Final RFP CCC Under City CCTV Surveillance Project Vol II 04032016

July 8, 2016 | Author: Nishant Verma | Category: N/A
Share Embed Donate


Short Description

tennder copy from Rajasthan...

Description

2015 Final RFP for Establishment and Commissioning of Command & Control Centre (Video Surveillance Room, Dial 100 Control Room, Forensic Investigation Room, ITMS Room and Data Center & FMS/NOC Room) under Surveillance and Incident Response Project at seven cities of the State of Rajasthan

Volume II

Contact Information Anil Singh General Manager (Technical), RISL [email protected]

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

Table of Contents ITEM NO 1 : BLADE CHASSIS

5

ITEM NO 2 : BLADE SERVER

6

ITEM NO 3 : KVM SWITCH

7

ITEM NO 4 : RACK WITH COOLING SOLUTION & FIRE DETECTION/SUPPRESSION

7

ITEM NO 5 : WALL MOUNT NETWORK RACK

11

ITEM NO 6 : PRIMARY STORAGE (400 TB USABLE NL-SAS DISKS AND 5 TB USABLE SAS DISKS)

12

ITEM NO 7 : SECONDARY STORAGE

13

ITEM NO 8 : SAN SWITCH

17

ITEM NO 9 : LED (PROFESSIONAL DISPLAY TO BE USED FOR VIDEO WALL)

18

ITEM NO 10 : DISPLAY CONTROLLER FOR VIDEO WALL (2X2)

19

ITEM NO 11 : WORKSTATIONS

20

ITEM NO 12 : DESKTOP

21

ITEM NO 13 : WORKSTATION(4 TB STORAGE)FOR FORENSIC INVESTIGATION ROOM

22

ITEM NO 14 : LASER NETWORK DUPLEX PRINTER

23

ITEM NO 15 : LASER NETWORK MULTIFUNCTION DUPLEX PRINTER

23

ITEM NO 16 : RADIO GATEWAY SYSTEM

24

ITEM NO 17 : RUGGED VEHICLE MOUNTED MOBILE DATA TERMINAL / TABLETS

25

ITEM NO 18 : CAMERA FOR INTERNAL SURVEILLANCE

26

ITEM NO 19 : NETWORK VIDEO RECORDER FOR INTERNAL SURVEILLANCE

27

ITEM NO 20 : TABLE

28

ITEM NO 21 : CHAIR

35

ITEM NO 22 : WATER LEAKAGE DETECTION SYSTEM

35

ITEM NO 23 : RODENT REPELLENT SYSTEM

37

ITEM NO 24 : ACCESS CONTROL SYSTEM

38

ITEM NO 25 : FIRE ALARM SYSTEM

40

ITEM NO 26 : FIREWALL CUM IPS

43

ITEM NO 27 : ACCESS SWITCH

46

ITEM NO 28 : CORE SWITCH-DATA CENTER

47

ITEM NO 29 : CORE ROUTER-DATA CENTER

48 Page 2 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

ITEM NO 30 : DG SET

50

ITEM NO 31 : UPS FOR DATACENTER

57

ITEM NO 32 : UPS FOR COMMAND AND CONTROL CENTER

60

ITEM NO 33 : POWER PANEL (MAIN PANEL, APFC PANEL,AMF PANEL, SUB PANEL )

63

ITEM NO 34 : COMFORT AIR CONDITIONING FOR CCC AND ATAL SEVA KENDRA-DATA CENTER

69

ITEM NO 35 : CAT 6A CABLE

69

ITEM NO 36 : CAT 6A INFORMATION OUTLET

70

ITEM NO 37 : CAT 6A MODULAR PATCH CORDS

71

ITEM NO 38 : CAT 6A – 24 PORT PATCH PANEL

71

ITEM NO 39 : OPTICAL FIBER –SINGLE MODE (FOR CONNECTIVITY BETWEEN CCC,DATA CENTER,DIAL 100 CONTROL ROOM,ITMS ROOM AND FORENSIC INVESTIGATION ROOM)

73

ITEM NO 40 : ANTIVIRUS SOLUTION

76

ITEM NO 41 : VIDEO MANAGEMENT SOFTWARE (ONVIF PROFILE S COMPLIANT)

78

ITEM NO 42 : CENTRAL COMMAND AND CONTROL CENTER SOFTWARE

84

ITEM NO 43 : VIDEO ANALYTICS-I

92

ITEM NO 44 : VIDEO ANALYTICS-II

93

ITEM NO 45 : VIDEO ANALYTICS-III

94

ITEM NO 46 : REAL TIME AND OFFLINE FACE RECOGNITION SYSTEM

95

ITEM NO 47 : AUTOMATIC NUMBER PLATE RECOGNITION SOFTWARE

98

ITEM NO 48 : SPEED, STOP LINE AND RED LIGHT VIOLATION DETECTION SOFTWARE

101

ITEM NO 49 : CENTRALIZED VIOLATION MANAGEMENT SYSTEM

103

ITEM NO 50 : DIGITAL EVIDENCE MANAGEMENT FOR FORENSIC INVESTIGATION

105

ITEM NO 51 : FORENSIC INVESTIGATION SOFTWARE/VIDEO AND IMAGE FORGERY DETECTION SOFTWARE

109

ITEM NO 52 : EMS SOFTWARE

110

ITEM NO 53 : HELP DESK SOFTWARE

113

ITEM NO 54 : DIAL 100-COMPUTER AIDED DISPATCH SOFTWARE

115

ITEM NO 55 : EPABX SYSTEM AND CONFIGURATION

129

ITEM NO 56 : IP TELEPHONE

130

ITEM NO 57 : RADIO GATEWAY SOFTWARE SPECIFICATIONS

131

ITEM NO 58 : ACCESS FLOOR

132 Page 3 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

ITEM NO 59 : ACCESS CEILING

133

Page 4 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

TECHNICAL SPECIFICATIONS Note: All the specifications below are minimum specifications and higher specifications shall be used wherever necessary/ required. Deviation on higher side shall only be considered and no extra weightage shall be awarded for such deviations. Item No 1 : BLADE CHASSIS S.N o 1. 2. 3.

Item

Description of Requirement

Make Model Form Factor

4. IO Modules 5. Ethernet Module (10GBps)

IO

6. Fibre Channel IO Module 7. Mid plane 8.

Power Modules

9.

Chassis Management Module

10. System Panel 11. 12. 13.

Max 10U Rack mounted Chassis to house at least 12 Dual Socket Compute Nodes. Min Four high-speed switch bays capable of supporting I/O architectures in Ethernet, Fiber Channel and FCoE. IO modules/ Switches should be scalable. The chassis should have 2 Nos. of 10 Gbps redundant network switches/ interconnect modules with sufficient number of 10 Gbps Downlinks ports per switch with respect to the number of blade servers populated in the chassis and at least 8 x 10 GB SR SFP+ uplink ports per switch for connecting to the data center switch. It should also include all the required cables and SFP connectors for all the ports. The chassis should have 2 Nos. of Fiber Channel SAN switches/ modules with at least 6 * 16 Gbps auto-negotiating FC uplinks and also at least 16 Gbps auto-negotiating downlinks to all server bays. It should also include all the required cables and SFP connectors for all the ports. Dual network connectivity for each blade server for redundancy should be provided. Backplane/Midplane should be completely passive device. If it is active, dual Backplane/Mid plane should be provided for redundancy Redundant power modules that provide N+N or N+1 redundancy (Fully populated power supplies to be included from day one) Integrated two redundant chassis Management Modules providing IP based management of the compute nodes and vital elements like FC and Ethernet Switches. Should also provide for controlling Power, Fan management, Chassis and compute node initialization, Switch management, Resource discovery and inventory management, Resource alerts and monitoring management, Chassis and compute node power management and diagnostics for elements including Chassis, I/O options and compute nodes. LED/LCD on the front information panel that can be used to obtain the status of the chassis Identify, Check log and faults on the LED/LCD display Should provide a single console to monitor enclosure

Management Features

Should support simultaneous remote access for different servers in the enclosure Should include OEM management/controlling software license for a fully populated enclosure Page 5 of 133

Compliance (Yes/No)

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

14.

15. 16. 17.

Accessories Warranty

Should provide remote management capabilities, performance management capabilities, smart power management capabilities. The Blade servers will be used for Virtualization purpose therefore, these should be virtualization enabled from day 1. All required cables, connectors and related accessories to be supplied 5 Years Comprehensive onsite OEM Warranty

Item No 2 : BLADE Server S. No 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

Item Make Model Processor Chipset Memory (RAM) HDD RAID Network Interfaces SAN Connectivity Graphics Operating System

13.

14. 15.

16. 17. 18.

Description of Requirement

Management Features Keyboard and Mouse Anti-virus feature

Quality Warranty Certifications

Min. 2 x Intel® Xeon® E5-2640 V3 (2.6GHz/ 1866MHz FSB, 20 MB Cache) or higher Intel C600 Series or higher Min. 64 GB DDR4 ECC 1866Mhz RDIMM with Memory Mirroring/ Online Sparing expandable to 512 GB RAM Min. 2 x 300GB hot plug SFF 12 Gbps 10K RPM SAS drives or higher Integrated Hardware RAID Controller with RAID 0, 1 Min. 2 x 10Gbps (WoL and TCP/IP Offloading) Min. 1 x USB 2.0/3.0 Port Min. 2 x 16 Gbps Fiber Channel HBA ports Integrated Genuine MS-Windows Server 2012 R2 standard Edition/RHEL 7 with 5 Years OEM Support, Subscription/ Software Assurance. (Bidder to provide updates, upgrades and patches with 5 years OEM Support) Two Virtual machine per server shall be created from day 1. In case of any virtualized host failure virtual machine should automatically restart on the redundant virtualized host Virtual KVM based remote control Advanced antivirus, antispyware, desktop firewall, intrusion prevention (comprising of a single, deployable agent) which can be managed by a central server. (Support, updates, patches and errata for the entire contract/ project period) The Server OEM preferably should be in the latest Gartner Leader Quadrant 5 Years Comprehensive onsite OEM Warranty Should be certified on the supplied OS

Page 6 of 133

Compliance (Yes/No)

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

Item No 3 : KVM Switch

S. No. 1. 2. 3. 4. 5.

6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16.

Particulars

Compliance (Yes/No)

Make: Model : Form Factor- It should be rack-mountable Supported servers–Min.48 Minimum Ports: Min. 24 x10/100/1000Mbps-RJ45serverports 1x15PinSVGA/XGA 1xPS/2or USB2.0Mouse 1xPS/2or USB2.0Keyboard It should support min.1LAN (Local), min.3 WAN(Remote) access It should support min.4number of simultaneous users The KVM switch should be SNMP enabled. It should be operable from remote locations. It should have min. 18.5inchTFTmonitoranda movable front panel It should support multiple operating system It should have dual power with failover and built-insurge protection It should support multi-user access and collaboration It should have support for blade server and rack mounted server of different brands/OEM It should include required software (server/client),cables, and other accessories It should support password protection for restricted access 5 Years Comprehensive onsite OEM Warranty

Item No 4 : RACK with Cooling Solution & Fire Detection/Suppression S. No. 1. 2. 3. 4.

Particulars

5.

As a direct condenser, the integrated air/refrigerant heat exchanger should guarantee a cooling output of min. 10 kW with standard server enclosure dimensions, the lowest possible weight, and comprehensive possibilities for monitoring. (Considering ambient temperature - 48 degree) The Closed Loop Cooling Units, should be mounted on the sides of the racks. The warm server air is drawn in directly from the rear of the rack and the cooled air is blown back in front of the 19" equipment level from the side, over the whole height of the enclosure. The Cooling Units is closed up to the server rack at the front and rear and there forms a flush joint with the rack The Cooling Units should be equipped with EC fans, for maximum efficiency and minimum power consumption. The flow characteristics of the heat exchanger are optimised for the lowest possible pressure losses on the air side. This should minimise the energy consumption of the fans

6.

7.

Compliance (Yes/No)

Make: Model: CLOSE LOOP COOLING TECHNICAL SPECIFICATIONS : Closed Loop Cooling Solution with variable capacity Technology (DX Type with R410a) –to support total IT Load of 40kW (N+1 for each row). IT-optimised design, providing ideal support for “front-to-back” air routing for the 19" installations

Page 7 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

8. 9. 10.

11.

12. 13.

14.

15.

16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29.

30. 31.

The Cooling Units should be equipped with corresponding controller & should serve to regulate the speed of the installed condenser The cooling capacity should regulate from 25%-100% based on the IT Load & Ambient temperature This should permit step less adaptation of the output, also in partial-load operation, and by reducing energy consumption also should achieve a reduction in operating costs Alongside the compressor, the cooling circuit of the Cooling Units should comprise a collecting tank, liquid separator/receiver, electronic/ thermostatic expansion valve, optimised heat exchanger, high and low-pressure sensors, Schrader valves, filter dryer, non-return valve, high-pressure switch and shut-off devices The refrigerant connections and the electrical power connection to the unit should be realised from above or below The Cooling Units and the Server Rack should remain separate from each other. This simplifies assembly and service work and excludes the need for unwanted access to the server rack for maintenance purposes Maintenance and service for all relevant components should be realised quickly. The fans should be exchanged quickly and at any time, even while the system is operational (hot swapping).The fans should be installed in the cold air section, which increases their service life Condensate management should be integrated into the unit. Any condensate is collected in a collecting tray in the base and from there discharged to the outside via a hose Monitoring and alarm management for all physical parameters should be realised via SNMP over Ethernet A display with operating keys should be integrated on the front of the unit to display and set the physical parameters In case of InRow Solution bidder shall have to be provisioned with Cold Aisle containment which shall able to provide the better efficiency Technical specifications of Indoor Cooling Units: Useful cooling output: Minimum 10 kW at 47 °C ambient temperature at place of installation of the condenser Minimum 10 kW at 47 °C ambient temperature at place of installation of the condenser Intake temperature, set: 22 °C Power supply: 400 V, 3~, N, PE, 50/ 60 Hz (voltage range 380-460 V) Refrigerant: R410a Connection length, max.: 30 m Installed fans: As per manufacturer design Air throughput: max. 5000 m³/h The External Condenser unit for Closed Loop Cooling Solution The air-cooled condenser unit needed to operate the cooling packages should have axial fans with speed controlled according to the pressure in the cooling circuit. The housing should be manufactured from galvanised sheet steel and subsequently powder-coated. The condenser should have possibility to be mounted either horizontally or vertically using the enclosed accessories. A main switch with cover is enclosed with the unit. Technical specifications of External Condenser  Air throughput: Approx.5000 m³/h  Power supply: 230 V, 1~, 50/60 Hz  Max. connected load: 400 W  Refrigerant: R410a Page 8 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

32. 33.

34. 35.

36. 37. 38.

39.

40.

41.

42.

 Sound pressure level (10 m distance): 43 dB(A) 1.1 Copper piping Refrigerant copper piping with closed cell elastomeric nitrile rubber tubular insulation between each set of indoor & outdoor units as per specifications, all piping inside the room shall be properly supported with MS hanger. Transmission wiring between indoor to outdoor unit in a suitable PVC conduit - 1.5 sq.mm 4 core. PVC Drain Piping - 25mm dia. Rigid PVC piping complete with fittings, supports as per specifications duly insulated with 6mm thick nitrile rubber tubular sleeves 1.2 Refrigerant Gas Supply of R – 410A, refrigerant gas, and charging it, after cleaning the line and pretesting for leakage. Testing the line after charging the gas as per standards and directions Preferred make: Schneider/ Emerson/ Rittal 1.3 Fire Detection and Suppression system For Server Room Rack-mountable Fire Detection and Suppression system Fire detection and suppression master system must be compact enough to occupy minimum space. Rack Mountable device should have built-in high sensitivity smoke detection with active air-sampling. Also the NOVEC 1230 suppression system cylinders must be supplied in sufficient quantity. The Fire detection and suppression system should be equipped with fire panel, and along with accessories. The system should include a manual abort option. This device should be monitored using potential free contacts. It should have possibility to expand up to 10 nos. of IT Rack using master & slave configuration or as per OEM design Rack-mountable Fire Suppression System Fire detection and suppression Slave unit must be compact enough to occupy minimum space in IT rack. Rack Mountable Slave device should have the NOVEC 1230 suppression system cylinders and supplied in sufficient quantity. The Fire suppression Slave unit should be communicating with master units for activation and suppression system or as per OEM design Fire detection and suppression - Installation related services Bidder shall provide installation related services for fire detection system & Novec1230 gas based automated suppression system. The design, equipment, installation, testing and maintenance of the Clean Agent Suppression System shall be in accordance with the applicable requirements set forth in the latest edition of the NFPA Standards. 1.4 Fault Signals Provisioning of monitoring fault signals alarm Remote Monitoring system with Graphical user interface with e-mail alerts. The following devices to be monitored: Temperature/Humidity, Water Leakage, Fire Detection & Extinguishing, Air-condition Units, Door access sensor. It should also monitor & control Automatic Door Opening. It should provide a single TCP IP interface for remote monitoring of all components and generate email alerts and warnings. The central monitoring device should also be connected to Signal Pillar with Audio & Visual alarm extension. It should be able to operate with Protocols: TCP/IPv4, TCP/IPv6, SNMPv1, SNMPv2c, SNMPv3, Telnet, SSH, FTP, SFTP, HTTP, HTTPS, NTP, DHCP, DNS, SMTP, XML, Syslog, LDAP. The system should have feature to generate SMS alerts as well. 1.5 IP Based CCTV Camera Small-sized Indoor Network Camera - Fixed lens and adjustable focus. Multiple, individually configurable H.264 and Motion JPEG streams; max SVGA 800 x 600 resolution at 30 fps. Video motion detection. Connects over wired Ethernet. MicroSD/SDHC memory card slot for edge storage. Includes stand and clamp for easy mounting and power supply with Basic Software to monitor both the Camera. (Excludes MicroSD/SDHC Memory card) Page 9 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

43.

44.

45. 46. 47. 48. 49. 50. 51.

52. 53. 54. 55. 56. 57. 58. 59. 60. 61. 62. 63.

1.6 Complete Installation, testing & commissioning of complete Integrated Data Centre. Installation and Training: (i) Installation of Data Centre and the relevant components has to be carried out by qualified technicians. (ii) 02 day on site training to the user at site RACK SPECIFICATION These Racks will be used to mount and house all servers/network/storage devices in the data centre. The rack has to be designed to meet the safety requirements of the modern data centre. Both the front and rear door should be designed to give active high performance closed loop cooling system with handle & key lock system, Cable entry should be entered via the roof plate and via the gland plate without affecting the climatic conditions inside the rack. Rack Height – 42 U Server/Storage Rack Maximum Width – 600 mm Maximum Depth – Bidder to propose Network Rack Maximum Width – 800 mm Maximum Depth – Bidder to propose Each Rack should include 19” Rack frame with sturdy frame construction made of nine/sixteen fold or more rolled hollow frame section punched in 25mm DIN pitch pattern and load bearing capacity of 1000Kg or more 2 pairs of 42U 19" L Type angles at Front & Rear on 6nos of punched sections with "U" Marking Front Glass Door with door stiffeners, Rear Sheet Steel Door with door stiffeners, with Comfort Handle with Unique key lock Set of Side Panels Top cover plain, Bottom cover with cut out of 400Wx150D with wire brush insert at back side for cable entry Vertical PDU, 32A, Single Phase, with Digital Ammeter, 12 o’s of C13 and 4 No’s of C19, 32A MCB & IEC309 Socket as Input. (2nos Per Rack) Base Plinth 100mm height Earthing kit, Cu Earth rail 15x3x500 with 10 Points with screws and insulators & Earth Straps, 4Sqm, 170mm In length Hardware pack of 20 (2 packs / Rack) Metal Shunting rings/ Vertical Cable Manager for network rack Blanking Panel 1 U, ABS Material (20 no’s /Rack) The Rack & the cooling Solution shall be of the same make 5 Years Comprehensive onsite OEM Warranty

Page 10 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

Item No 5 : Wall Mount Network Rack S. No. 1. 2. 3. 4. 5. 6.

Item Make Model HEIGHT

TYPE WIRE MANAGERS POWER DISTRIBUTION 7. DOOR 8. FAN TRAYS 9. DEPTH 10. METAL 11. Warranty

Description of Requirement

Min.6U (To house two patch panel and two access switch) WALL MOUNT ONE HORIZONTAL POWER DISTRIBUTION (Adequate number of sockets as per requirement) GLASS DOOR IN FRONT WITH LOCK WITH FANS 600 MM ALUMINIUM EXTRUDED PROFILE/CRCA Sheet Steel 5 Years Comprehensive onsite OEM Warranty

Page 11 of 133

Compliance (Yes/No)

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

Item No 6 : Primary Storage (400 TB Usable NL-SAS disks and 5 TB usable SAS disks) S. No

Item

Description of Requirement

Solution Type

Bidder is expected to provide Unified Storage solution meeting benchmark performance parameters specified in SLA. Solution proposed should yield low cost per TB, while meeting the performance parameters

Storage Size

400 TB usable Storage shall be offered (Disks should be preferably of 4 TB or higher capacity dual ported min. 7.2 K RPM 6 Gbps NLSAS Drives.) under RAID 6. 5 TB usable Storage shall be offered (Disks should be of 600 GB 10K SAS 6 Gbps Drives.) under RAID 5 or equivalent/better. Should support latest technology SSD, SAS, NL-SAS/SATA Drives and automated tiering/movement of data between all the types of drives

Hardware Platform

  

Rack mounted form-factor Modular design to support disk drives expansion Min. 16 Backend SAS lanes for disk connectivity



2 numbers of Controllers in active/active mode – Unified Storage with 64 GB onboard DRAM Cache across SAN controllers The SI shall be responsible for smooth flow of video at CCC for live video, playback and video analytics. In case the complete solution requires higher cache the SI has to provide cache accordingly. The controllers I Storage nodes should be upgradable seamlessly, without any disruptions I downtime to production workflow for performance, capacity enhancement and software I firmware upgrades.

1.

2.

3.

4.

 Controllers 

5.

Ports

Min. 4 * 16 Gbps FC ports, min. 4 * 10G Ethernet and 2 replication ports

6.

Operating System and Virtualization Support

Windows, Linux and Virtualization Platform like VMware, RHEL, Xenserver and HyperV

7.

Protocol Support

FC, ISCSI, NFS, CIFS, SMB

8.

Management Protocol Support

SNMP, LDAP/AD, Network Time Protocol

9.

RAID support

Should support various hardware industry standard RAID levels ( 1,5,6,10 )or equivalent

10.

Redundancy and High Availability

The Storage System should be able to protect the data against single point of failure with respect to hard disks, connectivity interfaces, fans and power supplies.

11.

Management software



All the necessary software to configure and manage the storage space, RAID configuration, logical drives allocation, snapshots etc. Page 12 of 133

Compliance (Yes/No)

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II



GUI/Single Command Console for entire storage system



Should also include storage performance monitoring and management software. Should provide the functionality of proactive monitoring of Disk drive and Storage system for all possible disk failures Should be able to take “snapshots".

  12.

Licenses Software

13.

Data Protection

The storage array must have cache protection mechanism either by de-staging data to disk or providing cache data protection with battery backup for up to 48 hours.

14.

Retrieval Time

Retrieval time for any data stored should be maximum 4 hours for critical data and 8 hours for other data. This would be taken care in to account for SLA calculation. Critical data means – any data needing urgent attention by the judicial system or by the Police Department for investigation / Terrorist Threat perception.

15.

Other

All required cable and connectors to be supplied

16.

Quality

The Storage OEM preferably should be in the latest Gartner Leader Quadrant or should be in top 5 OEM as per IDC

17.

Warranty

5 Years Comprehensive onsite OEM Warranty

and

Auto-tiering, Thin Provisioning, Remote Replication, Quality of Service Software for IOPS, Response Time and bandwidth.

Item No 7 : Secondary storage There are two options provide to bidder for providing secondary storage. Bidder has to propose any one option in the technical bid and quote the financial bid only for any one option. Option 1: Usable 2.5 PB Storage OR Option 2: LTO 7 Tape library and Shared file system table library software. The details are as follows: A. Option 1 a. Usable 2.5 PB Storage S. No.

Compliance (Yes/No)

Description of Requirement

1.

Make:

2.

Model:

3.

2.5 PB of usable storage capacity for archiving the Video files for at least 30 days.

4.

Should be able to efficiently store PBs of data, billions of small files and/or large media files and Video Surveillance data.

5.

Storage system must have protection mechanism with no single point of failure including power supply and controller. Page 13 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

S. No.

Compliance (Yes/No)

Description of Requirement

6.

Solution must be flexible to address a wide range of applications and unstructured data (such as video files, image files, e-mails and documents).

7.

Storage system must support high density disk enclosure of 4 TB to 8TB HDD capacity

8.

Bidder to provide all the necessary software to configure and manage the storage space, RAID configuration, logical drives allocation etc.

9.

GUI/Single Command Console for entire storage system

10.

Should also include storage performance monitoring and management software.

11.

Should provide the functionality of proactive monitoring of Disk drive and Storage system for all possible disk failures

12.

Min. 4 * 16 Gbps FC ports, min. 4 * 10G Ethernet

13.

Bidder has to ensure complete backup of audio and video recording, configuration of all virtual machines and application software from all storage appliances and servers installed in datacentre.

14.

The Storage OEM preferably should be in the latest Gartner Leader Quadrant or should be in top 5 OEM as per IDC

15.

One rack is provisioned for secondary storage. However if any additional rack is required, bidder has to provide the same having specification mentioned in RFP at Item No 4 and include the cost in secondary storage only.

16.

5 Years Comprehensive onsite OEM Warranty

B. Option 2 If the bidder choose option 2 than bidder has to add the cost of LTO-7 Tape Library and Shared file system tape library software. Bidder has to provide certificate from original developer of quoted VMS that they have tested their VMS Software for compatibility with the offered shared file system for successful implementation and as per functional requirement of the Project. 1. LTO-7 Tape Library S. No 1. 2. 3. 4. 5.

Item

Description of Requirement

Make Model No. of Drives

6

Native data Capacity

Min. 6.0 TB

Max. Speed

Min. 300MB/s native Up to 750 – 758 MB/s compressed

Uncompressed

Page 14 of 133

Compliance (Yes/No)

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

S. No 6. 7. 8.

9.

10. 11. 12. 13. 14. 15.

16.

Item

Description of Requirement

Compression capable

2.5 : 1 (Compressed capacity – uptoMin. 15TB)

No. of Active Media Slots

80

No. of Physical Media Slots

400 Media cartridges should be moved from active slots to physical slots on user action/console with in the library using internal robotics.

Data Cartridge

LTO-7 (rewritable) LTO-7 Cleaning cartridge: LTO Universal Cleaning Cartridge

Backward Compatibility

Read/write LTO-6 media. Reads LTO-5 media.

Interface

8Gb/s Dual Port Fibre Channel (auto-negotiates to 4Gb/s);

Media cartridges

400 LTO-7 media cartridges

Redundant Power Supply

Yes

Reporting feature

Yes

Additional Rack

One rack is provisioned for secondary storage. However if any additional rack is required, bidder has to provide the same having specification mentioned in RFP at Item No 4 and include the cost in secondary storage only.

Warranty

5 Years Comprehensive onsite OEM Warranty

Compliance (Yes/No)

2. Shared File System Tape Library S. Item No. 1. Make:

Compliance (Yes/No)

2.

Model:

3.

The Shared SAN File System software shall support large file systems and in-Built data archiving to tape mechanism ,scaling to Petabytes(PB)

4.

The Shared SAN File System shall provide low latency, high throughput concurrent data access to all the clients on SAN connected and LAN connected systems. For LAN Clients, File system can use any server on SAN as a Gateway to to get the access of the Data for LAN Clients. The Shared SAN File System shall support automatic placement of the files created by the user / applications into appropriate multi-vendor storage arrays/ pools/based on the defined affinity policies.

5.

Page 15 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

S. Item No. 6. The Shared SAN File System shall support heterogeneous clients on SAN network with shared data access of the same data set. Heterogeneous clients include Microsoft Windows, Red Hat Enterprise Linux & SUSE Linux. 7.

The Shared SAN File System shall provide NFS/NAS services to LAN clients supporting load balancing, failover and teaming of network cards.

8.

The Shared SAN File System shall permit consolidation of Storage Arrays with different capacities, performance capabilities and make and model into a common storage pool.

9.

Offered solution shall be installable on to the Servers for the metadata Controller configuration. For the best performance of the Metadata Server configuration shall support to run on an industry standard servers with a Good configuration. Offered filesystem shall have the inbuilt Data Archiving functionality as a single software and single GUI to move the data on to Tape Library in native file format and leave the Stubs on to primary Storage. Offered file system shall also have the inbuilt functionality of retrieving the data from Tape active slots in native file format to Primary storage through the VMS application by accessing the stubs on the Primary Storage Shared SAN File System should be capable of recovery in case of system crash or unplanned shutdown.

10.

11. 12. 13.

14. 15. 16. 17. 18. 19. 20.

Addition, deletion or failure of any clients shall not have any effect on file system functionality. Under the implementation of highly available architecture - (System configuration with adequate redundancies and architectural feature), the Shared file system shall assure continuity of support under all modes of single point failures. This shall include (but not limited to) failure of metadata server and/or any of its subsystems/ components, failure of any of switch / failure of any of interfaces interconnecting the servers and clients with the storage and network resources. The Shared SAN File System shall support multi-vendor switches. The Shared SAN File System shall support enabling of Storage allocation quotas at user and group and Project levels. The Shared SAN File System should present a single global namespace view of all the files and directories in the file system to all the heterogeneous clients. The Shared SAN File System should present the location of the file with the same file path and filename to all its clients. The Shared SAN File System should allow multiple clients to access the same file for concurrent read. Metadata server should support file sharing locks to assure integrity while supporting concurrent access The file system should support POSIX locks in addition to native locking mechanism.

21.

The Shared SAN File System shall allow online expansion and retirement of storage capacity and disk array swap-outs without taking the file system off line. This includes adding addition disks to existing storage arrays, adding incremental or new storage arrays, and/or the removal of older arrays in replacement of new storage subsystems

22. 23.

Shall have automated de-fragmentation capabilities Shall have administration capabilities through GUI and CLI Page 16 of 133

Compliance (Yes/No)

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

S. No. 24. 25. 26. 27. 28.

29.

30.

Compliance (Yes/No)

Item Shall provide capabilities for user administration File system shall provide features for file system audits File system shall provide extensive alert capabilities. The Shared SAN File System shall support replication for Disaster Recovery Bidder has to estimate licensing requirement for server, workstations and storage equipment’s. It is the bidder responsibility to make the solution operational as per RFP requirement. Bidder has to maintain a copy of audio and video recording, configuration of all virtual machines and application software from all storage appliances and servers installed in datacentre. Warranty/Technical Support: 5 Years Comprehensive onsite OEM Warranty with necessary updates, upgrades and patches

Item No 8 : SAN Switch S. No. 1. 2. 3. 4. 5. 6.

7. 8.

9.

10. 11.

Compliance (Yes/No)

Description of Requirement Make: Model: The SAN Switch solution should be highly available with no single point of failure Switch should support non disruptive Micro code/Firmware upgrade Bidder should provision for a highly available fiber channel switch architecture with no single point of failure Switch shall support minimum 48 ports X16 Gbps (with port activation licenses). However bidder has to ensure sufficient number of ports of 16 Gbps looking to the overall solution requirement of the project The switch shall support Port zoning and LUN zoning, GUI management software The SAN switch should have capability to interface with HBA of different makes and model from multiple OEM, supporting multiple Operating Systems, including, but not limited to HP-UX,IBM AIX, Linux, MS-Window, Sun Solaris etc. The SAN switch should support all leading SAN disk array and tape libraries including, but not limited to, EMC, Hitachi, HP, IBM, Sun, NetApp etc. Product shall be provided with all the required licenses, software required accessories, cable etc. as applicable to meet all the above mentioned specification and hence the proposed solution. HBA Cables shall be provided by the Bidder to meet the solution requirement Warranty :5 Years Comprehensive onsite OEM Warranty

Page 17 of 133

Final RFP for CCC under Surveillance and Incident Response Project-Vol.II

Item No 9 : LED (Professional Display to be used for Video Wall) #

Features

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15.

Make Model Screen Size Panel Type Aspect Ratio Resolution Brightness Display Color Response Time Viewing Angle Bezel Width Bezel Color Inputs Ports External Control Remote Control

16.

17. 18.

19. 20.

21. 22.

Description of Requirement

55 inch Direct LED 16:9 1920x1080 (FHD) 500 Cd/m2 Minimum 8 bit -16 million 95% for loads greater than 100% of system load >94% for loads greater than 50% of system load

14.

Acoustical noise

dB (A) of noise 0.98

20.

Input current distortion

21.

OUTPUT

22.

Output Voltage

3×415/240V.

23.

Regulation

Earthing principle: [TN-S] [TT] or [IT] Output voltage regulation for steady state and transient variations (at default parameter settings) ± 1% steady state for a static 100% balanced load. ± 1% steady state for a static 100% unbalanced load.

24.

Output Frequency

a. Synchronized to mains over the range of 50 Hz+ 5% or 60 Hz+ 5% in normal operation b. 50 Hz ± 0.1 Hz in battery operation.

25.

Output voltage a.
View more...