MATERIAL LIST GUYED MAST TOWER 3LG 72M
SN
A
Mark no.
Project for
:
Site Name Site ID Revision
: : :
Rev dwg
Profile
PT.TRANSPORTASI GAS INDONESIAIssued Data SAKERNAN Prepared by Checked by C Length
Grade
:
12/23/2013
: :
Nuh.A Nurshahib
Weight kg/m kg/pc
Qty
Perunit Weight
PLATE 1 PL1
0
PL
6
56
100
SS400
2.64
0.26
66
2 PL2
0
PL
6
63
100
SS400
2.97
0.30
6
1.78
3 PL3
0
PL
6
57
100
SS400
2.68
0.27
66
17.72
4 PL4
0
PL
6
67
100
SS400
3.16
0.32
6
1.89
5 PL5
0
PL
6
59
100
SS400
2.78
0.28
66
18.34
6 PL6
0
PL
6
67
100
SS400
3.16
0.32
6
1.89
7 PL7
0
PL
6
60
100
SS400
2.83
0.28
66
18.65
8 PL8
0
PL
8
60
100
SS400
3.77
0.38
6
2.26
9 PL9
0
PL
16
160
160
SS400
20.10
3.22
3
9.65
10 PL10
0
PL
16
160
160
SS400
20.10
3.22
18
57.88
11 PL11
0
PL
16
175
175
SS400
21.98
3.85
3
11.54
12 PL12
0
PL
16
175
175
SS400
21.98
3.85
18
69.24
13 PL13
0
PL
16
195
195
SS400
24.49
4.78
3
14.33
14 PL14
0
PL
16
195
195
SS400
24.49
4.78
18
85.97
15 PL15
0
PL
16
210
210
SS400
26.38
5.54
3
16.62
16 PL16
0
PL
16
210
210
SS400
26.38
5.54
18
99.70
17 PL17
0
PL
16
210
210
SS400
26.38
5.54
3
16.62
18 PL18
0
PL
10
100
670
SS400
7.85
5.26
36
189.34
19 PL19
0
PL
10
100
660
SS400
7.85
5.18
36
186.52
20 PL20
0
PL
10
100
645
SS400
7.85
5.06
36
182.28
21 PL21
0
PL
10
100
630
SS400
7.85
4.95
36
178.04
22 PL22
0
PL
8
100
120
SS400
6.28
0.75
24
18.09
23 PL23
C
PL
12
150
400
SS400
14.13
5.65
6
Sub Total : B
17.41
33.91 1,249.65
PIPE
24 P1
0
PD
1.5"
2976
SCH40
4.10
12.20
3
36.60
25 P2
0
PD
1.5"
2984
SCH40
4.10
12.23
15
183.52
26 P3
0
PD
2"
2984
SCH40
5.44
16.23
18
292.19
27 P4
0
PD
2.5"
2984
SCH40
9.12
27.21
18
489.85
28 P5
0
PD
3"
2984
SCH40
11.34
33.84
15
507.58
29 P6
0
PD
3"
2976
SCH40
11.34
33.75
3
101.24
30 P7
C
PD
2"
1000
SCH40
5.44
5.44
6
Sub Total : C
32.64 1,643.63
ROUND BAR
31 RB1
0
D
16
4860
SS400
1.58
7.68
18
32 RB2
0
D
16
655
SS400
1.58
1.03
90
93.14
33 RB3
0
D
16
4825
SS400
1.58
7.62
18
137.22
34 RB4
0
D
16
645
SS400
1.58
1.02
90
91.72
35 RB5
0
D
16
4740
SS400
1.58
7.49
18
134.81
36 RB6
0
D
16
630
SS400
1.58
1.00
90
89.59
37 RB7
0
D
16
4640
SS400
1.58
7.33
18
131.96
38 RB8
0
D
16
620
SS400
1.58
0.98
90
Sub Total : D
88.16 904.82
Bolt and Nut
39 Bolt+Nut+Sw+Fw
0
M16
75
8.8
0.1809
276
Sub Total : Total E
138.22
Waste & Galvanize (10%)
49.93 49.93 3,798.10 379.81
Grand Total :
Checked by.
Nurshahib Usmanto Director
4,177.91
Guyed Mast Tower 3LG 72M Project 2013 Site ID Vendor Project Site Name Tower Height Scope of Works Project Manager
: : : Guyed Mast Tower 3LG 72M : Sakernan : 72M : Guyed Mast Tower and Foundation : Issued Date : 12/23/2013
No I
II
Item Works
Site Preparation 1 Site Survey - Java - Outside Java - Islands 2 M obilization dan Demobilization - Java - Outside Java - Islands Steel Material Tower 1 Steel M aterial and Fabrication - Plate, Round Bar and Pipe Included Bolt, Nuts and Washer - Plate and Angle Included Bolt, Nuts and Washer 2 Delivery 3 Galvanizing (Hot Deep and Cold Galvanizing) 4 Erection 5 Painting
Qty
Unit
1.00 -
Ls Ls Ls
1.00 -
Ls Ls Ls
Amount IDR
Comment
6,000.00 6,000.00 6,000.00 6,000.00 6,000.00
kg kg kg kg kg kg
-
Ls Ls
IV Base Frame Shelter of Works 1 Base frame WF - 200 x 100 x 5.5 x 8 (Hot Deep Galvanized) 2 HILTI + Chemical Fishes M 16mm - 240mm
-
kg set
132.00 -
m3 m' set set set set set set set set set m' m' point m2 point m2 point kg
-
pcs pcs pcs pcs pcs m'
Foundation Tower Strengthening of Works Concrete pouring with reinforcement steel bar (included excavation and compaction) Foundation Bore Pile diameter 40 cm HILTI - HIT RE - 500 (with rebar) / Fisher FIS380C HILTI HVU+HAS-N (8.8) M 20-280 HILTI HIT RE 500 HILTI HIT RE 500 HAS E-F (M 16-150mm) HILTI - HVU - HAS - E - F (M 16 - 500mm) HILTI - HVU - HAS - E - F (M 20 - 300mm) HILTI - HVU - HAS - E - F (M 24 - 290mm) HILTI - HVU - HAS - E - F (M 27 - 340mm) Chipping existing footing / building floor (Included water profing) Casing Concrete Diameter 80cm -100cm (M aterial) Short Well Digging Diameter 100cm (Excavation) SIKAGROUT 214 -11 Injection (Zak@25 kg) Grouting SIKATOP 107 - SEAL (Zak@25 kg) Waterproofing SIKADUR - 31 - (Zak@6 kg/set) Coring SIKADUR - 752 - (Zak@10 kg/set) Crack Welding M oving M aterial Tower for Extend & Strengthening Included Accessories to Roof Top Building M oving M aterial to Roof Top Building - Poles 3 meter Included Accessories - Poles 6 meter Included Accessories - Poles 9 meter Included Accessories - Poles 12 meter Included Accessories - Poles 15 meter Included Accessories 21 Guy Wire dia 10mm Included Accessories
Total Price IDR
-
III Finishing of Works 1 Site Recondition 2 Dock for ATP and Site Binder (BAST)
Guyed Mast Tower 3LG 72M Project 2013 Site ID Vendor Project Site Name Tower Height Scope of Works Project Manager
: : : Guyed Mast Tower 3LG 72M : Sakernan : 72M : Guyed Mast Tower and Foundation : Issued Date : 12/23/2013
Item Works No 22 Guy Wire dia 12mm Included Accessories - Guy Wire dia 12mm (IWRC) - Cable Clamp / Wire Clip for Wire M 12 (Gunnebo) - Turnbucle Eye and Eye M 12 (Gunnebo) - Thimble (Gunnebo) - Steel Cable End Crimp Shoe (IWRC) - Steel Wire Turnbuckle Anti Rotation Loop M 6 (IWRC) - Cable Clamp / Wire Clip for Wire M 6 (Gunnebo) - Shackle(Gunnebo)
VI Supply, Delivery and Install Antenna Mounting (FR + MW) 1 Supply, Delivery and Install Antenna M ounting 3 Sectoral for poles included U-bouts, nuts, bouts and washer 2 Supply, Delivery and Install Antenna M ounting 1 Sectoral for poles included U-bouts, nuts, bouts and washer
-
set set
VII 1 2 3 4 5 6 7 8 9
-
set m' m' pcs pcs m' m' Ls Ls
VIII
Supply, Delivery and Install Grounding System Splitzen + Aluminum 60 mm Steel Cable Wire 80mm AAC 70mm2 (Aluminum) Copper Lightning Arrester 30 cm Aluminum Busbar 300mm x 50mm x 8m PVC Pipe 1'' (Inch) PVC Pipe 1'' Flexible 1'' (Inch) Repositioning Lightning rod and Support Repositioning OB-Light and Support
Unit Price IDR
Total Price IDR
Amount IDR
Comment
m' pcs pcs pcs pcs pcs pcs pcs -
-
Miscellaneous of Works 1 Concrete Works (K-225 With SK SNI 03.2002 Standard) Include Volume of Bored Pile 2 Steel Weight (SNI 07.2052 1990/JIS G-3112 Standard)
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.