PERHITUNGAN PRODUKSI ALAT

PERHITUNGAN PRODUKSI ALAT BULLDOZER KOMATSU D85 A

JENIS KEGIATAN

URAIAN

Jenis pekerjaan

PERHITUNGAN

NILAI

Penggusuran tanah berbatu

Kapasitas Pisau

3.42

Jenis material

x

1.15

Tanah kering padat Tanah kering padat

x(

1.15

x

2.00

)/

60% 40%

Berat tanah asli Berat tanah lepas Faktor kembang

(

1.80

/(

1.60

-

1

)x

100

Kapasitas pisau

(

4.52

/(

1

+(

12

/

100

1.80

x

4.04

Berat batu pecah Berat alat Traksi kritis

SATUAN

13 69

x

0 60

))

2.00

=

4.52

m3

= =

60.00 40.00

% batu % tanah

= =

1.80 1.60

Ton/m3 Ton/m3

= ~ =

12.50 12.00 4.04

% % m3

=

7.27

=

13.69

Ton

=

8 21

Ton

Ton (oke)

PERHITUNGAN PRODUKSI ALAT BULLDOZER KOMATSU D 85 A

JENIS KEGIATAN Jenis pekerjaan Volume tanah lepas yang ditebar Panjang Bendung

URAIAN

PERHITUNGAN

NILAI

Meratakan tanah timbunan (

1.00

+

40.00

%

)

x

D

=

18.50

m

10,283.47

Tebal lapisan penebaran Panjang pisau efective Volume per meter lebar Bila dianggap penebaran dilakukan 1 bidang, maka lebar total tebaran Jumlah trip setiap jalur haluan

SATUAN

18.50

x

=

14,396.85

m3

=

0.020

km

=

0.20

m

3.42

x

0.75

=

2.57

m

2.57

x

0.20

=

9.49

m3

14,396.85

/

9.49

=

1,516.97

n

=

5

m

kali

PERHITUNGAN PRODUKSI ALAT BULLDOZER KOMATSU D 85 A

JENIS KEGIATAN Jenis pekerjaan Volume tanah lepas yang ditebar Panjang Bendung

URAIAN

PERHITUNGAN

NILAI

Meratakan tanah timbunan (

1.00

+

40.00

%

)

x

D

=

18.50

m

10,283.47

Tebal lapisan penebaran Panjang pisau efective Volume per meter lebar Bila dianggap penebaran dilakukan 1 bidang, maka lebar total tebaran Jumlah trip setiap jalur haluan

SATUAN

18.50

x

=

14,396.85

m3

=

0.020

km

=

0.20

m

3.42

x

0.75

=

2.57

m

2.57

x

0.20

=

9.49

m3

14,396.85

/

9.49

=

1,516.97

n

=

5

m

kali

PERHITUNGAN PRODUKSI ALAT EXCAVATOR

JENIS KEGIATAN

Jenis pekerjaan

URAIAN

PERHITUNGAN

NILAI

SATUAN

Galian tanah biasa dengan kedalaman 0 - 5 m

Kapasitas Bucket Waktu gali Waktu transport Waktu buang Waktu siklus

2

x

16.00 8.00 8.00

q1

=

0.90

m3

detik detik detik Cm

= = = =

16.00 16.00 8.00 40.00

detik detik detik detik

Faktor koreksi : Effisiensi kerja Faktor bucket

Produksi/siklus

Jadi produksi/siklus

E k

q

=

q1

x

k

0.90

x

0.60

0.65 0.60

m3

=

0.54

m3

       

PERHITUNGAN PRODUKSI ALAT EXCAVATOR

JENIS KEGIATAN

Jenis pekerjaan

URAIAN

PERHITUNGAN

NILAI

SATUAN

Galian tanah biasa di Borow Area

Kapasitas Bucket Waktu gali Waktu transport Waktu buang Waktu siklus

2

x

19.00 8.00 6.00

q1

=

0.90

m3

detik detik detik Cm

= = = =

19.00 16.00 6.00 41.00

detik detik detik detik

Faktor koreksi : Effisiensi kerja Faktor bucket

Produksi/siklus

Jadi produksi/siklus

E k

q

=

q1

x

k

0.90

x

0.60

0.65 0.60

m3

=

0.54

m3

       

PERHITUNGAN PRODUKSI ALAT EXCAVATOR

JENIS KEGIATAN

Jenis Pekerjaan

URAIAN PERHITUNGAN

NILAI

SATUAN

Galian tanah berbatu hasil breaker dengan kedalaman 0 - 5 m

Kapasitas Buket

ql

Waktu gali Waktu putar Waktu buang Waktu siklus

2.00

x

35.00 8.00 6.00

detik detik detik Cm

= = = = =

0.90

m³/jam

35.00 16.00 6.00 57.00

detik detik detik detik

Faktor koreksi: Effisiensi kerja Faktor bucket

Produksi / siklus

Jadi Produksi / jam

E k

q

=

q1

0 90

0.65 0.60

x

k

=

x

0 60

=



0 54



PERHITUNGAN PRODUKSI VIBRO ROLLER BW.170

JENIS KEGIATAN

URAIAN

Lebar efektif haluan

W

=

Kecepatan gerak alat

V

Tinggi / tebal tiap lapisan padat

H

1.45

PERHITUNGAN

-

NILAI

0.20

SATUAN

=

1.25

m

=

=

1.50

km/jam.

=

=

0.20

m

= = =

0.75 0.67 1.00

=

0.50

=

6.00

kali

=

31 25

m3/jam

Faktor Koreksi ( FK ) Ketrampilan Operator Efisiensi kerja Cara kerja biasa Faktor Koreksi ( FK )

FK

=

Jumlah trip diambil

N

=

W

x

V

x

H N

x

1,000

x

FK

1 25

x

2

x

0 20

x

1 000

x

0 50

Jumlah produksi

Jumlah produksi

0.75

x

0.67

x

1.00

PERHITUNGAN PRODUKSI DUMP TRUCK ( 4 TON )

JENIS KEGIATAN

URAIAN

PERHITUNGAN

NILAI

Kapasitas muat Jarak angkut diperkirakan

SATUAN

=

2.40

m3

=

200

m'

d

=

Kecepatan kendaraan dengan muatan

V1

=

10

km / jam

=

167

m/menit

 

Kecepatan kendaraan tanpa muatan

V2

=

15

km / jam

=

250

m/menit

 

Waktu Muat

kapasitas truk  kapasitas bucket

x x

CM faktor bucket  

menit

Waktu Mu CT.1

2.40 0.80

x x

0.90 0.60

=

4.50

menit

Waktu per CT.2

d V1

=

200 166.67

=

1.20

menit

=

1.50

menit

=

0 80

menit

Waktu bua CT.3 Waktu kemCT 4

d

200

 

 

 

 ANALISIS PRODUKSI & BIAYA PERALATAN No

1

URAIAN KEGIATAN KOMBINASI ALAT YANG DIGUNAKAN

GALIAN BATU - Bulldozer - Excv+Breaker - Excv - Dump Truck - Waktu (Hari) - Jam Kerja/Hr

: : : : : :

SAT

Menggusur s/d Jarak 50 M Menggali Galian tanah berbatu hasil Excavator + Breaker dengan kedalaman 0 - 5 M Mengangkut bahan galian ke Tempat Buangan 1.00 8.00

Jumlah Alat Dibutuhkan : Produksi Alat Dalam Waktu Rencana : - Bulldozer : - Excv+Breaker : - Excv : - Dump Truck :

241.50 163.70 252.70 242.50

M³ M³ M³ M³

Biaya Produksi Yang Dominan untuk Item Pek. ini adalah Produksi Excv+Breaker sehingga Prod Alat yang Lain menyesuaikan - Bulldozer : 508,500.00 : 20.46 - Excavator : 510,000.00 : 20.46 Breaker : 510 000 00 : 20 46

M³ m³/Jam m³/Jam m³/Jam m³/Jam m³/Jam

Unit Unit Unit Unit

x x x

1.00 1.00 1 00

= = =

Rp/M³ Rp/M³ Rp/M³

KAPASITAS PROD/ALAT / VOL PEK 

JUMLAH ALAT

100.00 30.19 20.46 31.59 30.32 20.46

1.00 1.00 1.00 2.00 1.00

0.41 0.62 0.40 0.42

1.00 1.00 1.00 1.00

24,849.50 24,922.80 24 922 80

4

GALIAN TANAH BIASA :



KOMBINASI GABUNGAN ALAT - Bulldozer : Menggusur s/d Jarak 50 M - Excavator : Menggali - Dump Truck : Mengangkut bahan galian ke Tempat Buangan

-

Waktu (Hari) Jam Kerja/Hr

: :

Jumlah Alat Dibutuhkan : Produksi Alat Dalam Waktu Rencana : - Bulldozer : - Excavator : - Dump Truck :

1.00 8.00

100.00

M³/Jam M³/Jam M³/Jam M³/Jam

30.19 31.59 30.32 30.19

1.00 1.00 2.00 2.00

Unit Unit Unit

0.41 0.40 0.41

1.00 1.00 1.00

( Rencana )

241.50 M³ 252.70 M³ 242.50 M³

Biaya Produksi Yang Dominan untuk Item Pekerjaan ini adalah Produksi Excavator : sehingga Prod Alat yang Lain menyesuaikan, - Bulldozer : 508,500.00 : 30.19 x - Excavator : 510,000.00 : 30.19 x - Dump Truck : 380,000.00 : 30.19 x

1.00 1.00 1.00

= Rp/M³ = Rp/M³ = Rp/M³ JUMLAH HARGA SATUAN PER-M3

Daftar Harga Material

16,844.00 16,893.70 12,587.50 46,325.20

Daftar Harga Material Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011 No

Material 1 2 3 4 5 6 7

Pasir Pasang Pasir Beton Pasir Halus Pasir Urug Batu Kali Agregat Kasar Agregat Halus

Satuan m3 m3 m3 m3 m3 m3 m3

Harga Rp Rp Rp Rp Rp Rp Rp

70,000.00 70,000.00 70,000.00 69,200.00 220,000.00 415,000.00 415 000 00

Harga Upa Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011 No

Tenaga Kerja 1 2 3 4 5 6

Operator Terlatih Operator Kurang Terlatih Sopir Mekanik Pembantu Operator Pembantu Sopir / Kenek

Satuan jam jam jam jam jam jam

Upah Rp Rp Rp Rp Rp Rp

14,285.71 12,857.14 14,285.71 13,571.43 10,000.00 10 000 00

Daftar Harga Material Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011 No

Alat 1 2 3 4 5 6

Asphalt Mixing Plant, 60 t/jam Asphalt Finisher, 10 ton Asphalt Sprayer Bulldozer 100-150 HP Compressor 4000-6500/m3 C t Mi 0 3 0 6/ 3

Satuan jam jam jam jam jam j

Harga Sewa Rp Rp Rp Rp Rp Rp

4,802,000.00 357,000.00 75,757.00 508,500.00 194,805.00 81 168 00

Menggali 1 m3 tanah biasa sedalam 1 meter Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Tenaga Kerja

1. Pekerja

OH

0.750

50,000.00

37,500.00

2. Mandor

OH

0.025

85,714.30

2,142.86

Jumlah

39,642.86

Keuntungan 10%

3,964.29

Jumlah Harga per Satuan Pekerjaan

43,607.14

Menggali 1 m3 tanah biasa sedalam 2 meter Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Tenaga Kerja

1. Pekerja

OH

0.900

50,000.00

45,000.00

2. Mandor

OH

0.045

85,714.30

3,857.14

Jumlah

48,857.14

Menggali 1 m3 tanah cadas sedalam 1 meter Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Tenaga Kerja

1. Pekerja

OH

1.500

50,000.00

75,000.00

2. Mandor

OH

0.060

85,714.30

5,142.86

Jumlah

80,142.86

Keuntungan 10%

8,014.29

Jumlah Harga per Satuan Pekerjaan

88,157.14

Menggali 1 m3 tanah lumpur sedalam 1 meter Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Tenaga Kerja

1. Pekerja

OH

1.200

50,000.00

60,000.00

2. Mandor

OH

0.045

85,714.30

3,857.14

Jumlah

63,857.14

Memadatkan 1 m3 tanah (per 20cm) Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Tenaga Kerja

1. Pekerja

OH

0.500

50,000.00

25,000.00

2. Mandor

OH

0.050

85,714.30

4,285.72

Jumlah

29,285.72

Keuntungan 10%

2,928.57

Jumlah Harga per Satuan Pekerjaan

32,214.29

Mengurug 1 m3 pasir urug Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Pasir Urug Tenaga Kerja

m3

1.200

69,200.00

83,040.00

Memasang 1 m3 pondasi batu belah, campuran 1PC : 3PP Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Batu Belah 15~20cm

m3

1.200

295,000.00

354,000.00

2. Semen PC (40kg)

zak

5.050

69,900.00

352,995.00

3. Pasir Pasang

m3

0.485

70,000.00

33,950.00

1. Pekerja

OH

1.500

50,000.00

75,000.00

2. Tukang Batu

OH

0.600

71,427.85

42,856.71

3. Kepala Tukang

OH

0.050

85,714.30

4,285.72

4. Mandor

OH

0.075

85,714.30

6,428.57

Jumlah

869,516.00

Keuntungan 10%

86,951.60

Jumlah Harga per Satuan Pekerjaan

956,467.60

Tenaga Kerja

Memasang 1 m3 pondasi batu belah, campuran 1PC : 5PP Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Batu Belah 15~20cm

m3

1.200

295,000.00

354,000.00

2. Semen PC (40kg)

zak

3.400

69,900.00

237,660.00

3. Pasir Pasang

m3

0.544

70,000.00

38,080.00

1. Pekerja

OH

1.500

50,000.00

75,000.00

2. Tukang Batu

OH

0.600

71,427.85

42,856.71

3. Kepala Tukang

OH

0.050

85,714.30

4,285.72

4. Mandor

OH

0.075

85,714.30

6,428.57

Jumlah

758,311.00

Keuntungan 10%

75,831.10

Jumlah Harga per Satuan Pekerjaan

834,142.10

Tenaga Kerja

Memasang 1 m3 pondasi batu belah, campuran 1PC : 8PP Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Batu Belah 15~20cm

m3

1.200

295,000.00

354,000.00

2. Semen PC (40kg)

zak

2.275

69,900.00

159,022.50

3. Pasir Pasang

m3

0.584

70,000.00

40,880.00

1. Pekerja

OH

1.500

50,000.00

75,000.00

2. Tukang Batu

OH

0.600

71,427.85

42,856.71

3. Kepala Tukang

OH

0.050

85,714.30

4,285.72

4. Mandor

OH

0.075

85,714.30

6,428.57

Jumlah

682,473.50

Keuntungan 10%

68,247.35

Jumlah Harga per Satuan Pekerjaan

750,720.85

Tenaga Kerja

Memasang 1 m3 pon asi si op 60% campuran 1PC : 2PB : 3KR an 40% Batu Be a Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Batu Belah 15~20cm

m3

0.480

295,000.00

141,600.00

2. Semen PC (40kg)

zak

4.850

69,900.00

339,015.00

3. Pasir Beton

m3

0.312

70,000.00

21,840.00

4. Kerikil (Split)

m3

0.468

420,000.00

196,560.00

5. Besi Beton

kg

126.000

9,500.00

1,197,000.00

6. Kawat Beton

kg

1.800

24,000.00

43,200.00

1. Pekerja

OH

3.000

50,000.00

150,000.00

2. Tukang Batu

OH

0.850

71,427.85

60,713.67

3. Kepala Tukang

OH

0.085

85,714.30

7,285.72

4. Mandor

OH

0.150

85,714.30

12,857.15

Jumlah

2,170,071.53

Tenaga Kerja

Membuat 1 m3 beton f'c=7,4MPa (K-100) Slump 12 ± 2 ; w/c=0,87 Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

6.175

69,900.00

431,632.50

2. Pasir Beton

m3

0.745

70,000.00

52,140.00

3. Kerikil (Split Maks 30mm)

m3

0.888

420,000.00

372,960.00

4. Air

liter

215.000

100.00

21,500.00

1. Pekerja

OH

1.650

50,000.00

82,500.00

2. Tukang Batu

OH

0.275

71,427.85

19,642.66

3. Kepala Tukang

OH

0.028

85,714.30

2,400.00

4. Mandor

OH

0.083

85,714.30

7,114.29

Jumlah

989,889.45

Keuntungan 10%

98,988.94

Tenaga Kerja

Membuat 1 m3 beton f'c=12,2MPa (K-150) Slump 12 ± 2 ; w/c=0,72 Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

7.475

69,900.00

522,502.50

2. Pasir Beton

m3

0.685

70,000.00

47,940.00

3. Kerikil (Split Maks 30mm)

m3

0.904

420,000.00

379,680.00

4. Air

liter

215.000

100.00

21,500.00

1. Pekerja

OH

1.650

50,000.00

82,500.00

2. Tukang Batu

OH

0.275

71,427.85

19,642.66

3. Kepala Tukang

OH

0.028

85,714.30

2,400.00

4. Mandor

OH

0.083

85,714.30

7,114.29

Jumlah

1,083,279.45

Keuntungan 10%

108,327.94

Tenaga Kerja

Membuat 1 m3 beton f'c=16,9MPa (K-200) Slump 12 ± 2 ; w/c=0,61 Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

8.800

69,900.00

615,120.00

2. Pasir Beton

m3

0.627

70,000.00

43,860.00

3. Kerikil (Split Maks 30mm)

m3

0.916

420,000.00

384,906.67

4. Air

liter

215.000

100.00

21,500.00

1. Pekerja

OH

1.650

50,000.00

82,500.00

2. Tukang Batu

OH

0.275

71,427.85

19,642.66

3. Kepala Tukang

OH

0.028

85,714.30

2,400.00

4. Mandor

OH

0.083

85,714.30

7,114.29

Jumlah

1,177,043.61

Keuntungan 10%

117,704.36

Tenaga Kerja

Membuat 1 m3 beton f'c=21,7MPa (K-250) Slump 12 ± 2 ; w/c=0,56 Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

9.600

69,900.00

671,040.00

2. Pasir Beton

m3

0.593

70,000.00

41,520.00

3. Kerikil (Split Maks 30mm)

m3

0.924

420,000.00

387,893.33

4. Air

liter

215.000

100.00

21,500.00

1. Pekerja

OH

1.650

50,000.00

82,500.00

2. Tukang Batu

OH

0.275

71,427.85

19,642.66

3. Kepala Tukang

OH

0.028

85,714.30

2,400.00

4. Mandor

OH

0.083

85,714.30

7,114.29

Jumlah

1,233,610.28

Keuntungan 10%

123,361.03

Tenaga Kerja

Membuat 1 m3 beton f'c=26,4MPa (K-300) Slump 12 ± 2 ; w/c=0,52 Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

10.775

69,900.00

753,172.50

2. Pasir Beton

m3

0.584

70,000.00

40,860.00

3. Kerikil (Split Maks 30mm)

m3

0.908

420,000.00

381,173.33

4. Air

liter

215.000

100.00

21,500.00

1. Pekerja

OH

1.650

50,000.00

82,500.00

2. Tukang Batu

OH

0.275

71,427.85

19,642.66

3. Kepala Tukang

OH

0.028

85,714.30

2,400.00

4. Mandor

OH

0.083

85,714.30

7,114.29

Jumlah

1,308,362.78

Keuntungan 10%

130,836.28

Tenaga Kerja

Membuat 1 m3 beton f'c=31,2MPa (K-350) Slump 12 ± 2 ; w/c=0,48 Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

11.200

69,900.00

782,880.00

2. Pasir Beton

m3

0.572

70,000.00

40,020.00

3. Kerikil (Split Maks 30mm)

m3

0.889

420,000.00

373,333.33

4. Air

liter

215.000

100.00

21,500.00

1. Pekerja

OH

1.650

50,000.00

82,500.00

2. Tukang Batu

OH

0.275

71,427.85

19,642.66

3. Kepala Tukang

OH

0.028

85,714.30

2,400.00

4. Mandor

OH

0.083

85,714.30

7,114.29

Jumlah

1,329,390.28

Keuntungan 10%

132,939.03

Tenaga Kerja

Pem esian 10 g po os Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Besi Beton BJTP-U24

kg

10.500

9,500.00

99,750.00

2. Kawat Beton

kg

0.150

24,000.00

3,600.00

1. Pekerja

OH

0.070

50,000.00

3,500.00

2. Tukang Besi

OH

0.070

71,427.85

4,999.95

3. Kepala Tukang

OH

0.007

85,714.30

600.00

4. Mandor

OH

0.004

85,714.30

300.00

Jumlah

112,749.95

Keuntungan 10%

11,274.99

Jumlah Harga per Satuan Pekerjaan

124,024.94

Tenaga Kerja

Pembesian 10 kg (ulir)

Memasang 10 g esi wiremes Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Besi Beton BJTP-U24 (dilas)

kg

10.200

11,400.00

116,280.00

2. Kawat Beton

kg

0.050

24,000.00

1,200.00

1. Pekerja

OH

0.025

50,000.00

1,250.00

2. Tukang Besi

OH

0.025

71,427.85

1,785.70

3. Kepala Tukang

OH

0.025

85,714.30

2,142.86

4. Mandor

OH

0.001

85,714.30

107.14

Jumlah

122,765.70

Keuntungan 10%

12,276.57

Jumlah Harga per Satuan Pekerjaan

135,042.27

Tenaga Kerja

Memasang 1 m2 bekisting untuk pondasi

1. Pekerja

OH

0.660

50,000.00

33,000.00

2. Tukang Kayu

OH

0.330

71,427.85

23,571.19

3. Kepala Tukang

OH

0.033

85,714.30

2,828.57

4. Mandor

OH

0.033

85,714.30

2,828.57

Jumlah

282,228.33

Keuntungan 10%

28,222.83

Jumlah Harga per Satuan Pekerjaan

310,451.17

Memasang 1 m2 e isting untu

antai

Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.040

2,200,000.00

88,000.00

2. Paku 5~7cm

kg

0.400

18,000.00

7,200.00

3. Oli

liter

0.200

25,000.00

5,000.00

4. Balok Kayu Kelas II

m3

0.018

2,750,000.00

49,500.00

5. Plywood 9mm

lbr

0.350

138,000.00

48,300.00

6. Dolken Galam (dia 8-10cm ; L=4m)

btg

6.000

11,000.00

66,000.00

Memasang 1 m2 e isting untu

antai

Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.040

2,200,000.00

88,000.00

2. Paku 5~7cm

kg

0.400

18,000.00

7,200.00

3. Oli

liter

0.200

25,000.00

5,000.00

4. Balok Kayu Kelas II

m3

0.018

2,750,000.00

49,500.00

5. Plywood 9mm

lbr

0.350

138,000.00

48,300.00

6. Dolken Galam (dia 8-10cm ; L=4m)

btg

6.000

11,000.00

66,000.00

1. Pekerja

OH

0.660

50,000.00

33,000.00

2. Tukang Kayu

OH

0.330

71,427.85

23,571.19

3. Kepala Tukang

OH

0.033

85,714.30

2,828.57

4. Mandor

OH

0.033

85,714.30

2,828.57

Jumlah

326,228.33

Tenaga Kerja

Memasang 1 m2 e isting untu tangga Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.003

2,200,000.00

6,600.00

2. Paku 5~7cm

kg

0.400

18,000.00

7,200.00

3. Oli

liter

0.150

25,000.00

3,750.00

4. Balok Kayu Kelas II

m3

0.015

2,750,000.00

41,250.00

5. Plywood 9mm

lbr

0.350

138,000.00

48,300.00

6. Dolken Galam (dia 8-10cm ; L=4m)

btg

2.000

11,000.00

22,000.00

1. Pekerja

OH

0.660

50,000.00

33,000.00

2. Tukang Kayu

OH

0.330

71,427.85

23,571.19

3. Kepala Tukang

OH

0.033

85,714.30

2,828.57

4. Mandor

OH

0.033

85,714.30

2,828.57

Jumlah

191,328.33

Tenaga Kerja

Mem uat 1 m3 eton ertu ang untu pon asi 1 0 g esi + e isting Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.200

2,200,000.00

440,000.00

2. Paku 5~7cm

kg

0.150

18,000.00

2,700.00

liter

0.400

25,000.00

10,000.00

3. Oli 4. Besi Beton Polos

kg

157.500

9,500.00

1,496,250.00

5. Kawat Beton

kg

2.250

24,000.00

54,000.00

6. Semen PC (40kg)

zak

8.400

69,900.00

587,160.00

7. Pasir Beton

m3

0.540

70,000.00

37,800.00

8. Kerikil (Split)

m3

0.810

420,000.00

340,200.00

1. Pekerja

OH

5.300

50,000.00

265,000.00

2. Tukang Batu

OH

0.275

71,427.85

19,642.66

3. Tukang Kayu

OH

1.300

71,427.85

92,856.21

4 T k

OH

1 050

71 427 85

74 999 24

Tenaga Kerja

B i

Mem uat 1 m3 eton ertu ang untu Kebutuhan

o om 300 g esi + e isting Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.400

2,200,000.00

880,000.00

2. Paku 5~7cm

kg

4.000

18,000.00

72,000.00

liter

2.000

25,000.00

50,000.00

3. Oli 4. Besi Beton Polos

kg

315.000

9,500.00

2,992,500.00

5. Kawat Beton

kg

4.500

24,000.00

108,000.00

6. Semen PC (40kg)

zak

8.400

69,900.00

587,160.00

7. Pasir Beton

m3

0.540

70,000.00

37,800.00

8. Kerikil (Split)

m3

0.810

420,000.00

340,200.00

9. Balok Kayu Kelas II

m3

0.150

2,750,000.00

412,500.00

10. Plywood 9mm

lbr

3.500

138,000.00

483,000.00

11. Dolken Galam (dia 8-10cm ; L=4m)

btg

20.000

11,000.00

220,000.00

OH

7 050

50 000 00

352 500 00

Tenaga Kerja

1 P k j

Mem uat 1 m3 eton ertu ang untu Kebutuhan

ao

200 g esi + e isting Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.320

2,200,000.00

704,000.00

2. Paku 5~7cm

kg

3.200

18,000.00

57,600.00

liter

1.600

25,000.00

40,000.00

3. Oli 4. Besi Beton Polos

kg

210.000

9,500.00

1,995,000.00

5. Kawat Beton

kg

3.000

24,000.00

72,000.00

6. Semen PC (40kg)

zak

8.400

69,900.00

587,160.00

7. Pasir Beton

m3

0.540

70,000.00

37,800.00

8. Kerikil (Split)

m3

0.810

420,000.00

340,200.00

9. Balok Kayu Kelas II

m3

0.140

2,750,000.00

385,000.00

10. Plywood 9mm

lbr

2.800

138,000.00

386,400.00

11. Dolken Galam (dia 8-10cm ; L=4m)

btg

16.000

11,000.00

176,000.00

OH

6 350

50 000 00

317 500 00

Tenaga Kerja

1 P k j

Mem uat 1 m3 eton ertu ang untu Kebutuhan

o om 1 0 g esi + e isting Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.320

2,200,000.00

704,000.00

2. Paku 5~7cm

kg

3.200

18,000.00

57,600.00

liter

1.600

25,000.00

40,000.00

3. Oli 4. Besi Beton Polos

kg

157.500

9,500.00

1,496,250.00

5. Kawat Beton

kg

2.250

24,000.00

54,000.00

6. Semen PC (40kg)

zak

8.400

69,900.00

587,160.00

7. Pasir Beton

m3

0.540

70,000.00

37,800.00

8. Kerikil (Split)

m3

0.810

420,000.00

340,200.00

9. Balok Kayu Kelas II

m3

0.120

2,750,000.00

330,000.00

10. Plywood 9mm

lbr

2.800

138,000.00

386,400.00

11. Dolken Galam (dia 8-10cm ; L=4m)

btg

32.000

11,000.00

352,000.00

OH

5 300

50 000 00

265 000 00

Tenaga Kerja

1 P k j

Mem uat 1 m3 eton ertu ang untu Kebutuhan

in ing 1 0 g esi + e isting Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.240

2,200,000.00

528,000.00

2. Paku 5~7cm

kg

3.200

18,000.00

57,600.00

liter

1.600

25,000.00

40,000.00

3. Oli 4. Besi Beton Polos

kg

157.500

9,500.00

1,496,250.00

5. Kawat Beton

kg

2.250

24,000.00

54,000.00

6. Semen PC (40kg)

zak

8.400

69,900.00

587,160.00

7. Pasir Beton

m3

0.540

70,000.00

37,800.00

8. Kerikil (Split)

m3

0.810

420,000.00

340,200.00

9. Balok Kayu Kelas II

m3

0.160

2,750,000.00

440,000.00

10. Plywood 9mm

lbr

2.800

138,000.00

386,400.00

11. Dolken Galam (dia 8-10cm ; L=4m)

btg

24.000

11,000.00

264,000.00

OH

5 300

50 000 00

265 000 00

Tenaga Kerja

1 P k j

Mem uat 1 m3 eton ertu ang untu Kebutuhan

in ing 200 g esi + e isting Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Kayu Kelas III

m3

0.250

2,200,000.00

550,000.00

2. Paku 5~7cm

kg

3.000

18,000.00

54,000.00

liter

1.200

25,000.00

30,000.00

3. Oli 4. Besi Beton Polos

kg

210.000

9,500.00

1,995,000.00

5. Kawat Beton

kg

3.000

24,000.00

72,000.00

6. Semen PC (40kg)

zak

8.400

69,900.00

587,160.00

7. Pasir Beton

m3

0.540

70,000.00

37,800.00

8. Kerikil (Split)

m3

0.810

420,000.00

340,200.00

9. Balok Kayu Kelas II

m3

0.105

2,750,000.00

288,750.00

10. Plywood 9mm

lbr

2.500

138,000.00

345,000.00

11. Dolken Galam (dia 8-10cm ; L=4m)

btg

14.000

11,000.00

154,000.00

OH

5 650

50 000 00

282 500 00

Tenaga Kerja

1 P k j

Memasang 1 m2 p esteran 1PC : 1PP, te a 1 mm Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

0.388

69,900.00

27,093.24

2. Pasir Pasang

m3

0.016

70,000.00

1,120.00

1. Pekerja

OH

0.200

50,000.00

10,000.00

2. Tukang Batu

OH

0.150

71,427.85

10,714.18

3. Kepala Tukang

OH

0.015

85,714.30

1,285.71

4. Mandor

OH

0.010

85,714.30

857.14

Jumlah

51,070.28

Keuntungan 10%

5,107.03

Jumlah Harga per Satuan Pekerjaan

56,177.30

Tenaga Kerja

Memasang 1 m2 plesteran 1PC : 2PP, tebal 15 mm

Memasang 1 m2 p esteran 1PC : 4PP, te a 1 mm Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

0.156

69,900.00

10,904.40

2. Pasir Pasang

m3

0.024

70,000.00

1,680.00

1. Pekerja

OH

0.200

50,000.00

10,000.00

2. Tukang Batu

OH

0.150

71,427.85

10,714.18

3. Kepala Tukang

OH

0.015

85,714.30

1,285.71

4. Mandor

OH

0.010

85,714.30

857.14

Jumlah

35,441.44

Keuntungan 10%

3,544.14

Jumlah Harga per Satuan Pekerjaan

38,985.58

Tenaga Kerja

Memasang 1 m2 plesteran 1PC : 5PP, tebal 15 mm

Memasang 1 m2 p esteran 1PC : 7PP, te a 1 mm Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

0.098

69,900.00

6,878.16

2. Pasir Pasang

m3

0.028

70,000.00

1,960.00

1. Pekerja

OH

0.200

50,000.00

10,000.00

2. Tukang Batu

OH

0.150

71,427.85

10,714.18

3. Kepala Tukang

OH

0.015

85,714.30

1,285.71

4. Mandor

OH

0.010

85,714.30

857.14

Jumlah

31,695.20

Keuntungan 10%

3,169.52

Jumlah Harga per Satuan Pekerjaan

34,864.71

Tenaga Kerja

Memasang 1 m2 plesteran 1PC : 8PP, tebal 15 mm

Memasang 1 m2 p esteran granit 1PC : 2Granit, te a 10 mm Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

0.250

69,900.00

17,475.00

2. Batu Granit

kg

15.000

2,212.50

33,187.50

1. Pekerja

OH

0.450

50,000.00

22,500.00

2. Tukang Batu

OH

0.200

71,427.85

14,285.57

3. Kepala Tukang

OH

0.020

85,714.30

1,714.29

4. Mandor

OH

0.025

85,714.30

2,142.86

Jumlah

91,305.21

Keuntungan 10%

9,130.52

Jumlah Harga per Satuan Pekerjaan

100,435.73

Tenaga Kerja

Memasang 1 m2 plesteran teraso 1PC : 2Teraso, tebal 10 mm

Memasang 1 m2 inis ing siar pasangan atu a i, a u an 1PC : 2PP Kebutuhan

Satuan

Indeks

Harga Satuan Bahan/Upah (Rp)

Jumlah (Rp)

Bahan

1. Semen PC (40kg)

zak

0.159

69,900.00

11,079.15

2. Pasir Pasang

m3

0.012

70,000.00

840.00

1. Pekerja

OH

0.300

50,000.00

15,000.00

2. Tukang Batu

OH

0.140

71,427.85

9,999.90

3. Kepala Tukang

OH

0.014

85,714.30

1,200.00

4. Mandor

OH

0.015

85,714.30

1,285.71

Jumlah

39,404.76

Keuntungan 10%

3,940.48

Jumlah Harga per Satuan Pekerjaan

43,345.24

Tenaga Kerja

Memasang 1 m2 acian

Re

apitu asi Harga Satuan Pe erjaan Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011

No A

Harga Satuan Pekerjaan

Pekerjaan Pekerjaan Tanah (Manual) 1 Menggali 1 m3 tanah biasa sedalam 1 meter

Rp

43,607.14

2 Menggali 1 m3 tanah biasa sedalam 2 meter

Rp

53,742.86

3 Menggali 1 m3 tanah biasa sedalam 3 meter

Rp

64,067.14

4 Menggali 1 m3 tanah keras sedalam 1 meter

Rp

58,017.14

5 Menggali 1 m3 tanah cadas sedalam 1 meter

Rp

88,157.14

6 Menggali 1 m3 tanah lumpur sedalam 1 meter

Rp

70,242.86

7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter

Rp

3,221.43

D

Pekerjaan Beton 1 Membuat 1 m3 beton f'c=7,4MPa (K-100)

Rp

1,088,878.39

2 Membuat 1 m3 beton f'c=9,8MPa (K-125)

Rp

1,147,256.31

3 Membuat 1 m3 beton f'c=12,2MPa (K-150)

Rp

1,191,607.39

4 Membuat 1 m3 beton f'c=14,5MPa (K-175)

Rp

1,245,862.14

5 Membuat 1 m3 beton f'c=16,9MPa (K-200)

Rp

1,294,747.97

6 Membuat 1 m3 beton f'c=19,3MPa (K-225)

Rp

1,335,663.39

7 Membuat 1 m3 beton f'c=21,7MPa (K-250)

Rp

1,356,971.31

8 Membuat 1 m3 beton f'c=24,0MPa (K-275)

Rp

1,393,394.14

9 Membuat 1 m3 beton f'c=26,4MPa (K-300)

Rp

1,439,199.06

10 Membuat 1 m3 beton f'c=28,8MPa (K-325)

Rp

1,447,691.06

11 Membuat 1 m3 beton f'c=31,2MPa (K-350)

Rp

1,462,329.31

12 Membuat lantai kerja f'c=7,4MPa (K-100)

Rp

1,034,067.15

13 Pembesian 1 kg (polos)

Rp

12,402.49

14 P

Rp

13 499 74

b i

1 k ( li )

E

Pekerjaan Plesteran 1 Memasang 1 m2 plesteran 1PC : 1PP, tebal 15 mm

Rp

56,177.30

2 Memasang 1 m2 plesteran 1PC : 2PP, tebal 15 mm

Rp

46,335.82

3 Memasang 1 m2 plesteran 1PC : 3PP, tebal 15 mm

Rp

41,861.15

4 Memasang 1 m2 plesteran 1PC : 4PP, tebal 15 mm

Rp

38,985.58

5 Memasang 1 m2 plesteran 1PC : 5PP, tebal 15 mm

Rp

37,109.68

6 Memasang 1 m2 plesteran 1PC : 6PP, tebal 15 mm

Rp

35,710.39

7 Memasang 1 m2 plesteran 1PC : 7PP, tebal 15 mm

Rp

34,864.71

8 Memasang 1 m2 plesteran 1PC : 8PP, tebal 15 mm

Rp

34,019.03

9 Memasang 1 m2 plesteran skoning 1PC : 2PP, lebar 10 mm

Rp

38,819.68

10 Memasang 1 m2 plesteran granit 1PC : 2Granit, tebal 10 mm

Rp

100,435.73

11 Memasang 1 m2 plesteran teraso 1PC : 2Teraso, tebal 10 mm

Rp

82,182.61

12 Memasang 1 m2 plesteran ciprat 1PC : 2PP

Rp

32,541.76

13 Memasang 1 m2 finishing siar pasangan batu kali, adukan 1PC : 2PP

Rp

43,345.24

14 M

Rp

24 051 52

1

2

i