Foundation Drawings
Short Description
Drawings...
Description
INDEX DESCRIPTION
S.NO.
DRG.NO.
PAGE NO.
132 KV TOWER FOUNDATIONS A.1
Foundation Details of 132K.V.-General Arrangement
132KV-TL-G.A.
1
P TYPE A.2.1
Foundation Details of 132 K.V.-"P"Type Tower
A.2.2
Foundation Details of 132 K.V.-"P"Type Tower - DRY
132KV-TL-P-DRY
4
A.2.3
Foundation Details of 132 K.V.-"P"Type Tower - WET
132KV-TL-P-WET
5
A.2.4
Foundation Details of 132 K.V.-"P"Type Tower - PS / PBC
132KV-TL-P-P.S.
6
A.2.5
Foundation Details of 132 K.V.-"P"Type Tower - FS / BC
132KV-TL-P-F.S.
7
A.2.6
Foundation Details of 132 K.V.-"P"Type Tower - HARD ROCK
132KV-TL-P-H.R.
8
A.2.7
Foundation Details of 132 K.V.-"P"Type Tower - SOFT ROCK / F&F ROCK
132KV-TL-P-S.R.
9
2,3
R TYPE A.3.1
Foundation Details of 132 K.V.-"R"Type Tower
A.3.2
Foundation Details of 132 K.V.-"R"Type Tower - DRY
132KV-TL-R-DRY
12
A.3.3
Foundation Details of 132 K.V.-"R"Type Tower - WET
132KV-TL-R-WET
13
A.3.4
Foundation Details of 132 K.V.-"R"Type Tower - PS / PBC
132KV-TL-R-P.S.
14
A.3.5
Foundation Details of 132 K.V.-"R"Type Tower - FS / BC
132KV-TL-R-F.S.
15
A.3.6
Foundation Details of 132 K.V.-"R"Type Tower - HARD ROCK
132KV-TL-R-H.R.
16
A.3.7
Foundation Details of 132 K.V.-"R"Type Tower - SOFT ROCK / F&F ROCK
132KV-TL-R-S.R.
17
10,11
S TYPE A.4.1
Foundation Details of 132 K.V.-"S"Type Tower
A.4.2
Foundation Details of 132 K.V.-"S"Type Tower - DRY
132KV-TL-S-DRY
20
A.4.3
Foundation Details of 132 K.V.-"S"Type Tower - WET
132KV-TL-S-WET
21
A.4.4
Foundation Details of 132 K.V.-"S"Type Tower - PS / PBC
132KV-TL-S-P.S.
22
A.4.5
Foundation Details of 132 K.V.-"S"Type Tower - FS / BC
132KV-TL-S-F.S.
23
A.4.6
Foundation Details of 132 K.V.-"S"Type Tower - HARD ROCK
132KV-TL-S-H.R.
24
A.4.7
Foundation Details of 132 K.V.-"S"Type Tower - SOFT ROCK / F&F ROCK
132KV-TL-S-S.R.
25
18,19
INDEX DESCRIPTION
S.NO.
DRG.NO.
PAGE NO.
220KV-TL-G.A.
26
220KV-TL-A-DRY 220KV-TL-A-WET 220KV-TL-A-P.S. 220KV-TL-A-F.S. 220KV-TL-A-H.R. 220KV-TL-A-S.R.
27,28 29 30 31 32 33 34
220KV-TL-B-DRY 220KV-TL-B-WET 220KV-TL-B-P.S. 220KV-TL-B-F.S. 220KV-TL-B-H.R. 220KV-TL-B-S.R.
35,36 37 38 39 40 41 42
220KV-TL-C-DRY 220KV-TL-C-WET 220KV-TL-C-P.S. 220KV-TL-C-F.S. 220KV-TL-C-H.R. 220KV-TL-C-S.R.
43,44 45 46 47 48 49 50
220KV-TL-D-DRY 220KV-TL-D-WET 220KV-TL-D-WET+9 220KV-TL-D-P.S. 220KV-TL-D-F.S. 220KV-TL-D-H.R. 220KV-TL-D-S.R.
51,52 53 54 55 56 57 58 59
220 KV TOWER FOUNDATIONS B.1
Foundation Details of 220K.V.-General Arrangement A TYPE
B.2.1 B.2.2 B.2.3 B.2.4 B.2.5 B.2.6 B.2.7
Foundation Details of 220 K.V.-"A"Type Tower Foundation Details of 220 K.V.-"A"Type Tower - DRY Foundation Details of 220 K.V.-"A"Type Tower - WET Foundation Details of 220 K.V.-"A"Type Tower - PS / PBC Foundation Details of 220 K.V.-"A"Type Tower - FS / BC Foundation Details of 220 K.V.-"A"Type Tower - HARD ROCK Foundation Details of 220 K.V.-"A"Type Tower - SOFT ROCK / F&F ROCK B TYPE
B.3.1 B.3.2 B.3.3 B.3.4 B.3.5 B.3.6 B.3.7
Foundation Details of 220 K.V.-"B"Type Tower Foundation Details of 220 K.V.-"B"Type Tower - DRY Foundation Details of 220 K.V.-"B"Type Tower - WET Foundation Details of 220 K.V.-"B"Type Tower - PS / PBC Foundation Details of 220 K.V.-"B"Type Tower - FS / BC Foundation Details of 220 K.V.-"B"Type Tower - HARD ROCK Foundation Details of 220 K.V.-"B"Type Tower - SOFT ROCK / F&F ROCK C TYPE
B.4.1 B.4.2 B.4.3 B.4.4 B.4.5 B.4.6 B.4.7
Foundation Details of 220 K.V.-"C"Type Tower Foundation Details of 220 K.V.-"C"Type Tower - DRY Foundation Details of 220 K.V.-"C"Type Tower - WET Foundation Details of 220 K.V.-"C"Type Tower - PS / PBC Foundation Details of 220 K.V.-"C"Type Tower - FS / BC Foundation Details of 220 K.V.-"C"Type Tower - HARD ROCK Foundation Details of 220 K.V.-"C"Type Tower - SOFT ROCK / F&F ROCK D TYPE
B.5.1 B.5.2 B.5.3 B.5.4 B.5.5 B.5.6 B.5.7 B.5.8
Foundation Details of 220 K.V.-"D"Type Tower Foundation Details of 220 K.V.-"D"Type Tower - DRY Foundation Details of 220 K.V.-"D"Type Tower - WET(+0,+3,+6) Foundation Details of 220 K.V.-"D"Type Tower - WET(+9) Foundation Details of 220 K.V.-"D"Type Tower - PS / PBC Foundation Details of 220 K.V.-"D"Type Tower - FS / BC Foundation Details of 220 K.V.-"D"Type Tower - HARD ROCK Foundation Details of 220 K.V.-"D"Type Tower - SOFT ROCK / F&F ROCK
Back
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Stub
x COPING
75 G.L EXCAVATION LINE
225
GL
GL
FxF C
Excavation Line
M
SECTION G
W1
CL EAT S
A D1
G
EXCAVATION LINE
W2 W3
D2
D
C.C. 1:2:4
D3 L OF TOWER C
P.C.C. 1:4:8 Sand Filling
100 150 B/2
M
250
K
B/2 B
G
G PLAN
NOTE-1 : While classifying foundations of Wet, Partially submerged / Partially black cotton, Fully submerged / Black cotton foundations mentioned above, the worst conditions should be considered and not necessarily the conditions prevailing at the time of inspection. For instance there are areas where subsoil water raised when canal water is let out in the field raising subsoil water to a considerable degree. Similarly the effect of monsoon or when the nearby reservoirs are full should be considered and not the conditions prevailing in open season or summer when work is carried out normally.
NOTE-2 : For locations of cut point / angle towers, the classification of tower foundations shall be at next higher type for ensuring safety of the Transmission line, which is likely to be subjected to seasonal changes / climatic conditions from time to time. NOTE-3 : In case of highly collapsible & loose soils and river crossings, special design for foundations are to be made by Civil Engineering wing for adoption on case to case basis. NOTE-4 : All locations subjected to water logging, particularly in paddy fields, ponds, marshy areas etc., the chimney of all stubs are to be raised to 600 mm over the normal chimney being adopted in other cases. This shall be done after completion of erection of towers as a separate item for identified locations.
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-G.A.
132 K.V. TYPE TOWER Scale 1:50
Page
1
FOUNDATION DETAILS FOR 132 KV "P" TYPE TOWER Soil Type
Dry
Wet
P.S.
F.S.
Basic Tower Extn.
A (mm)
B (mm)
C (mm)
D (mm)
F (mm)
W1 W2 W3
D1 D2 D3
G (mm)
M (mm)
K (mm)
± 0.00 M
2800
1200
2350
350
300
300 150 0
200 150 0
1700
4607
8919
± 3.00 M
2800
1200
2350
350
300
1700
5123
9649
± 6.00 M
2800
1200
2350
350
300
1700
5638
10377
± 0.00 M
2800
1800
2300
400
450
2300
4607
9768
± 3.00 M
2800
1800
2300
400
450
2300
5123
10498
± 6.00 M
2800
1800
2300
400
450
2300
5638
11226
± 0.00 M
2950
2400
2000
700
450
2900
4607
10617
± 3.00 M
2950
2400
2000
700
450
2900
5123
11346
± 6.00 M
2950
2400
2000
700
450
2900
5638
12075
± 0.00 M
2950
2850
2000
700
450
3350
4607
11253
± 3.00 M
2950
2850
2000
700
450
3350
5123
11983
± 6.00 M
2950
2850
2000
700
450
3350
5638
12711
350 325 0
350 325 300
350 325 525
200 200 0
200 200 300
200 200 300
Vol. Of Excavation M3
Sand Bed
PCC 1:4:8
Vol. Of PCC 1:2:4
32.37 Cum
0.00 Cum
0.78 Cum
2.47 Cum
59.25 Cum
0.00 Cum
1.60 Cum
5.76 Cum
99.24 Cum
5.05 Cum
2.70 Cum
12.43 Cum
132.43 Cum
6.73 Cum
3.72 Cum
15.26 Cum
2
Hard Rock
F&F ROCK
140
1200
± 0.00 M
2700
730
1500
1200
450
730
4607
7548
± 0.00 M
2700
730
1500
1200
450
730
5123
8277
± 0.00 M
2700
730
1500
1200
450
730
5638
9006
± 0.00 M
2700
1200
2200
500
450
1200
4607
8212
± 0.00 M
2700
1200
2200
500
450
1200
5123
8942
± 0.00 M
2700
1200
2200
500
450
1200
5638
9670
375
2.56 Cum
0.00 Cum
0.00 Cum
2.80 Cum
15.55 Cum
0.00 Cum
0.00 Cum
4.91 Cum
500
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x COPING G.L
Stub 100x100x8
75
EXCAVATION LINE
225
GL
GL
300x300
M
SECTION
Excavation Line
2350
G 2800 G
CL EAT S
300 150
EXCAVATION LINE
200
250
C.C. 1:2:4 P.C.C. 1:4:8
150 100
M
600
600
L OF TOWER C
1200 1400 1700
K
SOIL CLASSIFICATION Where normal dry cohesive or non-cohesive soils are met.
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL Constants G M K Excavation + 0M 4,607 8,919 + 3M 1700 5,123 9,649 32.37 Cum + 6M 5,638 10,377
Volume of Concrete P.C.C.
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Sand
FOUNDATION DETAILS OF 2.47 Cum
0.78 Cum
0.00 Cum
Drg. No.
132 K.V. - "P" TYPE TOWER
132KV-TL-P-DRY
DRY
Pa g e
4
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x
Stub 100x100x8 COPING
75 G.L
225
GL
EXCAVATION LINE
GL
450x450 Excavation Line 2300
M
2800
SECTION CL EAT S
G
350
G 200
325
200 100
EXCAVATION LINE
C.C. 1:2:4 P.C.C. 1:4:8
900
900 1800 2000 2300
L OF TOWER C
M
250
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil. (OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane fields).
K
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL Constants G M K Excavation + 0M 4,607 9,768 + 3M 2300 5,123 10,498 59.25 Cum + 6M 5,638 11,226
Volume of Concrete P.C.C.
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Sand
FOUNDATION DETAILS OF 5.76 Cum
1.60 Cum
132 K.V. - "P" TYPE TOWER
0.00 Cum
Drg. No.
132KV-TL-P-WET
WET
Pa g e
5
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 x
Scale 1:50
Stub 100x100x8 COPING
75 G.L
225
GL
EXCAVATION LINE
GL
450x450 Excavation Line
2000 M
2950
SECTION CL EAT S
G
350 325
200
G
300
200
C.C. 1:2:4 P.C.C. 1:4:8 Sand Filling
300 100 150
EXCAVATION LINE
1200 L OF TOWER C
M
250
1200 2400 2600
K
2900
G
G PLAN
SOIL CLASSIFICATION a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below ground level. (OR) b) Where top layer of black cotton soil extends up to 50 % of the depth with normal soil thereafter. (OR) NOTE : Where soil is clayey type, not necessarily black in colour, Released for Construction which shrinks when dry, swells when wet. CHIEF ENGINEER/CIVIL
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 4,607 10,617 + 3M 2900 5,123 11,346 99.24 Cum 12.43 Cum 2.70 Cum + 6M 5,638 12,075
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Sand
FOUNDATION DETAILS OF 5.05 Cum
Drg. No.
132KV-TL-P-P.S.
132 K.V. - "P" TYPE TOWER PS / PBC
Page
6
Stub 100x100x8
T.O.O. Dir (Tr. & G.O.) M .S. No. 156 Dated 8-10-2004
Scale 1:50
75 x
225
GL
GL
COPING G.L
450x450 EXCA VATION LINE
Excavation Line
2000 2950 CL E A T S
350
M
325
200
SECTION
525
200
G
C.C. 1:2:4
300 100 150
G
P.C.C. 1:4:8 Sand Filling 1425
1425
EXCA VATION LINE
250
2850 3050 L OF TOW ER C
M
8 NOS. 10 TOR SUPPORTING RODS TOTAL 32 NOS. PER TOW ER
K
G
8 TOR @ 300 C/C.
SOIL CLASSIFICATION 10 NOS. 2 W AY (TOTAL 80 NOS. PER TOW ER) a) W here subsoil water table is within 0.75 Mtrs. depth from ground level. (OR) b) W here top layer of black cotton soil exceeds 50% and extends up to full depth or is followed by norm al soil. (OR) Released for Construction c) W here top layer is norm al soil up to 50% of the depth but the lower layer is a black cotton soil. CHIEF ENGINEER/CIVIL
G PL A N
Volume of Constants M K Excavation Concrete + 0M 4,607 11,253 + 3M 3350 5,123 11,983 132.43 Cum 15.26 Cum + 6M 5,638 12,711 G
3350
P.C.C.
Sand
3.72 Cum
6.73 Cum
Steel 202.34Kgs
TRANSM ISSION CORPORATION OF ANDHRA PRADESH LIM ITED FOUNDATION DETAILS OF
Drg. No.
132 K.V. - "P" TYPE TOW ER
132KV-TL-P-F.S.
FS / BC
Page
7
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
COPING
450X450
225
GL
G.L
Scale 1:25
STUB ANGLE 100X100X8
75
x
GL
EXCAVATION LINE
EARTH OR SOFT ROCK 0 to 1500
M
2700
SECTION
C.C. 1:2:4
G 1200
G
EXCAVATION LINE
730 L OF TOWER C
M
K
G
SOIL CLASSIFICATION a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level. (OR) b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level though top layer is of normal soil. (OR) c) Where chiseling, drilling and blasting is required for excavation.
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G + 0M +3M 730 +6M
M 4,607 5123 5638
K Excavation 7,548 2.56 to 5.76 8277 CuM 9006
Concrete 2.80 to 4.07CuM
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132 K.V. - "P" TYPE TOWER
132KV-TL-P-H.R.
HARD ROCK
Pa g e
8
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x 75
COPING
GL
G.L
STUB ANGLE 100X100X8
225
GL
EXCAVATION LINE
450X450 2200 2700
J
SECTION G G
500
C.C. 1:2:4
EXCAVATION LINE
1200
L OF TOWER C
M
K
G
SOIL CLASSIFICATION a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any other soil of similar nature is met. (OR) b) Where top layer of normal dry soil extends up to 85% of the depth followed by fissured rock without presence of water.
G PLA N
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
1200
M 4607 5123 5638
K Volume of 8212 Excavation Concrete 8942 15.55CuM 4.91CuM 9670
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-P-S.R.
132 K.V. - "P" TYPE TOWER SOFT ROCK/ F&F ROCK
Page
9
FOUNDATION DETAILS FOR 132 KV "R" TYPE TOWER Soil Type
Dry
Wet
P.S.
F.S.
Basic Tower Extn.
A (mm)
B (mm)
C (mm)
D (mm)
F (mm)
W1 W2 W3
D1 D2 D3
G (mm)
M (mm)
K (mm)
200 300 0
200 250 0
1850
8192
14202
± 0.00 M
2960
1350
2410
450
350
± 3.00 M
2960
1350
2410
450
350
1850
9325
15804
± 6.00 M
2960
1350
2410
450
350
1850
10453
17399
± 0.00 M
2960
2300
2430
430
450
2800
8192
15545
± 3.00 M
2960
2300
2430
430
450
2800
9325
17147
± 6.00 M
2960
2300
2430
430
450
2800
10453
18743
± 0.00 M
3110
2900
2130
730
450
3400
8192
16394
± 3.00 M
3110
2900
2130
730
450
3400
9325
17996
± 6.00 M
3110
2900
2130
730
450
3400
10453
19591
± 0.00 M
3110
3300
2130
730
450
3800
8192
16959
± 3.00 M
3110
3300
2130
730
450
3800
9325
18562
± 6.00 M
3110
3300
2130
730
450
3800
10453
20157
575 350 0
575 350 300
575 350 500
230 200 0
230 200 300
230 200 300
Vol. Of Excavation M3
Sand Bed
PCC 1:4:8
Vol. Of PCC 1:2:4
40.52 Cum
0.00 Cum
0.96 Cum
3.60 Cum
92.83 Cum
0.00 Cum
2.50 Cum
8.80 Cum
143.81 Cum
6.94 Cum
3.84 Cum
18.65 Cum
179.63 Cum
8.66 Cum
4.90 Cum
21.62 Cum
215
Hard Rock
2860
880
1460
1400
450
880
8192
12830
± 3.00 M
2860
880
1460
1400
450
880
9325
14432
± 6.00 M
2860
880
1460
1400
450
880
10453
16027
650
F&F ROCK
1400
± 0.00 M
4.34 Cum
5.76 Cum
35.04 Cum
8.85 Cum
550
± 0.00 M
2860
1750
2310
550
450
1750
8192
14060
± 3.00 M
2860
1750
2310
550
450
1750
9325
15662
± 6.00 M
2860
1750
2310
550
450
1750
10453
17258
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x COPING G.L
Stub 130x130x10
75
EXCAVATION LINE
225
GL
GL
350x350
M
SECTION
Excavation Line
2410
G 2960 G
CL EAT S
200 EXCAVATION LINE
300
200 250 100
L OF TOWER C
675
675
250
C.C. 1:2:4 P.C.C. 1:4:8
1350
M
K
1550 1850
G
SOIL CLASSIFICATION Where normal dry cohesive or non-cohesive soils are met. G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 8,192 14,202 + 3M 1850 9,325 15,804 40.52 Cum 3.60 Cum 0.96 Cum + 6M 10,453 17,399
Sand 0.00 Cum
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-R-DRY
132 K.V. - "R" TYPE TOWER DRY
Pa g e
12
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x
Stub 130x130x10 COPING
75 G.L
225
GL
EXCAVATION LINE
GL
450x450 Excavation Line 2430
M
2960
SECTION G 575
CL EAT S
G
350
230 EXCAVATION LINE
C.C. 1:2:4 P.C.C. 1:4:8
200 100 1150
L OF TOWER C
m
250
1150 2300 2500
K
2800
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil. (OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane fields).
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 8,192 15,545 + 3M 2800 9,325 17,147 92.83 Cum 8.80 Cum 2.50 Cum + 6M 10,453 18,743
Sand 0.00 Cum
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-R-WET
132 K.V. - "R" TYPE TOWER WET
Pag e
13
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x
Stub 130x130x10 COPING
75 G.L
225
GL
EXCAVATION LINE
GL
450x450
2130 M
Excavation Line
SECTION
3110
G G
CL EAT S
575 350
230
300
250
200 EXCAVATION LINE
C.C. 1:2:4 P.C.C. 1:4:8 Sand Filling
300 100 150 1450
L OF TOWER C
M
1450 2900 3100
K
3400
G G PLAN
SOIL CLASSIFICATION a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below ground level. (OR) b) Where top layer of black cotton soil extends up to 50% of the depth with normal soil thereafter. Released for Construction NOTE : Where soil is clayey type, not necessarily black in colour, which shrinks when dry, swells when wet. CHIEF ENGINEER/CIVIL
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 8,192 16,394 + 3M 3400 9,325 17,996 143.81 Cum 18.65 Cum 3.84 Cum + 6M 10,453 19,591
Sand 6.94 Cum
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-R-P.S.
132 K.V. - "R" TYPE TOWER PS / PBC
Pa g e
14
Stub 130x130x10
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
75 x
225
GL
GL
COPING G.L
450x450 EXCAVATION LINE
Excavation Line
2130
3110
CL EAT S
575
M
SECTION
350
230
500
G
200
C.C. 1:2:4
300 100 150
G
250
P.C.C. 1:4:8 Sand Filling
EXCAVATION LINE
1650
1650 3300 3500
L OF TOWER C
3800
M
8 NOS. 10 TOR SUPPORTING RODS/PIT TOTAL 32 NOS. /TOWER
K G
10 TOR @ 400 C/C. (9 NOS. 2 WAY) G PLAN
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 8,192 16,959 + 3M 3800 9,325 18,562 179.63 Cum 21.62 Cum 4.90 Cum + 6M 10,453 20,157
TOTAL 72 NOS. /TOWER SOIL CLASSIFICATION a) Where subsoil water table is within 0.75 Mtrs. depth from ground level. (OR) b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is followed by normal soil. (OR) Released for Construction c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black cotton soil. CHIEF ENGINEER/CIVIL
Sand
Steel
8.66 Cum 336.29 Kgs
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-R-F.S.
132 K.V. - "R" TYPE TOWER FS / BC
Page
15
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
COPING
450X450
225
GL
G.L
Scale 1:25
STUB ANGLE 130X130X10
75
x
GL
EXCAVATION LINE
EARTH OR SOFT ROCK 0 to 1460
1400 to 2860
M
SECTION
C.C. 1:2:4
G 1400
G
EXCAVATION LINE
880 L OF TOWER C
M
SOIL CLASSIFICATION a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR) b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level though top layer is of normal soil. (OR) c) Where chiseling, drilling and blasting is required for excavation.
K
G G PL A N
Released for Construction
CHIEF ENGINEER/CIVIL
G +0M +3M 880 +6M
M 8,192 9325 10453
K 12,830 14432 16027
Excavation
Concrete
4.34 to 8.86CuM
4.82 to 5.76CuM
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132 K.V. - "R" TYPE TOWER
132KV-TL-R-H.R.
HARD ROCK
Page
16
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x 75
COPING
GL
G.L
STUB ANGLE 130X130X10
225
GL
EXCAVATION LINE
450X450 2310 M
2860
SECTION G G
C.C. 1:2:4
550 EXCAVATION LINE
1750 L OF TOWER C
M
K
SOIL CLASSIFICATION a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any other soil of similar nature is met. (OR) b) Where top layer of normal dry soil extends up to 85% of the depth followed by fissured rock without presence of water.
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
2860
M 8192 9325 10453
K Volume of 14060 Excavation Concrete 15662 35.04CuM 8.85 CuM 17258
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-R-S.R.
132 K.V. - "R" TYPE TOWER
SOFT ROCK/ F&F ROCK
Page
17
FOUNDATION DETAILS FOR 132 KV "S" TYPE TOWER Soil Type
Dry
Wet
P.S.
F.S.
Basic Tower Extn.
A (mm)
B (mm)
C (mm)
D (mm)
F (mm)
W1 W2 W3
D1 D2 D3
G (mm)
M (mm)
K (mm)
± 0.00 M
3300
1800
2400
800
350
200 225 300
250 250 300
2300
8997
15976
± 3.00 M
3300
1800
2400
800
350
2300
10213
17696
± 6.00 M
3300
1800
2400
800
350
2300
11428
19414
± 0.00 M
3300
2700
2380
820
450
3200
8997
17249
± 3.00 M
3300
2700
2380
820
450
3200
10213
18969
± 6.00 M
3300
2700
2380
820
450
3200
11428
20687
± 0.00 M
3450
3600
1950
1250
450
4100
8997
18522
± 3.00 M
3450
3600
1950
1250
450
4100
10213
20242
± 6.00 M
3450
3600
1950
1250
450
4100
11428
21960
4350
8997
18876
575 550 0
575 550 450
575 550 575
420 400
420 400 430
420 400 530
± 0.00 M
3450
3850
1850
1350
450
± 3.00 M
3450
3850
1850
1350
450
4350
10213
20595
± 6.00 M
3450
3850
1850
1350
450
4350
11428
22313
Vol. Of Excavation M3
Sand Bed
PCC 1:4:8
Vol. Of PCC 1:2:4
69.83 Cum
0.00 Cum
1.60 Cum
7.21 Cum
135.17 Cum
0.00 Cum
3.36 Cum
18.14 Cum
231.98 Cum
10.09 Cum
5.78 Cum
40.08 Cum
261.13 Cum
11.35 Cum
6.56 Cum
49.13 Cum
340
Hard Rock
3200
1130
1270
1930
450
1130
8997
14322
± 3.00 M
3200
1130
1270
1930
450
1130
10213
16041
± 6.00 M
3200
1130
1270
1930
450
1130
11428
17760
± 0.00 M
3200
2000
2150
1050
450
2000
8997
15552
± 3.00 M
3200
2000
2150
1050
450
2000
10213
17272
± 3.00 M
3200
2000
2150
1050
450
2000
11428
18990
775
F&F ROCK
1930
± 0.00 M
9.86 Cum
11.13 Cum
51.20 Cum
18.78 Cum
1050
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x COPING G.L
Stub 150x150x12
75
EXCAVATION LINE
225
GL
GL
350x350
M
SECTION 2400
G
Excavation Line
3300 G CL EAT S
200
EXCAVATION LINE
225 250
300
250 L OF TOWER C
M
C.C. 1:2:4
300 100
P.C.C. 1:4:8 900
K
250
900 1800 2000
G
2300
SOIL CLASSIFICATION Where normal dry cohesive or non-cohesive soils are met.
G PLAN
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 8,997 15,976 + 3M 2300 10,213 17,696 69.83 Cum 7.21 Cum 1.60 Cum + 6M 11,428 19,414
Released for Construction
CHIEF ENGINEER/CIVIL Sand
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED
0.00 Cum
FOUNDATION DETAILS OF
Drg. No.
132KV-TL-S-DRY
132 K.V. - "S" TYPE TOWER DRY
Pag e
20
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 x
Scale 1:50
Stub 150x150x12 COPING
75 G.L
225
GL
EXCAVATION LINE
GL
450x450 Excavation Line 2380
M
3300
SECTION CL EAT S
G
575 G 420
550
250
EXCAVATION LINE
C.C. 1:2:4
400
P.C.C. 1:4:8
100 L OF TOWER C
M
1350
1350 2700
K
2900 3200
G G PLAN
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil. (OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane Released for Construction fields). CHIEF ENGINEER/CIVIL
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 8,997 17,249 + 3M 3200 10,213 18,969 135.17 Cum 18.14 Cum 3.36 Cum + 6M 11,428 20,687
Sand 0.00 Cum
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-S-WET
132 K.V. - "S" TYPE TOWER WET
Page
21
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Stub 150x150x12
Scale 1:50
75
x COPING
225
GL
GL
G.L
450x450
EXCAVATION LINE
1950
Excavation Line
575
CL EAT S
M
3450
SECTION
420
G
550 450
400
G
250
C.C. 1:2:4
430 EXCAVATION LINE
P.C.C. 1:4:8 Sand Filling
100 150 1800
L OF TOWER C
1800 3600
M
K
3800 4100
G G PLAN
SOIL CLASSIFICATION a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below ground level. (OR) b) Where top layer of black cotton soil extends up to 50% of the depth with normal soil thereafter. Released for Construction NOTE : Where soil is clayey type, not necessarily black in colour, which shrinks when dry, swells when wet. CHIEF ENGINEER/CIVIL
Constants Volume of G M K Excavation Concrete P.C.C. + 0M 8,997 18,522 + 3M 4100 10,213 20,242 231.98 Cum 40.08 Cum 5.78 Cum + 6M 11,428 21,960
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED Sand 10.09 Cum
FOUNDATION DETAILS OF
Drg. No.
132KV-TL-S-P.S.
132 K.V. - "S" TYPE TOWER PS / PBC
Page
22
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Stub 150x150x12
Scale 1:50
75 x 225
GL
COPING
GL
G.L
450x450 1850
Excavation Line
EXCAVATION LINE
575
CL EAT S
M
3450 420
SECTION
550
G 575
400
250
G
C.C. 1:2:4
530 EXCAVATION LINE
P.C.C. 1:4:8 Sand Filling
100 150 1925
L OF TOWER C
M
1925 3850 4050 4350
K 8 NOS. 10 TOR SUPPORTING RODS (32 NOS. /TOWER)
G G PLAN
10 TOR @ 375 C/C. 11 NOS. 2 WAY (TOTAL 88 NOS. /TOWER)
SOIL CLASSIFICATION a) Where subsoil water table is within 0.75 Mtrs. depth from ground level. (OR) b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is followed by normal soil. (OR) Released for Construction c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black cotton soil. CHIEF ENGINEER/CIVIL
Constants Volume of Steel M K Excavation Concrete P.C.C. Sand + 0M 8,997 18,876 + 3M 4350 10,213 20,595 261.13 Cum 49.13 Cum 6.56 Cum 11.35 Cum 487.82 Kgs + 6M 11,428 22,313
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED
G
FOUNDATION DETAILS OF
Drg. No.
132KV-TL-S-F.S.
132 K.V. - "S" TYPE TOWER FS / BC
Pa g e
23
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 STUB ANGLE 130X130X10
75
x COPING
450X450
225
GL
G.L
Scale 1:25 GL
EXCAVATION LINE
EARTH OR SOFT ROCK 0 to 1270 1930 to 3200
M
SECTION
C.C. 1:2:4
G 1930
G
EXCAVATION LINE
1130 L OF TOWER C
M
K
SOIL CLASSIFICATION a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR) b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level though top layer is of normal soil.(OR) c) Where chiseling, drilling and blasting is required for excavation.
G
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
Constants Volume of G M K Excavation Hard Rock Concrete + 0M 8,997 14,322 9.86 to 10.10 to 9.86 Cum + 3M 1130 10,213 16,041 16.34CuM 11.13 CuM + 6M 11,428 17,760
Sand 0.00 Cum
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132 K.V. - "S" TYPE TOWER
132KV-TL-S-H.R.
HARD ROCK
Page
24
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 150X150X12
225
GL
EXCAVATION LINE
450X450 2150 M 3200
SECTION G G
C.C. 1:2:4
1050 EXCAVATION LINE
L OF TOWER C
M
2000
SOIL CLASSIFICATION a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any other soil of similar nature is met. (OR) b) Where top layer of normal dry soil extends up to 85% of the depth followed by fissured rock without presence of water.
K
G
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
2000
M 8997 10213 11428
Volume of K 15552 Excavation Concrete 17272 51.20CuM 18.78CuM 18990
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
Drg. No.
132KV-TL-S-S.R.
132 K.V. - "S" TYPE TOWER SOFT ROCK/ F&F ROCK
Pag e
25
75
x COPING
G.L
GL
STUB ANGLE
GL
225
EXCAVATION LINE
FxF C J
W1
SECTION G A
W2
D1
G D
W3
D2
250
EXCAVATION LINE
C.C. 1:2:4 P.C.C. 1:4:8
D3 L OF TOWER C
100 B/2
J
K
B/2 B
G G PLAN
NOTE-1 : While classifying foundations of Wet, Partially submerged / Partially black cotton, Fully submerged / Black cotton foundations mentioned above, the worst conditions should be considered and not necessarily the conditions prevailing at the time of inspection. For instance there are areas where subsoil water raised when canal water is let out in the field raising subsoil water to a considerable degree. Similarly the effect of monsoon or when the nearby reservoirs are full should be considered and not the conditions prevailing in open season or summer when work is carried out normally.
NOTE-2 : For locations of cut point / angle towers, the classification of tower foundations shall be at next higher type for ensuring safety of the Transmission line which is likely to be subjected to seasonal changes / climatic conditions from time to time. NOTE-3 : In case of highly collapsible & loose soils and river crossings, special design for foundations are to be made by Civil Engineering wing for adoption on case to case basis. NOTE-4 : All locations subjected to water logging, particularly in paddy fields, ponds, marshy areas etc., the chimney of all stubs are to be raised to 600 mm over the normal chimney being adopted in other cases. This shall be done after completion of erection of towers as a separate item for identified locations.
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF 220 K.V. TYPE TOWER (L&T) Drg. No. 220KV-TL-G.A. Scale 1:50
Page
26
FOUNDATION DETAILS FOR 220 KV A-TYPE TOWER Soil Type
Dry
Wet
P.S.
F.S.
Basic Tower Extension
A (mm)
B (mm)
C (mm)
D (mm)
F (mm)
X (mm)
W1 W2 W3
D1 D2 D3
± 0.00 M
3000
1400
2500
500
300
6251
175 375 0
200 300 0
± 3.00 M
3000
1400
2500
500
300
6964
± 6.00 M
3000
1400
2500
500
300
7676
± 0.00 M
3000
2000
2250
750
450
6251
± 3.00 M
3000
2000
2250
750
450
6964
± 6.00 M
3000
2000
2250
750
450
7676
± 0.00 M
3000
2550
1950
1050
450
6251
± 3.00 M
3000
2550
1950
1050
450
6964
± 6.00 M
3000
2550
1950
1050
450
7676
± 0.00 M
3000
3000
1800
1200
450
6251
± 3.00 M
3000
3000
1800
1200
450
6964
± 6.00 M
3000
3000
1800
1200
450
7676
Vol. Of Excavation M3
44.76 Cum
325 450 0
1.02 Cum
G (mm)
1900
1.94 Cum
2500
350 400 300 120.93 Cum
325 450 500
Sand filling
350 400 0 77.50 Cum
375 375 300
PCC 1:4:8
3.03 Cum
5.58 Cum
3050
350 400 450 159.25 Cum
4.10 Cum
7.35 Cum
3500
J (mm)
K (mm)
6872
12405
7585
13414
8297
14421
6815
13173
7528
14182
8240
15189
6750
13859
7463
14868
8175
15875
6679
14395
7392
15404
8104
16411
Vol. Of PCC M-15 M3
3.70 Cum
10.16 Cum
17.73 Cum
26.00 Cum
275
HardRock
± 0.00 M
1200
1000
0
1200
450
6251
± 3.00 M
1200
1000
0
1200
450
6964
± 6.00 M
1200
1000
0
1200
450
7676
± 0.00 M
3000
1700
2350
650
450
6251
± 3.00 M
3000
1700
2350
650
450
6964
± 6.00 M
3000
1700
2350
650
450
7676
4.80 Cum
625
Soft Rock
1200
1000
6304
10329
7017
11338
7729
12345
6815
12042
7528
13050
8240
14057
5.04 Cum
650
34.68 Cum
1700
9.66 Cum
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 100X100X10
225
GL
EXCAVATION LINE
300X300
2500 J
3100
SECTION G 175
G
375 250
200
C.C. 1:2:4 P.C.C. 1:4:8
300 100
EXCAVATION LINE
700 L OF TOWER C
J
700 1400 1600 1900
K
SOIL CLASSIFICATION Where normal dry cohesive or non-cohesive soils are met.
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
1900
J 6872 7585 8297
K Volume of 12405 Excavation Concrete P.C.C. 13414 44.76CuM 3.70CuM 1.02CuM 14421
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "A" TYPE TOWER (L&T)
Drg. No.
220KV-TL-A-DRY
DRY
Page
29
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 100X100X10
GL
225
EXCAVATION LINE
450X450 2250 J
3100
SECTION G
325 G
450
350
250
C.C. 1:2:4 P.C.C. 1:4:8
400 EXCAVATION LINE
100 1000
1000 2000
L OF TOWER C
J
2200 2500
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil.(OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane fields).
K
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
2500
J 6815 7528 8240
Volume of K 13173 Excavation Concrete P.C.C. 14182 77.50CuM 10.16CuM 1.94CuM 15189
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "A" TYPE TOWER (L&T)
Drg. No. 220KV-TL-A-WET
WET
Pa ge
30
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 100X100X10
GL
225
EXCAVATION LINE
450X450 1950 J
3250 375
SECTION G
375
350 G
300
400 300 100 150
EXCAVATION LINE
G PLAN
1275 2550 2750
K
G
250
P.C.C. 1:4:8 Sand Filling 1275
L OF TOWER C
J
C.C. 1:2:4
3050 SOIL CLASSIFICATION a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below ground level.(OR) b) Where top layer of black cotton soil extends up to 50 % of the depth with normal soil thereafter. NOTE : Where soil is clayey type, not necessarily black in colour, which shrinks when dry, swells when wet. Released for Construction
CHIEF ENGINEER/CIVIL
G
J K Volume of + 0M 6,750 13,859 Excavation Concrete P.C.C. + 3M 3050 7,463 14,868 120.93 Cum 17.73 Cum 3.03 Cum + 6M 8,175 15,875
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED
Sand
FOUNDATION DETAILS OF
220 K.V. - "A" TYPE TOWER (L&T)
5.58 Cum
Drg. No.
220KV-TL-A-P.S.
PS / PBC
Page
31
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 100X100X10
GL
225
EXCAVATION LINE
450X450 1800
J
325
3250
SECTION
450
350
G G
500
400
250
C.C. 1:2:4
450 EXCAVATION LINE
P.C.C. 1:4:8 Sand Filling
100 150 1500 L OF TOWER C
J
K
1500 3000 3200 3500
SOIL CLASSIFICATION a) Where subsoil water table is within 0.75 Mtrs. depth from ground level. (OR) b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is followed by normal soil. (OR) c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black cotton soil.
G
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
J K Volume of + 0M 6,679 14,395 Excavation Concrete P.C.C. + 3M 3500 7,392 15,404 159.25 Cum 26.00 Cum 4.10 Cum + 6M 8,104 16,411
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED
G
Sand
FOUNDATION DETAILS OF
220 K.V. - "A" TYPE TOWER (L&T)
7.35 Cum
Drg. No.
220KV-TL-A-F.S.
FS / BC
Pa g e
32
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 STUB ANGLE 100X100X10
75
x COPING
EXCAVATION LINE
450X450
225
GL
G.L
Scale 1:25 GL
As per field conditions 0 to 1800
J 1200
SECTION
C.C. 1:2:4
G G
EXCAVATION LINE
1000
L OF TOWER C
J
SOIL CLASSIFICATION a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR) b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level though top layer is of normal soil.(OR) c) Where chiseling, drilling and blasting is required for excavation.
K
G
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
1000
J 6304 7017 7729
Volume of K 10329 Excavation Concrete 11338 4.8 to 5.04 to 12345 12.00CuM 6.50 CuM
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "A" TYPE TOWER (L&T)
Drg. No.
220KV-TL-A-H.R.
HARD ROCK
Page
33
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 100X100X10
225
GL
EXCAVATION LINE
450X450 2350 J
3000
SECTION G G 650
C.C. 1:2:4
EXCAVATION LINE
1700 L OF TOWER C
J
K
G
SOIL CLASSIFICATION a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any other soil of similar nature is met.(OR) b) Where top layer of normal dry soil extends up to 85% of the depth followed by fissured rock without presence of water.
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
1700
J 6815 7528 8240
K Volume of 12042 Excavation Concrete 13050 34.68CuM 9.66CuM 14057
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "A" TYPE TOWER (L&T)
Drg. No.
220KV-TL-A-S.R.
SOFT ROCK/ F&F ROCK
Pa g e
34
FOUNDATION DETAILS FOR 220 KV B-TYPE TOWER Soil Type
Basic Tower
A (mm)
B (mm)
C (mm)
D (mm)
F (mm)
X (mm)
W1 W2 W3
D1 D2 D3
± 0.00 M
3500
1650
2950
550
350
8300
200 450 0
150 400 0
± 3.00 M
3500
1650
2950
550
350
9301
± 6.00 M
3500
1650
2950
550
350
10301
± 0.00 M
3500
2550
2475
1025
450
8300
± 3.00 M
3500
2550
2475
1025
450
9301
± 6.00 M
3500
2550
2475
1025
450
10301
± 0.00 M
3500
3000
2270
1230
450
8300
± 3.00 M
3500
3000
2270
1230
450
9301
± 6.00 M
3500
3000
2270
1230
450
10301
± 0.00 M
3500
3500
2200
1300
450
8300
Extension
Dry
Wet
P.S.
F.S.
± 3.00 M
3500
3500
2200
1300
450
9301
± 6.00 M
3500
3500
2200
1300
450
10301
Vol. Of Excavation 3 M
66.56 Cum
450 325 275
1.37 Cum
G (mm)
2150
3.03 Cum
3050
450 300 480 183.75 Cum
525 500 500
Sand filling
450 300 275 133.96 Cum
450 325 500
PCC 1:4:8
4.10 Cum
7.35 Cum
3500
450 300 550 240.00 Cum
5.48 Cum
9.60 Cum
4000
J (mm)
K (mm)
9301
16194
10302
17610
11302
19024
9167
17277
10168
18693
11168
20107
9092
17808
10093
19223
11093
20638
8992
18373
9993
19789
10993
21203
Vol. Of PCC M-15 M3 with Steps
6.29 Cum
17.48 Cum
27.44 Cum
40.53 Cum
425
HardRock
± 0.00 M
1300
1300
0
1300
450
8300
± 3.00 M
1300
1300
0
1300
450
9301
± 6.00 M
1300
1300
0
1300
450
10301
8.79 Cum
950
Soft Rock
± 0.00 M
3500
2350
2375
1125
450
8300
± 3.00 M
3500
2350
2375
1125
450
9301
± 6.00 M
3500
2350
2375
1125
450
10301
1300
1300
8375
13683
9376
15098
10376
16512
9167
16287
10168
17703
11168
19117
9.03 Cum
1125
77.32 Cum
2350
27.02 Cum
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x STUB ANGLE 130X130X10
75
COPING
GL
G.L
GL
225
EXCAVATION LINE
350X350
J
2950
SECTION G 3600 G 200 EXCAVATION LINE
450
150
250
C.C. 1:2:4 P.C.C. 1:4:8
400 100
L OF TOWER C
825
825 1650
J
K
1850 2150
G
SOIL CLASSIFICATION Where normal dry cohesive or non-cohesive soils are met. G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
2150
J 9301 10302 11302
K Volume of 16194 Excavation Concrete P.C.C. 17610 66.56CuM 6.29CuM 1.37CuM 19024
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "B" TYPE TOWER (L&T)
Drg. No.
220KV-TL-B-DRY
DRY
Pa g e
37
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x
GL
G.L
STUB ANGLE 130X130X10
75
COPING
GL
225
EXCAVATION LINE
450X450
2475 J
SECTION G 3600 450
G
325 275
450
250
EXCAVATION LINE
300
L OF TOWER C
J
C.C. 1:2:4 P.C.C. 1:4:8
275 100 1275
1275 2550 2750 3050
K
G
G PLAN
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil.(OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level (example : Paddy fields, Released for Construction Sugarcane fields). CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
3050
J 9167 10168 11168
K Volume of 17277 Excavation Concrete P.C.C. 18693 133.96CuM 17.48CuM 3.03CuM 20107
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "B" TYPE TOWER (L&T)
Drg. No. 220KV-TL-B-WET
WET
Pa g e
38
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 GL
Scale 1:50
STUB ANGLE 130X130X10
75
GL
225
x COPING
G.L
450X450 EXCAVATION LINE
2270
450
3750 J
325
450
SECTION
500
250
G 300 G
C.C. 1:2:4 P.C.C. 1:4:8
480 100 150
EXCAVATION LINE
SAND FILLING 1500
1500 3000
L OF TOWER C
3200
J
K 3500
G G PLAN
SOIL CLASSIFICATION a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below ground level.(OR) b) Where top layer of black cotton soil extends up to 50% of the depth with normal soil thereafter. NOTE : Where soil is clayey type, not necessarily Released for Construction black in colour, which shrinks when dry, swells when wet. CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
3500
J 9092 10093 11093
K Volume of 17808 Excavation Concrete P.C.C. Sand filling 19223 183.75CuM 27.44CuM 4.10CuM 7.35CuM 20638
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "B" TYPE TOWER (L&T)
Drg. No.
220KV-TL-B-P.S.
PS /PBC
Pa g e
39
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 GL
Scale 1:50
STUB ANGLE 130X130X10
75
GL
225
x COPING
G.L
450X450 2200
EXCAVATION LINE
525 3750 J
500
450
500
250
SECTION G 300 G 550
C.C. 1:2:4 P.C.C. 1:4:8
100 150
EXCAVATION LINE
SAND FILLING 1750
L OF TOWER C
J
1750 3500 3700
K
4000 G G PLAN
SOIL CLASSIFICATION a) Where subsoil water table is within 0.75 Mtrs. depth from ground level.(OR) b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is followed by normal soil.(OR) c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black cotton soil. Released for Construction CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
4000
J 8992 9993 10993
Volume of K 18373 Excavation Concrete P.C.C. Sand filling 19789 240.00CuM 40.53CuM 5.48CuM 9.60CuM 21203
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "B" TYPE TOWER (L&T)
Drg. No.
220KV-TL-B-F.S.
FS / BC
Page
40
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 75
x COPING
225
GL
G.L
Scale 1:25
STUB ANGLE 130X130X10 450X450
GL
EXCAVATION LINE
As per field conditions 0 to 2200
J
SECTION
C.C. 1:2:4
G 1300
G
EXCAVATION LINE
L OF TOWER C
J
K
G
1300 SOIL CLASSIFICATION a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR) b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level though top layer is of normal soil.(OR) c) Where chiseling, drilling and blasting is required for excavation.
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
1300
J 8375 9376 10376
K Volume of 13683 Excavation Concrete 15098 8.79 to 9.03 to 16512 23.66 CuM 10.82 CuM
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "B" TYPE TOWER (L&T)
Drg. No.
220KV-TL-B-H.R.
HARD ROCK
Pag e
41
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 130X130X10
GL
225
EXCAVATION LINE
450X450
2375 J
SECTION
3500
G G
EXCAVATION LINE
1125
C.C. 1:2:4
L OF TOWER C
2350
J
SOIL CLASSIFICATION a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any other soil of similar nature is met.(OR) b) Where top layer of normal dry soil extends up to 85% of the depth followed by fissured rock without presence of water.
K
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M
2350
J 9167 10168 11168
K Volume of 16287 Excavation Concrete 17703 77.32CuM 27.02CuM 19117
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "B" TYPE TOWER (L&T)
Drg. No.
220KV-TL-B-S.R.
SOFT ROCK/ F&F ROCK
Page
42
FOUNDATION DETAILS FOR 220 KV C-TYPE TOWER Soil Type
Basic Tower
A (mm)
B (mm)
C (mm)
D (mm)
F (mm)
X (mm)
± 0.00 M
3500
2000
2800
700
350
8574
± 3.00 M
3500
2000
2800
700
350
9574
Extension
W1 W2 W3 475 350 0
D1 D2 D3
Vol. Of Excavation 3 M
PCC 1:4:8
Sand filling
G (mm)
450 250 0
Dry
90.00 Cum
J (mm)
K (mm)
9533
17017
10533
18431
2500
1.94 Cum
8.56 Cum
± 6.00 M
3500
2000
2800
700
350
10574
11533
19846
± 9.00 M
3500
2000
2800
700
350
11524
12533
21260
± 0.00 M
3500
3000
2400
1100
450
8574
9383
18219
± 3.00 M
3500
3000
2400
1100
450
9574
10383
19634
275 500 500
250 450 400
176.40 Cum
Wet
3500
4.10 Cum
24.79 Cum
± 6.00 M
3500
3000
2400
1100
450
10574
11383
21048
± 9.00 M
3500
3000
2400
1100
450
11574
12345
22408
± 0.00 M
3500
3500
2350
1150
450
8574
9282
18784
± 3.00 M
3500
3500
2350
1150
450
9574
10282
20198
P.S.
± 6.00 M
3500
3500
2350
1150
450
10574
± 9.00 M
3500
3500
2350
1150
450
± 12.00 M
3500
3500
2350
1150
450
525 500 500
250 450 450
240.00 Cum
5.48 Cum
9.60 Cum
Vol. Of PCC M-15 M3 with Steps
4000
37.70 Cum
11282
21612
11574
12275
23016
12574
13275
24431
± 0.00 M
3525
4050
2925
500
450
9574
± 3.00 M
3525
4050
2925
500
450
10574
1075 725
200 300
F.S.
304.33 Cum
7.23 Cum
12.42 Cum
9625
20046
10625
21461
4550
27.70 Cum
± 6.00 M
3525
4050
2925
500
450
11574
11625
22875
± 9.00 M
3525
4050
2925
500
450
11574
12625
24289
8649
14070
9649
15484
RCC ± 0.00 M
1500
1300
0
1500
450
10574
± 3.00 M
1500
1300
0
1500
450
11574
425 0 0
1500 0 0
Hard Rock
10.14 Cum
1300
10.38 Cum
± 6.00 M
1500
1300
0
1500
450
12574
10649
16898
± 9.00 M
1500
1300
0
1500
450
11574
12533
17724
± 0.00 M
3500
2600
2200
1300
450
11574
9383
16947
± 3.00 M
3500
2600
2200
1300
450
11574
10383
18361
Soft Rock
1075 0 0
1300 0 0
94.64 Cum
2600
37.18 Cum
± 6.00 M
3500
2600
2200
1300
450
11574!
11383
19775
± 9.00 M
3500
2600
2200
1300
450
11574
12345
21135
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75 225
COPING
GL
G.L
STUB ANGLE 150X150X12
GL
EXCAVATION LINE
350X350
2800
J
SECTION G
3600 G 475 EXCAVATION LINE
L OF TOWER C
450
350 250
C.C. 1:2:4 P.C.C. 1:4:8
250 100 1000
J
1000 2000
K
2200 2500
G
SOIL CLASSIFICATION Where normal dry cohesive or non-cohesive soils are met.
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M +9M
2500
J 9533 10533 11533 12533
K Volume of 17017 Excavation Concrete P.C.C. 18431 19846 90.00CuM 8.56CuM 1.94CuM 21260
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "C" TYPE TOWER (L&T)
Drg. No.
220KV-TL-C-DRY
DRY
Page
45
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x
GL
G.L
STUB ANGLE 150X150X12
75 225
COPING
GL
EXCAVATION LINE
450X450 2400 J
SECTION 275
G
3600 G
250
500
500
250
450
EXCAVATION LINE
C.C. 1:2:4 P.C.C. 1:4:8
400 100
L OF TOWER C
1500
1500 3000
J
K
3200 3500
G G PLAN
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil.(OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane fields).
Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +9M
3500
J 9383 10383 11383 12345
K Volume of 18219 Excavation Concrete P.C.C. 19634 21048 176.40CuM 24.79CuM 4.10CuM 22048
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "C" TYPE TOWER (L&T)
Drg. No.
220KV-TL-C-WET
WET
Pa g e
46
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
75 225
GL
Scale 1:50
STUB ANGLE 150X150X12
GL
COPING
x
G.L
450X450 EXCAVATION LINE
2350
3750 525 500
J
SECTION G
500
250
250 450
G
C.C. 1:2:4 P.C.C. 1:4:8
450 EXCAVATION LINE
100 150
SAND FILLING 1750
L OF TOWER C
J
K
G G
1750 3500 3700 4000
SOIL CLASSIFICATION a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below ground level.(OR) b) Where top layer of black cotton soil extends up to 50% of the depth with normal soil thereafter. NOTE : Where soil is clayey type, not necessarily black in colour, which shrinks when dry, swells when wet.
PLAN
Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +9M +12M
4000
J 9282 10282 11282 12275 13275
K Volume of 18784 Excavation Concrete P.C.C. Sand filling 20198 21612 240.00CuM 37.70CuM 5.48CuM 9.60CuM 23016 24431
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "C" TYPE TOWER (L&T)
Drg. No.
220KV-TL-C-P.S.
PS / PBC
Pa g e
47
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 GL
UB ANGL E 65 ST 15 0X15 0X16 L
A
X ( C/C OF PEDASTAL ) COPI NG PL I NT H FXF
C
150
EXCAV AT I ON L I NE
450X450 12 mm dia - 8 Nos. 6 mm dia - 200 c/c
2925
R.C.C. M15 D
58 E 22 43
GL
16 # @ 2 00 c / c AT BOT HWAYS ( C- T YPE F .S. SOI L ) .
LV L
Scale 1:50
STUB ANGLE 150X150X12
75 225
R.C.C. M15
3675 B
43
43
B R.C.C. 1:2:4 12 mm dia - 170 c/c both ways 16 mm dia - 200 c/c both ways Alternate bars are cranked P.C.C. 1:4:8
200 300 100 150
SAND FILLING
2600 J
4050 4250 4550
X
X
SOIL CLASSIFICATION a) Where subsoil water table is within 0.75 Mtrs. depth from ground level.(OR) b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is followed by normal soil.(OR) c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black cotton soil.
F J
Released for Construction
PLAN
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +9M
4550
J 9625 10625 11625 12625
K Steel (Kgs) Volume of 20046 Excavation Concrete P.C.C. Sand filling 21461 1974.86 22875 304.33CuM 27.70CuM 7.23CuM 12.42CuM 24289
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "C" TYPE TOWER (L&T)
Drg. No.
220KV-TL-C-F.S.
FS / BC
Pa g e
48
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 x
Scale 1:25
STUB ANGLE 150X150X12
75 COPING
225
GL
G.L
450X450
GL
EXCAVATION LINE
As per field conditions 0 to 2000
J
SECTION
C.C. 1:2:4
G G 1500 EXCAVATION LINE
L OF TOWER C
J
K
1300
SOIL CLASSIFICATION a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR) b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level though top layer is of normal soil.(OR) c) Where chiseling, drilling and blasting is required for excavation.
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +*9M
1300
J 8649 9649 10649 11649
Volume of K 14070 Excavation Concrete 15484 10.14 to 10.40 to 16898 23.66CuM 12.04CuM 17724
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "C" TYPE TOWER (L&T)
Drg. No.
220KV-TL-C-H.R.
HARD ROCK
Pa g e
49
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x 75 225
COPING
GL
G.L
STUB ANGLE 150X150X12
GL
EXCAVATION LINE
450X450 2200 J
SECTION
3500
G G
1300
EXCAVATION LINE
C.C. 1:2:4 L OF TOWER C
J
2600
K
SOIL CLASSIFICATION a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any other soil of similar nature is met.(OR) b) Where top layer of normal dry soil extends up to 85% of the depth followed by fissured rock without presence of water.
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +9M
2600
J 9383 10383 11383 12345
K Volume of 16947 Excavation Concrete 18361 19775 94.64CuM 37.18CuM 21135
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "C" TYPE TOWER (L&T)
Drg. No.
220KV-TL-C-S.R.
SOFT ROCK/ F&F ROCK
Pa g e
50
220 KV TOWERS L&T DESIGN OF FOUNDATION FOR TYPE-D TOWER Soil Type
Basic Tower
A (mm)
B (mm)
C (mm)
D (mm)
F (mm)
X (mm)
± 0.00 M
3500
2450
2450
1050
450
10734
± 3.00 M
3500
2450
2450
1050
450
11990
Extension
W1 W2 W3
D1 D2 D3
400 300 300
Vol. Of Excavation 3 M
PCC 1:4:8
Sand filling
G (mm)
450 300 300
Dry
125.32 Cum
J (mm)
K (mm)
11833
20906
13093
22688
2950
2.81 Cum
16.35 Cum
± 6.00 M
3500
2450
2450
1050
450
13250
14353
24470
± 9.00 M
3500
2450
2450
1050
450
14500
15613
26252
± 0.00 M
3500
3700
2000
1500
450
10734
11581
22318
± 3.00 M
3500
3700
2000
1500
450
11990
12841
24100
± 6.00 M
3500
3700
2000
1500
450
13250
14101
25882
± 9.00 M
3500
3800
1950
1550
450
11574
15340
27775
± 0.00 M
3425
4300
2775
550
450
10734
12032
23804
± 3.00 M
3425
4300
2775
550
450
11990
13292
25586
625 500 500
600 450 450 254.02 Cum
4200
6.08 Cum
Vol. Of PCC M-15 M3 with Steps
46.56 Cum
Wet
675 500 500 1150 775 0
P.S.
600 500 450 200 350 0
266.26 Cum
329.47 Cum
± 6.00 M
3425
4300
2775
550
450
13250
± 9.00 M
3425
4300
2775
550
450
11574
RCC
4300
6.40 Cum
8.10 Cum
13.82 Cum
4800
51.27 Cum
34.43 Cum
14552
27368
15812
29150
± 0.00 M
3425
4800
2775
550
450
10734
± 3.00 M
3425
4800
2775
550
450
11990
1375 800 0
200 350 0
F.S.
401.69 Cum
10.00 Cum
16.85 Cum
12032
24511
13292
26293
5300
42.94 Cum
± 6.00 M
3425
4800
2775
550
450
13250
14552
28075
± 9.00 M
3425
4800
2775
550
450
11574
15812
29857
10825
17147
12085
18929
± 0.00 M
1600
1300
0
1600
450
10734
± 3.00 M
1600
1300
0
1600
450
11990
RCC 425 1600 0 0 0 0
Hard rock
10.82 Cum
1300
11.06 Cum
± 6.00 M
1600
1300
0
1600
450
13250
13345
20711
± 9.00 M
1600
1300
0
1600
450
11574
14605
22493
± 0.00 M
3500
2900
1800
1700
450
10734
11581
20479
± 3.00 M
3500
2900
1800
1700
450
11990
12841
22261
Soft rock
1225 0 0
1700 0 0
117.74 Cum
2900
58.89 Cum
± 6.00 M
3500
2900
1800
1700
450
13250
14101
24043
± 9.00 M
3500
2900
1800
1700
450
11574
15340
25795
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 150X150X16
GL
225
EXCAVATION LINE
450X450
2450 J
SECTION G 3600 400
G
300
450 EXCAVATION LINE
300
300
L OF TOWER C
300 100
C.C. 1:2:4 P.C.C. 1:4:8
1225
J
250
K
1225 2450 2650
G
2950
SOIL CLASSIFICATION Where normal dry cohesive or non-cohesive soils are met.
G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +9M
2950
J 11833 13093 14353 15613
K Volume of 20906 Excavation Concrete P.C.C. 22688 24470 125.32CuM 16.35CuM 2.81CuM 26252
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "D" TYPE TOWER (L&T)
Drg. No.
220KV-TL-D-DRY
DRY
Pa ge
53
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 75 x
GL
Scale 1:50 STUB ANGLE 150X150X16
GL
225
COPING
G.L 450X450
EXCAVATION LINE
2000
625 J
SECTION
3600 500
600
G G
500
450
C.C. 1:2:4 P.C.C. 1:4:8
450
EXCAVATION LINE
250
100 1850
1850 3700
L OF TOWER C
3900
J
K
4200
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil.(OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level (example : Paddy fields, Sugarcane fields).
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M
4200
J 11581 12841 14101
Volume of K 22318 Excavation Concrete P.C.C. 24100 254.02CuM 46.56CuM 6.08CuM 25882
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "D" TYPE TOWER (L&T)
Drg. No. 220KV-TL-D-WET
WET(+0, +3, +6M)
Pa g e
54
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 Scale 1:50 x 75
COPING
GL
G.L
STUB ANGLE 150X150X16
GL
225
EXCAVATION LINE
450X450 1950 J
675
SECTION G 3600
500
600
G 500
500
250
EXCAVATION LINE
C.C. 1:2:4 P.C.C. 1:4:8
450 100
L OF TOWER C
J
1900
1900 3800 4000 4300
K
G
G PLAN
SOIL CLASSIFICATION a) Where sub soil water is met at 1.5 Mtrs. or more below the ground level in normal soil.(OR) b) Where surface water could stand for long period with water penetration not exceeding 1 Mtr. Below ground level Released for Construction (example : Paddy fields, Sugarcane fields). CHIEF ENGINEER/CIVIL
+0 M +3M +6M +9M
G
J
K
4250
15340
27704
Volume of Excavation Concrete P.C.C.
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
266.26CuM 51.27CuM
220 K.V. - "D" TYPE TOWER (L&T)
6.40CuM
Drg. No. 220KV-TL-D-WET+9
WET (+9M)
Pa g e
55
GL 65
X ( C/C OF PEDASTAL ) STUB ANGL E 15 0X15 0X16 L
STUB ANGLE 150X150X16
75
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
GL
225
16 # @ 2 00 c / c AT BOTHWAYS ( C- TYPE F.S. SOI L ) .
150
COPI NG
PL I NTH
LV L
450X450
FXF A
C
Scale 1:50
EXCAV ATI ON L I NE R.C.C. M15 D
58 E 43 22
R.C.C. M15
12 mm dia - 8 Nos. 6 mm dia - 200 c/c
2875 B
43
43
B 3675
R.C.C. 1:2:4 12 mm dia - 170 c/c both ways 16 mm dia - 175 c/c both ways Alternate bars are cranked
200
P.C.C. 1:4:8
350 100 150
Sand filling 2750
X J
X 4300 4500 4800
F J
PLAN
SOIL CLASSIFICATION a) Where sub soil water is encountered between 0.75 Mtrs. and 1.5 Mtrs. depth below ground level.(OR) b) Where top layer of black cotton soil extends up to 50% of the depth with normal soil thereafter. NOTE : Where soil is clayey type, not necessarily black in colour, which shrinks when dry, swells when wet. Released for Construction
CHIEF ENGINEER/CIVIL
G +0 M +3M +6M +9M
4800
J 12032 13292 14552 15812
K Steel (Kgs) Volume of 23804 Excavation Concrete P.C.C. Sand filling 25586 2248.13 27368 338.69CuM 34.51CuM 8.10CuM 13.82CuM 29150
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "D" TYPE TOWER (L&T)
Drg. No.
220KV-TL-D-P.S.
PS / PBC
Page
56
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004 65
GL
X ( C/C OF PEDASTAL ) ST UB ANGL E 15 0X15 0X16 L
STUB ANGLE 150X150X16
75
GL
225
16 # @ 2 00 c / c AT BOT HWAYS F .S. SOI L ) .
150( C- T YPE
COPI NG
PL I NT H
LV L
FXF A
C
Scale 1:50
450X450 EXCAV AT I ON L I NE
R.C.C. M15 D
58 E 43 22
R.C.C. M15
B
43
43
12 mm dia - 8 Nos. 6 mm dia - 200 c/c
2875
B 3675
R.C.C. 1:2:4 12 mm dia - 170 c/c both ways
350
16 mm dia - 175 c/c both ways Alternate bars are cranked P.C.C. 1:4:8
100 150
Sand filling
200
X J
3200 4800 5000 5300
X
F J
PLAN
SOIL CLASSIFICATION a) Where subsoil water table is within 0.75 Mtrs. depth from ground level.(OR) b) Where top layer of black cotton soil exceeds 50% and extends up to full depth or is followed by normal soil.(OR) c) Where top layer is normal soil up to 50% of the depth but the lower layer is a black cotton soil. Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +9M
5300
J 12032 13292 14552 15812
K Volume of Steel (Kgs) 24511 Excavation Concrete P.C.C. Sand filling 26293 2876.45 28075 412.92CuM 43.02CuM 10.00CuM 16.85CuM 29857
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "D" TYPE TOWER (L&T)
Drg. No.
220KV-TL-D-F.S.
FS / BC
Page
57
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
COPING
450X450
225
GL
G.L
Scale 1:25
STUB ANGLE 150X150X16
75
x
GL
EXCAVATION LINE
As per field conditions 0 to 1900
J
SECTION G G 1600
C.C. 1:2:4
EXCAVATION LINE
L OF TOWER C
J
K 1300
G G PLAN
SOIL CLASSIFICATION a) Where hard rock is encountered at 1.5 Mtrs. or less below ground level.(OR) b) Where hard rock is encountered from 1.5 Mtrs. to 2.5 Mtrs. below ground level though top layer is of normal soil.(OR) Released for Construction c) Where chiseling, drilling and blasting is required for excavation. CHIEF ENGINEER/CIVIL
G +0 M +3M +6M +*9M
1300
J 10825 12085 13345 14605
K Volume of 17147 Excavation Concrete 18929 10.82 to 11.06 to 20711 23.66CuM 12.60CuM 22491
TRANSMISSION CORPORATION OF ANDHRA PRADESH LIMITED FOUNDATION DETAILS OF
220 K.V. - "D" TYPE TOWER (L&T)
Drg. No.
220KV-TL-D-H.R.
HARD ROCK
Pa g e
58
T.O.O. Dir (Tr. & G.O.) M.S. No. 156 Dated 8-10-2004
Scale 1:50
x 75
COPING
GL
G.L
STUB ANGLE 150X150X16
GL
225
EXCAVATION LINE
450X450 1800
J
SECTION
3500
G G 1700 EXCAVATION LINE
C.C. 1:2:4 L OF TOWER C
J
2900
K
SOIL CLASSIFICATION a) Where decomposed or fissured rock, hard gravel, kankar, lime stone, laterite or any other soil of similar nature is met.(OR) b) Where top layer of normal dry soil extends up to 85% of the depth followed by fissured rock without presence of water.
G G PLAN
Released for Construction
CHIEF ENGINEER/CIVIL G +0 M +3M +6M +9M
2900
J 11581 12841 14101 15340
K Volume of 20479 Excavation Concrete 22261 24043 117.74CuM 58.89CuM 25795