Description

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

Projects 1.General & Supplies Co. Data

SUD1-03-001 Page 1 of 7

and Information:

Manufacture

HICO

2. Mechanical Check And Visual Inspection: As per TCS –P–105 Item no 4.1 Item Description Check tightness of all connections 1 Inspect for physical damage / defects 2 Panel condition, cleanliness, organization, labeling, readiness for service, panel 3 doors, handles...etc 4 CT shorting checked Indications checked 5 6 Check the ferrules as per specification Panel Earthing checked 7 Confirm that each panel has been properly secured to the floor in its final service 8 location. Confirm that panels are constructed and wired as per SEC relevant 9 specification. 10 Check case cover and gasket for proper seal against dust. Check all installed equipment nameplate information for compliance to 11 approved drawings and equipment /material lists. For all internal and external panel wiring, confirm that all screw terminations are tight and that crimp connectors are firmly secured to the wire and to the 12 termination point. Ensure that no part of the wire is bent at the termination point. Check Ferrules. Check that panel equipment is mounted securely and protected against 13 mal operation due to vibration, shock, etc Use of ring type terminals for wire termination for current circuit wires. 14 15 16

Disconnectors Manual operation by handle and related interlocking conditions to be checked Mechanical interlocking between DS & ES to be checked

Checked Yes N/A Yes N/A Yes N/A Yes Yes Yes Yes Yes

N/A N/A N/A N/A N/A

Yes

N/A

Yes Yes

N/A N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

3. Electrical Tests Item 1 2 3 4 5

Description Insulation Resistance Test report of all wires to be submitted by the contractor prior witnessing and made available Dc power/ control supply checked. AC Power/ Control supply checked. Circuit Breaker, Disconnector and Earth Switch Open/Close status checked All CB’S, DSW’s and ESW’s should be tested before starting function Check

Yes

Checked N/A

Yes Yes Yes

N/A N/A N/A

Yes

N/A

4. Circuit breaker closing / tripping blocking conditions : Test Performed by: Name:

ENG/YASSER ELKADY

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

SUD1-03-001 Page 2 of 7

Projects & Supplies Co.

Sl no.

Setting values

Description st

1 2 3 4 5

SF6 Gas pressure 1 Stage nd SF6 Gas pressure 2 Stage rd SF6 Gas pressure 3 Stage CB spring charged condition Anti-Pumping condition

CB blocked status Closing Tripping

5.7 bar 5.5 bar 6.7 bar 20 SEC ----

    

5. Checking of operation and indications: Operation Indication Equip. Command LOCAL BCU SAS LOCAL BCU Ref SAS close 504

open

close

506

505 open 501Y

501Z

  

  

  

  

  











  







 

 





 



Close / Open

Condition

Remarks OK

Test

OK

Service

OK



Test

OK





Service

OK

 

 

 

Test

OK

Service

OK

 

 

 

 

Test

OK

Service

OK











Test

OK













Service

OK













Test

OK

 

 

 

 

 

 













Test Performed by: Name:

OK OK OK OK OK

    

Service

open

close

501X

  

Remarks

ENG/YASSER ELKADY

OK Independent condition

OK OK

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

Projects 6. & Supplies Co. Functional

SUD1-03-001 Page 3 of 7

and interlocking test for circuit breaker -505:

Operation Close/open

Condition Test Service-1

Close* Open

Service-2 Test & service

Equipments DS 504&506 CB- S1305 DS 506 CB-S1305 CB-S1305 DS 504

Status FO Test FC O O FC

L0CAL,BCU,REMOTE & Protection Relays

Operated

Remarks OK OK OK OK

7. Functional and interlocking test for Bus Disconnector 504: Operation Close/open

Close/open

Condition Test

Service

Bus Close/open transfer-1

Bus Close/open transfer-2

Test Performed by: Name:

ENG/YASSER ELKADY

Equipments ES 501Y ES 501Z & 141A (bus bar earth switch) CB 505 DS 506, ES 501X, 501Y, 501Z, 141A & S 1401 DS 506,136 & 134 CB 130 ES 501X, 501Y, 501Z , 141A & S 1301 DS 106,226A,226B, 124A,124B, 236 & ,234 CB 220 & 230 ES 501X, 501Y, 501Z, 141A & S 1301

Status

Remarks

FO

OK

FC

OK

O FO FC C

OK

OK

FO FC

OK

C FO

OK

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

Projects 8. & Supplies Co. Functional

SUD1-03-001 Page 4 of 7

and interlocking test for Bus Disconnector 506:

Operation Close/open Close/open

Close/open

Condition Test Service

Bus transfer-1

Bus Close/open transfer-2

Equipments ES 501Z ES 501Y & 261A DS 504, ES 501X, 501Y, 501Z , 261A& S1301 CB 505 DS 504, 136 & 134 CB 130 ES 501X, 501Y, 501Z, 261A & S1301 DS 504,226A,226B, 124A,124B,236 & 234 CB 220 & CB 230 ES 501X, 501Y, 501Z ,261A & S1301

Status FO FC

Remarks OK

FO OK O FC C

OK

FO FC

OK

C FO

OK

9. Functional and interlocking test for Earth Switch 501Y: Operation

Condition

Close/open

------------

Equipments DS 504 & 506 S 1305

10. Functional and interlocking test for earth switch Operation

Condition

Close/open

------------

Status FO

Remarks OK

Test P 501Z:

Equipments DS 504 & 506 S 1305

Status FO

Remarks OK

Test P

11. Functional and interlocking test for Earth Switch 501X: Operation

Condition

Close/open

------------

Test Performed by: Name:

ENG/YASSER ELKADY

Equipments DS 504 & 506

Status FO

S 1305 U27R, U27Y, U27B

Test VOLT. AVALIABLE

Remarks OK

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

SUD1-03-001 Page 5 of 7

Projects & Supplies Co.

12. Functional and interlocking test for Earth Switch s1301: Operation

Condition

Close/open

------------

Equipments DS 504 & 506 S 1305

Status FO Test

Remarks OK

13. Functional and interlocking test for circuit breaker s1305 : Operation

Condition

Close/open

Service

Equipments 501X 501Y 501Z

Status FO FO FO

Remarks OK

All checked under normal sf6 gas pressure operating conditions * Protection relays should be reset

Note: FO: fully open

FC: fully close

O: open

C: close

14. Checking of LCC, Annun. Indication &Alarm :( annunciator) Test Performed by: Name:

ENG/YASSER ELKADY

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

Projects & Supplies Co. Channel

Events

no. 1 2 3 4 5

CB MOTOR SUPPLY FAIL DS/ES MOTOR SUPPLY FAIL CB CLOSE SUPPLY FAIL DS/ES CONTROL SUPPLY FAIL CB TRIP-1 SUPPLY FAIL

Test Performed by: Name:

ENG/YASSER ELKADY

SUD1-03-001 Page 6 of 7

Status OK OK OK OK OK

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

Projects6& Supplies CBCo. TRIP-2

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

SUPPLY FAIL INDICATION & GAS ALARM SUPPLY FAIL SPARE ALARM DC SUPPLY FAIL ALARM AC SUPPLY FAIL BCU SUPPLY FAIL LCC AC SUPPLY FAIL DS SWITCHING INCOMPLETE ES SWITCHING INCOMPLETE CB MOTOR RUNTIME EXCEED &SPRING UNCHARGE CB OPERATING MECHANISM FAIL DS/ES MANUAL MODE SPARE SPARE SPARE VT ISOLATOR OPEN VT ISOLATOR SWITCHING INCOMPLETE SPARE GIS VT MCB TRIP COMP.G5-1 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-1 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-2 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-2 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-3 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-3 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-5 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-5 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-6 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-6 SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-7 SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-7 SF6 GAS PRESSURE LOW STAGE-2 COMP.G1-1 SF6 GAS PRESSURE HIGH Events

Channel no. 38 39 40 41 42

SPARE COMP.G5-2 SF6 GAS PRESSURE HIGH SPARE COMP.G5-3 SF6 GAS PRESSURE HIGH SPARE Test Performed by:

Name:

ENG/YASSER ELKADY

SUD1-03-001 Page 7 of 7

OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK OK Status

OK OK OK OK OK

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084

Customer

SEC – COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

GT-1 D05 FUNCTION TEST

Sheet No.

Projects Co. 43& Supplies COMP.G5-5

44 45 46 47 48 49 50 51 52 53 54 55 56

SF6 GAS PRESSURE HIGH CB SF6 GAS PRESSURE LOW STAGE-1 COMP.G5-6 SF6 GAS PRESSURE HIGH CB SF6 GAS PRESSURE LOW STAGE-2 COMP.G5-7 SF6 GAS PRESSURE HIGH CB SF6 GAS PRESSURE HIGH SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE

SUD1-03-001 Page 8 of 7

OK OK OK OK OK OK OK OK OK OK OK OK OK OK

Note: All interlock points were checked according to interlocking conditions table which is approved by system Operation department.

Test Performed by: Name:

ENG/YASSER ELKADY

Test Witnessed by:

Date of Test

ENG/MOHAMED HAIDER

08/06/2014

Signature: Control/Record No.: R/PP/TC/1.084