Description

35500

120000

35500

KabelUtama Hanger 

Titik Sondir 2 (S.2)   e    t   a    D

Handroil

   )   m    (    h    t   p   e    D

   )   m    (    h    t   p   e    D

FieldTest SPT BH.2

Cone Resistant (kg/cm2)

N

0 10 30 50

  e    t   a    D

   )   m    (    h    t   p   e    D

   )   m    (    h    t   p   e

3

10 30 50

   D

3

2

5

RangkaJembatan

   5    8  .    2

   5    8  .    2

2.45

4 4.00

   0    0  .    1

   0    0  .    1

14

kabelAngin

4.45

   7    1    0    2    i    l   u    J

7

9

46

6.45

8.45

10 10.00 >60 10.45

12 12.00 13

12.45

14 14.00 14.45

15

6.45

8 8.00 >60

MAB +177.12

   0    0  .    6

3.00

MAN +175.65

3.00    0    0  .    6

11 12 13

20

25 0

qc=222.49kg/cm2 4 9kg/cm2 TF=261.97kg/cm 9 7kg/cm

4 5 6 7 8 9 10

10.45

12.00 12.45

14 14.00 14.45

15

   )   m    (    h    t   p   e    D

8.45

10 10.00 >60

8 8.00 >60

11

7

9

5 6 6.00

6 6.00 >60    7    1    0    2    i    l   u    J

1 50

2 3

48

4.45

BranchStrom 2 2.00

3

2.45

4 4.00

1

1 00

1

2 2.00

FieldTest SPT BH.1 N

50

0

1

0

50 100 150 200 250 300 350 400 450 500

Total Friction (kg/cm2)

+15.20

TK

L

L

K

L

T

T

.

.

5.50

.

4.00

2.75 1.25

1.25

3.10         5         3   .         2

        0         8   .         0

4.00

        0         0   .         7

4.00 6.50         5         8   .         2

0.25

0.25

0.25

0.25

        0         0   .         1

LANTAI KERJA BETON B.0 t = 10 cm

LANTAI KERJA BETON B.0 t = 10 cm

LAPISAN PASIR t = 10 cm

PONDASI SUMURAN Ø 3.00 M

L = 6.00 M

L = 6.00 M

        0         0   .         6

        0         0   .         6

0.50

3.00

1.00

3.00

0.50

8.00

        5         7   .         1

        0         5   .         2

        5         7   .         1

0.50

3.00

1.00

3.00

1.50

TAMPAK SAMPING TIANG PENYANGGA TIMUR

SKALA. 1 : 100 0.10

1.50

6.00

TAMPAK DEPAN TIANG PENYANGGA TIMUR

        0         0   .         6

LAPISAN PASIR t = 10 cm

PONDASI SUMURAN Ø 3.00 M

3.00

0.50

0.10

SKALA. 1 : 100

PONDASI SUMURAN Ø 3.00 M

L = 6.00 M

Catatan : - Beton : fc' = 30 Mpa. ( K.350 ) Untuk Abutment - Baja tulangan U-39 Ulir  - Jarak bersih antar tulangan yang berlapis 7.5 cm - Selimut Beton 4 cm - Ukuran Gambar Dalam Meter  Kecuali disebutkan Lain

TK

L

L

K

L

T

T

.

30

.

240 30

150 10

10

.

10

10

10

10

        0         0         1

 ANGKUR D25 - 300 (S4)

PASANGAN BATU         0         6

BETON fc' 30 MPa

        0         5

 ANGKUR D25 - 300 (S4)

        0         4

D16 - 200 (S2) D16 - 200 (S1)

D16 - 200 (S2)

        0         0         6

        0         0         5

        0         7         5

D13 - 600 (S3)

BETON CYCLOP D16 - 200 (S1)

30

D13 - 600 (S3)

240

300

POTONGAN 1 - 1 SKALA. 1 : 50         0         5

BETON fc' 30 MPa

        0         3

10 30

10 240

30

300

DETAIL PENULANGAN SUMURAN SKALA. 1 : 50

30

4.45

4.00

1.70

1.25

1.25

3.10         5         3   .         2

        0         8   .         0

detail sambungan antara pondasi sumuran dan cap pasangan batu belum ada, direkomendasikan memakai angkur dari pondasi sumuran masuk ke pasangan batu minimal 40 dia. tulangan

2.95

        0         0   .         7

4.00 5.45         5         8   .         2

0.25

0.25

0.25

0.25

        0         0   .         1

LANTAI KERJA BETON B.0 t = 10 cm

LANTAI KERJA BETON B.0 t = 10 cm

LAPISAN PASIR t = 10 cm

LAPISAN PASIR t = 10 cm

PONDASI SUMURAN Ø 2.50 M

L = 6.00 M

        0         0   .         6

        0         0   .         6

TAMPAK DEPAN TIANG PENYANGGA TIMUR

0.10

        5         7   .         1

        0         0   .         6

0.626

2.50

1.75

6.00

SKALA. 1 : 100 0.625

1.75

Mutu beton dan mutu baja disesuaikan dengan standar kriteria desain

2.50

0.70

2.50

2.50

0.70 6.95

2.50

0.626

0.625 0.10

TAMPAK SAMPING TIANG PENYANGGA TIMUR SKALA. 1 : 100

PONDASI SUMURAN Ø 2.50 M

L = 6.00 M

Catatan : - Beton : fc = 21.0 Mpa. ( K.250 ) Untuk Abutment - Baja : fy = 400 Mpa. ( BJTD-40 ) untuk Ø > 13 mm - Jarak bersih antar tulangan yang berlapis 7.5 cm - Selimut Beton 4 cm - Ukuran Gambar Dalam Meter   Kec uali disebutkan Lain

        0         5   .         2

        5         7   .         1

6.95

DENAH PENEMPATAN SUMURAN SKALA. 1 : 50