Freightliner Fld120

August 31, 2017 | Author: LO Consigo Antofagasta | Category: Anti Lock Braking System, Land Vehicles, Vehicles, Vehicle Technology, Wheeled Vehicles
Share Embed Donate


Short Description

Download Freightliner Fld120...

Description

FREIGHTLINER FLD 120

CPL CPL SYSTEMS SYSTEMS // GROENEVELD GROENEVELD AUTOMATIC AUTOMATIC GREASING GREASING SYSTEM SYSTEM INSTALLATION INSTALLATION MANUAL MANUAL FOR FOR CUSTOMER CUSTOMER SERVICE SERVICE TECHNICIANS TECHNICIANS May 6, 1999

1

PUMP MOUNTING - FLD 120 Mount bracket with 5/16” - 18 x 1” bolt, 5/16” flat washer and lockwasher through existing hole

Use drill template DT003 to drill two 11/32” holes in stack support to mount pump

large tyraps two spots

Pump mounted on the exhaust stack support using ‘FREIGHT’ bracket, 5/16” - 18 x 1 1/2” bolts, nuts & washers May 6, 1999

2

AIR & ELECTRICAL - FLD 120 secondary air tank

electrical, timer to solenoid

air supply

Air Supply: take it from the highest outlet available in a ‘secondary’ air tank (i.e.. Top, end or side). Never connect to the bottom, never connect to a ‘wet’ tank, never connect to a ‘primary’ tank Electrical - Timer to Solenoid: route with existing hoses etc. where possible - do not crush any air lines or wiring with tyraps General: avoid sharp bends and corners, protect with spirap where necessary

main line top view bottom view L/S

electrical, timer to solenoid

May 6, 1999

bottom view R/S

electrical, timer to solenoid

3

LEFT FRONT WHEEL - FLD 120 Most Freightliners have shocks - this routing will help avoid an interference

See note on right front wheel page about the direction of the slack fitting

cam tube, front

draglink, top view

kingpin & cam tube, top view

May 6, 1999

left knuckle

Important: fill cam tube with grease before removing the zerk fitting. Fill until grease can be seen squeezing out between the cam tube bushing and the slack adjuster. Do Not assume it has been done already even if someone says it has. Make sure! Always cycle the steering from ‘lock to lock’ to make sure sufficient clearance is available between fittings and lines to all components

4

LEFT FRONT FRAME RAIL - FLD120 12 port block

follow brake hose to brake chamber

electrical, timer to pressure switch

triple grease line, blue and black to the spring shackle, red to the transmission cross shaft large tyrap to huck bolt

Electrical - timer to pressure switch: coil some extra wire at the manifold so the pressure switch and waterproof connector can be serviced easily.

General: grease lines are to be routed along the brake hose from end to end. Install a large tyrap on the brake hose fitting at the frame end, small tyraps every 3 or 4” along the brake hose and a large tyrap, double wrapped, on the brake hose fitting at the brake chamber end. Tyrap to the brake hose only,do not include any ABS wiring in CPL tyraps.

May 6, 1999

spring shackle points

5

FIFTH WHEEL (3500 series on a Freightliner FLD 120, manifold mounted at the front of the slide plate)

secondary lining

large tyraps on main line

These studs need to be ground off flush with the nuts

Lines to be spiraped back to where movement begins, tyrap there too

large tyraps

This mainline to manifolds on fifth wheel deck could be routed a little different to improve the installation

This blue line represents ideal routing to minimize movement and vibration

May 6, 1999

keep manifold mounted close to the frame rail, out of harm’s way. Never drill holes in the frame rail flange.

do not put anything between the torque rod / bracket and the fifth wheel deck - it may get crushed !

6

RIGHT FRONT WHEEL - FLD 120 note that this fitting in the slack is pointing upward so it and the lining will not hit the axle ‘I’ beam when the wheels are turned

top view

rear view

Important !

front view

May 6, 1999

Fill the cam tube with grease before removing the zerk fitting. Fill until grease can be seen squeezing out between the cam tube bushing and the slack adjuster. Do Not assume it has been done already even if someone says it has. Make sure! Always cycle the steering from ‘lock to lock’ to make sure sufficient clearance is available between fittings and lines to all components.

7

RIGHT FRONT FRAME RAIL - FLD 120 triple grease line - blue and black to the shackle, red to the clutch cross shaft

9 port block

mainline can go through the frame rail protect with spirap and secure with tyraps

follow brake hose to knuckle area tyrap to Huck bolt

clamp to stud

OR it can be routed with the line going to the front spring pin and go under the rail to cross to the other side like this blue line

Spring shackle points

May 6, 1999

General: grease lines to the knuckle area are to be routed along the brake hose from end to end. Install a large tyrap on the brake hose fitting at the frame end, small tyraps every 3 or 4” along the brake hose and a large tyrap on the hose fitting at the brake chamber end. Tyrap to the brake hose only, do not include any ABS wiring in CPL tyraps.

8

DRIVE AXLE - FLD 120 Our tyraps

ABS bundle

large tyrap on brake hose fitting, both ends and also on brake chamber clamp

Important ! Fill cam tubes with grease before removing zerk fittings. Fill until grease can be seen squeezing out between the cam tube bushing and the slack adjuster. Do Not assume it has been done already even if someone says it has. Make sure!

May 6, 1999

Follow the brake lines down to the brake chamber, do not put our tyraps around the ABS wiring bundle General: grease lines are to be routed along the brake hoses from end to end. Install a large tyrap, double wrapped, on the brake hose fitting at the frame end, small tyraps every 3 or 4” along the brake hose and a large tyrap, double wrapped, on the brake hose fitting at the brake chamber end. Tyrap to the brake hose only, do not include any ABS wiring in CPL tyraps.

9

CLUTCH CROSS SHAFT - FLD 120

passenger side clutch cross shaft

optional to clutch release bearing must be on the Customer sales order

driver’s side clutch cross shaft

May 6, 1999

10

TIMER & ELECTRICAL - FLD 120 wiring for solenoid and pressure switch entering cab through firewall under windshield

ground terminal

Electrical - timer to solenoid and pressure switch: route through grommet with existing wiring and tyrap without crushing the bundle - route our wires so they are protected - avoid sharp edges - use grommets if necessary.

May 6, 1999

12 volts (+), ignition ‘on’ terminal

Timer can’t get hit or wet, keep wires neat

Always confirm both the ground and the 12 volt “ignition” source in the electrical panel with a multimeter

11

TIMER & ELECTRICAL - FLD 120 (Special timer location - Stone Transport)

wiring for solenoid and pressure switch entering cab through firewall under windshield

ground terminal

12 volts (+), ignition ‘on’ terminal

timer tyrapped in place

Electrical - timer to solenoid and pressure switch: route through grommet with existing wiring and tyrap without crushing the bundle - route our wires so they are protected - avoid sharp edges - use grommets if necessary. Always confirm both the ground and the 12 volt “ignition” source in the electrical panel with a multimeter

May 6, 1999

12

IM002-1 A

B REVISIONS

B 1

A 3

3

2

1

2

3

3 2

2 2

3 3

A

2

DESCRIPTION

DATE

APPROVED

04/29/99

#2 injector size, rear cams, were #1

Murray

C 8

3

REV

B1,2 2 3

3 1

ZONE

2 9

3

2 9

2 8

2

2 2

2

2 2

2

2

1

3 3 1

2

A

2

3

stack brkt

2

2 2

3 3

2

1 optional 0 release bearing

B 3

2

1 2

2

3

C

SECONDARY AIR TANK

3

2

3

2 2

2

2

1 3

Used on

NOTE - see the "5th Wheel Manual" for specifics on the secondary routing

- Freightliner FLD120

1

CPL SYSTEMS PHONE (905)875-1017

pump main grease line air supply line

May 6, 1999

FAX (905)875-2125

INSTALLATION SCHEMATIC

(with Holland 351 series, 4 points on top, 2 on pivot pockets manifold chassis mounted, with pins, shackles and release bearing) SIZE

A

SCALE

A

1

DATE DRAWN

DWG NO.

04/24/98 none

BY

REV

IM002-1 M Ouellette

SHEET

new 1

OF

1

B

13

MA001 A

B REVISIONS ZONE

REV

B2

DESCRIPTION

A

DATE

441.01 was 145.01

APPROVED

04/28/99

Murray

072.01

438.01

2

2

009.01 draglink - black 2.6 M

draglink - red k/pin btm - black

2.2 M

tie rod - red

2

slack - black 1.8 M

2

brake cam - red

1

k/pin top - blue

2 3

3

2

3

3

frt s/pin - black

1 3

1.4 M

clutch c/shaft - red spring shackle - blue

2.6 M

spring shackle - black

USED ON - Freightliner FLD120 - Mack CH w/14K frt axle

wrap with teflon

225.01 125.01 441.01

1

PHONE (905)875-1017

# 1 injector - 010.01 # 2 injector - 011.01 # 3 injector - 012.01

A

FAX (905)875-2125

MANIFOLD ASS'Y, L/F (with spring pins & shackles) SIZE

A

SCALE

May 6, 1999

1

CPL SYSTEMS

438.01

DATE DRAWN

DWG NO.

04/28/98 none

BY

REV

MA001 M Ouellette

SHEET

A 1

OF

1

B

14

MA002 A

B REVISIONS ZONE

A1

438.01

REV

A

DESCRIPTION

DATE

442.01 was 127.01

APPROVED

04/28/99

Murray

071.01

2

2

brake cam - red 1.9 M

1

k/pin top - blue slack - black

2

k/pin btm - black 2.2 M

tie rod - red spring shackle - black

1.5 M 1.4 M

clutch c/shaft -red spring shackle - blue frt spring pin - black

442.01

1

2 1 3

3 3 USED ON

3

- Freightliner FLD120 - Mack CH w/14K frt axle

3

PHONE (905)875-1017

# 1 injector - 010.01 # 2 injector - 011.01 # 3 injector - 012.01

May 6, 1999

FAX (905)875-2125

MANIFOLD ASSEMBLY, R/F (with spring pins & shackles) SIZE

A

SCALE

A

1

CPL SYSTEMS

DATE DRAWN

04/29/98 none

BY

DWG NO.

M Ouellette

REV

MA 002 SHEET

A 1

OF

1

B

15

MA003 A

B REVISIONS ZONE

REV

A,B 1 B1

A B

A2

DATE

APPROVED

08/18/98 04/22/99

MO Murray

04/28/99

Murray

069.01

C

F122-B wrap with teflon both ends

439.01

2

2

8

2

2

9

9

069.01 438.01

2

C

2

8

C

C

2

2

2

C left side

2

to right side to right side

c

s

c

s

s

5

5

5

5

5

5

# 1 injector - 010.01 # 2 injector - 011.01 # 8 injector - 017.01 # 9 injector - 124.02

c

B

s

B

2

2

c

right side

1

C

DESCRIPTION

lining colour and location added rear was side, front was top 439.01 was 112.01, #2's were #1's

to left side

to left side

1

CPL SYSTEMS PHONE (905)875-1017

NOTE: secondary lining shown for installers reference only - to be completed during installation

FAX (905)875-2125

MANIFOLD ASS'Y, REAR (Holland or Fontaine, 4 points on top, 2 on pivot pockets, manifold chassis mounted)

SIZE

A

SCALE

DATE DRAWN

DWG NO.

04/29/98 none

BY

REV

MA003 M Ouellette

SHEET

C 1

OF

1

B

A

l

l

l

16

l

May 6, 1999

MA013 A

B REVISIONS ZONE

REV

A1

A

DESCRIPTION

DATE

441.01 was 145.01

APPROVED

04/28/99

Murray

072.01

438.01

2

2 draglink - black 2.6 M

draglink - red k/pin btm - black

2.2 M

tie rod - red

2

slack - black 1.8 M

2

brake cam - red

1

k/pin top - blue

2

0

3

3

2

3

3

1 3

clutch release bearing - black ? M frt spring pin - black

1.4 M

clutch c/shaft - red spring shackle - blue

2.6 M

spring shackle - black

USED ON - Freightliner FLD120 - Mack CH w/14K frt axle

wrap with teflon

225.01 125.01 A

1

441.01

PHONE (905)875-1017

# 0 injector - 030.01 # 1 injector - 010.01 # 2 injector - 011.01 # 3 injector - 012.01

A

FAX (905)875-2125

MANIFOLD ASS'Y, L/F w/spring pins, shackles & clutch release bearing SIZE

A

SCALE

May 6, 1999

1

CPL SYSTEMS

438.01

DATE DRAWN

DWG NO.

01/07/99 none

BY

REV

MA013 M Ouellette

SHEET

A 1

OF

1

B

17

MA021 A

B REVISIONS ZONE

B

FS3749-4A

B2 A2, B1

9

front

2

2

pivot

SL059

rear

8

REV

A B

DESCRIPTION

*

* B * B *

2 8 9

rear front

05/14/99

Murray

2

20151-4-3 441.01 MA019 SL059 SL060 011.01 017.01 124.02 FS3749-4A

reusable, 3/16 Parflex, 1/4 npt tee, male run, 'O' ring manifold, 6 port secondary line, 3/16 triple secondary line, 3/16 triple injector, #2 injector, #8 injector, #9 connector, 90, 1/8npt - 1/4JIC

6.5 1 1 1 1 1 2 2

518B-3 20651-4-3 SB16-05971 SB16-00344 W-179 SB16-00518 TY27MX TY25MX

Parflex, 3/16" I.D. (feet) reusable, 3/16 Parflex, 1/4 JIC plug, 1/8npt bolt, 3/8"-16 x 1 1/4" washer, flat, fender, 3/8" washer, lock, 3/8" tyrap, large tyrap, small

P.N.

DESCRIPTION

1

CPL SYSTEMS

SL060

PHONE (905)875-1017

FAX (905)875-2125

MANIFOLD ASSEMBLY (Holland 351 series, 4 on top, 2 pivot, block mounted on 5th wheel)

SIZE

A

SCALE

A

May 6, 1999

Murray

1 1 1 1 1 2 2 2 1

ITEM QUAN

pivot

BY

04/06/99

This kit is set up to cover most situations. Parts in the list below with an 'asterisk' (*) are loose. See the Power Point presentation for the manifold sub-assembly detail. It can be found in F:\Inventory\Sub-assemblies\MA021.ppt

B

1

DATE

FS3749-4B and FS3749-4A added FS3748-4B & 3749-4B removed, 518B was IR503, Parker re-usables added

DATE DRAWN

DWG NO.

04/23/99 none

BY

REV

MA021 M Ouellette

SHEET

A 1

OF

1

B

18

MA024 A

B REVISIONS ZONE

REV

B1

A

DESCRIPTION

DATE

plug 442.01 removed

APPROVED

04/06/99

Murray

071.01

2

2

Secondary lining shown for illustration only. Lining to be provided and installed by a CST. slack - black

2

cam bushing - red slack - black

2

cam bushing - red 009.01 cam bushing - red slack - black cam bushing - red slack - black

2 2

2 2 2 2 A

1 8

009.01 011.01

plug, injector location injector, #2

1 1

438.01 071.01

connector, 90, 'O' ring - 3/16" manifold, transport, 9 PORT

ITEM QUAN

1

438.01

DESCRIPTION

P.N.

1

CPL SYSTEMS PHONE (905)875-1017

FAX (905)875-2125

MANIFOLD ASSEMBLY, REAR # 2 injector - 011.01

(used along with a manifold mounted on fifth wheel) SIZE

A

SCALE

A

May 6, 1999

DATE DRAWN

04/27/99 none

BY

DWG NO.

M Ouellette

REV

MA024 SHEET

A 1

OF

1

B

19

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF