PERHITUNGAN PRODUKSI ALAT
PERHITUNGAN PRODUKSI ALAT BULLDOZER KOMATSU D85 A
JENIS KEGIATAN
URAIAN
Jenis pekerjaan
PERHITUNGAN
NILAI
Penggusuran tanah berbatu
Kapasitas Pisau
3.42
Jenis material
x
1.15
Tanah kering padat Tanah kering padat
x(
1.15
x
2.00
)/
60% 40%
Berat tanah asli Berat tanah lepas Faktor kembang
(
1.80
/(
1.60
-
1
)x
100
Kapasitas pisau
(
4.52
/(
1
+(
12
/
100
1.80
x
4.04
Berat batu pecah Berat alat Traksi kritis
SATUAN
13 69
x
0 60
))
2.00
=
4.52
m3
= =
60.00 40.00
% batu % tanah
= =
1.80 1.60
Ton/m3 Ton/m3
= ~ =
12.50 12.00 4.04
% % m3
=
7.27
=
13.69
Ton
=
8 21
Ton
Ton (oke)
PERHITUNGAN PRODUKSI ALAT BULLDOZER KOMATSU D 85 A
JENIS KEGIATAN Jenis pekerjaan Volume tanah lepas yang ditebar Panjang Bendung
URAIAN
PERHITUNGAN
NILAI
Meratakan tanah timbunan (
1.00
+
40.00
%
)
x
D
=
18.50
m
10,283.47
Tebal lapisan penebaran Panjang pisau efective Volume per meter lebar Bila dianggap penebaran dilakukan 1 bidang, maka lebar total tebaran Jumlah trip setiap jalur haluan
SATUAN
18.50
x
=
14,396.85
m3
=
0.020
km
=
0.20
m
3.42
x
0.75
=
2.57
m
2.57
x
0.20
=
9.49
m3
14,396.85
/
9.49
=
1,516.97
n
=
5
m
kali
PERHITUNGAN PRODUKSI ALAT BULLDOZER KOMATSU D 85 A
JENIS KEGIATAN Jenis pekerjaan Volume tanah lepas yang ditebar Panjang Bendung
URAIAN
PERHITUNGAN
NILAI
Meratakan tanah timbunan (
1.00
+
40.00
%
)
x
D
=
18.50
m
10,283.47
Tebal lapisan penebaran Panjang pisau efective Volume per meter lebar Bila dianggap penebaran dilakukan 1 bidang, maka lebar total tebaran Jumlah trip setiap jalur haluan
SATUAN
18.50
x
=
14,396.85
m3
=
0.020
km
=
0.20
m
3.42
x
0.75
=
2.57
m
2.57
x
0.20
=
9.49
m3
14,396.85
/
9.49
=
1,516.97
n
=
5
m
kali
PERHITUNGAN PRODUKSI ALAT EXCAVATOR
JENIS KEGIATAN
Jenis pekerjaan
URAIAN
PERHITUNGAN
NILAI
SATUAN
Galian tanah biasa dengan kedalaman 0 - 5 m
Kapasitas Bucket Waktu gali Waktu transport Waktu buang Waktu siklus
2
x
16.00 8.00 8.00
q1
=
0.90
m3
detik detik detik Cm
= = = =
16.00 16.00 8.00 40.00
detik detik detik detik
Faktor koreksi : Effisiensi kerja Faktor bucket
Produksi/siklus
Jadi produksi/siklus
E k
q
=
q1
x
k
0.90
x
0.60
0.65 0.60
m3
=
0.54
m3
PERHITUNGAN PRODUKSI ALAT EXCAVATOR
JENIS KEGIATAN
Jenis pekerjaan
URAIAN
PERHITUNGAN
NILAI
SATUAN
Galian tanah biasa di Borow Area
Kapasitas Bucket Waktu gali Waktu transport Waktu buang Waktu siklus
2
x
19.00 8.00 6.00
q1
=
0.90
m3
detik detik detik Cm
= = = =
19.00 16.00 6.00 41.00
detik detik detik detik
Faktor koreksi : Effisiensi kerja Faktor bucket
Produksi/siklus
Jadi produksi/siklus
E k
q
=
q1
x
k
0.90
x
0.60
0.65 0.60
m3
=
0.54
m3
PERHITUNGAN PRODUKSI ALAT EXCAVATOR
JENIS KEGIATAN
Jenis Pekerjaan
URAIAN PERHITUNGAN
NILAI
SATUAN
Galian tanah berbatu hasil breaker dengan kedalaman 0 - 5 m
Kapasitas Buket
ql
Waktu gali Waktu putar Waktu buang Waktu siklus
2.00
x
35.00 8.00 6.00
detik detik detik Cm
= = = = =
0.90
m³/jam
35.00 16.00 6.00 57.00
detik detik detik detik
Faktor koreksi: Effisiensi kerja Faktor bucket
Produksi / siklus
Jadi Produksi / jam
E k
q
=
q1
0 90
0.65 0.60
x
k
=
x
0 60
=
m³
0 54
m³
PERHITUNGAN PRODUKSI VIBRO ROLLER BW.170
JENIS KEGIATAN
URAIAN
Lebar efektif haluan
W
=
Kecepatan gerak alat
V
Tinggi / tebal tiap lapisan padat
H
1.45
PERHITUNGAN
-
NILAI
0.20
SATUAN
=
1.25
m
=
=
1.50
km/jam.
=
=
0.20
m
= = =
0.75 0.67 1.00
=
0.50
=
6.00
kali
=
31 25
m3/jam
Faktor Koreksi ( FK ) Ketrampilan Operator Efisiensi kerja Cara kerja biasa Faktor Koreksi ( FK )
FK
=
Jumlah trip diambil
N
=
W
x
V
x
H N
x
1,000
x
FK
1 25
x
2
x
0 20
x
1 000
x
0 50
Jumlah produksi
Jumlah produksi
0.75
x
0.67
x
1.00
PERHITUNGAN PRODUKSI DUMP TRUCK ( 4 TON )
JENIS KEGIATAN
URAIAN
PERHITUNGAN
NILAI
Kapasitas muat Jarak angkut diperkirakan
SATUAN
=
2.40
m3
=
200
m'
d
=
Kecepatan kendaraan dengan muatan
V1
=
10
km / jam
=
167
m/menit
Kecepatan kendaraan tanpa muatan
V2
=
15
km / jam
=
250
m/menit
Waktu Muat
kapasitas truk kapasitas bucket
x x
CM faktor bucket
menit
Waktu Mu CT.1
2.40 0.80
x x
0.90 0.60
=
4.50
menit
Waktu per CT.2
d V1
=
200 166.67
=
1.20
menit
=
1.50
menit
=
0 80
menit
Waktu bua CT.3 Waktu kemCT 4
d
200
ANALISIS PRODUKSI & BIAYA PERALATAN No
1
URAIAN KEGIATAN KOMBINASI ALAT YANG DIGUNAKAN
GALIAN BATU - Bulldozer - Excv+Breaker - Excv - Dump Truck - Waktu (Hari) - Jam Kerja/Hr
: : : : : :
SAT
Menggusur s/d Jarak 50 M Menggali Galian tanah berbatu hasil Excavator + Breaker dengan kedalaman 0 - 5 M Mengangkut bahan galian ke Tempat Buangan 1.00 8.00
Jumlah Alat Dibutuhkan : Produksi Alat Dalam Waktu Rencana : - Bulldozer : - Excv+Breaker : - Excv : - Dump Truck :
241.50 163.70 252.70 242.50
M³ M³ M³ M³
Biaya Produksi Yang Dominan untuk Item Pek. ini adalah Produksi Excv+Breaker sehingga Prod Alat yang Lain menyesuaikan - Bulldozer : 508,500.00 : 20.46 - Excavator : 510,000.00 : 20.46 Breaker : 510 000 00 : 20 46
M³ m³/Jam m³/Jam m³/Jam m³/Jam m³/Jam
Unit Unit Unit Unit
x x x
1.00 1.00 1 00
= = =
Rp/M³ Rp/M³ Rp/M³
KAPASITAS PROD/ALAT / VOL PEK
JUMLAH ALAT
100.00 30.19 20.46 31.59 30.32 20.46
1.00 1.00 1.00 2.00 1.00
0.41 0.62 0.40 0.42
1.00 1.00 1.00 1.00
24,849.50 24,922.80 24 922 80
4
GALIAN TANAH BIASA :
M³
KOMBINASI GABUNGAN ALAT - Bulldozer : Menggusur s/d Jarak 50 M - Excavator : Menggali - Dump Truck : Mengangkut bahan galian ke Tempat Buangan
-
Waktu (Hari) Jam Kerja/Hr
: :
Jumlah Alat Dibutuhkan : Produksi Alat Dalam Waktu Rencana : - Bulldozer : - Excavator : - Dump Truck :
1.00 8.00
100.00
M³/Jam M³/Jam M³/Jam M³/Jam
30.19 31.59 30.32 30.19
1.00 1.00 2.00 2.00
Unit Unit Unit
0.41 0.40 0.41
1.00 1.00 1.00
( Rencana )
241.50 M³ 252.70 M³ 242.50 M³
Biaya Produksi Yang Dominan untuk Item Pekerjaan ini adalah Produksi Excavator : sehingga Prod Alat yang Lain menyesuaikan, - Bulldozer : 508,500.00 : 30.19 x - Excavator : 510,000.00 : 30.19 x - Dump Truck : 380,000.00 : 30.19 x
1.00 1.00 1.00
= Rp/M³ = Rp/M³ = Rp/M³ JUMLAH HARGA SATUAN PER-M3
Daftar Harga Material
16,844.00 16,893.70 12,587.50 46,325.20
Daftar Harga Material Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011 No
Material 1 2 3 4 5 6 7
Pasir Pasang Pasir Beton Pasir Halus Pasir Urug Batu Kali Agregat Kasar Agregat Halus
Satuan m3 m3 m3 m3 m3 m3 m3
Harga Rp Rp Rp Rp Rp Rp Rp
70,000.00 70,000.00 70,000.00 69,200.00 220,000.00 415,000.00 415 000 00
Harga Upa Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011 No
Tenaga Kerja 1 2 3 4 5 6
Operator Terlatih Operator Kurang Terlatih Sopir Mekanik Pembantu Operator Pembantu Sopir / Kenek
Satuan jam jam jam jam jam jam
Upah Rp Rp Rp Rp Rp Rp
14,285.71 12,857.14 14,285.71 13,571.43 10,000.00 10 000 00
Daftar Harga Material Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011 No
Alat 1 2 3 4 5 6
Asphalt Mixing Plant, 60 t/jam Asphalt Finisher, 10 ton Asphalt Sprayer Bulldozer 100-150 HP Compressor 4000-6500/m3 C t Mi 0 3 0 6/ 3
Satuan jam jam jam jam jam j
Harga Sewa Rp Rp Rp Rp Rp Rp
4,802,000.00 357,000.00 75,757.00 508,500.00 194,805.00 81 168 00
Menggali 1 m3 tanah biasa sedalam 1 meter Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Tenaga Kerja
1. Pekerja
OH
0.750
50,000.00
37,500.00
2. Mandor
OH
0.025
85,714.30
2,142.86
Jumlah
39,642.86
Keuntungan 10%
3,964.29
Jumlah Harga per Satuan Pekerjaan
43,607.14
Menggali 1 m3 tanah biasa sedalam 2 meter Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Tenaga Kerja
1. Pekerja
OH
0.900
50,000.00
45,000.00
2. Mandor
OH
0.045
85,714.30
3,857.14
Jumlah
48,857.14
Menggali 1 m3 tanah cadas sedalam 1 meter Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Tenaga Kerja
1. Pekerja
OH
1.500
50,000.00
75,000.00
2. Mandor
OH
0.060
85,714.30
5,142.86
Jumlah
80,142.86
Keuntungan 10%
8,014.29
Jumlah Harga per Satuan Pekerjaan
88,157.14
Menggali 1 m3 tanah lumpur sedalam 1 meter Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Tenaga Kerja
1. Pekerja
OH
1.200
50,000.00
60,000.00
2. Mandor
OH
0.045
85,714.30
3,857.14
Jumlah
63,857.14
Memadatkan 1 m3 tanah (per 20cm) Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Tenaga Kerja
1. Pekerja
OH
0.500
50,000.00
25,000.00
2. Mandor
OH
0.050
85,714.30
4,285.72
Jumlah
29,285.72
Keuntungan 10%
2,928.57
Jumlah Harga per Satuan Pekerjaan
32,214.29
Mengurug 1 m3 pasir urug Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Pasir Urug Tenaga Kerja
m3
1.200
69,200.00
83,040.00
Memasang 1 m3 pondasi batu belah, campuran 1PC : 3PP Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Batu Belah 15~20cm
m3
1.200
295,000.00
354,000.00
2. Semen PC (40kg)
zak
5.050
69,900.00
352,995.00
3. Pasir Pasang
m3
0.485
70,000.00
33,950.00
1. Pekerja
OH
1.500
50,000.00
75,000.00
2. Tukang Batu
OH
0.600
71,427.85
42,856.71
3. Kepala Tukang
OH
0.050
85,714.30
4,285.72
4. Mandor
OH
0.075
85,714.30
6,428.57
Jumlah
869,516.00
Keuntungan 10%
86,951.60
Jumlah Harga per Satuan Pekerjaan
956,467.60
Tenaga Kerja
Memasang 1 m3 pondasi batu belah, campuran 1PC : 5PP Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Batu Belah 15~20cm
m3
1.200
295,000.00
354,000.00
2. Semen PC (40kg)
zak
3.400
69,900.00
237,660.00
3. Pasir Pasang
m3
0.544
70,000.00
38,080.00
1. Pekerja
OH
1.500
50,000.00
75,000.00
2. Tukang Batu
OH
0.600
71,427.85
42,856.71
3. Kepala Tukang
OH
0.050
85,714.30
4,285.72
4. Mandor
OH
0.075
85,714.30
6,428.57
Jumlah
758,311.00
Keuntungan 10%
75,831.10
Jumlah Harga per Satuan Pekerjaan
834,142.10
Tenaga Kerja
Memasang 1 m3 pondasi batu belah, campuran 1PC : 8PP Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Batu Belah 15~20cm
m3
1.200
295,000.00
354,000.00
2. Semen PC (40kg)
zak
2.275
69,900.00
159,022.50
3. Pasir Pasang
m3
0.584
70,000.00
40,880.00
1. Pekerja
OH
1.500
50,000.00
75,000.00
2. Tukang Batu
OH
0.600
71,427.85
42,856.71
3. Kepala Tukang
OH
0.050
85,714.30
4,285.72
4. Mandor
OH
0.075
85,714.30
6,428.57
Jumlah
682,473.50
Keuntungan 10%
68,247.35
Jumlah Harga per Satuan Pekerjaan
750,720.85
Tenaga Kerja
Memasang 1 m3 pon asi si op 60% campuran 1PC : 2PB : 3KR an 40% Batu Be a Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Batu Belah 15~20cm
m3
0.480
295,000.00
141,600.00
2. Semen PC (40kg)
zak
4.850
69,900.00
339,015.00
3. Pasir Beton
m3
0.312
70,000.00
21,840.00
4. Kerikil (Split)
m3
0.468
420,000.00
196,560.00
5. Besi Beton
kg
126.000
9,500.00
1,197,000.00
6. Kawat Beton
kg
1.800
24,000.00
43,200.00
1. Pekerja
OH
3.000
50,000.00
150,000.00
2. Tukang Batu
OH
0.850
71,427.85
60,713.67
3. Kepala Tukang
OH
0.085
85,714.30
7,285.72
4. Mandor
OH
0.150
85,714.30
12,857.15
Jumlah
2,170,071.53
Tenaga Kerja
Membuat 1 m3 beton f'c=7,4MPa (K-100) Slump 12 ± 2 ; w/c=0,87 Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
6.175
69,900.00
431,632.50
2. Pasir Beton
m3
0.745
70,000.00
52,140.00
3. Kerikil (Split Maks 30mm)
m3
0.888
420,000.00
372,960.00
4. Air
liter
215.000
100.00
21,500.00
1. Pekerja
OH
1.650
50,000.00
82,500.00
2. Tukang Batu
OH
0.275
71,427.85
19,642.66
3. Kepala Tukang
OH
0.028
85,714.30
2,400.00
4. Mandor
OH
0.083
85,714.30
7,114.29
Jumlah
989,889.45
Keuntungan 10%
98,988.94
Tenaga Kerja
Membuat 1 m3 beton f'c=12,2MPa (K-150) Slump 12 ± 2 ; w/c=0,72 Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
7.475
69,900.00
522,502.50
2. Pasir Beton
m3
0.685
70,000.00
47,940.00
3. Kerikil (Split Maks 30mm)
m3
0.904
420,000.00
379,680.00
4. Air
liter
215.000
100.00
21,500.00
1. Pekerja
OH
1.650
50,000.00
82,500.00
2. Tukang Batu
OH
0.275
71,427.85
19,642.66
3. Kepala Tukang
OH
0.028
85,714.30
2,400.00
4. Mandor
OH
0.083
85,714.30
7,114.29
Jumlah
1,083,279.45
Keuntungan 10%
108,327.94
Tenaga Kerja
Membuat 1 m3 beton f'c=16,9MPa (K-200) Slump 12 ± 2 ; w/c=0,61 Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
8.800
69,900.00
615,120.00
2. Pasir Beton
m3
0.627
70,000.00
43,860.00
3. Kerikil (Split Maks 30mm)
m3
0.916
420,000.00
384,906.67
4. Air
liter
215.000
100.00
21,500.00
1. Pekerja
OH
1.650
50,000.00
82,500.00
2. Tukang Batu
OH
0.275
71,427.85
19,642.66
3. Kepala Tukang
OH
0.028
85,714.30
2,400.00
4. Mandor
OH
0.083
85,714.30
7,114.29
Jumlah
1,177,043.61
Keuntungan 10%
117,704.36
Tenaga Kerja
Membuat 1 m3 beton f'c=21,7MPa (K-250) Slump 12 ± 2 ; w/c=0,56 Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
9.600
69,900.00
671,040.00
2. Pasir Beton
m3
0.593
70,000.00
41,520.00
3. Kerikil (Split Maks 30mm)
m3
0.924
420,000.00
387,893.33
4. Air
liter
215.000
100.00
21,500.00
1. Pekerja
OH
1.650
50,000.00
82,500.00
2. Tukang Batu
OH
0.275
71,427.85
19,642.66
3. Kepala Tukang
OH
0.028
85,714.30
2,400.00
4. Mandor
OH
0.083
85,714.30
7,114.29
Jumlah
1,233,610.28
Keuntungan 10%
123,361.03
Tenaga Kerja
Membuat 1 m3 beton f'c=26,4MPa (K-300) Slump 12 ± 2 ; w/c=0,52 Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
10.775
69,900.00
753,172.50
2. Pasir Beton
m3
0.584
70,000.00
40,860.00
3. Kerikil (Split Maks 30mm)
m3
0.908
420,000.00
381,173.33
4. Air
liter
215.000
100.00
21,500.00
1. Pekerja
OH
1.650
50,000.00
82,500.00
2. Tukang Batu
OH
0.275
71,427.85
19,642.66
3. Kepala Tukang
OH
0.028
85,714.30
2,400.00
4. Mandor
OH
0.083
85,714.30
7,114.29
Jumlah
1,308,362.78
Keuntungan 10%
130,836.28
Tenaga Kerja
Membuat 1 m3 beton f'c=31,2MPa (K-350) Slump 12 ± 2 ; w/c=0,48 Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
11.200
69,900.00
782,880.00
2. Pasir Beton
m3
0.572
70,000.00
40,020.00
3. Kerikil (Split Maks 30mm)
m3
0.889
420,000.00
373,333.33
4. Air
liter
215.000
100.00
21,500.00
1. Pekerja
OH
1.650
50,000.00
82,500.00
2. Tukang Batu
OH
0.275
71,427.85
19,642.66
3. Kepala Tukang
OH
0.028
85,714.30
2,400.00
4. Mandor
OH
0.083
85,714.30
7,114.29
Jumlah
1,329,390.28
Keuntungan 10%
132,939.03
Tenaga Kerja
Pem esian 10 g po os Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Besi Beton BJTP-U24
kg
10.500
9,500.00
99,750.00
2. Kawat Beton
kg
0.150
24,000.00
3,600.00
1. Pekerja
OH
0.070
50,000.00
3,500.00
2. Tukang Besi
OH
0.070
71,427.85
4,999.95
3. Kepala Tukang
OH
0.007
85,714.30
600.00
4. Mandor
OH
0.004
85,714.30
300.00
Jumlah
112,749.95
Keuntungan 10%
11,274.99
Jumlah Harga per Satuan Pekerjaan
124,024.94
Tenaga Kerja
Pembesian 10 kg (ulir)
Memasang 10 g esi wiremes Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Besi Beton BJTP-U24 (dilas)
kg
10.200
11,400.00
116,280.00
2. Kawat Beton
kg
0.050
24,000.00
1,200.00
1. Pekerja
OH
0.025
50,000.00
1,250.00
2. Tukang Besi
OH
0.025
71,427.85
1,785.70
3. Kepala Tukang
OH
0.025
85,714.30
2,142.86
4. Mandor
OH
0.001
85,714.30
107.14
Jumlah
122,765.70
Keuntungan 10%
12,276.57
Jumlah Harga per Satuan Pekerjaan
135,042.27
Tenaga Kerja
Memasang 1 m2 bekisting untuk pondasi
1. Pekerja
OH
0.660
50,000.00
33,000.00
2. Tukang Kayu
OH
0.330
71,427.85
23,571.19
3. Kepala Tukang
OH
0.033
85,714.30
2,828.57
4. Mandor
OH
0.033
85,714.30
2,828.57
Jumlah
282,228.33
Keuntungan 10%
28,222.83
Jumlah Harga per Satuan Pekerjaan
310,451.17
Memasang 1 m2 e isting untu
antai
Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.040
2,200,000.00
88,000.00
2. Paku 5~7cm
kg
0.400
18,000.00
7,200.00
3. Oli
liter
0.200
25,000.00
5,000.00
4. Balok Kayu Kelas II
m3
0.018
2,750,000.00
49,500.00
5. Plywood 9mm
lbr
0.350
138,000.00
48,300.00
6. Dolken Galam (dia 8-10cm ; L=4m)
btg
6.000
11,000.00
66,000.00
Memasang 1 m2 e isting untu
antai
Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.040
2,200,000.00
88,000.00
2. Paku 5~7cm
kg
0.400
18,000.00
7,200.00
3. Oli
liter
0.200
25,000.00
5,000.00
4. Balok Kayu Kelas II
m3
0.018
2,750,000.00
49,500.00
5. Plywood 9mm
lbr
0.350
138,000.00
48,300.00
6. Dolken Galam (dia 8-10cm ; L=4m)
btg
6.000
11,000.00
66,000.00
1. Pekerja
OH
0.660
50,000.00
33,000.00
2. Tukang Kayu
OH
0.330
71,427.85
23,571.19
3. Kepala Tukang
OH
0.033
85,714.30
2,828.57
4. Mandor
OH
0.033
85,714.30
2,828.57
Jumlah
326,228.33
Tenaga Kerja
Memasang 1 m2 e isting untu tangga Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.003
2,200,000.00
6,600.00
2. Paku 5~7cm
kg
0.400
18,000.00
7,200.00
3. Oli
liter
0.150
25,000.00
3,750.00
4. Balok Kayu Kelas II
m3
0.015
2,750,000.00
41,250.00
5. Plywood 9mm
lbr
0.350
138,000.00
48,300.00
6. Dolken Galam (dia 8-10cm ; L=4m)
btg
2.000
11,000.00
22,000.00
1. Pekerja
OH
0.660
50,000.00
33,000.00
2. Tukang Kayu
OH
0.330
71,427.85
23,571.19
3. Kepala Tukang
OH
0.033
85,714.30
2,828.57
4. Mandor
OH
0.033
85,714.30
2,828.57
Jumlah
191,328.33
Tenaga Kerja
Mem uat 1 m3 eton ertu ang untu pon asi 1 0 g esi + e isting Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.200
2,200,000.00
440,000.00
2. Paku 5~7cm
kg
0.150
18,000.00
2,700.00
liter
0.400
25,000.00
10,000.00
3. Oli 4. Besi Beton Polos
kg
157.500
9,500.00
1,496,250.00
5. Kawat Beton
kg
2.250
24,000.00
54,000.00
6. Semen PC (40kg)
zak
8.400
69,900.00
587,160.00
7. Pasir Beton
m3
0.540
70,000.00
37,800.00
8. Kerikil (Split)
m3
0.810
420,000.00
340,200.00
1. Pekerja
OH
5.300
50,000.00
265,000.00
2. Tukang Batu
OH
0.275
71,427.85
19,642.66
3. Tukang Kayu
OH
1.300
71,427.85
92,856.21
4 T k
OH
1 050
71 427 85
74 999 24
Tenaga Kerja
B i
Mem uat 1 m3 eton ertu ang untu Kebutuhan
o om 300 g esi + e isting Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.400
2,200,000.00
880,000.00
2. Paku 5~7cm
kg
4.000
18,000.00
72,000.00
liter
2.000
25,000.00
50,000.00
3. Oli 4. Besi Beton Polos
kg
315.000
9,500.00
2,992,500.00
5. Kawat Beton
kg
4.500
24,000.00
108,000.00
6. Semen PC (40kg)
zak
8.400
69,900.00
587,160.00
7. Pasir Beton
m3
0.540
70,000.00
37,800.00
8. Kerikil (Split)
m3
0.810
420,000.00
340,200.00
9. Balok Kayu Kelas II
m3
0.150
2,750,000.00
412,500.00
10. Plywood 9mm
lbr
3.500
138,000.00
483,000.00
11. Dolken Galam (dia 8-10cm ; L=4m)
btg
20.000
11,000.00
220,000.00
OH
7 050
50 000 00
352 500 00
Tenaga Kerja
1 P k j
Mem uat 1 m3 eton ertu ang untu Kebutuhan
ao
200 g esi + e isting Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.320
2,200,000.00
704,000.00
2. Paku 5~7cm
kg
3.200
18,000.00
57,600.00
liter
1.600
25,000.00
40,000.00
3. Oli 4. Besi Beton Polos
kg
210.000
9,500.00
1,995,000.00
5. Kawat Beton
kg
3.000
24,000.00
72,000.00
6. Semen PC (40kg)
zak
8.400
69,900.00
587,160.00
7. Pasir Beton
m3
0.540
70,000.00
37,800.00
8. Kerikil (Split)
m3
0.810
420,000.00
340,200.00
9. Balok Kayu Kelas II
m3
0.140
2,750,000.00
385,000.00
10. Plywood 9mm
lbr
2.800
138,000.00
386,400.00
11. Dolken Galam (dia 8-10cm ; L=4m)
btg
16.000
11,000.00
176,000.00
OH
6 350
50 000 00
317 500 00
Tenaga Kerja
1 P k j
Mem uat 1 m3 eton ertu ang untu Kebutuhan
o om 1 0 g esi + e isting Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.320
2,200,000.00
704,000.00
2. Paku 5~7cm
kg
3.200
18,000.00
57,600.00
liter
1.600
25,000.00
40,000.00
3. Oli 4. Besi Beton Polos
kg
157.500
9,500.00
1,496,250.00
5. Kawat Beton
kg
2.250
24,000.00
54,000.00
6. Semen PC (40kg)
zak
8.400
69,900.00
587,160.00
7. Pasir Beton
m3
0.540
70,000.00
37,800.00
8. Kerikil (Split)
m3
0.810
420,000.00
340,200.00
9. Balok Kayu Kelas II
m3
0.120
2,750,000.00
330,000.00
10. Plywood 9mm
lbr
2.800
138,000.00
386,400.00
11. Dolken Galam (dia 8-10cm ; L=4m)
btg
32.000
11,000.00
352,000.00
OH
5 300
50 000 00
265 000 00
Tenaga Kerja
1 P k j
Mem uat 1 m3 eton ertu ang untu Kebutuhan
in ing 1 0 g esi + e isting Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.240
2,200,000.00
528,000.00
2. Paku 5~7cm
kg
3.200
18,000.00
57,600.00
liter
1.600
25,000.00
40,000.00
3. Oli 4. Besi Beton Polos
kg
157.500
9,500.00
1,496,250.00
5. Kawat Beton
kg
2.250
24,000.00
54,000.00
6. Semen PC (40kg)
zak
8.400
69,900.00
587,160.00
7. Pasir Beton
m3
0.540
70,000.00
37,800.00
8. Kerikil (Split)
m3
0.810
420,000.00
340,200.00
9. Balok Kayu Kelas II
m3
0.160
2,750,000.00
440,000.00
10. Plywood 9mm
lbr
2.800
138,000.00
386,400.00
11. Dolken Galam (dia 8-10cm ; L=4m)
btg
24.000
11,000.00
264,000.00
OH
5 300
50 000 00
265 000 00
Tenaga Kerja
1 P k j
Mem uat 1 m3 eton ertu ang untu Kebutuhan
in ing 200 g esi + e isting Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Kayu Kelas III
m3
0.250
2,200,000.00
550,000.00
2. Paku 5~7cm
kg
3.000
18,000.00
54,000.00
liter
1.200
25,000.00
30,000.00
3. Oli 4. Besi Beton Polos
kg
210.000
9,500.00
1,995,000.00
5. Kawat Beton
kg
3.000
24,000.00
72,000.00
6. Semen PC (40kg)
zak
8.400
69,900.00
587,160.00
7. Pasir Beton
m3
0.540
70,000.00
37,800.00
8. Kerikil (Split)
m3
0.810
420,000.00
340,200.00
9. Balok Kayu Kelas II
m3
0.105
2,750,000.00
288,750.00
10. Plywood 9mm
lbr
2.500
138,000.00
345,000.00
11. Dolken Galam (dia 8-10cm ; L=4m)
btg
14.000
11,000.00
154,000.00
OH
5 650
50 000 00
282 500 00
Tenaga Kerja
1 P k j
Memasang 1 m2 p esteran 1PC : 1PP, te a 1 mm Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
0.388
69,900.00
27,093.24
2. Pasir Pasang
m3
0.016
70,000.00
1,120.00
1. Pekerja
OH
0.200
50,000.00
10,000.00
2. Tukang Batu
OH
0.150
71,427.85
10,714.18
3. Kepala Tukang
OH
0.015
85,714.30
1,285.71
4. Mandor
OH
0.010
85,714.30
857.14
Jumlah
51,070.28
Keuntungan 10%
5,107.03
Jumlah Harga per Satuan Pekerjaan
56,177.30
Tenaga Kerja
Memasang 1 m2 plesteran 1PC : 2PP, tebal 15 mm
Memasang 1 m2 p esteran 1PC : 4PP, te a 1 mm Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
0.156
69,900.00
10,904.40
2. Pasir Pasang
m3
0.024
70,000.00
1,680.00
1. Pekerja
OH
0.200
50,000.00
10,000.00
2. Tukang Batu
OH
0.150
71,427.85
10,714.18
3. Kepala Tukang
OH
0.015
85,714.30
1,285.71
4. Mandor
OH
0.010
85,714.30
857.14
Jumlah
35,441.44
Keuntungan 10%
3,544.14
Jumlah Harga per Satuan Pekerjaan
38,985.58
Tenaga Kerja
Memasang 1 m2 plesteran 1PC : 5PP, tebal 15 mm
Memasang 1 m2 p esteran 1PC : 7PP, te a 1 mm Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
0.098
69,900.00
6,878.16
2. Pasir Pasang
m3
0.028
70,000.00
1,960.00
1. Pekerja
OH
0.200
50,000.00
10,000.00
2. Tukang Batu
OH
0.150
71,427.85
10,714.18
3. Kepala Tukang
OH
0.015
85,714.30
1,285.71
4. Mandor
OH
0.010
85,714.30
857.14
Jumlah
31,695.20
Keuntungan 10%
3,169.52
Jumlah Harga per Satuan Pekerjaan
34,864.71
Tenaga Kerja
Memasang 1 m2 plesteran 1PC : 8PP, tebal 15 mm
Memasang 1 m2 p esteran granit 1PC : 2Granit, te a 10 mm Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
0.250
69,900.00
17,475.00
2. Batu Granit
kg
15.000
2,212.50
33,187.50
1. Pekerja
OH
0.450
50,000.00
22,500.00
2. Tukang Batu
OH
0.200
71,427.85
14,285.57
3. Kepala Tukang
OH
0.020
85,714.30
1,714.29
4. Mandor
OH
0.025
85,714.30
2,142.86
Jumlah
91,305.21
Keuntungan 10%
9,130.52
Jumlah Harga per Satuan Pekerjaan
100,435.73
Tenaga Kerja
Memasang 1 m2 plesteran teraso 1PC : 2Teraso, tebal 10 mm
Memasang 1 m2 inis ing siar pasangan atu a i, a u an 1PC : 2PP Kebutuhan
Satuan
Indeks
Harga Satuan Bahan/Upah (Rp)
Jumlah (Rp)
Bahan
1. Semen PC (40kg)
zak
0.159
69,900.00
11,079.15
2. Pasir Pasang
m3
0.012
70,000.00
840.00
1. Pekerja
OH
0.300
50,000.00
15,000.00
2. Tukang Batu
OH
0.140
71,427.85
9,999.90
3. Kepala Tukang
OH
0.014
85,714.30
1,200.00
4. Mandor
OH
0.015
85,714.30
1,285.71
Jumlah
39,404.76
Keuntungan 10%
3,940.48
Jumlah Harga per Satuan Pekerjaan
43,345.24
Tenaga Kerja
Memasang 1 m2 acian
Re
apitu asi Harga Satuan Pe erjaan Kecamatan Toboali (Zone 1) Kabupaten Bangka Selatan Tahun 2011
No A
Harga Satuan Pekerjaan
Pekerjaan Pekerjaan Tanah (Manual) 1 Menggali 1 m3 tanah biasa sedalam 1 meter
Rp
43,607.14
2 Menggali 1 m3 tanah biasa sedalam 2 meter
Rp
53,742.86
3 Menggali 1 m3 tanah biasa sedalam 3 meter
Rp
64,067.14
4 Menggali 1 m3 tanah keras sedalam 1 meter
Rp
58,017.14
5 Menggali 1 m3 tanah cadas sedalam 1 meter
Rp
88,157.14
6 Menggali 1 m3 tanah lumpur sedalam 1 meter
Rp
70,242.86
7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Rp
3,221.43
D
Pekerjaan Beton 1 Membuat 1 m3 beton f'c=7,4MPa (K-100)
Rp
1,088,878.39
2 Membuat 1 m3 beton f'c=9,8MPa (K-125)
Rp
1,147,256.31
3 Membuat 1 m3 beton f'c=12,2MPa (K-150)
Rp
1,191,607.39
4 Membuat 1 m3 beton f'c=14,5MPa (K-175)
Rp
1,245,862.14
5 Membuat 1 m3 beton f'c=16,9MPa (K-200)
Rp
1,294,747.97
6 Membuat 1 m3 beton f'c=19,3MPa (K-225)
Rp
1,335,663.39
7 Membuat 1 m3 beton f'c=21,7MPa (K-250)
Rp
1,356,971.31
8 Membuat 1 m3 beton f'c=24,0MPa (K-275)
Rp
1,393,394.14
9 Membuat 1 m3 beton f'c=26,4MPa (K-300)
Rp
1,439,199.06
10 Membuat 1 m3 beton f'c=28,8MPa (K-325)
Rp
1,447,691.06
11 Membuat 1 m3 beton f'c=31,2MPa (K-350)
Rp
1,462,329.31
12 Membuat lantai kerja f'c=7,4MPa (K-100)
Rp
1,034,067.15
13 Pembesian 1 kg (polos)
Rp
12,402.49
14 P
Rp
13 499 74
b i
1 k ( li )
E
Pekerjaan Plesteran 1 Memasang 1 m2 plesteran 1PC : 1PP, tebal 15 mm
Rp
56,177.30
2 Memasang 1 m2 plesteran 1PC : 2PP, tebal 15 mm
Rp
46,335.82
3 Memasang 1 m2 plesteran 1PC : 3PP, tebal 15 mm
Rp
41,861.15
4 Memasang 1 m2 plesteran 1PC : 4PP, tebal 15 mm
Rp
38,985.58
5 Memasang 1 m2 plesteran 1PC : 5PP, tebal 15 mm
Rp
37,109.68
6 Memasang 1 m2 plesteran 1PC : 6PP, tebal 15 mm
Rp
35,710.39
7 Memasang 1 m2 plesteran 1PC : 7PP, tebal 15 mm
Rp
34,864.71
8 Memasang 1 m2 plesteran 1PC : 8PP, tebal 15 mm
Rp
34,019.03
9 Memasang 1 m2 plesteran skoning 1PC : 2PP, lebar 10 mm
Rp
38,819.68
10 Memasang 1 m2 plesteran granit 1PC : 2Granit, tebal 10 mm
Rp
100,435.73
11 Memasang 1 m2 plesteran teraso 1PC : 2Teraso, tebal 10 mm
Rp
82,182.61
12 Memasang 1 m2 plesteran ciprat 1PC : 2PP
Rp
32,541.76
13 Memasang 1 m2 finishing siar pasangan batu kali, adukan 1PC : 2PP
Rp
43,345.24
14 M
Rp
24 051 52
1
2
i