Five Core Flow Rules (2) ISSUE 1.0

Wireless Curriculum Development Section

Contents

Chapter I RNP workflows

Chapter II Data modification flow

Radio network planning workflows

Pro Master Plan

Pre-planning process Network planning

Cutover /Launch

Acceptance Network optimization

Overall process RNE-RPO000 Document Name: RPO Master Plan Document No: RNE-RPO000 Reference: \RPO000

RNP & RNO

100 PrePlanning

RPO Master Plan

Prepared by: RNP, Huawei Approved by: RNP, Huawei

201 RF Survey

300 Cut-Over/ Launch

Effective Date: Version:

401 DT Optimization

202 Planning Concept

402 KPI Optimization

203 Practical Planning

403 Network Monitoring

Documents

404 Technical Support

RPO Master Plan Report

RPO Documents Checklist

Dec. 2003 Version 2.0

500 Network Acceptance

Pre-Planning RNE-RPO100 Document Name: Pre-Planning Process Document No: RNE-RPO100 Reference: \RPO000\RPO100

Pre-Planning Process

Prepared by: RNP, Huawei Approved by: RNP, Huawei

Effective Date: Version:

Dec. 2003 Version 2.0

002

DP Need Site Survey?

005

Current Network Analysis/Site Survey

DP

003

001 Requirement Analysis

Customer Provide Site List ?

Site List from Customer

006 DP

DP Plan based on map?

Simulation

Need Simulation?

004 `

RF Engineer

DP

Model Tuning

Need Model Tuning?

Plan Based on Map Network Dimensioning

DP Need Current Network Evaluation?

007

009

Network Evaluation

Pre-planning Report

008 DP

Document s

Test Electromag. Background ?

Electromag. Background Test

Electromagnetic Background Test Report

Network Evaluation Report

Pre-Planning Proposal

RF Survey RNE-RPO201

Documents

RF Engineer

Team Leader

Customer

Document Name: RF Survey Document No: RNE-RPO201 Reference: \RPO000\RPO200\RPO201

RF Survey

Prepared by: RNP, Huawei Approved by: RNP, Huawei

Effective Date: Version:

001

003

005

RF Survey Discussion

RF Survey

RF Survey Report Approval

001

005

RF Survey Discussion

RF Survey Report Approval

002 RF Survey Preparation

RF Survey Preparation Checklist

003 RF Survey

On-Site RF Survey Report (XXX Site)

004 RF Survey Report

RF Survey Report (XXX Site) RF Survey Summary

Dec. 2003 Version 2.0

006 Engineering Parameter

Site Database

Network Planning Concept 具体

RNE-RPO202

Document Name: Network Planning Concept Document No: RNE-RPO202 Reference: \RPO000\RPO200\RPO202

Network Planning Concept

Prepared by: RNP, Huawei Approved by: RNP, Huawei

Effective Date: Version:

001

Team Leader/Customer

Cell Name Cell ID 002 Freq./PN Planning 003

005

006

RNO Acceptance Criteria and Method

Practical Planning

Coverage / Capacity Highlights 004

Documents

Parameter Planning Consideration

Network Planning Concept RNP Default Parameter Setting Dual-band Parameter Setting

RNO Acceptance Criteria

Dec. 2003 Version 2.0

Practical Planning RNE-RPO203 Prepared by: RNP, Huawei Approved by: RNP, Huawei

Effective Date: Version:

Ducument s

Dec. 2003 Version 2.0

004 Proposal Approval 002 001

Freq./PN Planning

005

Planning Concept

003

RNP Data Config. Table

Data Config. Center

006

007

BSC Data

On-site Check

Neighbor Planning

BSS Engineer

RNO Engineer

Customer

Document Name: Practical Planning Document No: RNE-RPO203 Reference: \RPO000\RPO200\RPO203

Practical Planning

007 On-site Check

Network Planning Concept

Network Planning Proposal RNP Proposal Approval Report

RNP Data Configuration Table

RNP Default Parameter Setting Dual-band Parameter Setting

Cutover/Launch Process RNE-RPO300 Document Name: Cut-Over/Launch Process Document No: RNE-RPO300 Reference: \RPO000\RPO300

Documen ts

Project Team

001 Site Installation

Cut-Over/Launch Process

Prepared by: RNP, Huawei Approved by: RNP, Huawei

OK?

002 Site Commsioning

DP Installation?

DP

006 Cutover/ Launch

Y

N

DP Hardware?

003 Installation Adjustment

BTS Commissioning Test Checklist (for RNO)

Effective Date: Version:

004 Hardware Adjustment

Dec. 2003 Version 2.0

007 Monitoring

DP Feeder/ Antenna?

005 Antenna Adjustment

Cut-Over Process (for RNO)

Daily Performance Monitoring

Network Optimization Process RNE-RPO400 Document Name: Network Optimization Process Document No: RNE-RPO400 Reference: \RPO000\RPO400

Prepared by: RNP, Huawei Approved by: RNP, Huawei

002 DT Optimization 001 Cutover/ Launch

DP 90% BTS Launch? (around)

Network Optimization Process Effective Date: Version:

Meet Acceptance Criteria in X weeks? Y DP N

003 KPI Optimization

Y

N

DP Yes Keep on RF Optimization?

004 Network Monitoring

005 Technical Support

Dec. 2003 Version 2.0

006 Network Acceptance

DT Optimization RNE-RPO401 Prepared by: RNP, Huawei Approved by: RNP, Huawei

Team Leader

Document Name: DT Optimization Document No: RNE-RPO401 Reference: \RPO000\RPO400\RPO401

DT Optimization Effective Date: Version:

004 Result Confirmation

DP

RF Engineer

Y

001 DT Preparation

002 Drive Test

003 DT Data Analysis

Feeder/ Antenna? DP

N

OK?

DP Network Parameter?

005 Antenna Adjustment 006 Parameter Adjustment 007

DP Configuration Network Adjustment Configuration?

Docume nts

Dec. 2003 Version 2.0

DT Preparation Checklist

DT Data Analysis Table DT Optimization Bi-weekly Report

Site Database

DP Complete?

KPI Optimization RNE-RPO402

Effective Date: Version:

005 Discussion/ Approval 005 Discussion/ Approval

Documents

RF Engineer

Customer

Prepared by: RNP, Huawei Approved by: RNP, Huawei

Team Leader

Document Name: KPI Optimization Document No: RNE-RPO402 Reference: \RPO000\RPO400\RPO402

KPI Optimization

001 Traffic Statistic Data

002 Network Monitoring

Daily Performance Monitoring

003 Problem Analysis

004 Terms of Solution

Problem Feedback Form

005 Discussion/ Approval

Dec. 2003 Version 2.0

006 Solution Implement

RPO Project Report Change Request N/W Optimization Bi-weekly Report Parameter Adjustment Record Problem Investigation Report

Network monitoring RNE-RPO403 Prepared by: RNP, Huawei Approved by: RNP, Huawei

RF or Maintenance Engineer

Documents

Effective Date: Version:

001 Customer Complaint

Approval

004 Problem Solving

002 Traffic Statistic Data

Dec. 2003 Version 2.0

006

RF or TS Engineer

Customer

Document Name: Network Monitoring Document No: RNE-RPO403 Reference: \RPO000\RPO400\RPO403

Network Monitoring

003 Daily Monitoring

004 Problem Solving

DP

005 Report

Need Supported?

Daily Performance Monitoring

Problem Feedback Form Change Request Parameter Adjustment Record

Problem Investigation Report

Technical Support RNE-RPO404

Technical Support of HQ

Document Name: Technical Support Document No: RNE-RPO404 Reference: \RPO000\RPO400\RPO404

Prepared by: RNP, Huawei Approved by: RNP, Huawei

Effective Date: Version:

003 Technical Support of HQ

Regional Technical Support RF/ Maintenance Engineer

Documents

Technical Support

002 Regional Technical Support

005 Result Confirming

N OK?

Dec. 2003 Version 2.0

005

DP

Result Confirming Y

001

004

005

Problem Identification & Description

Solution Implement

Result Confirming

CRMS (800/Problem Feedback Form)

Change Request Parameter Adjustment Record

Problem Investigation Report

Network Acceptance Process RNE-RPO500

003 Acceptance Discussion 003 Acceptance Discussion

Documents

RF Engineer

Customer

Prepared by: RNP, Huawei Approved by: RNP, Huawei

Team Leader

Document Name: Network Acceptance Process Document No: RNE-RPO500 Reference: \RPO000\RPO500

Network Acceptance Process Effective Date: Version:

Dec. 2003 Version 2.0

005 Approval 004 Acceptance Report

001 Traffic Statistic Data

006 Complete Optimization

006 Complete Optimization

002 DT Data

Network Optimization Report Proposal for Expansion

Data backup RPO Document Checklist

Contents

Chapter I RNP workflows

Chapter II Data modification flow

Data modification flow Purpose Modify the network planning data based on a unified system Ensure network security and reduce the man-made incidents. Improve network optimization efficiency. Ensure the feasibility and rationality of data modification. Standardize data modification.

Data modification flow

Check data

Backup data

Modify data

Suggestions

Submit Network Operation Application Form to Customer

Prepare Data Modification Plan

Call tests

Check traffic statistics

Archive modification information

Drive tests

GSM RNO parameters level definition Equipment Effect Level 

Level 0: No effect on equipment running, that is, the equipment running is not affected during the parameter setting.



Level 1: Minor effect on equipment running, and temporarily block the object to be adjusted. For example, block the channel and carrier during the parameter adjustment but it is not required to re-load the equipment program.



Level 2: Larger effect on equipment running, and reset the object to be adjusted during the adjustment. The equipment requires resetting base station or board and re-loading the program and data of base station or board during the parameter adjustment.



Level 3: Major effect on equipment running, and BSC service will be interrupted during the adjustment and the adjustment is performed in the morning after the approval. The parameter adjustment requires resetting BSC and re-loading the data and program of BSC.

GSM RNO parameters level definition Network Effect Level 

Level 0: No effect on network service. The usage and status of all the users are not affected during the parameter modification, that is, the user cannot feel network change.



Level 1: Minor effect on network service. This does not affect the operation of user being called or connecting with a network but affects the user behaviors in idle state.



Level 2: Larger effect on network service, and the network service will be interrupted for a short time. The parameter modification will result in the disconnection of user but the call is resumed after a short time.



Level 3: Major effect on network service and network service will be interrupted. The parameter modification will enable network to interrupt the service and the network service is resumed after a short time.