Function Test for 132KV GIS LCC
January 30, 2017 | Author: Ahmed Soomro | Category: N/A
Short Description
Download Function Test for 132KV GIS LCC...
Description
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
Projects 1.General & Supplies Co. Data
SUD1-03-001 Page 1 of 7
and Information:
Manufacture
HICO
2. Mechanical Check And Visual Inspection: As per TCS –P–105 Item no 4.1 Item Description Check tightness of all connections 1 Inspect for physical damage / defects 2 Panel condition, cleanliness, organization, labeling, readiness for service, panel 3 doors, handles...etc 4 CT shorting checked Indications checked 5 6 Check the ferrules as per specification Panel Earthing checked 7 Confirm that each panel has been properly secured to the floor in its final service 8 location. Confirm that panels are constructed and wired as per SEC relevant 9 specification. 10 Check case cover and gasket for proper seal against dust. Check all installed equipment nameplate information for compliance to 11 approved drawings and equipment /material lists. For all internal and external panel wiring, confirm that all screw terminations are tight and that crimp connectors are firmly secured to the wire and to the 12 termination point. Ensure that no part of the wire is bent at the termination point. Check Ferrules. Check that panel equipment is mounted securely and protected against 13 mal operation due to vibration, shock, etc Use of ring type terminals for wire termination for current circuit wires. 14 15 16
Disconnectors Manual operation by handle and related interlocking conditions to be checked Mechanical interlocking between DS & ES to be checked
Checked Yes N/A Yes N/A Yes N/A Yes Yes Yes Yes Yes
N/A N/A N/A N/A N/A
Yes
N/A
Yes Yes
N/A N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
Yes
N/A
3. Electrical Tests Item 1 2 3 4 5
Description Insulation Resistance Test report of all wires to be submitted by the contractor prior witnessing and made available Dc power/ control supply checked. AC Power/ Control supply checked. Circuit Breaker, Disconnector and Earth Switch Open/Close status checked All CB’S, DSW’s and ESW’s should be tested before starting function Check
Yes
Checked N/A
Yes Yes Yes
N/A N/A N/A
Yes
N/A
4. Circuit breaker closing / tripping blocking conditions : Test Performed by: Name:
ENG/YASSER ELKADY
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
SUD1-03-001 Page 2 of 7
Projects & Supplies Co.
Sl no.
Setting values
Description st
1 2 3 4 5
SF6 Gas pressure 1 Stage nd SF6 Gas pressure 2 Stage rd SF6 Gas pressure 3 Stage CB spring charged condition Anti-Pumping condition
CB blocked status Closing Tripping
5.7 bar 5.5 bar 6.7 bar 20 SEC ----
5. Checking of operation and indications: Operation Indication Equip. Command LOCAL BCU SAS LOCAL BCU Ref SAS close 504
open
close
506
505 open 501Y
501Z
Close / Open
Condition
Remarks OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Service
OK
Test
OK
Test Performed by: Name:
OK OK OK OK OK
Service
open
close
501X
Remarks
ENG/YASSER ELKADY
OK Independent condition
OK OK
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
Projects 6. & Supplies Co. Functional
SUD1-03-001 Page 3 of 7
and interlocking test for circuit breaker -505:
Operation Close/open
Condition Test Service-1
Close* Open
Service-2 Test & service
Equipments DS 504&506 CB- S1305 DS 506 CB-S1305 CB-S1305 DS 504
Status FO Test FC O O FC
L0CAL,BCU,REMOTE & Protection Relays
Operated
Remarks OK OK OK OK
7. Functional and interlocking test for Bus Disconnector 504: Operation Close/open
Close/open
Condition Test
Service
Bus Close/open transfer-1
Bus Close/open transfer-2
Test Performed by: Name:
ENG/YASSER ELKADY
Equipments ES 501Y ES 501Z & 141A (bus bar earth switch) CB 505 DS 506, ES 501X, 501Y, 501Z, 141A & S 1401 DS 506,136 & 134 CB 130 ES 501X, 501Y, 501Z , 141A & S 1301 DS 106,226A,226B, 124A,124B, 236 & ,234 CB 220 & 230 ES 501X, 501Y, 501Z, 141A & S 1301
Status
Remarks
FO
OK
FC
OK
O FO FC C
OK
OK
FO FC
OK
C FO
OK
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
Projects 8. & Supplies Co. Functional
SUD1-03-001 Page 4 of 7
and interlocking test for Bus Disconnector 506:
Operation Close/open Close/open
Close/open
Condition Test Service
Bus transfer-1
Bus Close/open transfer-2
Equipments ES 501Z ES 501Y & 261A DS 504, ES 501X, 501Y, 501Z , 261A& S1301 CB 505 DS 504, 136 & 134 CB 130 ES 501X, 501Y, 501Z, 261A & S1301 DS 504,226A,226B, 124A,124B,236 & 234 CB 220 & CB 230 ES 501X, 501Y, 501Z ,261A & S1301
Status FO FC
Remarks OK
FO OK O FC C
OK
FO FC
OK
C FO
OK
9. Functional and interlocking test for Earth Switch 501Y: Operation
Condition
Close/open
------------
Equipments DS 504 & 506 S 1305
10. Functional and interlocking test for earth switch Operation
Condition
Close/open
------------
Status FO
Remarks OK
Test P 501Z:
Equipments DS 504 & 506 S 1305
Status FO
Remarks OK
Test P
11. Functional and interlocking test for Earth Switch 501X: Operation
Condition
Close/open
------------
Test Performed by: Name:
ENG/YASSER ELKADY
Equipments DS 504 & 506
Status FO
S 1305 U27R, U27Y, U27B
Test VOLT. AVALIABLE
Remarks OK
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
SUD1-03-001 Page 5 of 7
Projects & Supplies Co.
12. Functional and interlocking test for Earth Switch s1301: Operation
Condition
Close/open
------------
Equipments DS 504 & 506 S 1305
Status FO Test
Remarks OK
13. Functional and interlocking test for circuit breaker s1305 : Operation
Condition
Close/open
Service
Equipments 501X 501Y 501Z
Status FO FO FO
Remarks OK
All checked under normal sf6 gas pressure operating conditions * Protection relays should be reset
Note: FO: fully open
FC: fully close
O: open
C: close
14. Checking of LCC, Annun. Indication &Alarm :( annunciator) Test Performed by: Name:
ENG/YASSER ELKADY
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
Projects & Supplies Co. Channel
Events
no. 1 2 3 4 5
CB MOTOR SUPPLY FAIL DS/ES MOTOR SUPPLY FAIL CB CLOSE SUPPLY FAIL DS/ES CONTROL SUPPLY FAIL CB TRIP-1 SUPPLY FAIL
Test Performed by: Name:
ENG/YASSER ELKADY
SUD1-03-001 Page 6 of 7
Status OK OK OK OK OK
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
Projects6& Supplies CBCo. TRIP-2
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37
SUPPLY FAIL INDICATION & GAS ALARM SUPPLY FAIL SPARE ALARM DC SUPPLY FAIL ALARM AC SUPPLY FAIL BCU SUPPLY FAIL LCC AC SUPPLY FAIL DS SWITCHING INCOMPLETE ES SWITCHING INCOMPLETE CB MOTOR RUNTIME EXCEED &SPRING UNCHARGE CB OPERATING MECHANISM FAIL DS/ES MANUAL MODE SPARE SPARE SPARE VT ISOLATOR OPEN VT ISOLATOR SWITCHING INCOMPLETE SPARE GIS VT MCB TRIP COMP.G5-1 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-1 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-2 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-2 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-3 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-3 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-5 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-5 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-6 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-6 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-7 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-7 SF6 GAS PRESSURE LOW STAGE-2 COMP.G1-1 SF6 GAS PRESSURE HIGH Events
Channel no. 38 39 40 41 42
SPARE COMP.G5-2 SF6 GAS PRESSURE HIGH SPARE COMP.G5-3 SF6 GAS PRESSURE HIGH SPARE Test Performed by:
Name:
ENG/YASSER ELKADY
SUD1-03-001 Page 7 of 7
OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Status
OK OK OK OK OK
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
Customer
SEC – COA
Substation No.
S/S : 8515
Contractor
DELTA Co.
Contract No.
Site Test Record
GT-1 D05 FUNCTION TEST
Sheet No.
Projects Co. 43& Supplies COMP.G5-5
44 45 46 47 48 49 50 51 52 53 54 55 56
SF6 GAS PRESSURE HIGH CB SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-6 SF6 GAS PRESSURE HIGH CB SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-7 SF6 GAS PRESSURE HIGH CB SF6 GAS PRESSURE HIGH SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE
SUD1-03-001 Page 8 of 7
OK OK OK OK OK OK OK OK OK OK OK OK OK OK
Note: All interlock points were checked according to interlocking conditions table which is approved by system Operation department.
Test Performed by: Name:
ENG/YASSER ELKADY
Test Witnessed by:
Date of Test
ENG/MOHAMED HAIDER
08/06/2014
Signature: Control/Record No.: R/PP/TC/1.084
View more...