Five Core Flow Rules (Part2) ISSUE1.0
Short Description
Five Core Flow Rules (Part2) ISSUE1.0...
Description
Five Core Flow Rules (2) ISSUE 1.0
Wireless Curriculum Development Section
Contents
Chapter I RNP workflows
Chapter II Data modification flow
Radio network planning workflows
Pro Master Plan
Pre-planning process Network planning
Cutover /Launch
Acceptance Network optimization
Overall process RNE-RPO000 Document Name: RPO Master Plan Document No: RNE-RPO000 Reference: \RPO000
RNP & RNO
100 PrePlanning
RPO Master Plan
Prepared by: RNP, Huawei Approved by: RNP, Huawei
201 RF Survey
300 Cut-Over/ Launch
Effective Date: Version:
401 DT Optimization
202 Planning Concept
402 KPI Optimization
203 Practical Planning
403 Network Monitoring
Documents
404 Technical Support
RPO Master Plan Report
RPO Documents Checklist
Dec. 2003 Version 2.0
500 Network Acceptance
Pre-Planning RNE-RPO100 Document Name: Pre-Planning Process Document No: RNE-RPO100 Reference: \RPO000\RPO100
Pre-Planning Process
Prepared by: RNP, Huawei Approved by: RNP, Huawei
Effective Date: Version:
Dec. 2003 Version 2.0
002
DP Need Site Survey?
005
Current Network Analysis/Site Survey
DP
003
001 Requirement Analysis
Customer Provide Site List ?
Site List from Customer
006 DP
DP Plan based on map?
Simulation
Need Simulation?
004 `
RF Engineer
DP
Model Tuning
Need Model Tuning?
Plan Based on Map Network Dimensioning
DP Need Current Network Evaluation?
007
009
Network Evaluation
Pre-planning Report
008 DP
Document s
Test Electromag. Background ?
Electromag. Background Test
Electromagnetic Background Test Report
Network Evaluation Report
Pre-Planning Proposal
RF Survey RNE-RPO201
Documents
RF Engineer
Team Leader
Customer
Document Name: RF Survey Document No: RNE-RPO201 Reference: \RPO000\RPO200\RPO201
RF Survey
Prepared by: RNP, Huawei Approved by: RNP, Huawei
Effective Date: Version:
001
003
005
RF Survey Discussion
RF Survey
RF Survey Report Approval
001
005
RF Survey Discussion
RF Survey Report Approval
002 RF Survey Preparation
RF Survey Preparation Checklist
003 RF Survey
On-Site RF Survey Report (XXX Site)
004 RF Survey Report
RF Survey Report (XXX Site) RF Survey Summary
Dec. 2003 Version 2.0
006 Engineering Parameter
Site Database
Network Planning Concept 具体
RNE-RPO202
Document Name: Network Planning Concept Document No: RNE-RPO202 Reference: \RPO000\RPO200\RPO202
Network Planning Concept
Prepared by: RNP, Huawei Approved by: RNP, Huawei
Effective Date: Version:
001
Team Leader/Customer
Cell Name Cell ID 002 Freq./PN Planning 003
005
006
RNO Acceptance Criteria and Method
Practical Planning
Coverage / Capacity Highlights 004
Documents
Parameter Planning Consideration
Network Planning Concept RNP Default Parameter Setting Dual-band Parameter Setting
RNO Acceptance Criteria
Dec. 2003 Version 2.0
Practical Planning RNE-RPO203 Prepared by: RNP, Huawei Approved by: RNP, Huawei
Effective Date: Version:
Ducument s
Dec. 2003 Version 2.0
004 Proposal Approval 002 001
Freq./PN Planning
005
Planning Concept
003
RNP Data Config. Table
Data Config. Center
006
007
BSC Data
On-site Check
Neighbor Planning
BSS Engineer
RNO Engineer
Customer
Document Name: Practical Planning Document No: RNE-RPO203 Reference: \RPO000\RPO200\RPO203
Practical Planning
007 On-site Check
Network Planning Concept
Network Planning Proposal RNP Proposal Approval Report
RNP Data Configuration Table
RNP Default Parameter Setting Dual-band Parameter Setting
Cutover/Launch Process RNE-RPO300 Document Name: Cut-Over/Launch Process Document No: RNE-RPO300 Reference: \RPO000\RPO300
Documen ts
Project Team
001 Site Installation
Cut-Over/Launch Process
Prepared by: RNP, Huawei Approved by: RNP, Huawei
OK?
002 Site Commsioning
DP Installation?
DP
006 Cutover/ Launch
Y
N
DP Hardware?
003 Installation Adjustment
BTS Commissioning Test Checklist (for RNO)
Effective Date: Version:
004 Hardware Adjustment
Dec. 2003 Version 2.0
007 Monitoring
DP Feeder/ Antenna?
005 Antenna Adjustment
Cut-Over Process (for RNO)
Daily Performance Monitoring
Network Optimization Process RNE-RPO400 Document Name: Network Optimization Process Document No: RNE-RPO400 Reference: \RPO000\RPO400
Prepared by: RNP, Huawei Approved by: RNP, Huawei
002 DT Optimization 001 Cutover/ Launch
DP 90% BTS Launch? (around)
Network Optimization Process Effective Date: Version:
Meet Acceptance Criteria in X weeks? Y DP N
003 KPI Optimization
Y
N
DP Yes Keep on RF Optimization?
004 Network Monitoring
005 Technical Support
Dec. 2003 Version 2.0
006 Network Acceptance
DT Optimization RNE-RPO401 Prepared by: RNP, Huawei Approved by: RNP, Huawei
Team Leader
Document Name: DT Optimization Document No: RNE-RPO401 Reference: \RPO000\RPO400\RPO401
DT Optimization Effective Date: Version:
004 Result Confirmation
DP
RF Engineer
Y
001 DT Preparation
002 Drive Test
003 DT Data Analysis
Feeder/ Antenna? DP
N
OK?
DP Network Parameter?
005 Antenna Adjustment 006 Parameter Adjustment 007
DP Configuration Network Adjustment Configuration?
Docume nts
Dec. 2003 Version 2.0
DT Preparation Checklist
DT Data Analysis Table DT Optimization Bi-weekly Report
Site Database
DP Complete?
KPI Optimization RNE-RPO402
Effective Date: Version:
005 Discussion/ Approval 005 Discussion/ Approval
Documents
RF Engineer
Customer
Prepared by: RNP, Huawei Approved by: RNP, Huawei
Team Leader
Document Name: KPI Optimization Document No: RNE-RPO402 Reference: \RPO000\RPO400\RPO402
KPI Optimization
001 Traffic Statistic Data
002 Network Monitoring
Daily Performance Monitoring
003 Problem Analysis
004 Terms of Solution
Problem Feedback Form
005 Discussion/ Approval
Dec. 2003 Version 2.0
006 Solution Implement
RPO Project Report Change Request N/W Optimization Bi-weekly Report Parameter Adjustment Record Problem Investigation Report
Network monitoring RNE-RPO403 Prepared by: RNP, Huawei Approved by: RNP, Huawei
RF or Maintenance Engineer
Documents
Effective Date: Version:
001 Customer Complaint
Approval
004 Problem Solving
002 Traffic Statistic Data
Dec. 2003 Version 2.0
006
RF or TS Engineer
Customer
Document Name: Network Monitoring Document No: RNE-RPO403 Reference: \RPO000\RPO400\RPO403
Network Monitoring
003 Daily Monitoring
004 Problem Solving
DP
005 Report
Need Supported?
Daily Performance Monitoring
Problem Feedback Form Change Request Parameter Adjustment Record
Problem Investigation Report
Technical Support RNE-RPO404
Technical Support of HQ
Document Name: Technical Support Document No: RNE-RPO404 Reference: \RPO000\RPO400\RPO404
Prepared by: RNP, Huawei Approved by: RNP, Huawei
Effective Date: Version:
003 Technical Support of HQ
Regional Technical Support RF/ Maintenance Engineer
Documents
Technical Support
002 Regional Technical Support
005 Result Confirming
N OK?
Dec. 2003 Version 2.0
005
DP
Result Confirming Y
001
004
005
Problem Identification & Description
Solution Implement
Result Confirming
CRMS (800/Problem Feedback Form)
Change Request Parameter Adjustment Record
Problem Investigation Report
Network Acceptance Process RNE-RPO500
003 Acceptance Discussion 003 Acceptance Discussion
Documents
RF Engineer
Customer
Prepared by: RNP, Huawei Approved by: RNP, Huawei
Team Leader
Document Name: Network Acceptance Process Document No: RNE-RPO500 Reference: \RPO000\RPO500
Network Acceptance Process Effective Date: Version:
Dec. 2003 Version 2.0
005 Approval 004 Acceptance Report
001 Traffic Statistic Data
006 Complete Optimization
006 Complete Optimization
002 DT Data
Network Optimization Report Proposal for Expansion
Data backup RPO Document Checklist
Contents
Chapter I RNP workflows
Chapter II Data modification flow
Data modification flow Purpose Modify the network planning data based on a unified system Ensure network security and reduce the man-made incidents. Improve network optimization efficiency. Ensure the feasibility and rationality of data modification. Standardize data modification.
Data modification flow
Check data
Backup data
Modify data
Suggestions
Submit Network Operation Application Form to Customer
Prepare Data Modification Plan
Call tests
Check traffic statistics
Archive modification information
Drive tests
GSM RNO parameters level definition Equipment Effect Level
Level 0: No effect on equipment running, that is, the equipment running is not affected during the parameter setting.
Level 1: Minor effect on equipment running, and temporarily block the object to be adjusted. For example, block the channel and carrier during the parameter adjustment but it is not required to re-load the equipment program.
Level 2: Larger effect on equipment running, and reset the object to be adjusted during the adjustment. The equipment requires resetting base station or board and re-loading the program and data of base station or board during the parameter adjustment.
Level 3: Major effect on equipment running, and BSC service will be interrupted during the adjustment and the adjustment is performed in the morning after the approval. The parameter adjustment requires resetting BSC and re-loading the data and program of BSC.
GSM RNO parameters level definition Network Effect Level
Level 0: No effect on network service. The usage and status of all the users are not affected during the parameter modification, that is, the user cannot feel network change.
Level 1: Minor effect on network service. This does not affect the operation of user being called or connecting with a network but affects the user behaviors in idle state.
Level 2: Larger effect on network service, and the network service will be interrupted for a short time. The parameter modification will result in the disconnection of user but the call is resumed after a short time.
Level 3: Major effect on network service and network service will be interrupted. The parameter modification will enable network to interrupt the service and the network service is resumed after a short time.