AMINEX PETROLEUM COMPANY

S. Malak 1 1st Stage (MiniFrac With Prop Slug) Matulla

Ticket Number: 85887

Post Job Report For: AMINEX Engineers Date: Thursday, December 10, 2009

Notice: Although the information contained in this report is based on sound engineering practices, the copyright owner(s) does (do) not accept any responsibility whatsoever, in negligence or otherwise, for any loss or damage arising from the possession or use of the report whether in terms of correctness or otherwise. The application, therefore, by the user of this report or any part thereof, is solely at the user’s own risk.

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

Table of Contents 1.0 1.1 1.2 1.3 2.0 2.1 3.0 3.1 4.0 4.1 4.2 5.0 5.1 5.2 5.3 5.4 5.5

Well Information .............................................................................................................................................3 Customer Information .....................................................................................................................................3 Pipe Information..............................................................................................................................................3 Perforation Intervals........................................................................................................................................3 Pumping Schedule...........................................................................................................................................4 Designed Pumping Schedule...........................................................................................................................4 Actual Stage Summary....................................................................................................................................5 Stage Summary ...............................................................................................................................................5 Performance Highlights...................................................................................................................................6 Job Summary...................................................................................................................................................6 Comments: ......................................................................................................................................................7 Attachments.....................................................................................................................................................8 Pressure Test ...................................................................................................................................................8 Acid Pumping, Spotting & Soaking ................................................................................................................9 Chemical Additives Job Summary ................................................................................................................10 Prop Slug 1ppg ..............................................................................................................................................11 Proposed Main Job Pumping Schedule .........................................................................................................12

2 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

1.0 WELL INFORMATION 1.1

Customer Information

Customer Ticket Number Well Name Interval Well Number Start Time Halliburton Representative 1.2

Pipe Information

Equipment

Top MD ft

Surface Pipe Tubing Tubing Packer Tubing Tubing Casing

0.0 0.0 10783.3 10794.0 10800.7 10803.9 0.0

1.3

AMINEX PETROLEUM COMPANY 85887 S. Malak 1 1 10-Dec-2009 Mohamed Amer/Amr ElSayed

Bottom MD ft 290.0 10783.3 10794.0 10800.7 10803.9 10805.2 11025.0

OD in

ID in

4.000 4.500 5.000

3.000 3.826 2.970 3.880 4.250 2.992 6.184

5.530 3.500 7.000

Grade

Weight lb/ft

N-80

15.50

N-80

9.30 29.00

Perforation Intervals

Top MD ft 10847.0

Bottom MD ft 10912.0

Number of Shots 781

Perf Density spf 12.0

Perf Phasing ° 30

Perf Diameter in 0.380

Perf Formation Matulla Zone

3 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

2.0 PUMPING SCHEDULE 2.1

Designed Pumping Schedule

Stage Number

Description

1

15% HCL Pickle

2

Spotting Acid

3

Soaking for 10 mins Squeezing Acid

4 5 6 7

Shut-In Pad Sand Slug 1ppg

8

Flush

9

Shut in For Analysis

Fluid System

15% HCL HYDROCHLORI C ACID WATER FRAC H 40#

WATER FRAC H 40# HYBOR H 40# HYBOR H 40#

WATER FRAC H 40#

Clean Volume gal

Slurry Volume gal

Prop Conc Start lb/gal

Prop Conc End lb/gal

Prop Type

Prop Mass 100*lb

Rate Stage Start bpm

Rate Stage End bpm

Stage Time min

1000

1000

0.00

0.00

5.0

5.0

4.76

6600

6600

0.00

0.00

5.0

5.0

31.43

0

0

0.00

0.00

0.0

0.0

0.00

1000

1000

0.00

0.00

5.0

5.0

4.76

0 6000 5000

0 6024 5227

0.00 0.00 1.00

0.00 0.00 1.00

0.0 15.0 15.0

0.0 15.0 15.0

0.00 9.56 8.30

7500

7515

0.00

0.00

15.0

15.0

11.93

0

0

0.00

0.00

0.0

0.0

0.00

PROP PREMIUM PLUS20/40

50.00

4 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

3.0 ACTUAL STAGE SUMMARY 3.1

Stage Summary

Stage Number

Start Time

1 2 3 4 5 6 7 8 9

12:48:25 12:58:15 13:28:36 13:46:18 13:46:20 13:46:23 13:56:03 14:01:55 14:12:16

Max Treating Pressure psi 7378 9042 8075 0 0 9955 9927 10238 0

Avg Treating Pressure psi 5467 8515 8075 0 0 9311 9584 9567 0

Max Slurry Rate bpm

Avg Slurry Rate bpm

3.3 7.1 1.6 0.0 0.0 18.5 17.8 19.1 0.0

2.5 5.2 1.6 0.0 0.0 16.4 17.4 16.8 0.0

Avg Clean Rate bpm 2.5 5.2 1.6 0.0 0.0 16.2 16.5 16.8 0.0

Slurry Volume gal

Clean Volume gal

1007 6588 1 0 0 6112 4291 7274 0 25273

1007 6588 1 0 0 6060 4063 7274 0 24992

Proppant Mass Pumped 100*lb 0.00 0.00 0.00 0.00 0.00 7.44 56.56 0.00 0.00 64.00

Avg HHP hp

341 1079 311 0 0 3733 4087 3933 0

5 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

4.0 PERFORMANCE HIGHLIGHTS 4.1

Job Summary

Start Time End Time Pump Time Max Treating Pressure Avg Treating Pressure Max Slurry Rate Avg Slurry Rate Slurry Volume Max Proppant Concentration Avg Proppant Concentration Proppant Mass Pumped

10-Dec-09 12:09:49 10-Dec-09 15:32:28 64.72 10238 8444 19.1 9.3 25273 1.78 1.35 64.00

min psi psi bpm bpm gal lb/gal lb/gal 100*lb

Disclaimer: The average and maximum values (except volumes and bottom hole values) are based on the start and end averaging times.

6 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

4.2

Comments: •

An acid wash with 15% HCl was used to both pickle the tubing and dissolve some of which was casing restrictions in the near well bore area. The acid was left to soak in the formation and then over displaced so not to cause any precipitations in the NWB



We could see the decrease in pressure once acid started hitting the top perforations which caused a decrease in pressure. This made us be able to pump at higher rates compared to the last trial



The second step was making sure that the formation could with stand prop when reaching inside and that was done by pumping a cross-linked gel with a 1ppg from which we did prove that the formation could take the prop slug although a pressure increase could be seen but this was due to the decrease in hydrostatic pressure and flushing the volume with 7% KCL caused friction to increase that also did effect the pressure trend. Please find attached the job graphs below.



The job design for this stage proposed was to reach to 6ppg with a rate of 25bpm. After watching the stages pumped we recommend the job to be pumped at 20bpm with a maximum sand concentration of 5ppg.



The option of changing the schedule, pumping rate and prop concentration will all depend on the pressure respond that will be seen during pumping.



The job is still critical although pressure limits were better then the trials conducted before. Screen out is still a condition that could be seen during the main treatment.

7 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

5.0 ATTACHMENTS 5.1

Pressure Test Treating Pressure (psi)

Backside Pressure (psi)

15000 1

Treating Line PRV 12500

Treating Line Pressure Test

10000

7500

5000

Backside Pressure Test Backside PRV

2500

1

0 12:10

12:15

12:20

12:25

12/10/2009

Time

12:30

12:35 12/10/2009

8 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

5.2

Acid Pumping, Spotting & Soaking

A 15000

Backside Pressure (psi) Slurry Rate (bpm) BH Proppant Conc (lb/gal)

A Treating Pressure (psi) B Slurry Proppant Conc (lb/gal) C

A C

B

C

35

14

30

12

25

10

20

8

15

6

10

4

5

2

0

0

12500 1000 Gal 15% HCL

Surface ISIP 8110psi Acid Hitting Bottom Flushed Acid till Perforation

10000

7500

5000

2500

6 5 1

2

3

4

0 12:50 12/10/2009

13:00

13:10

13:20 Time

13:30

13:40 12/10/2009

INSITE for Stimulation v3.4.1 10-Dec-09 15:17

9 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

5.3

Chemical Additives Job Summary Vicon NF Conc. (gal/Mgal)

CL-28M Conc. (gal/Mgal)

3.5

3.0

2.5

2.0

1.5

1.0

0.5

6 5 4

7

8

9

0.0 13:45

13:50

13:55

12/10/2009

14:00 Time

14:05

14:10 12/10/2009

10 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

5.4

Prop Slug 1ppg

A 15000

Backside Pressure (psi) Slurry Rate (bpm) BH Proppant Conc (lb/gal)

A Treating Pressure (psi) B Slurry Proppant Conc (lb/gal) C

Cross Linked PAD 6000gal 40#

12500

Flushed with 7%KCL

A C

ISIP 9224psi

B

C

35

14

30

12

25

10

20

8

15

6

10

4

5

2

0

0

10000

7500

5000

2500

6 5 4

7

8

9

0 13:50 12/10/2009

14:00

14:10 Time

14:20

14:30 12/10/2009

INSITE for Stimulation v3.4.1 10-Dec-09 15:21

11 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)

AMINEX PETROLEUM COMPANY S. Malak 1 Stage 1 Matulla

5.5

Proposed Main Job Pumping Schedule

Company Well Name: Formation:

Aminex S.Malak 1 Mutallah Sand December 10, 2009

Date: Stage

5 6 7 8 9 10 11

Clean Vol

Dirty Vol

Rate

Prop Start

Prop End

State time

gal bbls

gal bbls

bpm

ppg kg/lit

ppg kg/lit

min

20

0 0 1 0.12 2 0.24 3 0.4 4 0.5 5 0.6 0 0

0 0 1 0.12 2 0.24 3 0.4 4 0.5 5 0.6 0 0

23.81

20,000.0 476.2 10,000.0 238.1 10,000.0 238.1 8,500.0 202.4 8,500.0 202.4 5,000.0 119.0 6,300.0 150

20,000.0 476.2 10,441.4 248.6 10,882.8 259.1 9,625.6 229.2 10,000.8 238.1 6,103.5 145.3 6,300.0 150

Pumping Time Total X.Linker

87 min 62,000 gals

Total Base Gel Total

6,300 gals 68,300 gals

20 20 20 20 20 20

Proppant

type

Remarks

vol lbs PAD 1

Cross-Linked Gel

12.43

Premium Prop 20/40

10,000.0

Cross-Linked Gel

12.96

Premium Prop 20/40

20,000.0

Cross-Linked Gel

11.46

Premium Prop 16/30

25,500.0

Cross-Linked Gel

11.91

Premium Prop 16/30

34,000.0

Cross-Linked Gel

7.27

Premium Prop 16/30

25,000.0

Cross-Linked Gel

7.50

Flush

Total Proppant

Base Gel Fluid

114,500.0

lbs

114,500.0

lbs

12 Created: December 10, 2009 at 4:50 PM INSITE for Stimulation V. 3.4.1 (IFS v3.4.1)