ENSAYO DE PERMEABILIDAD LUGEON
PROYECTO:
ÁREA:
PROF. DE ENSAYO DE :
ESTUDIOS COMPLETARIOS DEL ESTUDIO DE FACTIBILIDAD DE LAS CC.HH. RAPAY 1 Y RAPAY 2
258.60
FECHA :
CASA DE MAQUINAS, PIQUE VETICAL Y CHIMENEA DE EQUILIBRIO DE LA C.H. RAPAY 1
A
3/20/2015
Hr.INIC.
263.90 12:30
m.
Hr.FIN.
SONDEO N°:
DDH-CHC-CM-01
ENSAYO N°
5
14:30
LITOLOGIA DEL TRAMO:
CAUDALIMETRO Long. Min. MANOMETRO
1.00 m
hm
=
ALTURA DEL MANÓMETRO
a
=
ALTURA SOBRE NIVEL DEL TERRENO
ha
=
PROFUNDIDAD NIVEL FREÁTICO
∆h
=
SOBRECARGA HIDRÁULICA
d
=
PROFUNDIDAD DEL OBTURADOR
L
=
PROFUNDIDAD DE PERFORACIÓN
a
=
INCLINACIÓN C/HORIZONTAL
∆h'
=
∆h CORREGIDA = Sen a x ∆h
l
=
LONGITUD TRAMO DE ENSAYO
Ø
=
DIÁMETRO DEL BULBO DEL ENSAYO
Cilindro de Expansión Bomba
hm h
a
ha
e d
=
PRESIÓN MANOMETRICA
PEF
=
PRESIÓN EFECTIVA EN EL PUNTO MEDIO DEL TRAMO DEL ENSAYO
∆p
=
PERDIDAS DE CARGA
q
=
VOLUMEN DE AGUA EN LITROS POR MINUTO DURANTE EL ENSAYO
qt
=
VOLUMEN TOTAL DE AGUA EN LITROS PARA CADA ESTADIO
G
=
CAUDAL EN LITROS POR MINUTO PARA CADA ESTADIO
Q
=
UL
=
CAUDAL EN LITROS POR MINUTO POR Mt. DE TRAMO DE ENSAYO UNIDAD LUGEON ( Q x 10 / PEF )
ha
l
l/2
DIÁMETRO DE LA TUBERÍA DE ENSAYO
PM
Dh
L
0.75 1.50 175.00 175.75 258.60 263.90 90 175.75 5.30 9.6 3.06
m m m m m m ° m m cm pulg
Ø
Kg/cm2 PM =
3.00
Kg/cm2 PM =
Kg/cm2 PM =
6.00
10.00
Kg/cm2 PM =
6.00
Kg/cm2 PM =
3.00 GRÁFICO DE PATRON DE RESULTADOS PARA LA SELECCIÓN DE UNIDADES LUGEON
TIEMPO EN
LECTURA
LECTURA
MINUTO
CAUDAL.
0
830.00
1
889.00
59.00
1,676.00
76.00
2,550.00
90.00
4,394.00
74.00
5,184.00
64.00
2
950.00
61.00
1,747.00
71.00
2,641.00
91.00
4,468.00
74.00
5,247.00
63.00
3
1,009.00
59.00
1,817.00
70.00
2,732.00
91.00
4,542.00
74.00
5,311.00
64.00
4
1,070.00
61.00
1,889.00
72.00
2,822.00
90.00
4,615.00
73.00
5,375.00
64.00
5
1,124.00
54.00
1,960.00
71.00
2,913.00
91.00
4,688.00
73.00
5,439.00
64.00
6
1,182.00
58.00
2,030.00
70.00
3,004.00
91.00
4,760.00
72.00
5,501.00
62.00
7
1,240.00
58.00
2,100.00
70.00
3,095.00
91.00
4,832.00
72.00
5,564.00
63.00
8
1,296.00
56.00
2,170.00
70.00
3,186.00
91.00
4,905.00
73.00
5,627.00
63.00
9
1,354.00
58.00
2,239.00
69.00
3,277.00
91.00
4,977.00
72.00
5,690.00
63.00
10
1,410.00
56.00
2,309.00
70.00
3,368.00
91.00
5,049.00
72.00
5,753.00
q (l)
LECTURA q (l)
CAUDAL.
CAUDAL.
1,600.00
LECTURA q (l)
2,460.00
CAUDAL.
LECTURA q (l)
4,320.00
CAUDAL.
q (l)
U.L.
5,120.00 0.00
580.00
709.00
908.00
729.00
633.00
G ( l/min )
58.00
70.90
90.80
72.90
63.30
Q ( l/min/m )
10.94
13.38
17.13
13.75
11.94
∆p ( kg/cm2 )
0.04
0.06
0.10
0.07
0.05
CH(∆h'/10)
17.58
17.58
17.58
17.58
17.58
PEF ( kg/cm2 )
20.54
23.52
27.48
23.51
20.53
UL
5.33
5.69
6.24
5.85
5.82
1
2
3
4
5
REPRESENTACIÓN GRAFICA
6.00
8.00
10.00
2
3
4
5
UNIDAD LUGEON SELECCIONADA :
K
(PERMEABILIDAD):
5.85
UL
7.61E-05
cm/s
K = UL x 1.3 x 10-5 cm/seg
OBSERVACIONES:
FLUJO LAMINAR
CLASIFICACION DEL VALOR LUGEON
27.00 26.00 25.00
PEF24.00 23.00 22.00 21.00 20.00 9.00
12.00
ESTADIO
PEF = (PM - ΔP) + (Δh' / 10)
28.00
4.00
1
63.00
qt(l)
2.00
10.00
11.00
12.00
13.00
Q
14.00
15.00
16.00
17.00
18.00
CESEL INGENIEROS
GEOTECNIA PERUANA S.R.L.
ENSAYO DE PERMEABILIDAD LUGEON
PROYECTO:
PROF. DE ENSAYO DE :
PERFORACION DE MONITOREO ZONA LVUSF RIOLITA
A
FECHA :
UBICACIÓN
m.
Hr.INIC.
SONDEO N°:
Hr.FIN.
LITOLOGIA DEL TRAMO:
ENSAYO N°
6
CAUDALIMETRO Long. Min. MANOMETRO
1.00 m
hm
=
ALTURA DEL MANÓMETRO
a
=
ALTURA SOBRE NIVEL DEL TERRENO
ha
=
PROFUNDIDAD NIVEL FREÁTICO
∆h
=
SOBRECARGA HIDRÁULICA
d
=
PROFUNDIDAD DEL OBTURADOR
L
=
PROFUNDIDAD DE PERFORACIÓN
a
=
INCLINACIÓN C/HORIZONTAL
∆h'
=
∆h CORREGIDA = Sen a x ∆h
l
=
LONGITUD TRAMO DE ENSAYO
Ø
=
DIÁMETRO DEL BULBO DEL ENSAYO
Cilindro de Expansión Bomba
hm h
a
ha
e d
=
PRESIÓN MANOMETRICA
PEF
=
PRESIÓN EFECTIVA EN EL PUNTO MEDIO DEL TRAMO DEL ENSAYO
∆p
=
PERDIDAS DE CARGA
q
=
VOLUMEN DE AGUA EN LITROS POR MINUTO DURANTE EL ENSAYO
qt
=
VOLUMEN TOTAL DE AGUA EN LITROS PARA CADA ESTADIO
G
=
CAUDAL EN LITROS POR MINUTO PARA CADA ESTADIO
Q
=
UL
=
CAUDAL EN LITROS POR MINUTO POR Mt. DE TRAMO DE ENSAYO UNIDAD LUGEON ( Q x 10 / PEF )
ha
l l/2
DIÁMETRO DE LA TUBERÍA DE ENSAYO
PM
Dh
L
0.75 1.50 175.00 175.75 0.00 0.00 90 175.75 0.00 9.6 3.06
m m m m m m ° m m cm pulg
Ø
Kg/cm2 PM =
Kg/cm2 PM =
1.50
Kg/cm2 PM =
3.00
6.00
Kg/cm2 PM =
3.00
Kg/cm2 PM =
1.50 GRÁFICO DE PATRON DE RESULTADOS PARA LA SELECCIÓN DE UNIDADES LUGEON
TIEMPO EN
LECTURA
LECTURA
MINUTO
CAUDAL.
0
800.00
1
848.00
48.00
1,536.00
56.00
2,216.00
106.00
3,452.00
52.00
4,107.00
47.00
2
895.00
47.00
1,593.00
57.00
2,321.00
105.00
3,505.00
53.00
4,153.00
46.00
3
943.00
48.00
1,648.00
55.00
2,428.00
107.00
3,559.00
54.00
4,200.00
47.00
4
990.00
47.00
1,703.00
55.00
2,534.00
106.00
3,612.00
53.00
4,247.00
47.00
5
1,038.00
48.00
1,758.00
55.00
2,640.00
106.00
3,665.00
53.00
4,293.00
46.00
6
1,085.00
47.00
1,812.00
54.00
2,746.00
106.00
3,719.00
54.00
4,339.00
46.00
7
1,132.00
47.00
1,867.00
55.00
2,851.00
105.00
3,772.00
53.00
4,386.00
47.00
8
1,179.00
47.00
1,922.00
55.00
2,956.00
105.00
3,826.00
54.00
4,432.00
46.00
9
1,226.00
47.00
1,975.00
53.00
3,061.00
105.00
3,879.00
53.00
4,478.00
46.00
10
1,273.00
47.00
2,029.00
54.00
3,166.00
105.00
3,933.00
54.00
4,525.00
47.00
q (l)
CAUDAL.
LECTURA q (l)
CAUDAL.
1,480.00
qt(l)
473.00
G ( l/min )
47.30
q (l)
2110.00
549.00
Q ( l/min/m ) #DIV/0!
LECTURA CAUDAL.
LECTURA q (l)
3,400.00
1056.00
CAUDAL.
q (l)
533.00
0.00
54.90
105.60
53.30
46.50
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00
0.00
0.00
0.00
0.00
CH(∆h'/10)
17.58
17.58
17.58
17.58
17.58
PEF ( kg/cm2 )
19.08
20.58
23.58
20.58
19.08
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
3
4
5
1
2
2.00
4.00
6.00
8.00
10.00
12.00
1
2
ESTADIO 3
4
5
465.00
∆p ( kg/cm2 )
U L #DIV/0!
U.L.
4,060.00
PEF = (PM - ΔP) + (Δh' / 10)
UNIDAD LUGEON SELECCIONADA :
K
(PERMEABILIDAD):
4.88
UL
6.34E-05
cm/s
K = UL x 1.3 x 10-5 cm/seg
REPRESENTACIÓN GRAFICA
OBSERVACIONES:
36.00
CLASIFICACION DEL VALOR LUGEON
34.00 32.00 30.00 28.00
PEF
26.00 24.00 22.00 20.00 18.00 8.00
9.00
10.00
11.00
12.00
Q
13.00
14.00
15.00
16.00
CESEL INGENIEROS
GEOTECNIA PERUANA S.R.L.
WATER PRESSURE TEST Job No. :
Hole No :
Client :
Antamina
Project :
Stage V Dam Raise
Location :
Antamina
0.096
Interval Top (m) :
0.00
Tested Length (m) :
0.00
Pressure Gauge Height (m agl) :
Interval Base (m) :
0.00
Pneumatic - Wireline - Double
Presumed Water Temperature :
Date :
Packer Type :
Gauge Pressure kPa
No
P5
Discharge/m (L/min/m)
0.00 48.00 47.00 48.00 47.00 48.00 47.00
0.00 48.00 47.00 48.00 47.00 48.00 47.00
0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
300
1480.0 1536.0 1593.0 1648.0 1703.0 1758.0
Total : Average: 0.00 56.00 57.00 55.00 55.00 55.00
285.00 47.500 0.00 56.00 57.00 55.00 55.00 55.00
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
600
0 1 2 3 4 5 6 7 8 9 10
0:00:00 0:01:00 0:02:00 0:03:00 0:04:00 0:05:00
0 01:00 01:00 01:00 01:00 01:00
2110.0 2216.0 2321.0 2428.0 2534.0 2640.0
Total : Average: 0.00 106.00 105.00 107.00 106.00 106.00
278.00 55.600 0.00 106.00 105.00 107.00 106.00 106.00
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
300
0 1 2 3 4 5 6 7 8 9 10
0:00:00 0:01:00 0:02:00 0:03:00 0:04:00 0:05:00
0 01:00 01:00 01:00 01:00 01:00
3400.0 3452.0 3505.0 3559.0 3612.0 3665.0
Total : Average: 0.00 52.00 53.00 54.00 53.00 53.00
530.00 106.000 0.00 52.00 53.00 54.00 53.00 53.00
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 1 2 3 4 5 6 7 8 9 10
0:00:00 0:01:00 0:02:00 0:03:00 0:04:00 0:05:00
0 01:00 01:00 01:00 01:00 01:00
4060.0 4107.0 4153.0 4200.0 4247.0 4293.0
Total : Average: 0.00 47.00 46.00 47.00 47.00 46.00
265.00 53.000 0.00 47.00 46.00 47.00 47.00 46.00
#DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Total : Average:
233.00 46.600
#DIV/0! #DIV/0!
150
TEST RESULTS
Lugeon Value Curve
Net Pressures
Flow vs. Pressure
0
2
4
6
8
10
FILE: insert file path / file name
120.0
P2
#DIV/0!
P3
#DIV/0!
P4
#DIV/0!
P5
#DIV/0!
140.1
P1
283.7
P2 Stage No. P3 P4
106.0
100.0
Gauge Pressure
Flow Rate (L/min) 80.0
521.5
60.0
285.9
40.0
H LOSS
47.5 46.6
55.6 53.0
32.95
Stage No.
c:
1
c:
1
Finish Date & Time : 04:08 March 17, 2011
kPa Average
300
kPa
Q
61.74
L/min
H
28.0
m
#DIV/0!
uL
P5
140.8
20.0
Interpreted Result
0.0
Reported Permeability at Stage Average #DIV/0!
Flow Type DILATION
Supervisor de Construcción Mota-Engil FIRMA NOMBRE FECHA
Supervisor de CQC
Supervisor de CQA
Supervisor de
Mota-Engil
Golder
Antamina
1
1
Interpreted Result & Hydraulic Conductivity
100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 500.0 550.0
12
1
c:
K = Q/2HL * ln(L/r), from Cedergren, 1989, where:
Net Interval Pressure (kPa)
Lugeon Value
#DIV/0!
Start Date & Time : 03:35 March 17, 2011 c:
where PMAX = 20 kPa/m depth below overburden/bedrock interface to a maximum of 800 kPa.
Lugeon Value
P1
Remarks c:
0 01:00 01:00 01:00 01:00 01:00
1/3 PMAX
10 76.2 1 de 2
Discharge (L/min)
0:00:00 0:01:00 0:02:00 0:03:00 0:04:00 0:05:00
2/3 PMAX
0.75
Date : Volume (L)
0 1 2 3 4 5 6 7 8 9 10
PMAX
P4
Litres
Water Meter Readings Reading (Litres) 800.0 848.0 895.0 943.0 990.0 1038.0 1085.0
150
2/3 PMAX
P3
Time Intervals (min) 0 01:00 01:00 01:00 01:00 01:00 01:00
175.00
Casing Inner Diameter (mm ) :
0 1 2 3 4 5 6 7 8 9 10
1/3 PMAX
P2
Water Meter Reading in :
Actual Time (h:m:s) 0:00:00 0:01:00 0:02:00 0:03:00 0:04:00 0:05:00 0:06:00
Used in analysis (m bgl) :
Checked By :
Rock tested :
Date : March 18, 2011
P1
Immediately prior to test (m bgl) :
Hole Diameter (m) :
Computed By :
Pressure Stage
Vertical depth to Groundwater
Drilling Method :
-90
Tested By :
Stage No.
0
Dip (Deg) :