PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

B.4.4 PEKERJAAN MEKANIKAL

B.4.4. 1. PEKERJAAN MEKANIKAL A. PEKERJAAN PLUMBING B. PEKERJAAN PEMADAM KEBAKARAN

C. PEKERJAAN TATA UDARA D. PEKERJAAN LIFT

E. PEKERJAAN GONDOLA

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART INSTALASI AIR BERSIH MULAI PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING PERIKSA & PERBAIKI

IJIN PELAKSANAAN MERGER TEST KABEL

PEK. PERSIAPAN

INSTALASI PIPA PPR PN 10 TIDAK

TEST YA

PERIKSA & PERBAIKI

PENYAMBUNGAN KE POMPA PENYAMBUNGAN KESANITAIR

TEST & COM

BERITA ACAR PENGETESAN

SELESAI PEMAS. POMPA TRANSFER

PASANG KABEL POWER, KABEL KONTROL & PANEL

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PROSES PENYAMBUNGAN PIPA PPR ( AIR BERSIH ) TAHAPAN PELAKSANAAN 1.

Buang bagian kasar sisa potongan pipa dengan menggunakan cutter / pisau

2.

Uji kecocokan pipa dengan fitting, panjang pipa harus pas sampai batas socket fitting

3.

Buat garis lurus dengan menggunakan spidol baik di socket fitting maupun di pipa, untuk memudahkan penyambungan

4.

Tandai kedalaman socket fiiting di pipa, dan lepaskan socket dari pipa.

5.

Bersihkan ujung pipa dngan lap kering sampai bersih

APLIKASI SYSTEM o

Pipa PPR – PN 10 : Digunakan untuk pipa air bersih

o

Pipa PPR – PN 20 : Digunakan untuk pipa air panas

1

2

3

4

5

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART INSTALASI AIR KOTOR / AIR BEKAS & VENT MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEMASANGAN PANEL & KABEL POWER

IJIN PELAKSANAAN

PERIKSA & PERBAIKI

PEK. PERSIAPAN TIDAK

TEST

IN DOOR

YA

PENYAMBUNGAN KE STP

PEMASANGAN & SUPPORT

TEST & COMM. INSTALASI PVC CLASS AW PERIKSA & PERBAIKI TEST GENANG YA

TIDAK

PEMASANGAN POMPA SUMPIT

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN SYSTEM AIR HUJAN MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEKERJAAN PERSIAPAN

INSTALL HANGER & SUPPORT

INSTALASI PIPA PVC CLASS AW PERIKSA & PERBAIKI TEST GELONTOR

PEMASANGAN ROOF DRAIN

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PROSES PENYAMBUNGAN PIPA PVC ( AIR BEKAS/AIR KOTOR ) TAHAPAN PELAKSANAAN 1.

Buang bagian kasar sisa potongan pipa dengan menggunakan cutter / pisau

2.

Uji kecocokan pipa dengan fitting, panjang pipa harus pas sampai batas socket fitting

3.

Buat garis lurus dengan menggunakan spidol baik di socket fitting maupun di pipa, untuk memudahkan penyambungan

4.

Tandai kedalaman socket fiiting di pipa, dan lepaskan socket dari pipa.

5.

Bersihkan ujung pipa dngan lap kering sampai bersih

6.

Olesi ujung pipa bagian luar dengan solvent cement pralon secara merata

7.

Sambung pipa dengan socket dan dorong socket ke pipa sampai batas

8.

Tahan pipa dan socket selama 20 deting untuk menghindari slip

9.

Bersihkan sisa-sisa lem dengan kain dan diamkan hasil selama 30 menit untuk mendapatkan hasil yang terbaik

1

2

4

3

5

6

7

8

9

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN SYSTEM FIRE HYDRANT & FIRE SPRINKLER MULAI PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEMASANGAN INDOOR HYDRANT BOX

PEMASANGAN, POMPA HYDRANT : JOCKEY, DIESEL & ELECTRIC

PEK.PERSIAPAN PEMASANGAN SLEEVE PEK. GALIAN

PEMASANGAN GANTUNGAN PIPA

INSTALASI KABEL POWER & KONTROL

PABRIKASI PIPA

PERIKSA & PERBAIKI

PABRIKASI PIPA

PEMASANGAN PIPA BS Scĥ 40 PERIKSA & PERBAIKI TEST TEKAN

TIDAK

MEGGER PEMASANGAN PIPA BS Scĥ 40

YA

PERIKSA & PERBAIKI

TIDAK

YA

PEK.URUGAN

PEMASANGAN OUT DOORHYDRANT BOX & PILAR HYDRANT

TEST TEKAN YA

PEMASANGAN SPRINKLER HEAD

TIDAK

PENYAMBUNGAN KABEL KE PANEL DAN POMPA

TEST COMM.

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN POMPA 

PENURUNAN POMPA: A.

ALAT YANG DIGUNAKAN



FORKLIFT



PIPA ROLLER



TACKEL



DONGKRAK

• B.

TALI SLING

PENURUNAN DAN PELETAKAN POMPA •

SETTING FORKLIFT DEKAT LOKASI PENURUNAN



POMPA DIANGKAT FORKLIFT DARI TRUK DILETAKAN DIATAS PIPA ROLLER



DENGAN TACKEL DAN SLING, POMPA DITARIK DAN DIDUDUKAN DIATAS PONDASI



PIPA DI DONGKRAK UNTUK MELEPAS PIPA ROLLER



KENCANGKAN PENGIKAT DUDUKAN POMPA AGAR POSISI TIDAK BERGESER

RELOKASI MENUJU KE RUANG PUMP

DITARIK DENGAN TACKEL

1

2 3

4

5

2 3

FORMASI PERPINDAHAN ROLLER

4

5

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN POMPA

INSTALASI PIPA FABRIKASI PIPA HEADER& SUPPORT



PEMASANGAN SUPPORT PIPA



PEMASANGAN PIPA HEADER & VALVE



PEMASANGAN ASSESORIES



TES TEKANAN PIPA

D. INSTALASI LISTRIK : •

E.

D D 1 2



D

C.

1

PENARIKAN KABEL KONTROL



PEMASANGAN PANEL POMPA

TESTING •

MEGGER KABEL POWER & KABEL GROUNDING



RUNNING TES POMPA

3

WALL SLEVE NOTES : 1.

SERVICE PIPE

2.

STEEL SLEEVE PIPE WITH CONICAL ENDS

3.

CAULKING WITH ROCKWALL FROM BOTH ENDS

PENARIKAN KABEL POWER & KABEL GROUNDING



2

DRY PART STANDART FLANGE FABRICATED FLANGE

FULL WELDED

WET PART PIPE SLEVE

WALL WATER TANK

WATER TIGHT SLEEVE

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FOTO ILUSTRASI PEKERJAAN FIRE HYDRANT & FIRE SPRINKLER FIRE SPRINKLER

FIRE EXTINGHUISER

BOX HYDRANT

H YD R A N T

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FOTO ILUSTRASI FIRE EXTNGUISHER

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN SYSTEM TATA UDARA / AC MULAI PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PANEL CABLE

WIRING

WIRING

PEKERJAAN PERSIAPAN PERIKSA & PERBAIKI

PEMASANGAN SLEEVE PEMAS. GANTUNGAN PIPA

PEMAS. GANTUNGAN DUCTING

TEST

PEMAS. PIPA PERIKSA & PERBAIKI TEST TEKAN

PABRIKASI DUCTING

TEST COMM.

SERTIFIKAT

PEMASANGAN ISOLASI & JACKETING

SELESAI

SERTIFIKAT

INSTALL SPLITE DUCT VRV/VRF SYSTEM

PERIKSA & PERBAIKI

PEMAS. OUTDOOR TYPE FREE STANDING

PEMAS. EXHAUST FAN

PERIKSA & PERBAIKI

TEST

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN AC & VENTILASI MEKANIK MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEK. PERSIAPAN

INSTALASI HANGER & SUPPORT

INSTALASI PIPA DRAIN PVC - AW

INSTALASI DUCTING

TEST

INSTALASI PIPA REFRIGERAN & INSULASI

PERIKSA & PERBAIKI

TEST

PERIKSA & PERBAIKI

INSTALASI KABEL POWER & KONTROL

TEST PENYAMBUNGAN KE UNIT AC

TESTING & COMMISIONING

SELEASI

PERIKSA & PERBAIKI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN EXHAUST FAN MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING PEK. PERSIAPAN

INSTALASI HANGER & SUPPORT

PEMASANGAN EXHAUST FAN

INSTALASI DUCTING

TEST

TIDAK

PERIKSA & PERBAIKI

YA

PENYAMBUNGAN KE UNIT FAN

INSTALASI KABEL POWER & KONTROL TIDAK

TEST YA

TESTING & COMMISIONING

SELEASI

PERIKSA & PERBAIKI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI DUCTING

Instalasi Ducting : 

Fabrikasi BJLS & support ducting



Pemasangan support ducting



Pemasangan isolasi ducting



Pemasangan ducting sesuai shop drawing



Pemasangan flexible ducting



Pemasangan grille

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN LIFT MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEK. PERSIAPAN : MENGUKUR DIMENSI : PINTU LIFT SHAFT PIT LIFT

PEMASANGAN : • SCAFOLDING • COUNTER WEIGHT BRACKET • CAR GUIDE RAIL & PIT WORK • LANDING DOOR SILL • DOOR HEADER • DOOR JAM • DOOR PANEL

PEMASANGAN : • TRACTION • CONTROL PANEL

PERIKSA & PERBAIKI

PEMASANGAN : • CR FRAME • PLAT FORM • CAR CABIN • DOOR OPERATOR • CAR DOOR

TEST RUNNING

SELESAI

PEMASANGAN : • ROPING • COUNTER WEIGHT FRAME • FILE WEIGHT LOADING • HOIST WAY CABLE

WIRING CABLE PERIKSA & PERBAIKI TEST RUNNING

CLEANING

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN TRANSPORTASI DALAM GEDUNG (LIFT) PEKERJAAN PERSIAPAN :  PENGUKURAN DIMENSI  PENURUNAN ELEVATOR : PERALATAN :  MOBILE CRANE / FORK LIFT  SLING

 TACKEL

 PEKERJAAN PEMASANGAN CABIN :  PEMASANGAN CAR FRAME  PEMASANGAN PLAT FORM

 PEMASANGAN CAR CABIN  PEMASANGAN DOOR OPERATOR  PEMASANGAN CAR DOOR

 PEKERJAAN PEMASANGAN PENGGERAK VERTIKAL :

 HYDRAULIC JACK

PEMASANGAN ROPING

 HAND PALLET / TROLEY

PEMASANGAN COUNTER WEIGHT FRAME

 PEKERJAAN PEMASANGAN : CAR BRACKET COUNTER WEIGHT BRACKET CAR GUIDE RAIL & PIT WORK LANDING DOOR SILL DOOR HEADER DOOR JAM DOOR PANEL

 PEKERJAAN PEMASANGAN EQUIPMENT :  PEMASANGAN TRACTION  PEMASANGAN CONTROL PANEL

PEMASANGAN FILER WEIGHT LOADING PEMASANGAN HOIST WAY CABLE

 TESTING :  TEST MEGGER  TEST FUNGSI

FLOW CHART PEKERJAAN GONDOLA PT. WASKITA KARYA (Persero) INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN GONDOLA MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

TEST NAIK-TURUN

IJIN PELAKSANAAN

TEST BEBAN PEKERJAAN PERSIAPAN REL, IWF, GONDOLA PERMANENT ( FIX ARM )

MENAIKKAN KONSTRUKSI HOIST CRANE KEATAS GEDUNG

MEMASANG GONDOLA MOBILE ROOF BEAM

PASANG REL IWF

MERAKIT KONSTRUKSI GONDOLA / DAVID SOCKET ARM

PASANG HOIST, WIRE ROPE, KABEL POWER, WIRE WINDER KEDALAM SANGKAR

TEST JALAN HORIZONTAL

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

B.4.4 PEKERJAAN ELEKTRIKAL

B.4.4. 2. PEKERJAAN ELEKTRIKAL & ELEKTRONIKA A. PEKERJAAN LISTRIK B. PEKERJAAN PENANGKAL PETIR

C. PEKERJAAN GENSET D. PEKERJAAN TELEPON

E. PEKERJAAN DATA F. PEKERJAAN FIRE ALARM G. PEKERJAAN TATA SUARA H. PEKERJAAN CCTV

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI TEGANGAN MENENGAH FLOWCHART PEKERJAAN INSTALASI TEGANGAN MENENGAH MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEMASANGAN KABEL TM N2XSY PEKERJAAN PERSIAPAN PERBAIKI PEKERJAAN PONDASI

TIDAK

TEST YA

SETTING PANEL TM

PENYAMBUNGAN KE TRAVO PANEL TM

SETTING TRAVO PENYAMBUNGAN KE PLN PEMASANGAN SUPPORT KABEL LADDER ENERGIZING PEMASANGAN KABEL LADDER

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN PANEL TR FLOWCHART PEKERJAAN PANEL TR MULAI

PERSETUJUAN MATERIAL

PEMASANGAN PANEL TR/TM

PERSETUJUAN SHOP DRAWING

TERMINASI KE PANEL

IJIN PELAKSANAAN

PEKERJAAN PERSIAPAN

TEST BEBAN PARSIAL

INSTALASI KABEL TRAY PEMASANGAN AIR TERMINAL LENGKAP DENGAN TIANG

PENARIKAN KABEL TR DARI TRAFO KE LVMDP

TESTING & COMMISIONING

PENARIKAN KABEL FEEDER PERBAIKI TEST MEGGER

YA

TIDAK

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI KABEL POWER FLOWCHART PEKERJAAN INSTALASI KABEL POWER MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEKERJAAN PERSIAPAN

PEMASANGAN SUPORT & HANGER

GALIAN KABEL

PENARIKAN KABEL RACK/KABEL LADDER

PENGISIAN PASIR

PENARIKAN KABEL

PENARIKAN KABEL PERBAIKI

PERBAIKI TEST & MEGGER

TIDAK

TEST & MEGGER

YA

TIDAK

YA

PEMASANGAN TIANG LAMPU

PENGURUGAN & PEMASANGAN PELINDUNG

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN PEMASANGAN PANEL TM & TR TAHAPAN PEMASANGAN

A.

Peralatan yang digunakan 



Forklift kapasitas sesuai kebutuhan Dongkrak

B.

Penurunan panel 

Seting forklift di lokasi penurunan panel



Panel diangkat dengan forklif dan diletakkan ke arah lokasi panel



Kencangkan pengikat dudukan panel agar tidak bergeser

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN PEMASANGAN PANEL TM & TR ELEKTRIKAL SISTEM 

Pemasangan kabel power



Pemasangan kabel grounding



Tes magger kabel power & kabel grounding



Tes simulasi panel



Tes running panel



Tes urutan phase

KABEL TRAY

KABEL INSTALASI PANEL

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN PANEL LVMDP 1 MARKING

A. PANEL LVMDP 1.

2 BOR LUBANG DYNABOLT

2.

MARKING PENEMPATAN PANEL PADA PONDASI PANEL

BOR LUBANG DYNABOLT UNTUK PENGUAT DUDUKAN PANEL

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN PANEL LVMDP 3

4

PANEL A. PANEL MVMDP / LVMDP 3.

TEMPATKAN PANEL PADA POSISI YANG TELAH DITENTUKAN

4.

PASANG & KENCANGKAN BAUT DYNABOLT, LALU PASANG SEMUA ASESORI PANEL YANG DIBUTUHKAN

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN PANEL LVMDP

1.

PENURUNAN PANEL

DIANGKUT DENGAN CONTAINER

CONTAINER PANEL

PENURUNAN PANEL DARI KONTAINER DENGAN FORKLIFT

PANEL FORK LIFT

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN PANEL LVMDP

2.

MENUJU PANEL

PANEL FORK LIFT

DIANGKUT MENUJU KE RUANG PANEL RUANG PANEL

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN PANEL LVMDP 3. SETTING UP DIRUANG PANEL

SUSUNAN PANEL POSISI TERTUTUP

RUANG PANEL

PANEL DALAM POSISI TERBUKA

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN INSTALL TRANSFORMATOR

1.

PENURUNAN TRANSFORMATOR

DIANGKUT DENGAN CONTAINER

CONTAINER TRANSFORMATOR

PENURUNAN TRANSFORMATOR DARI CONTAINER DENGAN FORKLIFT

FORK LIFT TRANSFORMATOR

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN INSTALL TRANSFORMATOR

2.

MENUJU RUANG TRANSFORMATOR

FORK LIFT TRANSFORMATOR DIANGKUT MENUJU KE RUANG TRANSFORMATOR

RUANG TRANSFORMATOR

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN INSTALL TRANSFORMATOR

3. SETTING DI RUANG TRANSFORMATOR

TRAFO 3100 KVA

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI TITIK LAMPU FLOWCHART PEKERJAAN INSTALASI TITIK LAMPU MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEKERJAAN PERSIAPAN

PEKERJAAN GALIAN KABEL

INSTALASI PIPA KONDUIT

INSTALASI KABEL

INSTALASI KABEL TRAY PERBAIKI TIDAK

TEST

INSTALASI KABEL PERBAIKI

YA

TIDAK

TEST

PEKERJAAN URUGAN

YA PEMASANGAN LAMPU

PEMASANGAN TIANG LAMPU

PEMASANGAN LAMPU

TESTING & COMMISIONING

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN ELEKTRIK, INSTALASI LAMPU & STOP KONTAK FLOWCHART PEKERJAAN ELEKTRIK, INSTALASI LAMPU & STOP KONTAK MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PERBAIKI

PEKERJAAN PERSIAPAN TIDAK TEST FUNGSI INSTALASI PIPA KONDUIT YA TESTING & COMMISIONING

INSTALASI KABEL TRAY

INSTALASI KABEL

SELESAI PERBAIKI

TEST MEGGER

TIDAK

YA PEMASANGAN SAKLAR, LAMPU & STOP KONTAK TERMINASI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI PENANGKAL PETIR FLOWCHART PEKERJAAN INSTALASI PENANGKAL PETIR MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING PEMASANGAN GROUNDING PENTANAHAN

PEKERJAAN PERSIAPAN

PERBAIKI TIDAK TEST

INSTALASI PIPA KONDUIT

YA PEMASANGAN KABEL PERBAIKI TIDAK

TEST YA

PEMASANGAN BAK KONTROL

PEMASANGAN AIR TERMINAL LENGKAP DENGAN TIANG & PENGUAT

PEMASANGAN LAMPU OBSTRUCTION LIGHT

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI LISTRIK 1

2 MARKING

MARKING BOR

3

KLEM

CONDUIT

MARKING LINE

1. Marking plat lantai untuk jalur conduit yang akan digunakan sebagai jalur installasi sound system. 2. Bor plat lantai untuk memasang klem pipa konduit. 3. Pasang pipa konduit sesuai dengan jalur marking yang telah dibuat dengan menggunakan klem yang berwarna sesuai dengan jenis pekerjaanya.

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI LISTRIK

4

5 CONDUIT

KABEL PANCING

CONDUIT

KABEL PANCING

4. Masukkan kabel pancing untuk menarik kabel.

5.

Sambung ujung kabel dengan ujung kawat pancing, kemudian tarik kawat pancing untuk menarik kabel instalasi tersebut.

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI LISTRIK 6

6.

Potong kabel listrik sesuai dengan kebutuhan.

7.

Hubungkan jalur instalasi titik percabangan didalam Tee-Dos.

8.

Lalu tutup sambungan dengan menggunakan lasdop

KABEL YANG AKAN DIGUNAKAN

SPOOL KABEL

9. Tutup kembali Tee-Dos

7

8

9

KABEL TEE-DOS

TEE -DOS

KABEL TERSAMBUNG

TEE-DOS

CONDUIT

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI LISTRIK

1

2

MARKING

1.

MARKING LOKASI INSTALASI LISTRIK PADA DINDING SESUAI KETINGGIAN YANG DIINGINKAN DARI LANTAI.

SPARING

2.

SEDIAKAN SPARING UNTUK CONDUIT & INBOW DOOS PADA LOKASI YANG SUDAH DITENTUKAN.

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI LISTRIK 3

5

4 SPARING CONDUIT

3.

PASANG CONDUIT PADA SPARING YANG SUDAH DISEDIAKAN.

GROUTING INBOW DOOS

4.

PASANG INBOW DOOS PADA SPARING YANG SUDAH DISEDIAKAN & HUBUNGKAN DENGAN CONDUIT YANG SUDAH TERPASANG.

5.

SETELAH CONDUIT & INBOW DOOS TERPASANG DENGAN BENAR & RAPI, GROUTING DENGAN MORTAR SELASELA ANTARA SPARING DENGAN CONDUIT & INBOW DOOS.

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI LISTRIK 8 7 6

KABEL

KABEL

ALAT TEST

6.

PASANG KABEL KEDALAM CONDUIT HINGGA KE INBOW DOOS 7.

LAKUKAN TEST MEGGER SETELAH KABEL TERPASANG.

6.

SAMBUNGKAN OUTLET / STOP KONTAK DENGAN KABEL & PASANG PADA INBOW DOOS, PEMASANGAN INSTALASI SELESAI.

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN GENSET MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEK. PERSIAPAN PEK. PONDASI

SETING GENSET

PEMASANGAN TANGKI BBM

PEMASANGAN PEREDAM SUARA

PEMASANGAN POMPA BBM

PEMASANGAN PANEL GENSET

TERMINASI KE PANEL

PEMASANGAN KABEL POWER

TEST & COMM.

TEST

PERIKSA & PERBAIKI

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN GENSET

GENSET



PENURUNAN GENSET: A.

B.

ALAT YANG DIGUNAKAN •

MOBIL CRANE KAP. 30 TON



PIPA ROLLER Ø 3 “



SLING



TACKEL



DONGKRAK

PENURUNAN GENSET •

SETTING MOBIL CRANE DEKAT LOKASI PENURNAN



MOBIL PENGANGKUT GENSET DI DEKATKAN DENGAN MOBIL CRANE



GENSET DIANGKAT DAN DITURUNKAN KE DEKAT PIPA ROLLER



DENGAN MENGGUNAKAN TACKEL & SLING GENSET DITARIK KE ARAH PONDASI VIA PIPA ROLLER



SAMPAI DIATAS PONDASI GENSET DIANGKAT DENGAN DONGKRAK UNTUK MENGELUARKAN PIPA ROLLER



GENSET DUDUK DENGAN POSISI BENAR DIPONDASI

GENSET

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN GENSET 





INSTALASI FUEL SISTEM: •

PABRIKASI PIPA



PEMASANGAN PIPA & TES TEKAN UNTUK MENGETATHUI KEBOCORAN



PEMASANGAN TANGKI HARIAN DILENGKAPI LEVEL SWICTH



PEMASANGAN TANKI BULANAN DILENGKAPI LEVEL SWICTH



PEMASANGAN POMPA BBM



PEMASANGAN PANEL POMPA DAN KABEL POMPA

ELEKTRIKAL SISTEM GENSET •

PEMASANGAN SISTEM GENSET



PEMASANGAN KABEL POWER GENSET



PEMASANGAN KABEL KONTROL



PEMASANGAN KABEL GROUNDING



PEMASANGAN GROUNDING

TESTING: •

MEGGER KABEL POWER DAN KABEL GROUNDING



TES DENGAN LOAD BANK



RUNNING TES GENSET



TES PROTEKSI GENSET



TES AUTO SYNCHRONIZING GENSET



TES NOISE RUANG GENSET

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN TELEPON MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEMASANGAN TELEPON SET

PEK. PERSIAPAN

PENYAMBUNGAN KE TELKOM

PEMASANGAN KABEL TRAY PEMBUATAN BAK KONTROL

TEST & COMM

• •

PERIKSA & PERBAIKI

PEMASANGAN GROUNDING SYSTEM & KABEL BC PERIKSA & PERBAIKI TEST

INSTALASI TITIK TLP : CONDUIT & ACESS. KABEL ITC

TEST

PEMASANGAN OUTLET DATA & TELEPON

PEMASANGAN PABX

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN TELEPON FOTO-FOTO ILUSTRASI

PEMASANGAN PERALATAN TELEPON 

PABX

TELEPON





OUTLET TELEPON MDF

PEMASANGAN FIXTURE •

TELEPON



OUTLET TELEPON



TERMINAL BOX

PEMASANGAN PERALATAN UTAMA •

PABX 6 TRUNK LINE 36 EXTENTION



MDF 100 PEIR SOLDERLESS



GROUNDING

TESTING •

TEST LOOP KABEL



TEST FUNGSI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN INSTALASI SYSTEM JARINGAN KABEL DATA MULAI

PERSETUJUAN MATERIAL

PERSETUJUAN SHOP DRAWING

PEMASANGAN KABEL FO

PERIKSA & PERBAIKI

IJIN PELAKSANAAN TEST CONTINUTY

PEKERJAAN PERSIAPAN

BERITA ACARA TEST COMISIONING

PEMASANGAN : OPTICAL LINE TERMINAL, IPTV HEADEN, MIDD LAWER, VOD SERVER, NETWORK MANAGER SYSTEM, SIP PABX 1000 USER, KEYBOARD, MONITOR, ROUTER FIRE WALL, SERVER CCTV, SERVER ACC CONTROL, PACT PANEL, HUB

SELESAI PERIKSA & PERBAIKI

TEST CONTINUTY

PEMASANGAN RAK KABEL

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN FIRE ALARM SYSTEM MULAI

PERSETUJUAN MATERIAL

PEMASANGAN : • FACP - ADRESSIBLE • MDF

PERSETUJUAN SHOP DRAWING

PEKERJAAN PERSIAPAN

PEMASANGAN RAK KABEL

TEST FUNGSI

OK

PEMASANGAN KABEL NYY 4 PERIKSA & PERBAIKI

LOOP TEST

PEMASANGAN/ SETING : • ROR • SMOKE DETECTOR • FIXED TEMPERATURE DETECTOR • GAS DETECTOR • MANUAL BREACK GLASS • BELL ALARM • INDICATOR LAMP • JACK TELEPHONE + INSTALASI

TEST & COMM.

SELESAI

PERIKSA & PERBAIKI

TIDAK

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

ILUSTRASI PEKERJAAN FIRE ALARM SYSTEM FOTO-FOTO ILUSTRASI

PEMASANGAN PERALATAN FIRE ALARM 

SMOKE DETECTOR/HEAT DETECTOR

MASTER CONTROL FIRE ALARM (MCFA) ALARM BELL





MANUAL BREACK GLASS

INDICATOR LAMP

PEMASANGAN FIXTURE •

ROR



SMOKE DETECTOR



FIXED TEMPERATURE DETECTOR



GAS DETECTOR



MANUAL BREACK GLASS



BELL ALARM



INDICATOR LAMP



JACK TELEPHONE + INSTALASI

PEMASANGAN PERALATAN UTAMA •

FACP - ADRESSIBLE



MDF

TESTING •

TEST LOOP KABEL



TEST FUNGSI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN INSTALASI TATA SUARA (SOUND SYSTEM) MULAI

PERSETUJUAN MATERIAL

PEMASANGAN : • VOLUME CONTROL • CEILLING SPEAKER • HORN SPEAKER

PERSETUJUAN SHOP DRAWING

IJIN PELAKSANAAN

PEMASANGAN PERALATAN UTAMA : • MIXER PREE AMP • EQUALIZER • POWER AMP. 300 W • RADIO TUNNER • REMOTE MICROPHONE • MULTY CD/DVD/MP3 • PAGGING MICROPHONE • MDF • POWER SUPPLY • CABINET RACK

PEK. PERSIAPAN

PEMASANGAN KONDUIT

PEMASANGAN KABEL NYMHY 3X1,5 MM2 PERIKSA & PERBAIKI TIDAK

TEST

TEST & COMM.

YA BERITA ACARA TEST

BERITA ACARA TEST COMISIONING

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN INSTALASI TATA SUARA (SOUND SYSTEM) FOTO-FOTO ILUSTRASI

PEMASANGAN PERALATAN TATA SUARA 

PEMASANGAN FIXTURE •

CEILLING SPEAKER



VOLUME CONTROL



HORN SPEAKER

POWER AMPLIFIER CABINET RACK

PAGING MICROPHONE

CEILLING SPEAKER

HORN SPEAKER

VOLUME CONTROL



PEMASANGAN PERALATAN UTAMA •

MIXER PREE AMP



EQUALIZER



POWER AMP. 300 W



RADIO TUNNER



REMOTE MICROPHONE



MULTY CD/DVD/MP3



PAGGING MICROPHONE



MDF



POWER SUPPLY



CABINET RACK

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

FLOW CHART PEKERJAAN CLOSE CIRCUIT TELEVISION (CCTV) MULAI

PERSETUJUAN MATERIAL

PEMASANGAN • IP INDOOR FIX • CAMERA • IP OUTDOOR

PERSETUJUAN SHOP DRAWING

IJIN PELAKSANAAN

• • • • • •

PEKERJAAN PERSIAPAN

PEMASANGAN KONDUIT

PEMASANGAN PERALATAN UTAMA : MONITOR LCD 21” (SPOT) MONITOR LCD 29” VIDEO MANAGER PC COMPUTER + SOFTWARE DIGITAL VIDEO MANAGER 16 CH UPS 5 KVA

PENARIKAN KABEL PERIKSA & PERBAIKI

TEST & COMM.

TEST CONTINUTY BERITA ACARA TEST COMISIONING

PEMASANGAN PERALATAN PENUNJANG: • BRACKET • HOUSING • RACK KABINET

SELESAI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN CCTV FOTO-FOTO ILUSTRASI

PEMASANGAN PERALATAN CCTV 

PEMASANGAN FIXTURE •

DVR RECORDER

DOME CAMERA



VIDEO SPLITER



UPS

MONITOR

DOME COLOUR CAMERA

PEMASANGAN PERALATAN UTAMA •

DVR RECORDER 16 CHANEL



KEY BOARD



POWER SUPLY 12 V



VIDEO SPLITER



UPS 4 KVA



CABINET RACK UNTUK CCTV



MONITOR

TESTING •

TEST LOOP KABEL



TEST FUNGSI

PT. WASKITA KARYA

(Persero)

INDUSTRI KONSTRUKSI

PEKERJAAN CCTV Penjelasan Singkat CCTV (closed circuit television) adalah suatu sistem pemantauan jarak jauh yang mana sistem ini diperlukan sebagai sarana pemantauan area gedung tersbut. Adapun fungsi dan kegunaan selain sebagai untuk melihat situasi gedung CCTV juga bisa digunakan sebagai alat penjagaan gedung karena sistem ini dilengkapi dengan proses penyimpanan data (record) tentang yang terjadi pada hari hari sebelumnya. Jangka waktu (proses penyimpanan data) tergantung pada memori yang terdapat pada alat tersebut. Lingkup Pekerjaan :

1.

Pengadaan dan pemasangan system CCTV yang terdiri dari Digital Video Recorder (DVR), Camera / lensa , monitor dan accessories.

2.

Pengadaan dan pemasangan kabel instalasi dari DVR ke Camera lengkap dengan supportnya.

3.

Pengadaan dan pemasangan Rak / meja peralatan utama di ruang operator.

4.

Pengadaan dan pemasangan instalasi kabel power / stop kontak untuk system CCTV.