are to be located within the work site.



LSTK CONTRACTOR shall ensure that all workers and sub-Contractors on the site are informed that the trees not affected by the construction are not to be lopped, disturbed, or damaged.

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

Backfilling

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:



Filling shall be performed with excavated material if appropriate and approved by SAPMT Representative.



Filling shall be clean soil free from clay, rock, vegetable material, or other deleterious matter.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

18 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA LSS

ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

DISCIPLINE ENGINEER SH

DATE:



Finished level

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

Samples & Approvals

LSS



The LSTK CONTRACTOR shall allow for sufficient time to SAPMT for review and approval of any Contractor request or proposed sample such as: -

 -

-

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO



DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Items to be demolished/ removed Imported topsoil and Spreading to grass areas Substitutions in landscape materials if not obtainable. New concrete unit pavers Color sample of aggregate mix and color additives for exposed aggregate Concrete paths. Exterior flooring Patio / walkway Installation of irrigation equipment Submission Details: At least thirty (30) days before the proposed installation of irrigation equipment. The Contractor shall submit samples and technical literature for sprinklers, quick-coupling valves, automatic valves, valve boxes, controller, and controller housings. Backfilling above irrigation mains and laterals Submission Details: At least one (1) working day prior to the proposed backfilling above irrigation mains and laterals the Contractor shall provide notification that irrigation pipes and laterals are in place with sand bedding and covering.

2.5.

CIVIL UTILITIES

2.5.1.

General 

LSTK CONTRACTOR shall design, supply, install, test and document all utilities design for irrigation system consisting of TSE lines and Irrigation Water with connection to raw water, storm drainage system and sanitary sewer system. The LSTK CONTRACTOR shall meet all current SAUDI ARAMCO standards, references, and requirements of the Project Drawings and Documents.



LSTK CONTRACTOR shall field verify all dimensions, elevations, coordinates and shall prepare drawings for the non-electric utilities under this scope of work that impact the scope of work. LSTK CONTRACTOR shall confirm all dimensions/elevations prior to fabrication and construction.



LSTK CONTRACTOR shall conduct additional exploratory excavations or ground penetrating radar survey as required for underground/buried installations for design verification prior to construction/installation of facilities.



LSTK CONTRACTOR shall conduct additional topographic surveys that are required to support the detailed engineering and design.



LSTK CONTRACTOR shall prepare and submit to SAUDI ARAMCO all necessary hydraulic calculations required for the design of the utilities under this scope.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

19 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

DESCRIPTION

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)



2.5.2.

CONTRACTOR`s Overall Responsibilities

2.5.2.1.

Storm Drainage System

10-01382 01/21/16

F

00

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

LSTK CONTRACTOR shall prepare and submit new drawings and revision to existing drawings for all non-electric utilities works to be performed for this project.



LSTK CONTRACTOR shall provide permanent diversion of the existing channel containing the flow of three existing culverts by constructing an open channel with grating and somewhere protected with grated fence type-five on sides along with box culverts and discharging it into the runoff receiving area as shown in Drawing No. HA-273956 and HA-273955 sheet no. (01, 02, 03, 06,10,13,14 and 15). Moreover, this channel shall also be used to cater for the surface runoff of the proposed development and to be intercepted by the swales and depressed gutters in the area as shown in Drawing No. HA-273955.



LSTK CONTRACTOR shall construct four (04) unlined swales (SW-01, 02, 03 and 04) along with pipe culverts as required on crossings and as shown in the Drawing No. HA-273955, sheets (01 - 22).



LSTK CONTRACTOR shall construct two (02) unlined swales (SW-01, 02) along with pipe culverts as required on crossings as shown in the Drawing No. HA273955, sheets (01-22).



LSTK CONTRACTOR shall construct concrete swale in connection with depressed gutters identified on suitable locations across the road to intercept the sheet flows as shown in the Drawing HA-273955, sheets (01-22).



LSTK CONTRACTOR shall construct one storm water pipeline (line-A) including five storm water grated manholes cover at top as indicated on various required locations to collect storm water as shown in the Drawings No. HA-273955, sheets (018 to 022). Also storm water lines - B and C, RCP 300 mm up to interface point shall be constructed as per HA-273955 sheets (012 and 017).



LSTK CONTRACTOR shall construct four (04) Retention Basins (RB-01, 02, 03 and 04) as indicated on suitable locations to promote filtration and retention of storm water as shown in the Drawings No HA-273955, sheets (07, 13, 17, 19 and 20).



LSTK CONTRACTOR shall construct one (01) Retention Basins (RB-01) as indicated on suitable locations to promote filtration and retention of storm water as shown in the Drawings No. HA-273955, sheets (013 and 014).



LSTK CONTRACTOR shall follow the Aramco Standards SAES-S-030, SAES-S070 and SAES-A-112 for Storm Water Drainage Systems.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

2.5.2.2. BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Sewage Collection System 

LSTK CONTRACTOR shall provide re-routed sanitary sewer line 500 mm (20”) RTR and provide tie-in interface near the existing manhole DH 2048 and extends

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

20 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

10-01382 01/21/16

F

00

2.5.2.3.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16



LSTK CONTRACTOR shall demolish the existing sanitary sewer 500 mm Steel (STL) line in between the existing manholes DH 2048 and up to splitter box as shown in Drawing No. HA-273943.



LSTK CONTRACTOR shall provide re-routed 200 mm RTRP line up to the interface point between the re-routed 200 RTRP line in package-07 and re-routed trunk line 500 mm RTRP by stub out/ plug. Refer to drawings HA-273942.



LSTK CONTRACTOR shall construct the sanitary sewer network including various sizes ranging 200-250 mm and finally collecting at splitter box near relocated RSPS-02 as shown in Drawing No. HA-273942, sheets (01-20).



LSTK CONTRACTOR shall provide tie-in to three (03) stand alone toilets situated at certain locations as shown in Drawing No. HA-273942, sheets (001, 010 and013).



LSTK CONTRACTOR shall follow the Aramco Standards SAES-S-010 for Sanitary Sewers and SAES-S-070 for Utility Installation.

Irrigation System 

LSTK CONTRACTOR shall provide re-routed 28” FRP Secondary Treated Effluent as indicated on the Drawing No. HA-273957.



LSTK CONTRACTOR shall demolish the existing 28” FRP Secondary Treated Effluent as indicated on the Drawing No. HA-273950.



LSTK CONTRACTOR shall provide re-routed 16” Cement Lined Steel (CLS) Tertiary Treated Effluent line as indicated on the Drawing No. HA-273958.



LSTK CONTRACTOR shall demolish the existing 16” CLS Tertiary Treated Effluent as indicated on the Drawing No. HA-273951.



LSTK CONTRACTOR shall provide the TSE Irrigation network along with all valves on main and laterals, including controllers for open area/public area landscape and strip planting with provision of connection to existing Central Control Center located at Saudi Aramco Gardening and Sanitation Office located along Canyon Road. Irrigation central control (existing) is computer based and enables the programming, monitoring and operation of the irrigation system. They are applicable to open areas, strip planting, parks schools, hotels and recreational facilities. Existing central control can monitor and automatically adapt system operation and irrigation run time in response to conditions in the system and surrounding area (weather change, pipe break), as well as parameter defined by the operator. However, connection or communication to existing Central Control Center will be by an SA approved vendor scope and will be submitted in separate package.

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

21 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA

up to the new RSPS-02 as shown in the Drawing No. HA-273944. Moreover, diameter from last manhole of 500 mm re-routed line to splitter box is 600 mm RTRP.

LSS

ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA

TSE irrigation water will be supplied from a re-routed pipe 16” RTR coming from AWTP after tertiary treatment.  LSTK CONTRACTOR shall provide irrigation control valves (ICV’s) and associated fittings for each Villa irrigation system connected to raw water as indicated on the Drawing No. HA-273949, Shts (01-20). Individual or stand alone irrigation controllers for each Villa shall be provided and programmed to provide the water requirement of different species of plant. No connection or communication to existing Central Control Center is required.  LSTK CONTRACTOR shall follow Aramco Standards SAES-040 for Irrigation system. TSE irrigation practices must comply with Saudi Aramco Environmental Health Code SAEHC-S-02, Section 5.4.2 “Reuse of Treated Wastewater for Family Communities” and in accordance with the criteria defined in SAES-A-104 for unrestricted irrigation. 2.6.

PIPING

2.6.1.

General 

LSTK CONTRACTOR shall construct and perform engineering, procurement, fabrication, installation, testing, documentation, as-built, inspection, precommissioning, and provide commissioning assistance of all piping and associated systems required to commission the Project SCOPE.



LSTK CONTRACTOR shall ensure that all piping systems comply with all Saudi Aramco standards and specifications and all referenced Industry Codes.



LSTK CONTRACTOR shall field verify all dimensions, elevations, coordinates and prepare drawings for the facilities under this scope of work and existing facilities that impact the scope of work.



LSTK CONTRACTOR shall confirm all dimensions/elevations prior to fabrication and construction.



LSTK CONTRACTOR shall provide all new valves which as minimum meet Saudi Aramco standards and the project requirements.



LSTK CONTRACTOR shall provide all new piping/fittings which as a minimum meet Saudi Aramco Standards and the project requirements.



LSTK CONTRACTOR shall fabricate a comprehensive standard supports as shown in the project drawing supports index as required by this project taking into consideration all loads and movements of piping systems.



LSTK CONTRACTOR shall perform Hydro test to all new piping system as shown in the project document and shall be witnessed by a Saudi Aramco Representative for approval.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

22 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

LSS

YAA LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

YAA

ASZ

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

10-01382

10-01382 01/21/16

F

00

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED



LSTK CONTRACTOR shall ensure that all underground water piping systems shall comply with Saudi Aramco color coding of Table 3 and paragraph 5.1.2.6 of SAESA-104. For exposed firewater piping system, LSTK Contractor shall ensure to comply with SAES-B-067 paragraph 4.2.1.



LSTK CONTRACTOR shall protect underground flange connection by shielding the exposed bolt by paint or by heat shrinkable tubing and sealing the gap between flanges.



LSTK CONTRACTOR shall perform fabrication, excavation, trenching, laying, jointing and backfilling Works as shown in Site Piping Plan Drawings. Trenching shall be as per SAES-S-070.



LSTK CONTRACTOR shall ensure that excavation, cleaning, laying, jointing and backfilling Works are executed in an orderly fashion.



LSTK CONTRACTOR shall ensure that no pipe will be left in trench overnight without proper coverage and protection.



LSTK CONTRACTOR shall backfill and compact the trench after exposed joints are inspected during leak testing or pressure testing. Complete backfilling and compaction shall be performed once the Works is accepted by Saudi Aramco Representative.



LSTK CONTRACTOR shall ensure that all piping in lay-down, fabrication shop, field and trench shall be covered at open ends at all times to protect it from dirt and from any other harmful materials.



LSTK CONTRACTOR shall procure and install anchor blocks at all change of directions for buried piping, for buried valves, and for buried mechanical jointing equipment e.g. mechanical, sleeve coupling.



LSTK CONTRACTOR shall furnish all labor, tools, transportation, equipment and supervision to fabricate, install, test and pre-commission all the piping systems as shown in the Drawings



LSTK CONTRACTOR shall provide bonding procedures for non-metallic materials including Procedure Qualification Records to Saudi Aramco Representative for approval prior to start of bonding Works.



LSTK CONTRACTOR shall be responsible for any needed rerouting/modifications that may have to be done to complete design intentions or in order to avoid obstruction(s) to any of the existing Facilities, equipment, material and/or piping.



LSTK CONTRACTOR shall provide gate valves buried or install inside an underground valve box.

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

23 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

YAA LSS

2.6.2.

CONTRACTOR`s Overall Responsibilities

2.6.2.1.

Detailed Scope The documents and drawings for this project shall be the LSTK CONTRACTOR basis for Constructing Increment II – Package 6 of the Expand Dhahran Residential Community. LSTK CONTRACTOR shall review, verify, modify, revise and prepare additional detailed engineering documents/drawings based on site conditions and other considerations identified during detailed engineering to reflect the intent of the facilities. LSTK CONTRACTOR shall complete the construction and engineering to the level that all aspects of design, procurement, construction, commissioning, cutover and documentation are implemented. The Scope shall include but not be limited to the following:   

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

      

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

2.6.2.2.

01/21/16

Field measurement verification prior to fabrication. Velocity and pressure drop calculations for all lines. Pipe sizing, rating identification, material selection, wall thickness calculations for all lines. Type of pipe joints/restraints according to pipe material, service, location (above ground/ buried). Pipe support types and locations on piping plan, isometrics and Supports Index. Hydrostatic Diagrams. Line hydro test and valve hydro test/seat test procedure. Tie-in locations, procedures, schedules and safety requirements. Non-destructive testing/documentation. Flange bolt torque verification including all structural bolts shall be torque.

Drinking Water System 

LSTK CONTRACTOR shall design provide, install, test, pre-commission and provide commission and start-up assistance for a complete functional Potable Water Network as per Layouts HA-273867 sheets 001 to 020, that shows the water network with the required main pipes diameters. The potable water system shall comply with Saudi Aramco Standards SAES-S-040 “Saudi Aramco Water Systems”, SAES-S-060 “Saudi Aramco Plumbing Code”, SAES-S-070 “Installation of Utility Piping Systems”, and Saudi Aramco Environmental Health Code Section SAEHC-S-01, and Saudi Aramco GI-0151.006



LSTK CONTRACTOR shall provide and install concrete valve boxes for the interface point with existing drinking water pipe.



LSTK CONTRACTOR shall handle the hydro-testing and flushing water as per SAEP-327 “Disposal of Wastewater from Cleaning, Flushing, and Hydrostatic Tests.



LSTK CONTRACTOR shall supply and install CPVC ball valves as specified on the valve data sheets HE-273874 Sht. 007 and 008.

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

24 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

DESCRIPTION

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

01/21/16

F

00

DISCIPLINE ENGINEER SH



Valves shall meet all the requirements specified in 04-SAMSS-035 “General Requirements for Valves” and 04-SAMSS-048 “Valve Inspection and Testing Requirements”.



All valves shall be according to Valves Data Sheets HE273874.



LSTK CONTRACTOR shall also secure the method of handling during transportation and storage, and both bacteriological and chemical qualities of the potable water and shall be in accordance with International Standards for Drinking Water, World Health Organization, Saudi Aramco Environmental Health Code Section SAEHC-S-01, and Saudi Aramco GI-0151.006 which shall be subject to Saudi Aramco review and approval.



LSTK CONTRACTOR shall perform disinfection of all drinking water piping per Saudi Aramco Environmental Health Code Section SAEHC-S-01, and Saudi Aramco GI-0151.006 which and shall be subject to Saudi Aramco review and approval.



LSTK CONTRACTOR shall perform works to Tie-in to an existing 8”- cement line carbon steel pipe drinking water line. Early exploratory survey shall be done to verify pipe size and material and elevation to prepare required materials.



An approved reduced pressure backflow preventer assembly shall be provided at all domestic water service connections in reclaimed water use areas. Any such devices must be included in the testing & pre-commissioning program.



All approved reduced pressure backflow preventer assemblies shall be NSF certified and shall conform to AWWA C511 or Saudi Aramco recognized industry standards. These assemblies shall be certified or listed by the agencies approved by the chairman of Plumbing and Utilities Standards Committee.

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

2.6.2.3.

CERTIFIED

Raw / Fire Water System

YAA 01/21/16 DATE:



LSTK CONTRACTOR shall design provide, install, test, pre-commission and provide commission and start-up assistance for the installation of Raw / fire water system including the raw water Feeding lines with related concrete valve boxes and fire hydrants for all facilities within project as shown in HA-273868 sheets 001 to 020



LSTK CONTRACTOR shall use RTR pipes and fittings (PN 12 bars) and shall install standard fire hydrants distributed in order to allow for firefighting to all of the buildings under this contract as shown on the drawings. The Riser to any Fire Hydrant shall be FBE coated carbon steel piping Schedule 40 Grade B. Each service connection pipe shall include a service isolation valve.



LSTK CONTRACTOR shall provide and install Fire Hydrants & direct buried valve post indicator type as per SAES-U-101 “Regulated Vendors List for Fire Protection Equipment” and in consultation with the RSA of the Fire Protection Department.

CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

25 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA LSS

ISSUED FOR 90% SUBMITTAL

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)



LSTK CONTRACTOR shall perform works to Tie-in to an existing 30”- cement line carbon steel pipe raw water line. Early exploratory survey shall be done to verify pipe size and material and elevation to prepare required materials.



The RTR pipes and fittings shall consider the following specifications:

c. Special fittings shall be provided whenever necessary and as per RTR pipes manufacturer `s recommendation. 

These valves locations shall be subject to Saudi Aramco review and approval. The following are the valve specifications for the Raw/Fire water network: a. Valves shall meet all the requirements specified in 04-SAMSS-035 “General Requirements for Valves” and 04-SAMSS-048 “Valve Inspection and Testing Requirements”. b. All valves shall be according to Valves Data Sheets HE273874.

01/21/16 DATE: PROJECT ENGINEER LSS



LSTK CONTRACTOR shall provide, install, test, and flush the fire water system to comply with SAES-B-017 “Fire Water System Design”, SAES-B-019 “Portable, Mobile and Special Fixed Firefighting Equipment”, SAES-S-040 “Saudi Aramco Water Systems”, and SAES-S-070 “Installation of Utility Piping Systems”, and SAEP-327 “Disposal of Wastewater from Cleaning, Flushing and Hydrostatic Tests”.



LSTK CONTRACTOR shall install identification tag to all isolation valves.



LSTK CONTRACTOR shall paint new piping with color coding as applicable per Saudi Aramco color codes specifically those exposed pipe inside the valve box.



LSTK CONTRACTOR shall provide wall sleeves for all penetrating pipes in the valve box.



LSTK CONTRACTOR shall ensure that the RW/FW system will provide a FW demand of at least 750 gpm at a residual pressure of 20 psi (1.38 bars) for duration of at least two hours per SAES-B-017.



LSTK CONTRACTOR shall provide block valves for RW/FW system ensuring that a failure of a single element along the RW/FW system will cause no more than four (4) hydrants or firefighting equipment to be shutdown from service.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

26 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA LSS

ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

LSTK CONTRACTOR shall perform disinfection of all raw water piping per Saudi Aramco Environmental Health Code Section SAEHC-S-01, and Saudi Aramco GI0151.006 which and shall be subject to Saudi Aramco review and approval.

b. RTR pipes and fittings shall be in accordance with SAES-L-105 “Piping Line Classes”; 1FE0U specification except pressure rating shall be 12 bars and with mechanical key lock joining system.

DISCIPLINE ENGINEER SH

DATE:



a. RTR pipes and fittings shall comply with 01-SAMSS-034 “RTR (Fiberglass) Pressure Pipe and Fittings”.

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

10-01382 01/21/16

F



LSTK CONTRACTOR shall ensure selected pipe size for main distribution piping and its branches comply with minimum required per SAES-B-017 and shall be supported with hydraulic calculation to ensure demands are met and shall be certified by a licensed fire protection engineer acceptable to both FrPD and LPD. The minimum size of distribution piping shall be 8 inches (203mm) and the size of lateral lines serving fire hydrants shall be 6 inches (152mm) per SAES-B-017 sections 5.10-5.14 and 12.10.5.



LSTK CONTRACTOR shall ensure no dead ends line serving fire hydrants exceed 21 m (68 feet) per SAES-M-100 section 101.4.5.1.



LSTK CONTRACTOR shall provide and install fire hydrants and fire water network as indicated on drawings, Fire Water Network Layout. Standard fire hydrants will be as per miscellaneous drawings attached and based on the international Fire Code (IFC) and Saudi Aramco standard SAES-B-017 “Fire Water System Design” and International Fire Codes.

2.7.

INSTRUMENTATION

2.7.1.

General 

CONTRACTOR’s scope shall be in full compliance with the LSTK contract requirements with Saudi Aramco including but not limited to the following:



Prepare Detail Design Engineering, procurement, fabrication or manufacture, installation, testing, commissioning and any other items or accessories required for construction, demolition and operation, including shipment of items to the construction sites.



The CONTRACTOR’s Scope of Work includes the review and incorporation of all the Project Proposal review pending issues that are labeled to be during detail design engineering.



The CONTRACTOR shall verify and correct any deficiencies in the LSTK bid package documents as necessary during the detail design. In addition, the LSTK CONTRACTOR shall verify those bid package documents are in full compliance with the Saudi Aramco standards/ Specification requirements.



CONTRACTOR shall arrange to provide specialized vendor services as required for all equipments supplied by CONTRACTOR.



CONTRACTOR shall inspect all equipment before and after unpacking. Any signs of damage during transportation shall be reported to the Saudi Aramco representative immediately.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

27 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

10-01382

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

SAUDI ARABIAN OIL COMPANY

00

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

YAA LSS

2.7.2.

CONTRACTOR`s Overall Responsibilities

2.7.2.1.

Drinking Water System 

Residential Villa Type 3 Bedrooms Villa Front Loaded 3 Bedrooms Villa Rear Loaded 4 Bedrooms Villa Rear Loaded



Meter Size

01/21/16 DATE: PROJECT ENGINEER LSS 01/21/16

Ultrasonic

20

Ultrasonic

149

Ultrasonic

97

Total =

266

1 ½” 1 ½”

CONTRACTOR shall supply, install and configure software, test and commission all of the following instrumentation related to Drinking Water Metering System as per the following documents and drawings below: Instrument Specification Sheet Instrument Installation Details Instrument Location Plan

CONTRACTOR shall supply, fabricate and install all protective UV housing boxes and all supporting structural material.



CONTRACTOR shall ensure to locate all the wireless water meters, data concentrators, gateways etc. in accessible locations free of any obstruction to avoid unconditional signal transmitting to Central Work Station and Management System located in existing Utilities Building 9020 Room 266 (supplied by package 4).



CONTRACTOR shall design, supply, install the Pressure Regulators, test, and commission all of the following as per Instrument Specification Sheets HE-273829, as shown in table below:

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16

Total



CERTIFIED

DATE:

Meter Type

1 ½”

HE-273823.001 HD-273821.001 HA-273820 SH 001-023

DISCIPLINE ENGINEER SH

DATE:

CONTRACTOR shall Design, supply, fabricate support, install the Wireless Water Meter instruments load the software, test, and commission all of the following Drinking Water Metering Devices as shown in table below:

OPERATIONS ASZ 01/21/16

DATE:

BY:

Instrument Tag S60-PRV-1113 / 1114 S60-PRV-1115 / 1116 

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Service

Size

Quantity

Drinking Water

6”

2

Raw Water

8”

2

CONTRACTOR shall also undertake any other work related to the instrumentation construction activities essential to commission the complete drinking water instrumentation and monitoring systems.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

28 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

2.7.2.2.

General Requirements

10-01382 01/21/16

F

00

DISCIPLINE ENGINEER SH



CONTRACTOR shall comply with the following, as a minimum, when performing I & C inspection and testing:



Only Saudi Aramco approved testing laboratories for specified tests and inspections, including the calibration of all instrumentation to be used during testing.



Inspection and testing of the WORK shall be in compliance with Contract drawings and specifications.



All test activities shall be witnessed and signed off by Saudi Aramco Representative. The witness schedule shall be developed so that activities are limited to Saudi Aramco’s five-day standard work week schedule (day shift only). No more than three concurrent testing witness activities shall be scheduled.



Verify the calibration and functionally test the newly-installed devices.



Fully pre-commission all system.



Prepare and Perform wireless loop checks for all water meter Instrumentation.



Provide commissioning assistance for all systems.

Instrumentation

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Testing, Pre-Commissioning and Commissioning

CONTRACTOR shall perform instrument inspection, testing, calibration and checkout duties as detailed below to provide a completely pre-commissioned and As-Built system:

01/21/16

CERTIFIED YAA 01/21/16 DATE:



Thirty (30) days prior to start of testing, CONTRACTOR shall submit a comprehensive list of the test and calibration equipment to be used. This equipment shall be in accordance with the manufacturer's recommendation and shall have a standard of accuracy better than or equal to the manufacturer's stated accuracy for the instrument to be tested/calibrated.



Test and calibration equipment shall be calibrated according to industry standards. The CONTRACTOR shall maintain a “Control Systems Test and Calibration Equipment Calibration Log” for each piece of test and calibration equipment. Acceptable evidence of the satisfactory calibration of equipment, e.g. current calibration certificates, shall be made available to Saudi Aramco. Test and calibration equipment shall be calibrated at six (6) month intervals by a certified test facility approved by Saudi Aramco. A test date stamp shall be affixed to the equipment.

CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

29 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA LSS

F



All electrical tools and equipment shall be suitable for 230-VAC, 60-Hz North American-type plugs and receptacles.



All inspection, testing and calibrations shall be recorded on forms. The CONTRACTOR shall develop the final format of these forms and submit them to Saudi Aramco for review and approval at least six (6) weeks prior to performing work which requires the use of these forms. When the forms are complete, signed, dated and approved, they will be placed in the Project Inspection Record Books.



CONTRACTOR shall provide a facility fully furnished with electrical and electronic supplies. Etc for checking and calibrating field instruments this facility shall be approved by SA.



Utilities such as water and electric power required for checkout of instrumentation shall be provided.



Testing of all wireless water meters shall be offered for witnessing by Saudi Aramco.



Any malfunction or failure of equipment to operate to manufacturer’s specifications shall be documented.



Acceptable standards of accuracy, repeatability, linearity, etc., for any particular instrument shall be those guaranteed by the instrument manufacturer.



All instruments, except as noted herein, shall be calibrated in both the upscale and downscale directions and, if necessary, adjusted until their accuracy is within the limit stated by the manufacturer. Upon completion, the results of each test shall be recorded on the appropriate forms.



The wireless water meter transmitters shall be checked as a minimum for wireless transmission signals, diagnostic operating status signals, and transmitter configuration in accordance with manufacturer specification.



Upon completion of tests the instrument shall be drained, and if necessary, blown through with dry air. Where applicable shipping stops shall be replaced.



After testing, all connections and entries shall be temporarily sealed to prevent subsequent ingress of moisture and dirt.



Instrument calibrations shall be repeated where required by other checks or to correct deficiencies.



On completion of each test, the stage reached in the testing procedure shall be indicated by affixing to each instrument or installation a colored label conforming to the following code and also the date of calibration and the name of the approved calibration technician shall be specified.  Blue Calibrated  Red Loop Checked  White Test Failed

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

30 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

LSS

10-01382 01/21/16

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

ASZ

SAUDI ARABIAN OIL COMPANY

00

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA



This identification shall be shown on all components already tested in the loop thereby making all personnel aware of the current status of any installation.



Upon completion of testing, the installation shall be made ready for precommissioning. This includes, but is not limited to, calibration checks, etc.

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

Pre-Installation Testing CONTRACTOR shall insure that all instruments be subjected to a pre-installation test and this test will commence as soon as practicable after the receipt of the instrument on site.



CONTRACTOR shall perform the test in the manner described herein, with adjustments being made in accordance with the manufacturer’s instructions.



Where the calibration test is not specified, or where circumstances prohibit the carrying out of the prescribed test, Manufacturer shall propose to the CONTRACTOR a method for testing, and shall receive Saudi Aramco approval in writing before any non standard modifications or adjustments are made.

Before commencing any tests, The CONTRACTOR shall check the following points:

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:



01/21/16

CERTIFIED



Instrument is not damaged in any way. Any such damage shall be rectified before any tests are attempted.



Nameplate on the instrument agrees with the information contained on the instrument specification sheet and nameplate schedules.



The battery power source available in each wireless water meter complying with the instrument specification requirements.



A suitable means is available for simulating the required process conditions and test meters are available with sufficient degree of accuracy for the tests to be performed.



Manufacturer’s “Instruction Manuals” are available.

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS

2.8.

MECHANICAL HVAC

2.8.1.

General

ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

This section describes the scope of the mechanical HVAC systems and equipment that are included in the LSTK CONTRACTOR scope of work and responsibilities.

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:



LSTK CONTRACTOR shall design, supply, fabricate, deliver, install, test, document as-built, inspect, pre-commission, and provide commissioning assistance of all mechanical HVAC tasks required under this package.



LSTK CONTRACTOR shall review revalidate and verify information contained in this package based on latest vendor information and other considerations arising

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

31 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

ASZ

SAUDI ARABIAN OIL COMPANY

LSS

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:



LSTK CONTRACTOR shall complete the detailed design engineering to the level that all aspects of design, procurement, construction, testing, balancing and commissioning, and handover are covered.



LSTK CONTRACTOR package documents LSTK CONTRACTOR compliance w i t h the



LSTK CONTRACTOR shall also refer to the Additional Scope Requirements and Clarifications issued for items and scope not covered by the IFB documentation, review comments log and includes them as part of the scope and requirements of this project.



LSTK CONTRACTOR shall provide a complete detailed design for the Mechanical system associated with this project and shall comply with applicable Saudi Aramco standards and relevant Industry standards.



LSTK CONTRACTOR shall be responsible for all design, procurement, vendor inspection, installation, testing, pre-commissioning, mechanical completion certificate compliance, and commissioning assistance of mechanical equipment and systems under this project.



LSTK CONTRACTOR shall be responsible for preparation of drawings and documents for all activities that are required to size, purchase, install, test and commission successfully all the Mechanical equipment and accessories.



LSTK CONTRACTOR shall procure, supply and install all mechanical equipment and associated materials (except procurement of those specifically nominated as free issue by Saudi Aramco). Materials shall conform to the latest edition of the applicable Saudi Aramco Materials System Specifications (SAMSS). Materials which have not been specified by SAMSS must be approved by Saudi Aramco representative prior to use.



LSTK CONTRACTOR shall prepare and issue equipment technical specifications, data sheets and related documents for the purchase of mechanical equipment by Saudi Aramco or by LSTK CONTRACTOR. The LSTK CONTRACTOR shall also be responsible for subsequent activities such as technical clarifications and bid evaluations.



Provide "as built" drawings and project record books, all in the English language, to facilitate operation and maintenance of the facilities.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

2.8.2. BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

shall Verify and correct any deficiencies in the bid as necessary during the detail design. In addition, the shall verify that the bid package documents a r e in full Saudi Aramco standards/ Specification requirements.

CONTRACTOR`s Overall Responsibilities. CONTRACTOR Scope of works shall be the following Villas: LSTK CONTRACTOR shall design/optimize, provide, install, test and commission Air CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

32 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

during detailed engineering. LSTK CONTRACTOR shall optimize design of HVAC system subject to SA PMT/Proponent approval.

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

LSTK CONTRACTOR shall design/optimize, provide, install, test and commission Supply, return and exhaust air duct works, clothes laundry dryer exhaust duct, kitchen hood exhaust ducts complete with air outlets/diffusers, return air diffusers, exhaust valves, volume dampers, insulation, and all necessary accessories.

ISSUED FOR 90% SUBMITTAL

LSTK CONTRACTOR shall provide testing and balancing of all HVAC system including supply, return and exhaust as per SAES-K-001 and SMACNA standards. LSTK CONTRACTOR shall design, provide, install, test and commission direct digital controller (DDC) for all HVAC systems. LSTK CONTRACTOR shall design, provide, install, test and commission exhaust fans for Toilets, Kitchen, workshop, etc. LSTK CONTRACTOR Scope of works shall be typical for the following Villas:

01/21/16

F

00

DISCIPLINE ENGINEER SH



Three Bedroom Villa – Front Loaded (one an Half Floors) Refer to HVAC drawings- HA-274008.001, HA-274008.002, HA-274009.001, HA274010.001, HA-274011.001, HA-273830.001, HA-273831.001 to .005; (Mirror) HA-274012.001, HA-274012.002, HA-274013.001



Three Bedroom Villa – Rear Loaded, 18M Wide Lot, Option B Refer to HVAC drawings- - HA-274505.001, HA-274505.002, HA-274506.001, HA274507.001, HA-274508.001, HA-273830.001, HA-273831.001 to .005; (Mirror) HA-274509.001, HA-274509.002, HA-274516.001



Four Bedroom Villa – Rear Loaded Option B Refer to HVAC drawings- - HA-274585.001, HA-274585.002, HA-274586.001, HA274587.001, HA-274588.001, HA-273830.001, HA-273831.001 to .005; (Mirror) HA-274589.001, HA-274589.002, HA-274590.001

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16

LSTK CONTRACTOR Scope of works for Standalone Toilet shall be to design, provide, install, test and commission the exhaust fan, duct, exhaust disc valves, door louvers and shall exhaust directly to the outside; not to concealed spaces such as attic or garage.

DATE:

OPERATIONS ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:



BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Stand Alone Toilets Refer to HVAC drawings- HA-274675.001, HA-273830.001, HA-273831.001 to .005

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

33 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

Handling Unit, vertical, direct expansion (DX-) type complete with matching air cooled condensing units (ACCUs), refrigerant piping, condensate drain piping, insulation, vibration isolators and all necessary accessories. Electric duct heater shall be provided to meet heating loads during winter. Air system shall be constant air volume (CAV).

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

YAA

MECHANICAL PLUMBING

2.9.1.

General Installation of Plumbing Systems shall be in accordance with SAES-S-60, Uniform Plumbing Code (UPC) and project requirements.

LSS

LSS

2.9.

10-01382

10-01382 01/21/16

F

00

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

Three Bed Room Front Loaded 

Contractor shall provide and install drinking, raw, hot water supply and return piping system, complete with pipes, fittings and accessories as shown on the design drawings HA-274060.001 and HA-274065.001



Contractor shall provide and install drinking, raw water supply by tapping-in to overall piping plan drawings HA-273685.001 and HA-273686.001 respectively.



Contractor shall provide and install electric water heaters along with recirculation pumps, controls and accessories. Water heater storage tank energy efficiency and performance requirements shall comply with Para 510 of Latest Saudi Aramco standard SAES-S-060, chapter 5. Water heaters shall be installed on a concrete pad and fiberglass grating.



Insulate new hot water supply, return lines using 25mm thick pre-molded fiberglass insulation with vapor barriers.



Contractor shall provide and install provide and install various plumbing fixtures water closet, bidet, ablution hoses, lavatories, bathtub, shower tray, laundry sink and kitchen sink as shown on drawings.



Contractor shall provide and install isolation valves on all branches of water distribution network as shown on design drawings HA-274060.001 and HA274065.001



Ablution hoses for water closets shall be provided with vacuum breakers to prevent backflow/back-siphonage.



All water closets shall be floor mounted and flush tank type as shown on Architectural drawings and schedules. WC shall be certified to deliver 3.0 liter per flush in compliance with SAES-S-060 para 402.2



Contractor shall provide and install di-electric unions at dissimilar piping material connections.



Contractor shall provide and install water hammer arrestors to suppress surge pressure in water supply system.



Contractor shall provide and install sanitary waste, drain and vent piping system including plumbing specialties as shown on design drawings.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

34 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

Floor drain in heater room shall be provided with floor drain trap sealer fitting to stop sewer gas back flow.



A minimum of 2% slope for drainage lines shall be maintained in horizontal run inside the building.



Sanitary drainage system shall be properly vented and provided with cleanouts required maintaining a free flow.



Contractor shall provide and install condensate drain pipes for A/C units and connect indirectly to floor drains as required.



Contractor shall perform leak test of plumbing piping system according to SAESS-060.



All newly constructed domestic water piping shall be protected from contamination during installation, and shall be disinfected in accordance with the requirements of SAES-S-060 section 613.0 and Section SAEHC-S-01 of Saudi Aramco Environmental Health Code, GI-0151.006

01/21/16 DATE: PROJECT ENGINEER LSS



Contractor shall provide and install drinking, raw, hot water supply and return piping system, complete with pipes, fittings and accessories as shown on the design drawings HA-274552 sheet 001, 002 and HA-274557 sheet 001, 002



Contractor shall provide and install drinking, raw water supply by tapping-in to overall piping plan drawings HA-273685.001 and HA-273686.001 respectively.



Contractor shall provide and install electric water heaters along with recirculation pumps, controls and accessories. Water heater storage tank energy efficiency and performance requirements shall comply with Para 510 of Latest Saudi Aramco standard SAES-S-060, chapter 5. Water heaters shall be installed on a concrete pad and fiberglass grating.



Insulate new hot water supply, return lines using 25mm thick pre-molded fiberglass insulation with vapor barriers.



Contractor shall provide and install provide and install various plumbing fixtures water closet, bidet, ablution hoses, lavatories, bathtub, shower tray, laundry sink and kitchen sink as shown on drawings.



Contractor shall provide and install isolation valves on all branches of water distribution network as shown on design drawings HA-274552 sheet 001, 002 and HA-274557 sheet 001, 002



Ablution hoses for water closets shall be provided with vacuum breakers to prevent backflow/back-siphonage.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

35 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

DISCIPLINE ENGINEER SH

DATE:



Three Bedroom Villa – Rear Loaded, 18M Wide Lot, Option B

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:



All water closets shall be floor mounted and flush tank type as shown on Architectural drawings and schedules. WC shall be certified to deliver 3.0 liter per flush in compliance with SAES-S-060 para 402.2



Contractor shall provide and install di-electric unions at dissimilar piping material connections.



Contractor shall provide and install water hammer arrestors to suppress surge pressure in water supply system.



Contractor shall provide and install sanitary waste, drain and vent piping system including plumbing specialties as shown on design drawings.



Floor drain in heater room shall be provided with floor drain trap sealer fitting to stop sewer gas back flow.



A minimum of 2% slope for drainage lines shall be maintained in horizontal run inside the building.



Sanitary drainage system shall be properly vented and provided with cleanouts required maintaining a free flow.



Contractor shall provide and install condensate drain pipes for A/C units and connect indirectly to floor drains as required.



Contractor shall perform leak test of plumbing piping system according to SAESS-060.



All newly constructed domestic water piping shall be protected from contamination during installation, and shall be disinfected in accordance with the requirements of SAES-S-060 section 613.0 and Section SAEHC-S-01 of Saudi Aramco Environmental Health Code, GI-0151.006

01/21/16

CERTIFIED

Four Bedroom Villa – Rear Loaded Option B

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA



Contractor shall provide and install drinking, raw, hot water supply and return piping system, complete with pipes, fittings and accessories as shown on the design drawings HA-274640 sheet 001, 002 and HA-274645 sheet 001, 002



Contractor shall provide and install drinking, raw water supply by tapping-in to overall piping plan drawings HA-273685.001 and HA-273686.001 respectively.



Contractor shall provide and install electric water heaters along with recirculation pumps, controls and accessories. Water heater storage tank energy efficiency and performance requirements shall comply with Para 510 of Latest Saudi Aramco standard SAES-S-060, chapter 5. Water heaters shall be installed on a concrete pad and fiberglass grating.



Insulate new hot water supply, return lines using 25mm thick pre-molded fiberglass insulation with vapor barriers.

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

36 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

ASZ

YAA YAA

YAA LSS

ISSUED FOR 90% SUBMITTAL

10-01382 01/21/16

F

00

10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

10-01382 01/21/16

F

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16



Contractor shall provide and install provide and install various plumbing fixtures water closet, bidet, ablution hoses, lavatories, bathtub, shower tray, laundry sink and kitchen sink as shown on drawings.



Contractor shall provide and install isolation valves on all branches of water distribution network as shown on design drawings HA-274640 sheet 001, 002 and HA-274645 sheet 001, 002



Ablution hoses for water closets shall be provided with vacuum breakers to prevent backflow/back-siphonage.



All water closets shall be floor mounted and flush tank type as shown on Architectural drawings and schedules. WC shall be certified to deliver 3.0 liter per flush in compliance with SAES-S-060 para 402.2



Contractor shall provide and install di-electric unions at dissimilar piping material connections.



Contractor shall provide and install water hammer arrestors to suppress surge pressure in water supply system.



Contractor shall provide and install sanitary waste, drain and vent piping system including plumbing specialties as shown on design drawings.



Floor drain in heater room shall be provided with floor drain trap sealer fitting to stop sewer gas back flow.



A minimum of 2% slope for drainage lines shall be maintained in horizontal run inside the building.



Sanitary drainage system shall be properly vented and provided with cleanouts required maintaining a free flow.



Contractor shall provide and install condensate drain pipes for A/C units and connect indirectly to floor drains as required.



Contractor shall perform leak test of plumbing piping system according to SAESS-060.



All newly constructed domestic water piping shall be protected from contamination during installation, and shall be disinfected in accordance with the requirements of SAES-S-060 section 613.0 and Section SAEHC-S-01 of Saudi Aramco Environmental Health Code, GI-0151.006

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

DATE:

BY:

Stand Alone Toilets 

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Contractor shall provide and install raw water & hot water supply piping system, complete with pipes, fittings and accessories as shown on the design drawings

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

37 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

10-01382

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

SAUDI ARABIAN OIL COMPANY

00

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)



Contractor shall provide and install isolation valves on all branches of water distribution network as shown on design drawings



All water closets shall be floor mounted and flush tank type as shown on Architectural drawings and schedules.



Ablution hoses for water closets shall be provided with vacuum breakers to prevent backflow/back-siphonage. Contractor shall provide and install di-electric unions at dissimilar piping material connections. Contractor shall provide and install water hammer arrestors to suppress surge pressure in water supply system.



Contractor shall provide and install sanitary waste, drain and vent piping system including plumbing specialties as shown on design drawings.



All floor drains shall be provided with floor drain trap sealer fitting to stop sewer gas back flow.



A minimum of 2% slope for drainage lines shall be maintained in horizontal run inside the building.



Sanitary drainage system shall be properly vented and provided with cleanouts required maintaining a free flow.



Contractor shall perform leak test of plumbing piping system according to SAESS-060.



All newly constructed domestic water piping shall be protected from contamination during installation, and shall be disinfected in accordance with the requirements of SAES-S-060 section 613.0 and Section SAEHC-S-01 of Saudi Aramco Environmental Health Code, GI-0151.006



REV NO.



DISCIPLINE ENGINEER SH

01/21/16

DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

38 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

Contractor shall provide and install provide and install various plumbing fixtures water closet, ablution hoses, lavatory as shown on drawings.

10-01382



01/21/16

Insulate new hot water supply lines using 25mm thick pre-molded fiberglass insulation with vapor barriers.

F



00

Contractor shall provide and install electric water heater along with pipes, fittings and accessories

10-01382



JO/EWO

Contractor shall provide and install raw water supply by tapping-in to the nonelectrical utility water line as shown on piping plan design drawing HA-273686.001

DATE



12/10/15

DESCRIPTION

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA LSS

2.10.

MECHANICAL FIRE PROTECTION

2.10.1.

General This section describes the scope of the supply and installation of Fire protection system and equipment that are included in the CONTRACTOR scope of work and responsibilities. Materials shall be in compliance with SAES-U-101, “Regulated vendor lists for Fire Protection Equipment”.

2.10.2.

LSTK CONTRACTOR shall supply, fabricate, deliver, install, test, document asbuilt, inspect, pre-commission, and provide commissioning assistance of all mechanical fire protection tasks required under this package.



LSTK CONTRACTOR shall prepare Shop Drawings, material submittals and specifications according to Section 4.5 of 2013 NFPA 13D.



CONTRACTOR shall review revalidate and verify information contained in this package based on latest Saudi Aramco Engineering Standards, Vendor information and other considerations arising during detailed engineering. Prior approval shall be obtained from FrPD for all fire protection equipment to be used in the project. Contact FrPD RSA for approved list of equipment.

CONTRACTOR’s Overall Responsibilities. This section describes the scope of the supply and installation of Fire protection system and equipment for each type of facilities under Package #6.

DISCIPLINE ENGINEER SH

Three Bedroom Villa – Front Loaded (one and Half Floors)

01/21/16 DATE: PROJECT ENGINEER LSS DATE:





LSTK CONTRACTOR shall design supply and install complete functional Fire protection for the Three Bedroom Front Loaded (one and half floors) villa as shown on drawings HA-274000 sheet 001, sheet 002 and HA-274001 sheet 001. The mirror image plans of the Three Bedroom Front Loaded (one and half floors) villa are shown on drawings HA-274002 sheet 001 & sheet 002. The system shall include but not limited to following:



LSTK CONTRACTOR shall design and install complete functional ‘Automatic Sprinkler System’ in full Compliance with applicable clauses of NFPA 13D SAESS-050, and other applicable NFPA standards.



Provide all related piping and fittings, ‘Sprinkler Control Valve Assembly’, test & drain valves and supports required to install, test, and commission the sprinkler system.



LSTK CONTRACTOR shall provide and install 2.5 lbs. (1.13 Kg) portable Multipurpose dry chemical Class ABC & 2.5 lbs. (1.13 Kg) Sodium Bicarbonate Residential Kitchen Fire Extinguishers as shown on the drawings. Type, capacity and distribution of the extinguishers shall be in full compliance with NFPA-10, SAES-B-019, SAES-M-100, & SAES-U-101. Where indicated, place the extinguisher in recessed cabinets. Mount other extinguishers on wall with complete support and bracket necessary signage, and accessories.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

39 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA LSS

Three Bedroom Villa – Rear Loaded, 18M Wide Lot, Option B LSTK CONTRACTOR shall design supply and install complete functional Fire protection for the Three Bedroom (Rear Loaded, 18M Wide Lot, Option B) villa as shown on drawings HA-274500 sheet 001, sheet 002 and HA-274501 sheet 001. The mirror image plans of the Three Bedroom (Rear Loaded, 18M Wide Lot, Option B) villa are shown on drawings HA-274503 sheet 001 & sheet 002. The system shall include but not limited to following:.



LSTK CONTRACTOR shall design and install complete functional ‘Automatic Sprinkler System’ in full Compliance with applicable clauses of NFPA 13D SAESS-050, and other applicable NFPA standards.



Provide all related piping and fittings, ‘Sprinkler Control Valve Assembly’, test & drain valves and supports required to install, test, and commission the sprinkler system.



LSTK CONTRACTOR shall provide and install 2.5 lbs. (1.13 Kg) portable Multipurpose dry chemical Class ABC & 2.5 lbs. (1.13 Kg) Sodium Bicarbonate Residential Kitchen Fire Extinguishers as shown on the drawings. Type, capacity and distribution of the extinguishers shall be in full compliance with NFPA-10, SAES-B-019, SAES-M-100, & SAES-U-101. Where indicated, place the extinguisher in recessed cabinets. Mount other extinguishers on wall with complete support and bracket necessary signage, and accessories.

Four Bedroom Villa – Rear Loaded Option B

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:





LSTK CONTRACTOR shall design supply and install complete functional Fire protection for the Four Bedroom (Rear Loaded, Option B) villa as shown on drawings HA-274575 sheet 001, sheet 002 and HA-274576 sheet 001. The mirror image plans of the Four Bedroom (Rear Loaded, Option B) villa are shown on drawings HA-274573 sheet 001 & sheet 002. The system shall include but not limited to following:.



LSTK CONTRACTOR shall design and install complete functional ‘Automatic Sprinkler System’ in full Compliance with applicable clauses of NFPA 13D SAESS-050, and other applicable NFPA standards.



Provide all related piping and fittings, ‘Sprinkler Control Valve Assembly’, test & drain valves and supports required to install, test, and commission the sprinkler system.



LSTK CONTRACTOR shall provide and install 2.5 lbs. (1.13 Kg) portable Multipurpose dry chemical Class ABC & 2.5 lbs. (1.13 Kg) Sodium Bicarbonate Residential Kitchen Fire Extinguishers as shown on the drawings. Type, capacity and distribution of the extinguishers shall be in full compliance with NFPA-10, SAES-B-019, SAES-M-100, & SAES-U-101. Where indicated, place the extinguisher in recessed cabinets. Mount other extinguishers on wall with complete support and bracket necessary signage, and accessories.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

40 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

ASZ

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA LSS

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

2.11.

ELECTRICAL

2.11.1.

General 

LSTK CONTRACTOR shall provide a complete detailed design for the electrical power system associated with this Project, in accordance with Saudi Building Code (SCB-Volume 4) and the latest edition of NFPA-70 (National Electrical Code), as supplemented and modified by Saudi Aramco Engineering Standards, Specifications, Procedures, Standard Drawings, Library Drawings, Engineering Report and General Instructions. The basic power system criteria shall be per Saudi Aramco Engineering Standard SAES-P-100. All Mandatory Saudi Aramco Engineering Requirements (MSAERs) should be strictly implemented.



LSTK CONTRACTOR shall ensure that detailed design include preparation of drawings and documents for all activities that requires sizing, purchase, install, demolition, Modification, redesign of existing drawings based on new load requirement and test, commission successfully all the electrical equipment and accessories associated with the SCOPE.



LSTK CONTRACTOR shall ensure that the drawing and document package includes, but not limited to, electrical equipment layouts; lighting, power, control and grounding layouts; cable and conduit routing; trench layouts; electrical installation details; electrical single-line diagrams; protection and metering schematic diagrams; block, wiring, schematic and interconnection diagrams; panelboard schedules; cable and conduit schedules; and electrical calculations, studies, and ETAP modeling especially for power supply tie-ins and expansion on the substation. All power supply passes the power quality requirements in accordance to the SAES also ensure that the design and drawing package is required for operations and maintenance personnel to energize operate and maintain the electrical system safely.



LSTK CONTRACTOR shall install and connect Two Pad mounted Switchgears (46-E333 & 46-E334) and associated MV cabling under package 6 scope. These Two Pad mounted switchgears (46-E333 & 46-E334) will be fed from Switchgears 46-E331 & 46-E332 which are part of Package 2 Scope of work. The LSTK CONTRACTOR shall install and connect package substations, MV Looping Devices, Transformers, MV Cables, LV Cables, Lighting Poles, Street and Alley lighting and cables, Landscape lighting and cables, Main Distribution Panel board (MDP), Low Voltage Distribution Panel (LVDB), Lighting control panels and other necessary electrical equipments required by SOW.



LSTK CONTRACTOR shall design, prepare, supply and install MV cables, from loop 32 (See DWG# HA-273925) and from loop 34 (See DWG# HA-273925) to two GSM towers (See DWG# HA-273925 and HA-273925) providing 112.5kVA, 13.8KV-400/230V Pad mounted transformer (loop feed) including but not limited to: 13.8 KV Cables, termination, duct banks, conduits, spacers, excavation, filling, marking, tagging and other accessories as per Mandatory Saudi Aramco Engineering Requirements (MSAER’s).



LSTK CONTRACTOR shall install and connect all pad mounted switchgears, package substation, MV Looping Devices, Transformers, MV Cables, LV Cables,

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

41 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA

Lighting Poles, Street and Alley lighting cables, Main Distribution Panel board (MDP), Low Voltage Distribution Panel (LVDB) and other necessary electrical equipments required by SOW

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:



LSTK CONTRACTOR shall supply and install all equipments, supports and accessories including, but not limited to, cables, raceways, conduits and fittings, lighting, grounding, protection devices, panel boards, power controlling and metering devices, power supply by disconnect switches for mechanical equipments, EWHs, AHUs, FCUs, PACUs, Water Pumps, Fire Pumps, and associated accessories and supports to complete the SCOPE unless specifically noted otherwise. Testing, pre-commissioning, commissioning and passing the entire performance test requirement is also included.



LSTK CONTRACTOR shall ensure that all CONTRACTORS supplied materials conform to the latest edition of the applicable Saudi Aramco Materials System Specifications (SAMSS). Materials which have not been specified by SAMSS must be approved by the Saudi Aramco Representative prior to use. Samples and brochures of these materials shall be submitted for review and approval.



LSTK CONTRACTOR shall be responsible for all design, procurement, vendor inspection, installation, checkout, testing, electrical energization certificates, pre-commissioning, and commissioning assistance of electrical equipment and overall electrical systems provided for this Project SCOPE. The electrical-system design, selection of equipment and installations shall be such that highest achievable levels of safety, reliability and availability are obtained and maintained for the new facilities within the confines of the relevant codes and standards, and design basis as detailed in the Project Proposal drawings and documents.



LSTK CONTRACTOR shall be responsible to complete the detailed-design engineering to the level that all aspects of design, procurements, construction, commissioning, cutover, and handover are covered.. During detailed engineering, the LSTK CONTRACTOR shall be responsible for determining final sizes and ratings of electrical equipment and materials to meet actual site and final design requirements in accordance with SAUDI ARAMCO Standards and Specifications.



Specific references to the Saudi Aramco Standards, Procedures and Specifications quoted in this document are strictly to point to the appropriate documents as references and shall not be taken as the only references. Other Saudi Aramco documents may also apply to the equipment and/or design. The LSTK CONTRACTOR shall ensure that all relevant requirements in various documents are followed. Omission of any such references shall not relieve the LSTK CONTRACTOR of complying with the requirements. Reference to NFPA-70 is not repeated elsewhere as it shall be the primary design code.



LSTK CONTRACTOR shall design, prepare and issue equipment technical specifications, data sheets, and related documents for the Request for Quotation (RFQ). Subsequent activities including bid evaluation and recommendation of equipment vendors shall be carried out as well.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

42 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

LSS

YAA LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

YAA

ASZ

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

2.11.2.

YAA

LSTK CONTRACTOR shall submit complete calculations confirming that all electrical equipments are adequately sized prior to placing relevant purchase orders.



LSTK CONTRACTOR shall provide three (3) “As-Built” red-lined copies of drawings and documents for all equipment and systems that are modified, added or deleted in the course of this Contract. The LSTK CONTRACTOR shall maintain an updated marked-up set of drawings on stick files during the duration of the Project, accessible to Saudi Aramco personnel.

CONTRACTOR`s Overall Responsibilities. 

LSTK Contractor must handle over all responsibilities for this Package 6 including but not limited to the following: Design, Provide and install Power Distribution equipment including cabling as shown on drawings considering existing power supply network.



Verify and finalize Load calculation and Earthling Calculation (Typical to existing Dhahran Hills housing) 

20 units – Three Bedroom

-

Front Loaded



149 units – Three Bedroom

-

Rear Loaded



97 units - Four Bedroom

-

Rear Loaded

Electrical Street Lighting (Alley Lighting)

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:



01/21/16

CERTIFIED



Design, Provide and install a complete functional lighting system composed of lighting poles, lighting fixtures, lighting fixture mounted photocell and its accessories including concrete pedestal and cabling as shown on drawings



Design, provide and install complete functional electrical system to provide power including lighting and general power supply from nearest Main Distribution Panel (MDP) considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements. Electrical equipments to be installed are shown on drawings.

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS

HA-273931 HA-273932.001 to 007

ASZ 01/21/16

Over-all Street Lighting/Parking Layout Street/parking Lighting Layout-Enlarged

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

Landscape Lighting

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:



Design, Provide and install a complete functional lighting system composed of Lighting panelboards, Lighting control system, lighting poles, Bollards, lighting fixtures, lighting fixture mounted photocell and its accessories including concrete pedestal and cabling as shown on drawings



Design, provide and install complete functional electrical system to provide power including lighting and general power supply from nearest Main Distribution Panel

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

43 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

LSS

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

HA273933 HA-273934.001 to 011

Three Bedroom Villa – Front Loaded (one and Half Floors)

ISSUED FOR 90% SUBMITTAL



01/21/16

F

00

Design, provide and install complete functional electrical system to provide power including lighting and general power supply considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements. Electrical equipment to be installed as shown on drawings. HA-274015 HA274015 HA-274016 HA-274016 HA-274017 HA-274018



Lighting Layout – First Floor Lighting Layout – Second Floor Power Layout – First Floor Power Layout – Second Floor Power Distribution Layout Grounding layout

Design, provide and install Carbon Monoxide and Multi-station Smoke Alarms in accordance with IRC 2009 and NFPA 72, and as shown on the drawing. HA-274003

DISCIPLINE ENGINEER SH

FDAS Layout

Three Bedroom Villa – Front Loaded (one and Half Floors) - Mirror

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Over-all landscape lighting layout Landscape Lighting Layout-Enlarged



01/21/16

CERTIFIED YAA 01/21/16

Design, provide and install complete functional electrical system to provide power including lighting and general power supply considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements. Electrical equipment to be installed as shown on drawings.

DATE: CONSTRUCTION AGENCY YAA

HA-274021 HA-274021 HA-274022 HA-274022 HA-274023 HA-274024

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:



BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Lighting Layout – First Floor Lighting Layout – Second Floor Power Layout – First Floor Power Layout – Second Floor Power Distribution Layout Grounding layout

Design, provide and install Carbon Monoxide and Multi-station Smoke Alarms in accordance with IRC 2009 and NFPA 72, and as shown on the drawing. HA-274005 HA-274005

FDAS Layout - First Floor FDAS Layout - Second Floor

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

44 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

(MDP) considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements. Electrical equipments to be installed are shown on drawings.

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

LSS



Design, provide and install complete functional electrical system to provide power including lighting and general power supply considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements.. Electrical equipment to be installed as shown on drawings. HA-274510 HA-274510 HA-274511 HA-274511 HA-274512 HA-274513



Design, provide and install Carbon Monoxide and Multi-station Smoke Alarms in accordance with IRC 2009 and NFPA 72, and as shown on the drawing.



DISCIPLINE ENGINEER SH

01/21/16

CERTIFIED YAA 01/21/16



DATE: CONSTRUCTION AGENCY YAA

01/21/16

OPERATIONS ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:



BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

FDAS Layout – First Floor FDAS Layout – Second Floor

Four Bedroom Villa – Rear Loaded Option B

DATE: EDSD VERIFICATION

Lighting Layout – First Floor Lighting Layout – Second Floor Power Layout – First Floor Power Layout – Second Floor Power Distribution Layout Grounding layout

Design, provide and install Carbon Monoxide and Multi-station Smoke Alarms in accordance with IRC 2009 and NFPA 72, and as shown on the drawing. HA-274503 HA-274503

DATE:

REVISION REVISIONCERTIFICATION CERTIFICATE

Design, provide and install complete functional electrical system to provide power including lighting and general power supply considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements.. Electrical equipment to be installed as shown on drawings. HA-274517 HA-274517 HA-274518 HA-274518 HA-274519 HA-274531

01/21/16 DATE: PROJECT ENGINEER LSS

00 THIS INDICATES THAT REV. NO.__________

FDAS Layout

Three Bedroom Villa – Rear Loaded, 18M Wide Lot, Option B - Mirror

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

HA-274502

DATE:

Lighting Layout – First Floor Lighting Layout – Second Floor Power Layout – First Floor Power Layout – Second Floor Power Distribution Layout Grounding layout

Design, provide and install complete functional electrical system to provide power including lighting and general power supply considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements.. Electrical equipment to be installed as shown on drawings. HA-274595 HA-274595

Lighting Layout - First Floor Lighting Layout - Second Floor

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

45 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

Three Bedroom Villa – Rear Loaded, 18M Wide Lot, Option B

YAA

YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

DESCRIPTION

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

HA-274596 HA-274596 HA-274597 HA-274598



10-01382 01/21/16

FDAS Layout

Four Bedroom Villa – Rear Loaded Option B - Mirror 

Design, provide and install complete functional electrical system to provide power including lighting and general power supply considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements.. Electrical equipment to be installed as shown on drawings. HA-274601 HA-274601 HA-274602 HA-274602 HA-274603 HA-274604



00

F

Design, provide and install Carbon Monoxide and Multi-station Smoke Alarms in accordance with IRC 2009 and NFPA 72, and as shown on the drawing. HA-274578

DISCIPLINE ENGINEER SH

Lighting Layout - First Floor Lighting Layout - Second Floor Power Layout - First Floor Power Layout - Second Floor Power Distribution Layout Grounding layout

Design, provide and install Carbon Monoxide and Multi-station Smoke Alarms in accordance with IRC 2009 and NFPA 72, and as shown on the drawing. HA-274573 HA-274573

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Power Layout - First Floor Power Layout - Second Floor Power Distribution Layout Grounding layout

FDAS Layout – First Floor FDAS Layout – Second Floor

Stand Alone Toilets

01/21/16



CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16

Design, provide and install complete functional electrical system to provide power including lighting and general power supply considering health/safety scope responsibilities but not limited to grounding, testing, pre-commissioning, commissioning and passed all the performance test requirements.. Electrical equipment to be installed as shown on drawings.

DATE:

OPERATIONS

HA-274676 HA-274677 HA-274677

ASZ 01/21/16

    

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

Manufacturers (Recommended):

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Lighting Layout Power Layout Grounding Layout

Lighting Fixtures: GE, COOPER LIGHTING, NLC, XAL, DISANO and PHILIPS. Wiring Devices: MK. Disconnect Switch: GE, Schneider (Square D). Grounding Accessories: Furse. Cables & Wires: Saudi Cables, Riyadh Cables.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

46 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

Any other materials shall be under Saudi Aramco approved Vendor 2.11.3

ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

FIRE/GAS DETECTION AND ALARM SYSTEM The fire/gas detection and alarm system under this SCOPE shall cover the construction of 266 single family residential villas of three (3) different types;    

20 villas Three Bedroom Front Loaded (9 Villas are mirrored from the original) 149 villas Three Bedroom Rear Loaded – B (71 villas are mirrored from the original) 97 villas Four Bedroom Rear Loaded – B (47 villas are mirrored from the original) And / Or other related support facilities which is within the boundary limit of Package 6

LSTK CONTRACTOR shall provide a complete detailed design, installation, testing and commissioning for the Fire/Gas Detection and Alarm System associated with this project, in compliance with the latest standard;     

DISCIPLINE ENGINEER SH

NFPA-72 (National Fire Alarm and Signaling Code) IBC (International Building Code) IRC (International Residential Code) NFPA-70 (National Electrical Code) Supplemented by Saudi Aramco Engineering Standards, Specifications, Procedures, Standard Drawings, Library Drawings and General Instructions.

The fire detection and alarm system for the residential/villa buildings shall include all the sleeping rooms, immediate vicinity to sleeping rooms and mechanical rooms duct detectors.

01/21/16

DATE: PROJECT ENGINEER LSS DATE:

Package substation, Switchgears, Panel Boards: GE, ABB, Schneider. MV Connectors & Accessories: 3M, Rycom, Nissad.

LSTK CONTRACTOR shall supply and install all equipment, including, but not limited to, cables, raceways, conduits, fittings, and associated accessories and supports to complete the SCOPE unless specifically noted otherwise.

01/21/16

CERTIFIED YAA 01/21/16 DATE:

LSTK CONTRACTOR shall ensure that supplied materials shall be UL Certified and Listed.

CONSTRUCTION AGENCY YAA

01/21/16 DATE:

LSTK CONTRACTOR shall ensure that all CONTRACTORS - supplied materials conform to the latest edition of the applicable Saudi Aramco Materials System Specifications (SAMSS). Materials which have not been specified by SAMSS must be approved by the Saudi Aramco Representative prior to use. Samples and brochures of these materials shall be submitted for review and approval.

OPERATIONS ASZ 01/21/16

BY:

Contractor shall install, in each villa, interconnected single station smoke alarms, carbon monoxide alarm, outdoor weatherproof horn/strobes, for villa dwelling units in consistent with above mentioned standards.

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

The smoke alarm, carbon monoxide alarm, horn and strobe alarm, and flow switch mechanical interface shall receive primary power from the building 230V AC power CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

47 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

 

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

LSTK CONTRACTOR shall ensure that the submitted shop drawings and calculations shall be prepared / certified by a qualified engineer approved by Saudi Aramco. LSTK CONTRACTOR shall ensure that installation CONTRACTORS shall be qualified according to 2010 NFPA 72, Section 10.4.2 as follows; Personnel who are professionally registered, licensed, or certified to install fire alarm systems. OR personnel who are certified by an internationally recognized certification organization. Personnel who are factory trained and certified for fire alarm system installation and emergency communication system installation of the specific type and brand of system by the manufacturer of the fire alarm system.

ISSUED FOR 90% SUBMITTAL

10-01382 01/21/16

LSTK CONTRACTOR shall be responsible for all design, procurement, vendor inspection, installation, checkout, testing, electrical energization certificates, precommissioning, and commissioning assistance of system devices and overall electrical systems provided for this Project SCOPE. The electrical-system design, selection of equipment and installations shall be such that highest achievable levels of safety, reliability and availability are obtained and maintained for the new facilities within the confines of the relevant codes and standards, and design basis as detailed in the Project Proposal drawings and documents. The drawings and documents attached with this package shall be the basis of the LSTK CONTRACTOR for designing the fire alarm and detection system and preparing shop drawings and documents. However, as these drawings and documents are based on preliminary engineering, the LSTK CONTRACTOR shall review, verify, modify, revise and prepare additional engineering drawings or documents based on site conditions and other considerations arising during shop engineering to reflect the intent of the facilities.

F

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

LSTK CONTRACTOR shall be responsible to complete the shop-design engineering to the level that all aspects of design, procurements, construction, commissioning, cutover, and handover are covered; as shown on the drawings and data sheets issued are based on best knowledge at the time they were developed. The LSTK CONTRACTOR shall be responsible to meet actual site and final design requirements in accordance with SAUDI ARAMCO Standards and Specifications.

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ

Specific references to the Saudi Aramco Standards, Procedures and Specifications quoted in this document are strictly to point to the appropriate documents as references and shall not be taken as the only references. Other Saudi Aramco documents may also apply to the equipment and/or design.

01/21/16

BY:

The LSTK CONTRACTOR shall ensure that all relevant requirements in various documents are followed. Omission of any such references shall not relieve the LSTK CONTRACTOR of complying with the requirements. Reference to NFPA-70 is not repeated elsewhere as it shall be the primary design code.

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

All fire alarm and detection system components indicated on the drawings and CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

48 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

and this shall be step-down to 110VAC form step-down transformer and secondary power supply from an individual 9 VDC battery inside each device. Such that, in case of any or one alarm in the building all the equipments will activate its audible warning sound.

00

10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

documents are preliminary. The LSTK CONTRACTOR shall verify and update them as part of the shop engineering phase. LSTK CONTRACTOR shall design, prepare and issue equipment technical specifications, data sheets, and related documents for the Request for Quotation (RFQ). LSTK CONTRACTOR shall provide three (3) “As-Built” red-lined copies of drawings and documents for all equipment and systems that are modified, added or deleted in the course of this Contract. The LSTK CONTRACTOR shall maintain an updated marked-up set of drawings on stick files during the duration of the Project, accessible to Saudi Aramco personnel.

10-01382 01/21/16

F

00

2.12.

COMMUNICATION

2.12.1.

General The Gigabit Passive Optical Network (GPON) will be established for the IP-based connectivity of the residential facilities. In this regard, Voice over IP (VoIP) shall be delivered by the service provider for all telephony needs. Also, IP-based TV (IPTV) shall be provided - as well as the guaranteed gigabit speed for the internet uplink of each Optical Network Terminal (ONT). The OSP infrastructure shall be Fiber-to-thehome (FTTH). The backbone infrastructure of FDT shall be FOC#7D0055 that will be interfaced from MH#DH279 of package 2.

2.12.2.

Communication site works

DISCIPLINE ENGINEER SH

The LSTK Contractor shall perform procurement, installation, construction, fabrication, manufacturing, testing, pre-commissioning, commissioning assistance, start up assistance and any other items or accessories required for construction, installation, demolition and operation, including transportation of items to the construction sites for the following Communications items:

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

LSTK CONTRACTOR’s Overall Responsibilities

01/21/16

CERTIFIED YAA 01/21/16

The LSTK Contractor must handle over all responsibilities for this Package 6 including but not limited to the following:

DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:



LSTK CONTRACTOR shall provide and construct TRENCH AND CONDUIT SYSTEM to be installed in concrete encasement and direct burial as per proposed TRENCH AND CONDUIT LAYOUT on drawing HA-273972 sheet 002-007.



LSTK CONTRACTOR shall supply, install, test and commission Outside Plant Fiber Optic Cable as per proposed SCHEMATIC DIAGRAM on drawing HA273971 sheet 003-014.



LSTK CONTRACTOR shall supply, install, test and commission Fiber Optic Distribution Panels, Fiber Patch Panel and its ancillaries at the identified endpoints of each Outside Plant Cabling System as per proposed SCHEMATIC DIAGRAM on drawing HA-273971 sheet 003-014.

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

49 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA

DISCIPLINE ENGINEER SH



LSTK CONTRACTOR shall provide and construct two (2) Pedestals with Guardrail, type UPC-1850 and its ancillaries located at the interface point/endpoint of proposed GSM tower on drawing HA-273972 sheet 003 and 005.



LSTK CONTRACTOR shall provide and install (12) Maintenance Hole type-1-B (3.1Mx1.85Mx2.0M) and (18) Service Maintenance Hole (1.838Mx1.5Mx2.0M) located as per TRENCH AND CONDUIT LAYOUT on drawing HA-273972 sheet 001-007.



LSTK CONTRACTOR shall provide and install two PVC 2-inch conduits from the interface point/endpoint of each entrance house of the Telecommunications cabinets (TC) at each residential house of the 266 houses.



LSTK Contractor shall provide and install 1-inch diameter PVC sub duct in the 2inch PVC entrance conduit in the drop point conduit system and 4 1-inch diameter sub duct in the proposed 4-inch diameter main duct before installing Fiber Optic Cable.



LSTK Contractor shall provide and install 60 units of Grounding Rod (GROUNDING COPPERWELD; 16MM DIA.; 3.0M (10FT) LONG) for MH and SMH and 2 units for Pedestal including its ancillaries.



LSTK Contractor shall provide and install 1 unit of Outdoor Cabinet, A Fiber Distribution Terminal (FDT) with 756 ports capacity and its ancillaries located near MH#TBD026B as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 004 and on drawing HA-273972 sheet 005.



LSTK CONTRACTOR shall Provide and install a 4-strand Fiber Optic Cable (FOC) from each telecom cabinet at each residential house of the 266 houses up to the nearest Maintenance Hole (MH) and Service Maintenance Hole (SMH) as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 003-013. The FOC shall be OSP-rated 4-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE:



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0055-01 between MH#TBD27C going to SMH#TBD010A and SMH#TBD013A as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 009.Also between MH#TBD27C and SMH#TBD0014A,MH#TBD015A and SMH#TBD016A on sheet 011. The FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0055-02 between MH#TBD27B going to MH#TBD012A and MH#TBD030A as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 010.Also between MH#TBD012A and SMH#TBD011A on sheet 013. Then between MH#TBD030A and SMH#TBD017A on sheet 012.Another 24-strand from MH#TBD27B up to SMH#TBD009A shown on sheet 009. The FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.

CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

50 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA

LSS

YAA LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

YAA

ASZ

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

01/21/16

F

00

DISCIPLINE ENGINEER SH

LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0055-03 between MH#TBD26B going to MH#TBD007A and SMH#TBD008A as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 008.Also between MH#TBD007A and SMH#TBD007B on sheet 013. Then between MH#TBD26B and SMH#TBD006A on sheet 007. The FOC shall be OSP-rated 24strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0055-04 between MH#TBD25C going to MH#TBD005A up to SMH#TBD005B as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 007 and 012 respectively. Also between MH#TBD25C and SMH#TBD004A up to SMH#TBD004B on sheet 006 and 012 respectively. The FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0055-05 between MH#TBD25B going to SMH#TBD003A as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 006. FOC shall be OSPrated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0084 from Communication Shelter under Package-3 passing at interface MH#DH279 under Package -2 going to proposed Pedestal#TBD01 as tie-in for GSM tower #8 as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 010 and 014. FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard. LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0085 from Communication Shelter under Package-3 passing at interface MH#DH279 under Package -2 going to proposed Pedestal#TBD02 as tie-in for GSM tower #7 as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 013014. FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



01/21/16 DATE: PROJECT ENGINEER LSS DATE:



01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0086 from Communication Shelter under Package-3 passing at interface MH#DH279 under Package -2 going to proposed MH#TBD028B as tie-in for GSM tower #9 under Package-7 as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 003. FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable, FOC#7D0055 at interface MH#DH279 going to proposed MH#TBD026B as tie-in for the existing cable FOC#7D0055 under Package-2 coming from Communication Shelter under PKG.3.Cable shall be terminated in the proposed FDT#04 located near MH#TBD026B as per SCHEMATIC DIAGRAM on drawing HA-273971 sheet 004. FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install a 24-strand Fiber Optic Cable,

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

51 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

ISSUED FOR 90% SUBMITTAL

10-01382 01/21/16

F



LSTK CONTRACTOR shall Provide and install 72-strand Fiber Optic Cables, FOC#7D0055-01 from Maintenance Hole MH#TBD27C up to proposed FDT#04 near MH#TBD026B as per SCHEMATIC LAYOUT on drawing HA-273971 sheet 003-004. The FOC shall be OSP-rated 72-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install 72-strand Fiber Optic Cables, FOC#7D0055-02 from Maintenance Hole MH#TBD27B up to proposed FDT#04 near MH#TBD026B as per SCHEMATIC LAYOUT on drawing HA-273971 sheet 004. The FOC shall be OSP-rated 72-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install 72-strand Fiber Optic Cables, FOC#7D0055-03 in Maintenance Hole MH#TBD26B up to proposed FDT#04 near MH#TBD026B as per SCHEMATIC LAYOUT on drawing HA-273971 sheet 004. The FOC shall be OSP-rated 72-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install 72-strand Fiber Optic Cables, FOC#7D0055-04 from Maintenance Hole MH#TBD25C up to proposed FDT#04 near MH#TBD026B as per SCHEMATIC LAYOUT on drawing HA-273971 sheet 004. The FOC shall be OSP-rated 72-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



LSTK CONTRACTOR shall Provide and install 72-strand Fiber Optic Cables, FOC#7D0055-05 from Maintenance Hole MH#TBD25B up to proposed FDT#04 near MH#TBD026B as per SCHEMATIC LAYOUT on drawing HA-273971 sheet 004. The FOC shall be OSP-rated 72-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.



At the MH/SMH, LSTK CONTRACTOR shall provide and install an OSP-rated FOC splice closure with built-in splicing organizer that should be able to accommodate 4-strand, 24-strand up to 72-strand FOC splices. With the supplied ancillaries for FOC splicing, all 4-strand FOC shall be fusion-spliced unto the backbone FOC. The multi-strand backbone FOC ranges from 24-strand to 72-strand OSP-rated.



LSTK CONTRACTOR shall make FOC testing as per SAES-T-634.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

1. Before installation for PKG.-2 backbone cables should have end-to-end test as per Site acceptance test (SAT) procedures. 2. Before installation for additional 24-strand and 72 strand backbone cables, FOC#7D0055-01-05,FOC#7D0084,7D0085,7D0086 and FOC# 7D0055 and 7D0056 and 4-strand FOC (drop cables),a Reel test on random strands – as CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

52 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

FOC#TBD7D0056 at interface MH#DH279 going to proposed MH#TBD028B as tiein for the existing cable FOC#7D0056 under PKG.-2 coming from Communication Shelter of PKG.-3 up to BLDG.# JH908 under PKG.-7 as per SHEMATIC DIAGRAM on drawing HA-273971 sheet 003. FOC shall be OSP-rated 24-strand Single Mode (SM) cable that is fully compliant with the recommendations of ITU-T G-652D standard.

00

10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

per Site acceptance test (SAT) procedures.

LSS

3. After installation of 4-strands FOC (drop cables) for residential houses, Shall have a Terminal-to-Terminal tests – as per Performance acceptance test (PAT) procedures.

JO/EWO

10-01382

10-01382

DATE

01/21/16

F

00

REV NO.

12/10/15

DESCRIPTION

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

Upon commissioning, sealant shall be applied on all underground voids between the sub-duct and conduits at end–points of EF and OSP conduits. LSTK Contractor of Package-6 is fully responsible of the interface manhole between package 6 and package 7 with all splices needed and accessories. LSTK Contractor of Package-6 shall early coordinate and fully cooperate in order to allow package 7 to install the conduit and cabling system in package 6 areas at street no.10B.Splicing of Fiber Optic Cable at all interface point (PKG-2, PKG-3, PKG-7) shall be done by the contractor who will install the cable last. Houses (Typical For All Types) CONTRACTOR shall perform procurement, installation, construction, fabrication, manufacturing, testing, pre-commissioning, commissioning assistance, start up assistance and any other items or accessories required for construction, installation, demolition and operation, including transportation of items to the construction sites for the following Communications items: A. Structured Cabling System (SCS) And Equipment Installation

1. Provision of a Telecommunications Closet (TC) and identified as TC-01. The TC size and location shall be fully compliant to the guidelines of SAES-T-570 “Design Residential Telecommunications Infrastructure”. The outside plant entrance facilities (EF) shall be established at the TC location.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

2. Provision of a Structured Cabling System (SCS). The SCS shall include provision of cableways, outlets, CAT-6 modular RJ45 jacks, CAT-6 UTP cables and Cat-6 wall-mounted patch panels for horizontal distribution. SCS for the houses shall be exclusive to the provision of UTP based cabling system only due to the IP-based provision of voice, data and video (VDV) by the GPON system of the service provider.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS

3. Provision of Telecommunications grounding system for the TMGB and its

ASZ

connectivity to the main ground grid of the house – as per guidelines on grounding provisions at TIA-607-B.

01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

B. Cable Support System

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

This project shall provide the necessary cableways required to support the Structured Cabling System inside the following buildings:  

Residential building 3 Bedroom Front Residential building 3 Bedroom Rear- Option B

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

53 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)



LSS

The facilities involved are horizontal and vertical cable runways, EMT conduits, outlet boxes and information outlets to the work areas. Installation shall be carried out in accordance with the manufacturer’s instruction, relevant SAUDI ARAMCO Standards, SAES-T-916, SAES-T-570 particularly and as per BICSI-TDM and EIA/TIA-568-C, 569-B and 606-B and NEC. C. Cabling System The construction work undertaken in this section includes the provisions and installation of the cables required to transport communications services between the cross-connect system and the served work areas. Commscope Systimax or equivalent Structured Cabling System will be employed to support all the communications transport requirements. All horizontal distribution cabling will be Commscope Systimax plus Unshielded Twisted Pair (UTP) plenum or equivalent cable (ANSI/TIA/EIA-568-C Category 6 compliant). All the cabling components, patch panels, patch cords, telecom outlets, etc. shall be Commscope Systimax SCS materials and shall be rated as Category 6 Compliant. The horizontal cabling on each floor will utilize a physical star-wired configuration. The cable will be run uninterrupted from the modular patch panel to the user outlets. The maximum allowable cable run is 90 meters.

DISCIPLINE ENGINEER SH

Only Commscope Systimax Certified Technicians are allowed to perform the cabling installation, termination and testing.

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Residential building 4 Bedroom Rear- Option B

The work shall also include the termination of cables and cable labeling.

01/21/16

The telecom information outlets are fed with 1” diameter EMT conduit concealed behind walls and partitions.

CERTIFIED YAA 01/21/16 DATE:

Information outlets shall be securely fastened to the wall openings. The telecommunications outlet drop will terminate two (2) Commscope Systimax 8-wire RJ 45 sockets (for voice, data or combination) using Commscope Systimax MGS400-318 GigaSpeed XL Modular IDC-RJ45 outlet, Cat 6. It is to be noted that only the 2” x 4” cover plate and sockets will be installed by this project.

CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

The Structured Cabling System (SCS) termination and testing shall be performed by Commscope Systimax “certified” installer. Copy of certification shall be attached to testing results documents.

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

D. Structured Cabling System Termination and Testing

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

SCS testing equipment must be as currently SAUDI ARAMCO use, FLUKE Omni scanner with link ware software v1.3.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

54 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

Test results shall be signed by the “certified” Commscope Systimax installer in each sheet and shall be witnessed by SAUDI ARAMCO representative. Testing shall be done in the presence of SAUDI ARAMCO representative. Minimum SAUDI ARAMCO representative shall be from representative/s of communications project inspection unit and Area IT.

ISSUED FOR 90% SUBMITTAL

Test results shall be submitted to IT/CE&TSD/CCD/PCG at least two copies (both hard and soft copy) in bookbinder format Detailed Scope of Work for Structured Cabling This project shall furnish and install, but not limited to, the following hardware’s:  Wall-mounted enclosures  Vertical Cable Runways  UTP Plenum-rated CAT6 cables  CAT6 Modular Outlets & Faceplates  CAT6 Modular Copper Patch Panel  Fiber Optic Patch Panels  CAT6 RJ45-to-RJ45 4-pair UTP patch cord  Fiber optic patch cords  Telecommunications Grounding System As part of the uniform wiring plan for communications, UTP wiring will be home run from the outlets/faceplates back to the Horizontal Cross-connect (HC) in the telecommunications cabinet (TC). Home run cabling method will be in EMT conduit system with 4-pair UTP cabling terminated into 8-conductor Modular Jacks in accordance T568A configuration.

01/21/16

F

00

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

Unless otherwise specified, two (2) ports per Telecom Information Outlets (IDC-toRJ45) shall be installed at each identified work area.

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

The faceplate and mounting frame shall be of flush mounted design. Each workstation outlet shall be with quadplex type faceplate. The quantity of modular CAT6 8-pin (IDCto-RJ45) jacks shall be on case to case bases. The default configuration shall be two (2) jacks per outlet. All outlets shall be wired with CAT6, 4-pair 24 AWG plenum-rated cable.

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

Below listed are the buildings that the Contractor shall provide SCS under this project.

DATE:

A. Distribution System - Cableways and Outlets 

10-01382-0008 (DCC) NO. _____________________

BY:

2.12.2..1. Residential Building Type 3 Bedroom Front Loaded

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONTRACTOR shall install cableways such as of 1” and 2” diameter EMT conduit and pull boxes up to each of the information outlet (IO) location of users as shown in drawing no. HA-274072.

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

55 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

Testing equipment shall bear calibration validity date sticker on the equipment itself. Copy of calibration validity certificate shall be attached to testing results document.

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

On IO points with up to two (2) RJ45 ports, contractor shall provide and install approximately fourteen (14) flush-mounted outlet box (4”X4”X2-1/4”)”) on wall. Height shall be 380mm above finished floor level (AFFL) for un-marked IO points, 1200mm AFFL for IO points with “WT” mark and 50mm below finished ceiling level (BFCL).IO point for WLAN.



At Wall-mounted Cabinet (TC-01), the contractor shall install approximately two (2) UTP patch panels with cat6 RJ45 jacks that are having the same as abovementioned specifications and configuration. For details, refer to drawing no. HA274074.



CONTRACTOR shall install approximately 14 of quadplex-type faceplate (ivory colored) on all other IO types. Unless otherwise specified, the default configuration shall be with 2 modular outlet jacks that are cat6 RJ45 in front and Insulation Displacement Connectors (IDC) at back using T568A termination configuration. Vacant slots shall be temporarily covered with “blank cover module”.



CONTRACTOR shall install a total of approximately 1525 meters of Cat 6 4-pair CMP-rated UTP cables. Cable densities for each IO points are easily deciphered through the suffixed Alpha characters at the outlet identifications. UTP cables shall be star-wired homeruns to the designated Telecommunication Cabinet. At the Residential Building, UTP cables shall be arranged and terminated into the designated ports at the UTP patch panels. At the outlet boxes, UTP cables shall be terminated into RJ-45 modular connectors with cable slacks of 3-to-6 inches. For details refer to drawing no. HA-274073.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

C. Grounding System – Distribution CONTRACTOR shall provide and install ground bonding using grounding lugs and #6 AWG stranded copper wire to all metallic cableways section joints – as well as between EMT conduit. Proper grounding bushing and grounding lugs must be utilized. For details, refer to drawing no. HA-274071.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

D. Grounding System at Telecommunications facilities

01/21/16 DATE:

OPERATIONS



At Residential Building, provide and install Telecommunications Main Grounding Busbar (TMGB), electro-tin plated copper bar with a dimension of 1/4"thick X 4" height X 20" width and its ancillaries as shown in drawing no. HA-274072.



CONTRACTOR shall provide and install ground bonding for all equipment cabinet and other metallic components using grounding lugs and #6 AWG stranded copper wire (or the gauge necessary to provide five (5) ohms maximum ground resistance) with insulated green with yellow stripes. The termination of grounding lugs at the busbar shall be compliant to the “PANI” grounding configuration as shown in drawing no. HA-274071.

ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

E. Communications Entrance Facility (EF) CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

56 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

01/21/16

F

00



B. Distribution System – UTP

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

CONTRACTOR shall provide and install a communications Entrance Facility (EF) at the telecommunications facility (TC-1) of each residential house. The EF shall have two 2-inch diameter PVC with an underground concrete encasement that protrudes up to the bottom of TC-1 cabinet which is about 830mm above finished floor level. The concrete encased PVC conduits shall terminate at 1000mm from the end of pavement outside the residential house. One of the PVC conduit shall have a 1-inch diameter sub-duct that is OSP-rated and will initially contain a pullrope. The other PVC conduit shall also have a pull-rope and shall be capped and sealed at both ends. For the TMGB connectivity to the ground grid, another 2-inch PVC conduit shall be provided beside the concrete encased PVC conduits which will also extend up to the bottom of TC-1. However, the other end of this PVC conduit shall terminate at the point nearest to the grounding grid established by the electrical engineering package. For details, refer to drawing nos. HA-274075. 2.12.2..2. Residential Building Type 3 Bedroom Rear- Option B A. Distribution System - Cableways and Outlets 

CONTRACTOR shall install cableways such as of 1” and 2” diameter EMT conduit and pull boxes up to each of the information outlet (IO) location of users as shown in drawing no. HA-274562.



On IO points with up to 2 RJ45 ports, contractor shall provide and install approximately 15 flush-mounted outlet box (4”X4”X2-1/4”)”) on wall. Height shall be 380mm above finished floor level (AFFL) for un-marked IO points, 1200mm AFFL for IO points with “WT” mark and 50mm below finished ceiling level (BFCL).IO point for WLAN.



At Wall-mounted Cabinet (TC-01), the contractor shall install approximately two (2) UTP patch panels with cat6 RJ45 jacks that are having the same as abovementioned specifications and configuration. For details, refer to drawing no. HA274564.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA

B. Distribution System – UTP

01/21/16 DATE: CONSTRUCTION AGENCY YAA



CONTRACTOR shall install approximately 15 of quadplex-type faceplate (ivory colored) on all other IO types. Unless otherwise specified, the default configuration shall be with 2 modular outlet jacks that are cat6 RJ45 in front and Insulation Displacement Connectors (IDC) at back using T568A termination configuration. Vacant slots shall be temporarily covered with “blank cover module”.



CONTRACTOR shall install a total of approximately 1220 meters of Cat 6 4-pair CMP-rated UTP cables. Cable densities for each IO points are easily deciphered through the suffixed Alpha characters at the outlet identifications. UTP cables shall be star-wired homeruns to the designated Telecommunication Cabinet. At the Residential Building, UTP cables shall be arranged and terminated into the designated ports at the UTP patch panels. At the outlet boxes, UTP cables shall be terminated into RJ-45 modular connectors with cable slacks of 3-to-6 inches. For details refer to drawing no. HA-274563.

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

57 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

C. Grounding System – Distribution

LSS

CONTRACTOR shall provide and install ground bonding using grounding lugs and #6 AWG stranded copper wire to all metallic cableways section joints – as well as between EMT conduit and the cable tray. Proper grounding bushing and grounding lugs must be utilized. For details, refer to drawing no. HA-274561.



At Residential Building, provide and install Telecommunications Main Grounding Busbar (TMGB), electro-tin plated copper bar with a dimension of 1/4"thick X 4" height X 20" width and its ancillaries as shown in drawing no. HA-274561.



CONTRACTOR shall provide and install ground bonding for all equipment cabinet and other metallic components using grounding lugs and #6 AWG stranded copper wire (or the gauge necessary to provide five (5) ohms maximum ground resistance) with insulated green with yellow stripes. The termination of grounding lugs at the busbar shall be compliant to the “PANI” grounding configuration as shown in drawing no. HA-274561.

10-01382

E. Communications Entrance Facility (EF)

01/21/16

CONTRACTOR shall provide and install a communications Entrance Facility (EF) at the telecommunications facility (TC-1) of each residential house. The EF shall have two 2-inch diameter PVC with an underground concrete encasement that protrudes up to the bottom of TC-1 cabinet which is about 830mm above finished floor level. The concrete encased PVC conduits shall terminate at 1000mm from the end of pavement outside the residential house. One of the PVC conduit shall have a 1-inch diameter sub-duct that is OSP-rated and will initially contain a pullrope. The other PVC conduit shall also have a pull-rope and shall be capped and sealed at both ends. For the TMGB connectivity to the ground grid, another 2-inch PVC conduit shall be provided beside the concrete encased PVC conduits which will also extend up to the bottom of TC-1. However, the other end of this PVC conduit shall terminate at the point nearest to the grounding grid established by the electrical engineering package. For details, refer to drawing no. HA-274565.

F

00

REV NO.

12/10/15

DATE

10-01382

JO/EWO

DESCRIPTION

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

D. Grounding System at Telecommunications facilities

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

2.12.2..3. Residential Building Type 4 Bedroom Rear- Option B

01/21/16

A. Distribution System - Cableways and Outlets

DATE:

OPERATIONS ASZ 01/21/16



CONTRACTOR shall install cableways such as of 1” and 2” diameter EMT conduit and pull boxes up to each of the information outlet (IO) location of users as shown in drawing no. HA-274652.



On IO points with up to 2 RJ45 ports, contractor shall provide and install approximately 16 flush-mounted outlet box (4”X4”X2-1/4”)”) on wall. Height shall be 380mm above finished floor level (AFFL) for un-marked IO points, 1200mm AFFL for IO points with “WT” mark and 50mm below finished ceiling level (BFCL).IO point for WLAN.



At Wall-mounted Cabinet (TC-01), the contractor shall install approximately two (2)

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

58 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA

ISSUED FOR 90% SUBMITTAL

01/21/16

F

00

CONTRACTOR shall install approximately 16 of quadplex-type faceplate (ivory colored) on all other IO types. Unless otherwise specified, the default configuration shall be with 2 modular outlet jacks that are cat6 RJ45 in front and Insulation Displacement Connectors (IDC) at back using T568A termination configuration. Vacant slots shall be temporarily covered with “blank cover module”.



CONTRACTOR shall install a total of approximately 1220 meters of Cat 6 4-pair CMP-rated UTP cables. Cable densities for each IO points are easily deciphered through the suffixed Alpha characters at the outlet identifications. UTP cables shall be star-wired homeruns to the designated Telecommunication Cabinet. At the Residential Building, UTP cables shall be arranged and terminated into the designated ports at the UTP patch panels. At the outlet boxes, UTP cables shall be terminated into RJ-45 modular connectors with cable slacks of 3-to-6 inches. For details refer to drawing no. HA-274653.

C. Grounding System – Distribution 

DISCIPLINE ENGINEER SH

CONTRACTOR shall provide and install ground bonding using grounding lugs and #6 AWG stranded copper wire to all metallic cableways section joints – as well as between EMT conduit and the cable tray. Proper grounding bushing and grounding lugs must be utilized. For details, refer to drawing no. HA-274651.

D. Grounding System at Telecommunications facilities

01/21/16 DATE: PROJECT ENGINEER LSS DATE:





At Residential Building, provide and install Telecommunications Main Grounding Busbar (TMGB), electro-tin plated copper bar with a dimension of 1/4"thick X 4" height X 20" width and its ancillaries as shown in drawing no. HA-274651.



CONTRACTOR shall provide and install ground bonding for all equipment cabinet and other metallic components using grounding lugs and #6 AWG stranded copper wire (or the gauge necessary to provide five (5) ohms maximum ground resistance) with insulated green with yellow stripes. The termination of grounding lugs at the busbar shall be compliant to the “PANI” grounding configuration as shown in drawing no. HA-274651.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

E. Communications Entrance Facility (EF)

BY:

CONTRACTOR shall provide and install a communications Entrance Facility (EF) at the telecommunications facility (TC-1) of each residential house. The EF shall have two 2-inch diameter PVC with an underground concrete encasement that protrudes up to the bottom of TC-1 cabinet which is about 830mm above finished floor level. The concrete encased PVC conduits shall terminate at 1000mm from the end of pavement outside the residential house. One of the PVC conduit shall have a 1-inch diameter sub-duct that is OSP-rated and will initially contain a pullrope. The other PVC conduit shall also have a pull-rope and shall be capped and

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

59 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

ASZ

B. Distribution System – UTP

LSS

YAA

UTP patch panels with cat6 RJ45 jacks that are having the same as abovementioned specifications and configuration. For details, refer to drawing no. HA274654.

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

LSS

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

sealed at both ends. For the TMGB connectivity to the ground grid, another 2-inch PVC conduit shall be provided beside the concrete encased PVC conduits which will also extend up to the bottom of TC-1. However, the other end of this PVC conduit shall terminate at the point nearest to the grounding grid established by the electrical engineering package. For details, refer to drawing nos. HA-274655.

10-01382

10-01382 01/21/16

4.

The CONTRACTOR and all CONTRACTOR employees, agents and subcontractors shall comply at all times with all applicable Saudi Arab Government safety, health and environmental regulations and all SAUDI ARAMCO General Instructions (G.I.s), and other related rules and regulations. Specifically, CONTRACTOR shall comply with the provisions of the SAUDI ARAMCO Construction Safety Manual (CSM), SAUDI ARAMCO Safety Handbook, all other such related requirements and any other successor manual or manuals that replace these. In case of conflicting requirements, the most stringent requirement shall apply. CONTRACTOR shall also take or cause to be taken any additional measures under the direction of the Company Representative to prevent the injury or death of any person, or any damage or loss of property, loss of process, or damage to the environment during CONTRACTORs performance of the WORK. Supervisory personnel or other qualified staff shall be present at the WORK Site while any WORK is in progress. SAUDI ARAMCO reserves the right to monitor and inspect any WORK Site, lay-down yard, fabrication yard, clinic, camp and dining facility (on or off SAUDI ARAMCO property) for compliance with the above referenced Safety, Health and Environmental Requirements. SAUDI ARAMCO reserves the right to reject, remove from site, or have CONTRACTOR destroy any tools or equipment found to be defective or of substandard quality. Homemade, including shop-made, tools are strictly prohibited. CONTRACTOR shall be responsible to identify and address all potential safety, health and environmental issues in accordance with Saudi Aramco Safety Management Guide for Contractor Pre-Job Safety Explanation Meetings checklist (Loss Prevention Guide 07-003-2007).

F

01/21/16 DATE: PROJECT ENGINEER LSS 01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

EDSD VERIFICATION

DATE:

00 THIS INDICATES THAT REV. NO.__________

SAFETY LSTK CONTRACTOR shall comply with Saudi Aramco standard Safety requirements and as per Schedule "D" of the construction contract Recommendations mentioned in the Traffic Impact during Construction report and Environmental Impact Assessment Report shall be included to the scope of LSTK CONTRACTOR during the execution of the Work.

DISCIPLINE ENGINEER SH

DATE:

PROJECT DESIGN STANDARD CUT-OFF DATE The Project proposal was based on cut-off date of March 2014 Saudi Aramco Engineering Standards and procedures. However, Detailed Design shall be carried out by LSTK Contractor based on latest Saudi Aramco Engineering Standards SAES and procedures available during the LSTK contract award date. Adjustments to the scope/design shall be implemented at detailed design stage to reflect any changes in the Saudi Aramco specifications and standards than the project proposal.

00

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

3.

5.

SCOPE EVALUATIONS AND EXECUTIONS CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

60 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

YAA

LSS

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

YAA

The LSTK CONTRACTOR shall have full responsibility for the engineering and design of all required items, elements and systems necessary for the complete, functional and safe operation of the entire scope of equipment and systems. The design criteria and contract documents included are not all-inclusive and represent minimum requirements. Any additional elements or items required to achieve the correct and safe operation of the system shall be engineered, designed and shall be in place, complete and functional. It is not the intent of this Document to describe all engineering details. It shall be the responsibility of the LSTK CONTRACTOR to select and supply all materials, techniques and equipment that have been designed and fabricated for the required services in accordance with all applicable codes and standards and current standards of engineering and workmanship suitable for the intended purpose. Project reference drawings are listed in Drawing Control Log of this Project Proposal. All Drawings in this log shall constitute an integral part of the WORK scope. This Detailed Project Description, project proposal documents and drawings are coherent and not to be used separately. Any item mentioned in Detailed Project Description and not shown on drawings or shown on drawings but not mentioned in Detailed Project Description shall be of like effect as if shown or mentioned in both. The LSTK CONTRACTOR shall refer to the drawings and Reference Standards for a more comprehensive description of the work. The LSTK CONTRACTOR shall procure and supply all materials and consumables required to complete the work in accordance with project drawings, job specifications and SAUDI ARAMCO Standards and perform all other procurement activities as required.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

6.

01/21/16

PROJECT STUDIES REQUIREMENTS Results and recommendation of all Project studies listed below shall be incorporated during the detail design of the project.

CERTIFIED YAA 01/21/16 DATE:

Where necessary, the LSTK CONTRACTOR shall use approved sub-Contractor, licensed software and experienced personnel to complete these studies/ analysis.

CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS

6.1.

ASZ

Preliminary Hydraulic (steady state & Transient) Analysis will be facilitated by SA during Project Proposal phase for Drinking Water Network, Raw/Fire Water Network, Irrigation Water Network and Sewage Network. The LSTK CONTRACTOR shall conduct hydraulic analysis to consider extended period for minimum Day demand and maximum Day demand Analysis during detail design for Drinking Water, Raw/Fire Water, Irrigation Water and Sewage Networks in compliance to all the requirements of latest Saudi Aramco standards including SAEP-27.

01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

EDSD VERIFICATION

DATE:

00 THIS INDICATES THAT REV. NO.__________

HYDRAULICS (STEADY STATE & TRANSIENT) ANALYSIS

6.2.

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Environmental Impact Assessment (EIA) for the project was prepared as per SAEP-13 CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

61 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

LSS

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

and SAEP-14. However, As per SA procedures the EIA study shall be updated and resubmitted to EPD at 50% DD. LSTK CONTRACTOR shall comply with the recommendations mentioned in EIA study reports and include to the scope during detail engineering and construction.

6.3.

Recommendations of the Traffic Management Plan and Traffic Impact Study shall be considered by LSTK CONTRACTOR during the detailed design preparation and upon execution.

6.4.

LESSONS LEARNED IMPLEMENTATION (LLI) WORKSHOP The Lessons Learned data collection and Implementation workshop was performed during project proposal. LSTK CONTRACTOR shall consider and refer to Lessons learned Implementation report for proper work execution. LSTK CONTRACTOR shall perform work shop sessions for Lessons Learned Implementation (LL-I) and Lessons Learned Collection (LL-C) at each of the detail design stage and construction stage.

10-01382 01/21/16

F

00

10-01382

JO/EWO DATE

12/10/15

PROJECT EXECUTION PLANNING WORKSHOP (PEPW) The Project Execution Planning Workshop (PEPW) was performed during project proposal. LSTK CONTRACTOR shall refer to PEPW report and to implement all related recommendations during the detailed design preparation and during construction.

6.5.

REV NO.

TRAFFIC MANAGEMENT PLAN AND TRAFFIC IMPACT STUDY

DISCIPLINE ENGINEER SH

6.6.

GEOTECHNICAL (SOIL INVESTIGATION) ANALYSIS

01/21/16

DATE: PROJECT ENGINEER LSS DATE:

The soil investigations provided by SA, for the proposed facilities under this project and the Geotechnical Investigation Report were used as the design basis for civil/structural work for this project.

01/21/16

CERTIFIED

LSTK CONTRACTOR shall check the above mentioned report during detail design and shall adopt the recommendation. Any additional boreholes if required shall be conducted by LSTK CONTRACTOR for finalization of detailed design.

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

6.7.

01/21/16 DATE:

TOPOGRAPHIC SURVEY AND ROUTING

OPERATIONS

Topographic Survey was provided by SA during project proposal phase. The LSTK CONTRACTOR shall validate the Topographic Survey of the proposed route and resurvey if required based upon the alignment sheets provided in the IFB and complete the detail design accordingly. The LSTK CONTRACTOR shall perform all necessary survey of the intended pipeline routes, grade and vertical profile required to support detail design and construction. Right of Way shall be restored based on the survey monuments and Plan & Profile drawings. The LSTK CONTRACTOR shall stake the proposed facilities and utilities boundaries and right of way limits prior to construction per Saudi Aramco standards. The LSTK CONTRACTOR shall check and verify all dimensions and elevations at each site.

ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

62 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

DESCRIPTION

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

LSTK CONTRACTOR as part of his Scope of Work, shall investigate and establish any development which may have been taken place since the topographical survey has carried out during Project Proposal stage and shall submit detailed documentation to support any proposed realignment of the surveyed points resulting from the actual conditions encountered during his investigations or as required by SAUDI ARAMCO. Any realignment of the surveyed points shall be subject to SAUDI ARAMCO approval prior to implementation.

6.8.

10-01382 01/21/16

F

00

Underground Radar mapping was provided by SA during project proposal stage. LSTK CONTRACTOR shall consider and refer to all provided drawings during detail design and verify the accuracy of it. CONTRACTOR shall conduct Underground Radar Mapping for suspected and uncovered areas prior to work execution.

6.9.

SITE SURVEY The LSTK CONTRACTOR shall perform during detailed design any survey work required to expand / update the available information, so as to allow for a safe installation of the facilities, in accordance with code requirements, the drawings and specifications in this CONTRACT, and good engineering practice in the opinion of Saudi Aramco. The LSTK CONTRACTOR shall perform all survey work required for the existing facilities and modification of the existing Saudi Aramco communication facilities shall be in accordance with good engineering practice to the satisfaction of Saudi Aramco.

DISCIPLINE ENGINEER SH

All surveys are to be performed in accordance with the drawings and specifications included in this CONTRACT, and in accordance with good engineering practice to the satisfaction of Saudi Aramco.

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

UNDERGROUND RADAR MAPPING

LSTK CONTRACTOR shall submit reservation forms to Saudi Aramco for all copper cable pairs, sub ducts, conduits, equipment locations and survey ports required by this project.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

7.

PROCUREMENT All materials to be supplied under this project shall comply with the applicable SAUDI ARAMCO Engineering Standards (SAES), SAUDI ARAMCO Material System Specifications (SAMSS), and relevant industrial applicable standard.

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

The LSTK CONTRACTOR shall procure all materials, equipment, commissioning and start-up spares required, including those of a temporary nature for testing and commissioning etc. All materials and equipments procured new from approved SAUDI ARAMCO vendor and shall be in accordance with the requirements in the relevant codes, and the provisions of this CONTRACT.

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

Unless otherwise expressly provided on the Drawings or in any of the other CONTRACT Documents, only new materials and equipment shall be incorporated in the work. All materials and equipment furnished by the CONTRACTOR under this CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

63 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL 10-01382

DESCRIPTION JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

project shall be subjected to inspection and approval by SAUDI ARAMCO Representative. Technical data and information for all the materials furnished by the LSTK CONTRACTOR for this project shall be submitted to SAUDI ARAMCO Representative in accordance with the Contract documents for review and approval prior to purchase. All inspections, certificates, records, and data for installed equipment shall be submitted or performed in accordance with the SAUDI ARAMCO Inspection Procedures.

8.

A detail project interface matrix and interface drawings shall be prepared by the LSTK CONTRACTOR during detail design of the project. The LSTK CONTRACTOR shall be responsible to coordinate with Saudi Aramco representatives and MOC to finalize the interface issues, create all necessary design documents, execution of the construction works and maintain safety issues.

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

8.1.

INTERFACES WITH OTHER BIs & EWOs This budget item is including wireless water meters and shall be interfaced to existing Central Workstation and Management System (CWSMS SUPPLIED BY PACKAGE 4). BI-10-01382 INCREMENT II LSTK Contractor for Package 6 shall co-ordinate, support with contractor of Package 4 till completion of testing, commissioning of CWSMS for new wireless water meters.

DISCIPLINE ENGINEER SH

8.2.

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

PROJECT INTERFACES

PROJECT PHYSICAL INTERFACES Project physical interfaces are the tie-in points to the existing utilities and facilities as described in Contract Documents. LSTK CONTRACTOR is fully responsible and shall provide the interface matrix with other packages (Increment I and Increment II related packages) and other facilities for all interfaces for the project that includes but not limited to:

01/21/16

CERTIFIED YAA 01/21/16

   

DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS

All the Governmental Affairs (Municipality, National Grid, WASA…Etc). Any required service provider (STC, Mobily, Zain…Etc). Contractors for Other Packages (Increment I packages, PKG 7& PKG 8) All the required interfaces with Saudi Aramco facilities and departments.

ASZ

LSTK CONTRACTOR shall be responsible for all coordination for his utilities, facilities and Roads works with all other contractors for Increment I Packages, Increment II Packages, and to insure that all Utilities, Facilities, Roads, Curbstone and Sidewalks installation and invert elevations are coordinated.

01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

9. BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

TIE-INS The LSTK CONTRACTOR shall verify each tie-in with regard to location, orientation, dimensions, etc., prior to final fabrication installation and construction. CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

64 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

DESCRIPTION

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

studied designed and implemented correctly to avoid degradation to the existing power systems.

10.

ISSUED FOR 90% SUBMITTAL

It shall be the responsibility of LSTK CONTRACTOR to provide power and water supply to be used during construction. LSTK CONTRACTOR shall provide proper cutover plans, matrix, JSA and design; this should not affect power quality of the nearby community power supply sources.

11.

01/21/16

The LSTK CONTRACTOR shall take special care in trenching to ensure existing pipelines, sewer lines, water lines, electrical cable, conduit and communication lines are not disturbed or damaged by construction operations. Hand excavation and/or the use of sheet piling may be necessary to prevent damages at sites (existing or under construction) where conduit, water, sewer, oil and fuel lines and electrical cables may exist.  Prior to excavation of trench, LSTK CONTRACTOR shall obtain plans and details of all existing and planned underground services from the relevant Saudi Aramco department and shall follow these plans closely at all times during the performance of work. All existing drawings shall be provided by Saudi Aramco to LSTK CONTRACTOR

00

F

TRENCHING Trench shall be the minimum width and depth provided on the construction drawings except in areas where otherwise specified. All extra depth trenches required shall be included as part of the LSTK CONTRACTOR's Scope of Work.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

POWER AND WATER SOURCE

01/21/16

CERTIFIED YAA



LSTK CONTRACTOR shall be responsible for the verification of any existing underground services/utilities.



LSTK CONTRACTOR responsisbility to coordinate with utilities departments’ prior excavation.



LSTK CONTRACTOR shall employ equipment and methods acceptable to S.A to keep the trench to the line established regardless of the type of soil and rock encountered and regardless of the depth of excavation necessary.



LSTK CONTRACTOR shall furnish all equipment, materials and supplies necessary for the completion and maintenance of the trench, including shoring and sheet piling, dewatering and any other incidental for the completion of the work in approved manner.



All trenching shall be carried out by LSTK CONTRACTOR in compliance with the applicable typical Standard drawings for rocky areas, sandy areas, sabkha areas issued with the PP drawings.

01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

65 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

ASZ

YAA YAA

YAA

LSS

The LSTK CONTRACTOR shall submit to SAUDI ARAMCO, for approval, specific procedures and sequences for tie-ins to existing facilities and to new facilities that have previously been placed into service. The Tie-in Procedures are to be submitted fourteen (14) days in advance of the planned tie-in date. Tie-ins for electrical power to be

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

ISSUED FOR CONSTRUCTION (IFC)

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)



12. ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

It shall be the LSTK CONTRACTOR’s responsibility to determine the location of all existing facilities and utilities within the WORK area of the project. The LSTK CONTRACTOR is responsible for the protection of all such utilities and facilities, except those which are required to be removed as directed by SAUDI ARAMCO. The LSTK CONTRACTOR shall obtain a Work Permit in accordance with SAUDI ARAMCO General Instruction for all WORK activities that are within 100 meters of an existing pipeline or fiber optic cable. Prior to excavation, then LSTK CONTRACTOR shall obtain all crossing permits and shall locate and mark all pipelines and all other utilities crossed. Pipeline crossings shall be installed in accordance with all crossing permit restrictions while maintaining the necessary clearances. The LSTK CONTRACTOR shall provide warning signs, cross bonding stations and line markers at crossings in accordance with SAUDI ARAMCO Engineering Standards.

10-01382

DESCRIPTION

01/21/16

F

00

10-01382

JO/EWO DATE

12/10/15

REV NO.

UTILITY AND OTHER PIPELINE CROSSING



Where the pipelines crosses road, existing pipelines, water lines, cables, conduits or other underground structures of any kind, LSTK CONTRACTOR shall dig grade and trench to a depth meeting the requirements indicated in the standard detail drawings. LSTK CONTRACTOR shall prepare and submit to SAUDI ARAMCO individual and detailed crossing installation procedure and drawings.



In locations where the trench is cut across roads, paths, wadis, walkways, and other access routes, LSTK CONTRACTOR shall provide temporary bridges. LSTK CONTRACTOR will evaluate each situation and the proposed solution will be submitted to S.A for approval.



Bypass roads as required by and in accordance with the regulations and standard practice of MOT or S.A and shall be constructed in accordance with procedure, in order to allow the passage of normal traffic with a minimum of inconvenience and interruption arrangements with local Police shall be made by LSTK CONTRACTOR as required.



Whenever, it is permissible to open cut a paved road crossing, the paving shall be removed and replaced by LSTK CONTRACTOR in accordance with restrictions and requirements of Saudi Aramco having jurisdiction thereof.



Where possible, LSTK CONTRACTOR shall arrange to complete the trenching, laying and backfilling of such crossings and to remove the temporary bridging before the end of the regular work day.

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Dewatering equipment, shoring and any other equipment and materials shall be provided by LSTK CONTRACTOR as required to excavate the trench, install the pipes and backfill the ditch in accordance with the PP drawings and document.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

66 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

YAA

LSS

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

10-01382

10-01382 01/21/16

13.



At underground service crossings of utility cables (power and telecom) and existing pipelines, a minimum vertical separation shall be kept between the new pipeline and the underground service as indicated in the detail drawings.

HIGHWAY AND ROAD CROSSING

The LSTK CONTRACTOR shall provide and maintain, in safe condition, temporary approaches and detours to any crossing of public roads, private roads and entrances that may be opened for construction. During boring or construction operations, the LSTK CONTRACTOR's equipment shall not block any roads. Bypass roads or bridges shall be provided by the LSTK CONTRACTOR in event roads are open cut. LSTK CONTRACTOR shall furnish and maintain signs, flares, signals and flagmen if required.

14.

00

F

Warning signs and barricades shall be placed and maintained while such crossings are open at night. LSTK CONTRACTOR shall provide and uses electrically operated warning lights or lanterns in accordance with the requirements of the responsible authorities, and, if necessary, provide watchmen.

It is mandatory to create detail design drawings for all highway and road crossings with method of execution. The LSTK CONTRACTOR shall obtain all crossing permits and shall perform the WORK in accordance with permit requirements. A time schedule is to be attached to each road crossing permit application showing the Start-Up date, duration of WORK, completion date and progress phases.

DISCIPLINE ENGINEER SH

CLEAN-UP After the demolition of existing facilities LSTK CONTRACTOR responsibility to keep the Construction Site clean at all times and disposal of waste shall be in accordance with the CSM, including the requirements of LPD and Industrial Hygiene.

01/21/16 DATE: PROJECT ENGINEER LSS DATE:



The LSTK CONTRACTOR shall conduct cleanup WORK so that it shall be finished as soon as possible after completion of the demolition work. WORK will be finished in a neat and workmanlike manner.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA



All refuse and unusable soil materials shall be collected for disposal in a designated location approved by Saudi Aramco



Selected loose rock exposed by the demolition and construction operations which is scattered over the R.O.W or adjacent property shall be graded and hauled by the LSTK CONTRACTOR to an approved site.



The construction R.O.W shall be graded smooth and surface soil shall be carefully replaced in accordance with the procedure approved by SAUDI ARAMCO.



All fences cut or damaged shall be repaired by installing new sections of fencing equal to or better than the sections cut or damaged. Temporary gates shall be removed and replaced by new fence sections.

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

67 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

YAA LSS



15.

PAINTING AND COATING WORK The LSTK CONTRACTOR is responsible to provide details of the coating system as per SAEP-303 must be specified in the coating Map and shall be submitted at 60% Detailed Design Submittal. The coating Map shall list the generic infrastructure, equipment, temperatures, pressures, fluid composition (for internal coatings), then it shall identify which coatings systems as per SAES-H-001 and SAES-H-002 or SAESH-003 are specified for which services. The LSTK CONTRACTOR is responsible for painting and coating (external) for all works that require painting and coating. The Scope of WORK includes procurement, storage, handling, application per Saudi Aramco Engineering Standards. The LSTK CONTRACTOR shall submit to SAUDI ARAMCO CONTRACTOR’s Procedures for coating and coating repairs, and other coating applications undertaken by The LSTK CONTRACTOR. All buried mainline piping shall be externally coated with FBE according to Saudi Aramco Standards. The LSTK CONTRACTOR shall inspect and repair all coatings, whether field or factory applied, prior to burial. FBE coating repairs shall be in accordance with the relevant standards in accordance with the manufacturer’s specifications or as directed by an authorized representative of the coating manufacturer.

16.

DISCIPLINE ENGINEER SH

PRE-COMMISSIONING AND TESTING ACCEPTANCE The LSTK CONTRACTOR shall be responsible for testing and demonstrating the performance of the equipment in the field.

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Disturbed areas during construction shall be dressed and gravel surfaced areas shall be reworked to finish condition.

Testing includes the field test performance on the equipment provided under this project. The LSTK Contractor shall be responsible for all testing being performed in accordance with the requirements of this project as indicated in this document and the approved Test plans and Test Procedures. The LSTK Contractor shall provide all needed test equipment during the testing and commissioning. Detailed Test Plan and Test Procedures shall be generated by The LSTK Contractor and shall provide to the SAMPT for approval.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ

16.1.

01/21/16

FIELD TEST

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

Field test are tests performed at the work sites after completion of all construction and installation work and consist of the following:

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

   

Approved equipment Operation & Maintenance (O&M) Manuals Approved Test Plans Approved Test procedures Redline Drawing

Proof-of-Performance Test requires the operation of this System Equipment Within the CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

68 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

ASZ

SAUDI ARABIAN OIL COMPANY

10-01382 01/21/16

F

00

DATE REV NO.

12/10/15

10-01382

JO/EWO

DESCRIPTION

ENGG CERT

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

10-01382

10-01382 01/21/16

F

00

performance limits that are specified specification. The LSTK CONTRACTOR shall provide in five (5) working days advance notice to the Company Representative for each Field Test. The LSTK CONTRACTOR shall perform all Field Performance Tests, which must be witnessed by SAUDI ARAMCO for the results to be acceptable to SAUDI ARAMCO. The LSTK CONTRACTOR shall provide all test equipment and material required for all testing and shall be responsible for each piece of equipment being within its calibration period during the Testing. Test pressure shall be in accordance with the requirements of Saudi Aramco Engineering Standard SAES-A-007 “Hydrostatic Testing Fluids and Lay-Up Procedures”. The basic criteria for the pressure limits shall be 90% of the Specified Minimum Yield Strength (SMYS) of the pipe at the high point and not to exceed 100% of the SMYS at the low point of the section under test.

16.2.

DEWATERING The LSTK CONTRACTOR shall dewater the pipeline in accordance with SAEP-327 “Disposal of Waste Water from cleaning, flushing and hydrostatic testing. The LSTK CONTRACTOR shall prepare a water disposal plan and submit it to Saudi Aramco for approval prior to start of filling.

16.3.

DRYING After acceptance of the pressure test, the test water shall be displaced and discharged into approved disposal areas as stated above. The LSTK CONTRACTOR shall dry the lines to the required dew point in accordance with Saudi Aramco Standards

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

17.

COMMISSIONING AND START-UP ASSISTANCE Labor and equipment shall be provided by the LSTK CONTRACTOR to assist Saudi Aramco in commissioning the water pipeline, utilities and facilities, but is not limited to closing valves, turning spectacle blinds, loading and unloading scrapers, operating scraper traps communication tools and any other activity deemed necessary, by Saudi Aramco, for successful completion of commissioning the pipeline.

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

Commissioning of the pipeline will be based on a 24- hour operation. Crews, each working 12 hour shifts, shall be equipped with all tools, material and equipment necessary to assist Saudi Aramco in commissioning the Pipelines.

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

DATE:

10-01382-0008 (DCC) NO. _____________________

BY:

Compensation of these services will be as per terms and condition of the Contract. The LSTK Contractor shall also provide necessary supports due to any unseen or unexpected situation in the process of commissioning the pipeline.

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

18.

MECHANICAL COMPLETION The activities and requirements for Mechanical Completion are defined in G.I.2.710. SAUDI ARAMCO may issue a Mechanical Completion Certificate (MCC) or partial Mechanical Completion Certificate(s) for the multiplex equipment installation and CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

69 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

YAA LSS

SAUDI ARABIAN OIL COMPANY

ASZ

YAA YAA

YAA

LSS ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ASZ

PMT OPRNS ENGG CERT

Saudi Aramco 2616-ENG (03/99)

testing at each site.

LSS

In addition to the requirements for Mechanical Completion reference above, the LSTK CONTRACTOR shall comply and to ensure the following:

01/21/16

YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

19.

OPERATIONS ASZ 01/21/16

All physical inspections have been carried out by the LSTK CONTRACTOR, QA personnel and SAUDI ARAMCO Representatives throughout the construction period and as part of the Mechanical Completion, Inspections, their results and comments shall be recorded in a site inspection log.



The LSTK CONTRACTOR has powered up, lined up and tested all station equipment. This shall be done in accordance with the approved test procedures. All tests result shall be recorded reviewed and signed by the Contractor’s test engineer. LSTK CONTRACTOR to provide NMR for all the long lead items materials

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

PERFORMANCE ACCEPTANCE

All tests shall be performed and documented in accordance with the approved test procedures and form.

20. BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

CONTROL NUMBER

DATE:

OF THIS DRAWING IS COVERED, FOR ALL



Performance acceptance shall take place after successful completion of the Mechanical Completion Activities, data delivery at the CCR for all the connected SubSystems and SAUDI ARAMCO issuance of the MCC (with only non-service affecting mechanical exception). At this time, the LSTK CONTRACTOR shall demonstrate (test) the system’s performance.

01/21/16 DATE:

EDSD VERIFICATION

All applicable drawings and plans, marked up to reflect the as built details and modification are provided at the work sites for the multiplex equipment and cable systems, as applicable.

The SAUDI ARAMCO Representative, at his option, may ask the LSTK CONTRACTOR to demonstrate or sample checks any or all tests previously performed by the LSTK CONTRACTOR. At this time, formal physical inspection and verification of as built drawings and documentation will take place. Equipment inventory will also take place.

CERTIFIED

REVISION REVISIONCERTIFICATION CERTIFICATE



After completion of all the above, the LSTK CONTRACTOR shall provide, in writing an invitation to the SAUDI ARAMCO Representative for inspection and verification of the test result. A minimum of five (5) working days notice shall be given. This should be included in the overall test plan and schedule.

01/21/16 DATE: PROJECT ENGINEER LSS

00 THIS INDICATES THAT REV. NO.__________

All components, assemblies or structures to be supplied by the LSTK CONTRACTOR have been installed at each site in accordance with the approved drawings and the Construction Scope of Work document.

along with schedule for FAT

DISCIPLINE ENGINEER SH

DATE:



PROJECT COMPLETION Project completion shall be achieved when:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

70 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

YAA

LSS

10-01382 01/21/16

F

00

ISSUED FOR 90% SUBMITTAL 10-01382

ISSUED FOR CONSTRUCTION (IFC)

JO/EWO DATE REV NO.

12/10/15

DESCRIPTION

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

YAA

 

LSS

LSS



DESCRIPTION

ISSUED FOR 90% SUBMITTAL

ISSUED FOR CONSTRUCTION (IFC)

21.

DOCUMENTATION As a minimum but not limited to, the following drawings and documents shall be prepared by LSTK CONTRACTOR in compliance with all Saudi Aramco standards, standard practices, standard drawings, standard forms, and drafting manual for submittal to Saudi Aramco representatives for review:    

10-01382 01/21/16

          

F

00

REV NO.

12/10/15

DATE

10-01382

JO/EWO



DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

Final Mechanical Completion Certificate has been issued (No Outstanding Exceptions). Performance Acceptance Test has been performed and accepted for all of the works. All final as built documentation and drawings have been delivered.

01/21/16



CERTIFIED YAA

Detailed Drawings and documents Power distribution drawings for control equipment. Source codes for all programs and any custom software shall be provided to Saudi Aramco. Documentation and database lists shall be checked, completed with all engineering information added, revised as needed and finalized. At project completion, all Key drawings as defined in the Saudi Aramco Drafting Manual and SAES-A-202 shall be as-built. Material Take Offs (MTOs) Purchase Requisition (PR) preparation and issue Technical Bid Evaluations (TBEs) Review and approval of vendor data (NMR601, NMR602 and NMR603) Red-lined and As-built drawings Factory Acceptance Test Procedures Commissioning and Performance Acceptance Test procedures Circuit Layout Records (CLR) Equipment Manuals Operating and Maintenance (O&M) Manuals and handbooks Spare Parts Data Package (SPDP) for cataloguing and standardization Interacting and compliance with other BI’s related.

01/21/16 DATE:

As-Built Drawings:

CONSTRUCTION AGENCY YAA

The LSTK CONTRACTOR shall keep records of all as-built changes that occur during the phase of construction. The LSTK CONTRACTOR shall submit to Saudi Aramco representative three (3) complete sets of prints marked up with all as-built changes. The markups shall be done in a professional manner utilizing the green color for all deletions and the red color for all additions or changes. The LSTK CONTRACTOR shall ensure that the “As-Built” drawings provide all data required for administrative management as specified by BICSI/EIA/TIA-606. The As-built copies shall be submitted to Saudi Aramco representative within two weeks following the completion of the works covered by this scope.

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

LSTK CONTRACTOR to provide three CD’s containing the electronic copy (in Micro station) of as built drawings related for all disciplines

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

71 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ

SAUDI ARABIAN OIL COMPANY

YAA

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

BI CWSMS EIA ER GES HCIS HVAC KV MCC M² M³ PP RIC ROW SOW UTP

LSS

LSS

ISSUED FOR CONSTRUCTION (IFC)

ISSUED FOR 90% SUBMITTAL

ABBREVIATIONS AND SYMBOLS Budget Item Central Workstation and Management System Environmental Impact Assessment Expenditure Request General Engineering Services High Commission on Industrial Security Heating, Ventilation and Air – Conditioning Kilo – Volt Motor Control Center Square Meter Cubic Meter Project Proposal Residential and Industrial Complex Right of Way Scope of Work Unshelled Twisted Pair

01/21/16

F

00

DISCIPLINE ENGINEER SH

01/21/16 DATE: PROJECT ENGINEER LSS DATE:

01/21/16

CERTIFIED YAA 01/21/16 DATE: CONSTRUCTION AGENCY YAA

01/21/16 DATE:

OPERATIONS ASZ 01/21/16

BY:

DATE:

10-01382-0008 (DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION REVISIONCERTIFICATION CERTIFICATE

00 THIS INDICATES THAT REV. NO.__________

EDSD VERIFICATION

DATE:

CONSTRUCTION SCOPE OF WORK

DWG.TYPE PLANT NO. INDEX

EXPAND DHAHRAN RESIDENTIAL COMMUNITY - DD PKG 6

DOC

RESIDENTIAL AREA DHAHRAN

SAUDI ARABIA

DRAWING NO.

S60

A

JO / EWO:

10-01382-0008

HE-273802

SHT.NO.

REV.NO.

72 OF 72

00

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

ASZ YAA

22.

10-01382

DESCRIPTION

10-01382

JO/EWO DATE

12/10/15

REV NO.

SAUDI ARABIAN OIL COMPANY

YAA

YAA

ENGG CERT

YAA

ASZ

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)