Gen2 Otis Aprendizaje

Share Embed Donate


Short Description

otis...

Description

OTIS ACD2 MRL Field Installation Manual

3.2 Check of Run -Direction

ERO

UP

OTIS ACD2 MRL Field Installation Manual

3.3 Manual Brake Release check See Reference about SPBC and details of MRO.

BRB2

BRB2 Keyswitched

Press BRB1

Press BRB1

 /  /

BRB2

BRB1 not pressed

OTIS ACD2 MRL Field Installation Manual

4

PREPARE FIRST NORMAL RUN  Attention: The elevator must be fully completed (wiring and mechanical assembly) before going beyond this point.

4.1 Position DSBD (connect 4T with 5T)

OTIS ACD2 MRL Field Installation Manual

4.2 Check of Hoistway Signals (PRS with RLEV/ADO)

ERO

Start

Unpublished Work Copyright © OTIS Elevator Company

ACD2 MRL Field Installation Manual

4.3 Check of Hoistway Signals (PRS without RLEV/ADO)

ERO

Start

OTIS ACD2 MRL Field Installation Manual

4.4 Start up of the door system 4.4.1 NGSOK startup: Reference: KAA31328AAA_SUR NGSOK Start up routine

OTIS ACD2 MRL Field Installation Manual

4.4.2 Start up of DCSS5E To startup the DCSS5 Operator please refer to the corresponding Field Installation Manual in  Appendix.

4.5 Learn run

OTIS ACD2 MRL Field Installation Manual

Press CHCS Press DDO

NORM

ERO

Press “1” for calibration Press “0” for maintain

NORM

OTIS ACD2 MRL Field Installation Manual

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF