PERENCANAAN :

GREEN SITE KAMPUS KEMENTERIAN PEKERJAAN UMUM , DAN GEDUNG UTAMA KEMENTERIAN PEKERJAAN UMUM

PEMBANGUNAN GEDUNG UTAMA KEMENTERIAN PEKERJAAN UMUM

PEMILIK DAN PEMBERI TUGAS

KONSIL GREEN BUILDING

PELAKSANA / KONTRAKTOR

PERENCANA

MANAJEMEN KONSTRUKSI

SEBAGAI :

LANDMARK KEBANGGAAN NASIONAL , DAN BENCHMARK BANGUNAN GEDUNG NEGARA REPUBLIK INDONESIA BERBASIS KONSEP

GREEN SITE & GREEN BUILDING SEHINGGA MENJADI LOW ENERGY CONSUMPTION BUILDING SERTA SERTA BERPERAN MENGURANGI DAMPAK

GLOBAL WARMING

Green Site Design Kampus Kementerian Pekerjaan Umum

Eksisting Campus Kementerian Pekerjaan Umum LEGENDA :

I

L

 A. GED UTAMA (4 LT.) B. 1. CIPTA KARYA & GED. MENTERI (8 LT.)

K

H

J

2.GED.BALIBANG & BPKSDM (8 LT.) 3.GEDUNG BINA MARGA (8 LT.)

G

C. GED. KEPEGAWAIAN (4 LT.)

E

F

D

C

B2

A

D. GED. TATA RUANG (3 LT.) E. GED. SDA (2 LT.)

B1

B3

F. GED. SDA (2 LT.) G. GED. SDA & FASUM (2 LT.) H. GED. TATA RUANG (2 LT.)

N O

P

I. GED. BIRO KEUANGAN (2 LT.)

M

J. GED. PUSDATA (1 & 2 LT.) K. KANTIN (1 LT.) L. POLIKLINIK (2 LT.) M. MASJID (2 LT.) N. GARDU PLN

Luas Total Luas Ruang Terbangun Luas Ruang Terbuka (dengan perkerasan) Luas Ruang Hijau

: 5,3846 Ha : 19.827,70 M² (36,82 %) : 22.210,27 M² (41,25 %) : 11.808,02 M² (21,93 %)

O. POWER HOUSE P. GED. SDA &TARU (8LT)

FILOSOFI ZERO RUN OFF:

‘GREEN ENVIRONMENT’ THERMAL CONTROL :

Meminimalkan buangan air hujan ke luar kawasan

Membentuk mikro klimat

Pemilihan material secara tepat 

 Pembuatan

detention pond / swale  Pembuatan

resapan setempat  Optimalisasi  jaringan saluran drainase keliling

Dari tatanan pola & pemilihan vegetasi  Membentuk sirkulasi udara ruang luar yang mengalir  Pengelolaan O2 & CO2 dengan penanaman tanaman bertajuk padat & lebar

RECYCLE REDUSE REUSE :

ECO FRIENDLY:



 

Meminimalkan material alami  Memilih produk finishing yg. poreus  Menyediakan & melengkapi sarana bagi pejalan kaki (termasuk penyandang cacat)

Penerapan sistem pengelolaan sampah tanaman  Penerapan pengelolaan air tanah dengan baik  Mengurangi penggunaan air siram dgn. meminimalkan tanaman perdu  Efisiensi penggunaan daya listrik utk. Pencahayaan ruang luar dg. Pemilihan  jenis lampu & sensor 

Green Site Concept Applications Kawasan Campus Green Campus Development “Green Site / Garden City” Concept:  High density development  More greenery (RTH)  Restrict movement of motorized vehicle  Interconnected walkways  Zero Runoff  Integrated Waste Management  Integrated MEP system.

• • • • • • •

Green Campus development plan

  More

greenery, walkways

“Green Site / Garden City” concept: High density development  More greenery (RTH)  Restrict movement of motorized vehicle  Interconnected walkways  Zero Runoff  Integrated Waste Management  Integrated MEP system.

• •

GED. PARKIR

• •

2



6

SERBAGUNA

• •

PUSAT DATA & PUSKOMPU

GED. Utama

4

GED. TATA RUANG

1

& GED. PARKIR

GED. Herigage

5

GED. CIPTA KARYA BINA MARGA BPKSDM BALITBANG

3

GED. SDA

7 MASJID

8

SEBELUM (MASTERPLAN AWAL)

SESUDAH (PENYESUAIAN – 2009)

Luas Total : 5,3846 Ha Luas Ruang Terbangun : 19.827,70 M² (36,82 %) Luas Ruang Terbuka (dengan perkerasan) : 22.210,27 M² (41,25 %)

Luas Total : 5,3846 Ha Luas Ruang Terbangun : 18.243,64 M² (33,88 %) Luas Ruang Terbuka (dengan perkerasan) : 17.541,20 M² (32,58 %)

Green Campus development plan

  More

trees, better microclimate

“Green Site / Garden City” concept:  High density development More greenery (RTH)  Restrict movement of motorized vehicle  Interconnected walkways  Zero Runoff  Integrated Waste Management  Integrated MEP system.

• • • • • • •



100 Pohon menyerap CO2 8 ton / tahun (Simpson and Mc Pherson)



Perpohon dapat menyerap 75% Partikel debu



½ ha RTH, dapat menahan aliran permukaan akibat hujan dan meresapkan air ke dalam tanah 10,219 m3/tahun (Urban forest 2002)



Menyerap 80 % dari radiasi matahari  evaporasi dan transpirasi

Better - Micro Climate THERMAL CONTROL : 

Pola Tata Vegetasi membentuk mikro klimat , mereduksi radiasi matahari & memberi kontribusi suplai O2.

Iklim Micro

  

100 Pohon menyerap CO2 8 ton / tahun (Simpson and Mc Pherson) Perpohon dapat menyerap 75% Partikel debu ½ ha RTH, dapat menahan aliran permukaan akibat hujan dan meresapkan air ke dalam tanah 10,219 m3/tahun (Urban forest 2002)

Restrict movement of motorized vehicle Interconnected walkways

• •

  More

Legenda

“Green Site/Garden City” concept:  High density development  More greenery (RTH) Restrict movement of motorized vehicle  Interconnected walkways  Zero Runoff  Integrated Waste Management  Integrated MEP system.

greenery, walkways

: Jalur pedestrian dengan canopy

• •

Jalur pedestrian terbuka



Jalur Kendaraan & Ged Parkir

• • • •

P

P

Green Campus development plan

ILUSTRASI

  More

greenery, walkways

Green Campus development plan

  Zero

Runoff

“Green Site/Garden City” concept:  High density development  More greenery (RTH)  Restrict movement of motorized vehicle  Interconnected walkways  Zero Runoff  Integrated Waste Management SERBAGUNA  Integrated MEP system.



= SUMUR RESAPAN

• •

= POND / AREA RESAPAN AIR HUJAN

• •

2



GED. PARKIR PUSAT DATA & PUSKOMPU



4

GED. TATA RUANG

6

& GED. PARKIR

GED. MENTRI

1 5 GED. UTAMA

GED. CIPTA KARYA BINA MARGA BPKSDM BALITBANG

3

GED. SDA

8 MASJID

7

Drainage air hujan kawasan menggunakan ring sistem, dialirkan ke area / taman resapan dan sumur resapan

Integrated waste management   recycle “Green Site/ Garden City” concept: Sampah basah, sampah organik seperti ; daun, sisa sayur,  High density development sisa makanan, daging, tulang tulang ikan/ayam, kulit buah-buahan,  More greenery (RTH) direncanakan di olah dengan menggunakan komposter  Restrict movement of motorized vehicle  Interconnected walkways  Zero Runoff  Integrated Waste Management  Integrated MEP system.

• •

 –

• • • • •

Sampah kering, sampah anorganik, tidak dapat di daur ulang secara alami dan cepat oleh tanah seperti ; 1. Botol kaca, gelas, piring. 2. Kain, plastik, styrofoam. 3. Kaleng. 4. B3 (Bahan Beracun Berbahaya)

Integrated MEP system  more effective & efficient “Green Site/ Garden City” concept:  High density development  More greenery (RTH)  Restrict movement of motorized vehicle  Interconnected walkways  Zero Runoff Local Security Control  Integrated Waste Management  Integrated MEP system.

• • • •

Local Security Control



Local Security Control

• •

Master Security Control

Local Security Control

Local Security Control Local Security Control

Local Security Control

Power grid Water waste/grey water Fire fighting system Clean water Security system Communication system

Local Security Control

Rencana Identifikasi Infrastruktur Bawah Tanah & Disain Parking Management Lansekap Kampus Kementerian Pekerjaan Umum

LED AVAILABLE SPACE PARKING

Rencana Identifikasi Infrastruktur Bawah Tanah & Disain JamKampus Matahari - Sundial Lansekap Kementerian Pekerjaan Umum

SUNDIAL  JAM - MATAHARI

Sundial

Rencana Identifikasi Infrastruktur Bawah Tanah & Disain Parkir LansekapSepeda – Bike Kampus KementerianRack Pekerjaan Umum

Parkir Sepeda

Bangku

Rencana Identifikasi Infrastruktur Bawah Tanah & Disain taman tempat sampah Lansekapdan Kampus Kementerian Pekerjaan Umum

Bangku Taman

Tempat Sampah

Rencana

Drinking Water Facilities

Fasilitas Penyediaan Air Minum pada : Interior : bisa sbg elemen pendukung desain Interior Eksterior: bisa sbg elemen estetis pada penataan lansekap

GREEN BUILDING DESIGN GEDUNG UTAMA KEMENTERIAN PEKERJAAN UMUM

Building form & orientation

Original block plan: Larger area of the building is oriented to east and west

Building form & orientation

Horizontal roof

Vertical South

Vertical East & West

Vertical North

Building form & orientation  minimize exposure to east and west solar radiation

Original building form

Modified building form

Modified Building form: 1. Reduced surface exposure of the working spaces to east and west sun 2. Narrow building form  improve daylight performance

Building form & orientation  orienting windows to north and south

Opaque walls

Windows glass

Daylighting  light shelves for better daylight distribution

Return air

thermal insulation

Daylighting  Mockup light shelves

PEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUM

PEMANFAATAN SINAR MATAHARI

Dengan dikombinasikan daylight sensors untuk area kerja dan motion sensors untuk area publik(toilet)  terbukti bisa menghemat energi 13%

Sinar matahari Sinar matahari Daylight sensor

14000.00

Translucent interior partitions  better daylight distribution

Solar Gain Exterior Windows (kW) 70

60

50

Pre-Design 40

Design01 Design02

30

Design03 Design04

20

10

0

(Pre-Design) Clear Glass no Insulation

0 1 2 3 4 5 6 7 8 9 10 11 1213 1415 16 1718 1920 21 2223 2425 26 272829 3031 32 3334 3536 37 3839 42 43 4445 46 47 1 40 41Clear Glass

no Insulation

2

Stopsol Darkblue no Insulation

3

Stopsol Darkblue + Insulation Stopsol Darkblue + Insulation +

Total Cooling (kW) 0 1 2 3 4 5 6 7 8 9 10 11 12 1314 15 16 17 1819 20 21 22 2324 25 26 27 2829 30 31 32 3334 35 36 3738 39 40 41 4243 44 45 46 47 -20

-40

-60

Pre-Design Design01

-80

Design02 -100

Design03 Design04

-120

-140

-160

-180

0

(Pre-Design) Clear Glass no Insulation

1

Clear Glass no Insulation

2

Stopsol Darkblue no Insulation

3

Stopsol Darkblue + Insulation Stopsol Darkblue + Insulation +

Daylight Performance  narrow building span & light shelves

Automatic Lighting Control Zone  saving electric lighting energy consumption > 30%

TIME SCHEDULE , DAY LIGHT (LUX SENSOR) & MOTION SENSOR

PEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUM

LAYOUT ZONE AC

Grey water system  substantially save water consumption

Clean water tank

Grey water Roof tank

sink

shower

toilet

wudhu

Rain

Makeup cooling tower

Grey water tank

To the ground

garden

Bio tank

Grey water system  substantially save water consumption



Pemakaian / Kebutuhan air bersih (A)



Recycling air kotor dan buangan (B) 

dari STP (120 m3/hari)

: 80 m3/hari

  Air condensate dari AC

:

  Air hujan

: 40 m3/hari

  Air wudhu

: 25 m3/hari Total



:180 m3/hari

5 m3/hari

: 150 m3/hari

Penggunaan kembali air buangan 

Flushing WC, urinoir

: 45 m3/hari



Siram taman/landscape

: 15 m3/hari Total

: 60 m3/hari

Sisa air buangan masuk ke resapan

 Air Bersih yang dihemat B : A = 83% (termasuk air hujan).

 Air Bersih yang dihemat = 61% (tanpa air hujan)

 Material & resources : use environmentally friendly materials

• • • • •

Local products Sustainable Low energy Recyclable / eco friendly Non toxic

Most building materials meet ISO 14001 standards and requirements

CORE

PEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUM

LIFT SERVICE TOILET DIFABEL

LIFT DIFABEL

JALUR DIFABLE

GENDER

TIPIKAL

Encourage bike to work  Provide bicycle racks and shower rooms

PEMBANGUNAN GEDUNG MENTERI KEMENTERIAN PEKERJAAN UMUM

POTONGAN

Jalur pejalan kaki dan difabel Jalur pencapaian dr gedung Parkir