Final Hydrology Chambal River_14.10.2015

January 24, 2018 | Author: amitkukna | Category: Discharge (Hydrology), Drainage Basin, River, Flood, Hydrology
Share Embed Donate


Short Description

Hydrology as per irc...

Description

HDROLOGY CALCULATION REPORTS AUGUST - 2015

24.08.2015

A

Issued for Approval

DATE

REV.NO

DESCRIPTION REVISIONS

EPC CONTRACTOR:

CLIENT:

AUTHORITY'S ENGINEER :

PROOOF CHECK CONSULTANTS :

DESIGN CONSULTANTS :

JOB NO :

TOTAL NO.OF PAGES :

TITLE : HDROLOGY CALCULATION REPORTS FOR CHAMBALOF RIVER

CODE IRC RELEASED FOR

TENDER

INFORMATION



APPROVAL

REV A

CONSTRUCTION

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

INTRODUCTION New 2 L Lane M Major Bridge proposedd at chainage 11+596 42.2m, AN j B id has h been b h i 11 596 with i h span arrangement off 16 x 42 2 PSC Girder type of superstructure resting on RCC Wall type Pier & Abutment with open foundation. The total width of the structure has been kept 14.8 m.

View of Chambal River

River bank towards Kota

Proposed Location of Bridge

River bank towards NH-76

The bridge is proposed on Chambal River with Span arrangement in accordance with the hydrological investigation based on HFL marks collected by local enquiry at the proposed location, soil strata at site & also on the Design Discharge of Kota Barrage. The Hydrological calculation for proposed bridge has been done for 50 years of return period.

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

The following methods are used for the hydrogical calculation of the proposed bridge :1 2 3 4

Dicken's Method; Rational Method; Manning's Formula; SUG Method.

The Detailed Engineering Survey has been conducted at proposed bridge location in both upstream and downstream directions upto 500 m of distances respectively which is helpful to give exact river profile.The Lsection and Cross sections of river are generated at many locations including at bridge site, upstream and d downstream di directions i with i h the h help h l off survey data. d Catchment area for this bridge is marked on GT Sheet No. 45O/16, 45P/9, 45P/13 & 54C/4 at Latitude 250 16' 03" & Longitude 750 54' 26" Detailed Hydrological calculations by these methods have been done on subsequent pages.

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

Hydrological Calculation for Bridge on Kota Bypass

1

Name / No. of Structure

:

-

Name of Nallah / Stream / River

:

Chambal

River Sub - Zone

:

Chambal Basin - 1 (b)

G.T Sheet No.

:

45 O/16, 45 P/9, 45 P/13 & 54 C/4

Scale

:

1 : 50,000

Location

:

CH 11+596

Latitude

:

25 0 16 ' 03 "

Longitude

:

75 0 54 ' 26 "

Discharge by Dicken's Formula :

( Refer IRC - SP : 13 - 2004, Clause : 4.2 )

Discharge as per Dicken's Formula, Q = C M 3/4 C = 14 - 19 where annual rainfall is more than 120 cm = 11 - 14 where annual rainfall is 60-120 cm = 22 in Western Ghats Value of " C " adopted in the present case

=

19

Catchment Area,

M

=

129.400 Sq. Km **

Discharge,

Q

=

728.961 Cumecs

** Catchment Area has been considered from location of Kota Barrage to the proposed location of bridge.

2

Discharge by Rational Formula :

( Refer IRC - SP : 13 - 2004, Clause : 4.7 )

Catchment Area,

A

=

129.400 Sq. Km

=

12940.00 Hectares

Length of path from Toposheet,

L

=

41.550 Km

Difference in Levels from Toposheet,

H

=

290 m

( Ref: Index Map / G.T.Sheet )

Maximum Rainfall, F

( Ref : SUG of Bridge )

=

109.46 mm

=

1 Hrs

Io = ( F / T ) x ( T + 1 ) / ( 1 + 1 )

=

109.46 mm / Hr

tc = ( 0.87 x L3 / H ) 0.385

=

Ic = Io x ( 2 / ( 1 + tc )

=

24.57 mm / Hr

Coefficient of Runoff, P

=

0.700

Fraction of maximum point intensity at centre of storm, depends on area, f

=

Catchment Area in Hectares, A

=

Critical Intensity of Rainfall, Ic

=

2.457 cm / Hr

Maximum Discharge, Q

=

560.883 Cumecs

Duration of Storm, T One Hour Rainfall,

Time of Concentration 7.91 Hrs

Critical Rainfall Intensity,

Discharge, Q = 0.028 x P x f x A x Ic

0.90 12940.00 Hectares

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

7

Vertical Clearance :

( Refer IRC : 5 - 1998, Clause : 106.2.1 )

Design Discharge,

Q

Vertical Clearance ( adopted ),

Minimum Soffit Level of Deck Slab

=

22909.404 Cumecs 1.50 m

HFL + Afflux + Vertical Clearance

=

8

= =

247.190 m

Linear Waterway : Since Lacey Equation is not applicable here. Therefore, HFL Spread including afflux at Proposed Bridge Location

=

2/3rd of HFL Spread

=

430.00 m

Span proposed (effective)

=

16 x 40.0 m

=

645.00 m

640.00 m which is justifiable.

9

Scour Depth :

( Refer IRC : 78 - 2000, Clause : 703 )

% Increase in Design Discharge

30 %

So, Increased Design Discharge

29782.225 Cumecs 2

Mean Depth of Scour,

dsm = 1.34 x ( Db / Ksf )

1/3

Db = Design discharge per metre width

49.637 Cumecs / m

Ksf = Silt factor

3.56

dsm =

11.853 m

Maximum Scour Depth, For Piers Piers,

2.0 x dsm

=

23 706 m 23.706

For Abutments,

1.27 x dsm

=

15.053 m

For Piers,

=

221.913 m

For Abutments,

=

230.566 m

10 Maximum Scour Level : Maximum Scour Level

=

HFL - Maximum Scour Depth

These scour depth will not be applicable if the non-scourable strata exists above this level.

Recommendation: As per analysis of data calculated, proposed waterway of bridge on Chambal River shall be adequate in consideration with the maximum Design Discharge of Kota Barrage. Also, this waterway has been kept in consideration with the maximum HFL observed at site. It is therefore recommended to provide the above mentioned waterway at proposed bridge location.

11 Level at Important Locations :

Location

S.No

RL as per Hydrological Calculation ( m )

1

HFL near at Proposed Bridge with Afflux

245.690

2

Lowest Bed Level at Proposed Bridge Location

231.470

3

Maximum Scour Level for Pier

221.913

4

Maximum Scour Level for Abutment

230.566

5

Minimum Soffit Level of Bridge Deck

247.190

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

3 Discharge by Flood Estimation Report - SUG : Name of Highway

:

Kota Bypass

Name of River / Nallah / Stream

:

Chambal

RD / Location

:

CH 11+596

Longitude

:

75 0 54 ' 26 "

Latitude

:

25 0 16 ' 03 "

GT Sheet No

:

45 O/16, 45 P/9, 45 P/13 & 54 C/4

Sub - Zone

:

Chambal Basin - 1 (b)

Base Flow

=

0.207 x (A)

-0.290

0.05 Cumes/Sq. Km

=

6.5379814 Cumecs

Estimation of Slope :

S.No.

Reduced Distance Reduced Levels of River starting from point of / Stream / Nallah Bed study

Length of each segment, Li

Height above datum, Di ( difference between datum and ith R.L. )

( Di-1 + Di )

Li x ( Di-1 + Di ) (4) x (6)

( m x Km )

( Km )

(m)

( Km )

(m)

(m)

(1)

(2)

(3)

(4)

(5)

(6)

(7)

1

0.000

220

0.000

0.0

0.0

0.000

2

6.604

240

6.604

20

20.0

132.08

3

12.901

260

6.297

40

60.0

377.82

4

17.327

280

4.426

60

100.0

442.6

5

20.258

300

2.931

80

140.0

410.34

6

23.275

320

3.017

100

180.0

543.06

7

25.541

340

2.266

120

220.0

498.52

8

27.992

360

2.451

140

260.0

637.26

9

30.509

380

2.517

160

300.0

755.1

10

33.283

400

2.774

180

340.0

943.16

11

34.627

420

1.344

200

380.0

510.72

12

36.366

440

1.739

220

420.0

730.38

13

38.003

460

1.637

240

460.0

753.02

14

41.55

510

3.547

290

530.0 Σ Li x ( Di-1 + Di ) =

S

2

=

Σ Li x ( Di-1 + Di ) / L

=

4.990 m / Km

Synthetic Unit Graph Parameters : Catchment Area,

A

=

d

=

ti = tr ( the unit duration of the UG )

=

Σ Qi ti = A x d / ( 0.36 x tr )

=

129.40 Sq. Km 1 cm ( Depth ) 1 Hr. 359.44 Cumec / Sec

L

=

41.55 Km

Lc

=

24.395 Km

L/(S)

1/2

=

18.60

1879.91 8613.970

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596 tp = 0.339 x ( L / S1/2 )0.826

=

3.79 Hrs

=

4 Hrs ( say )

-0.610

=

Qp = Catchment Area x qp

=

W50 = 2.215 x qp

-1.034

=

4.21 Hrs

W75 = 1.191 x qp

-1.057

=

2.30 Hrs

WR50 = 0.834 x qp

-1.077

=

1.63 Hrs

WR75 = 0.502 x qp

-1.065

=

Q50 = 0.5 x Qp

=

34.75 Cumecs

Q75 = 0.75 x Qp

=

52.12 Cumecs

0.613

=

15.58 Hrs

qp = 1.251 x tp

TB = 6.662 x tp

0.54 69.49 Cumecs

0.97 Hrs

16.0 Hrs ( say ) Tm = tp + tr / 2 =

=

4.5 Hrs

Unit Graph ( 1 cm 1 hour ) Time

Ordinate

1

0

0.00

2

1

12.00

3

2

27.00

4

3

52.00

5

4

69.49

6

5

56.00

7

6

44.00

8

7

32.00

9

8

22.00

10

9

15.00

11

10

10.00

12

11

7.50

13

12

5.50

14

13

3.50

15

14

2.00

16

15

1.00

17

16

0.00

DESIGN UNIT HYDROGRAPH 80

70

60

CUMECS DISCHARGE IN C

S.No.

tp + 1/2

50

40

30

20

10

0 0

2

4

6

8

10

12

14

TIME IN HOURS

358.99

9.99

Strom Duration, Td

=

1.1 x tp

=

4.17

4.00 Hrs ( say )

58.7

140.88 mm

Based on Storm Duration, Td Hrs

77.7

109.46 mm

Based on C.A. & Storm Duration

50 -Year Return Period , 24 Hour Point Rainfall =

240 mm

Conversion Factor, Arial Rainfall = 58.7 % of Point Rainfall Arial Reduction Factor ( for Td = 4.00 Hrs & C.A. = 129.4 Sq. Km )

77.7%

50 Years Return Period Based on Longitude & Latitude of site

16

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

Hourly Rainfall Increments :

Time Duration (Hours)

Design Loss Rate = 0.17 cm / Hr

Distribution Coefficient (%)

Storm Rainfall (mm)

1.7 mm / Hr

Hourly Storm Incremental (mm)

Hourly Incremental 50 Years and Td ( 4.00 Hrs ) areal Rainfall Excess (mm) rainfall has been split into 1 Hr

0.00

0.00

0.00

0

0

1.00

70.00

76.62

76.62

74.92

2.00

88.00

96.33

19.70

18.00

3.00

97.00

106.18

9.85

8.15

4.00

100.00

109.46

3.28

1.58

rainfall increments using time distribution coefficients.

Estimation of Design Flood Hydrograph :

Unit Graph ( 1 cm 1 hour )

R.E. ( Peak to Peak )

R.E. ( Reverse order )

S. No.

Time

Ordinate

1

0

0.00

0.00

2

1

12.00

1.896

0.00

3

2

27.00

4.27

21.60

4

3

52.00

8.15

1.58

8.22

48.60

89.90

0.00

5

4

69.49

74.92

18

10.98

93.60

202.28

9.78

0.00

6

5

56.00

18

74.92

8.85

125.08

389.58

22.01

0.00

0.00

7

6

44.00

1.58

8.15

6.95

100.80

520.62

42.38

0.00

0.00

0.00

8

7

32.00

5.06

79.20

419.55

56.63

0.00

0.00

0.00

9

8

22.00

3.48

57.60

329.65

45.64

0.00

0.00

0.00

10

9

15.00

2.37

39.60

239.74

35.86

0.00

0.00

11

10

10.00

1.58

27.00

164.82

26.08

0.00

0.00

12

11

7.50

1.19

18.00

112.38

17.93

0.00

13

12

5.50

0.87

13.50

74.92

12.23

14

13

3.50

0.55

9.90

56.19

8.15

15

14

2.00

0.32

6.30

41.21

16

15

1.00

0.16

3.60

26.22

17

16

0.00

0.00

1.80

18

17

0.00

0.00

19

18

0.00

20

19

0.00

21

20

22

0.158

1.800

7.492

0.815

0.000

0.000

0.000

Total Discharge ( Cumecs )

0.000 0.00

0.00

6.54

1.90

8.43

25.87

32.40

146.72

153.26

316.64

323.18

545.52

552.06

670.75

677.29

0.00

560.44

566.98

0.00

436.36

442.90

0.00

0.00

317.57

324.11

0.00

0.00

219.48

226.02

0.00

0.00

0.00

149.50

156.03

0.00

0.00

0.00

0.00

101.51

108.05

0.00

0.00

0.00

0.00

74.79

81.33

6.11

0.00

0.00

0.00

0.00

53.93

60.47

4.48

0.00

0.00

0.00

0.00

34.46

41.00

14.98

2.85

0.00

0.00

0.00

0.00

19.64

26.17

0.00

7.49

1.63

0.00

0.00

0.00

0.00

9.12

15.66

0.00

0.00

0.00

0.82

0.00

0.00

0.00

0.00

0.82

7.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

21

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

23

22

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

24

23

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

25

24

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

26

25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

27

26

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

28

27

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.54

Qp =

677.00 Cumecs

C.A. =

129.40 Sq. Km

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

DESIGN FLOOD HYDROGRAPH OF BRIDGE - 50 YEARS RETURN PERIOD 700

600

DISCHARGE IN CUMECS

500

400

300

200

100

0 0

3

6

9

12

TIME IN HOURS

15

18

21

24

27

Hydrological Calculation for Bridge at Chandloi River at Proposed CH 11+596

4 Discharge by Manning's Formula :

( Refer IRC - SP : 13 - 2004, Clause : 5.4 )

HFL at Bridge site without Afflux ( HFL' ) for Existing Span

=

245.619 m

The Hydrological Calculations has been done at three sections i.e. at Upstream side, Downstream side and Proposed Bridge location. ( Distance from Proposed Bridge = 250 m )

( i ) At U/S location : Cross - Sectional Area of Flow,

A

=

9180.62 Sq. m

Width of Flow,

W

=

1005.00 m

Wetted Perimeter ( perpendicular to direction of flow ) ,

P

=

1008.55 m

R=A/P

=

S

=

Hydraulic Mean Radius, Longitudinal Slope ( as calculated ),

Velocity by Manning's Formula,

V = ( 1/n ) R

2/3

S

9.10 m 0.0014 m per m

1/2

Co-efficient of Rugosity,

n

=

0.075

Velocity,

V

=

2.175 m/s

Q=AxV

=

19967.616 Cumecs

Cross - Sectional Area of Flow,

A

=

7817.63 Sq. m

Width of Flow,

W

=

645.00 m

Wetted Perimeter ( perpendicular to direction of flow ) ,

P

=

651.77 m

R=A/P

=

S

=

Discharge, ( ii ) At Proposed Bridge location :

Hydraulic Mean Radius, Longitudinal Slope ( as calculated ),

Velocity by Manning's Formula,

V = ( 1/n ) R

2/3

11.99 m 0.0014 m per m

S1/2

Co-efficient of Rugosity,

n

=

0.075

y Velocity,

V

=

2.614 m/s

Q=AxV

=

20436.050 Cumecs

Cross - Sectional Area of Flow,

A

=

6672.36 Sq. m

Width of Flow,

W

=

635.00 m

Wetted Perimeter ( perpendicular to direction of flow ) ,

P

=

638.09 m

R=A/P

=

S

=

Discharge, ( Distance from Proposed Bridge = 200 m )

( iii ) At D/S location :

Hydraulic Mean Radius, Longitudinal Slope ( as calculated ),

Velocity by Manning's Formula,

V = ( 1/n ) R

2/3

10.46 m 0.0029 m per m

S1/2

Co-efficient of Rugosity,

n

=

0.075

Velocity,

V

=

3.433 m/s

Q=AxV

=

22909.404 Cumecs

Discharge, Discharge at U/S location

=

19967.62 Cumecs

Discharge at Proposed Bridge location

=

20436.05 Cumecs

=

22909.40 Cumecs

Discharge at D/S location Run, Afflux for Pr

By comparision of U/S, D/S and Proposed Bridge location, the Design Discharge may be taken as , Design Discharge,

Q

=

22909.404 Cumecs

Hydrological Calculation for Bridge at Chandloi River at Proposed CH 11+596

5 Design Discharge :

( Refer IRC - SP : 13 - 2004, Clause : 6.2 )

Design Discharge of Kota Barrage

=

21237.000 Cumecs

Discharge by Dicken's Formula (including Design Discharge of Kota Barrage)

=

21965.961 Cumecs

Discharge by Rational Formula (including Design Discharge of Kota Barrage)

=

21797.883 Cumecs

Discharge by Flood Estimation Report - SUG ( 50 Years Return Period ) (including Design Discharge of Kota Barrage)

=

21914.000 Cumecs

Discharge by Manning's Formula

=

22909.404 Cumecs

Maximum Discharge

=

22909.404 Cumecs

Next Maximum Discharge

=

21965.961 Cumecs

=

22909.404 Cumecs

The difference is within 50% of the next maximum discharge. Hence, Design Discharge

6 Afflux Calculations : (i) Afflux Calculation for Proposed Span Cross - Sectional Area of Flow,

A

=

Width of Flow,

W

=

645.00 m

=

16 x 42.2 m

=

15 x 42.2 m

Proposed Span Arrangement at Bridge location Effective Span for passing the water at site Total Water Way provided,

L

=

Design Discharge,

Q

=

Dd = A / W

Depth of Flow at D/S of Bridge, ( a / A ) or ( L / W )

=

7817.63 Sq. m

600.00 m 22909.40 Cumecs 12.120 m

=

( Refer IRC - SP : 13 - 2004, Clause : 15.3 )

0.952

Co-efficient " e "

=

0.13

Co-efficient " CO "

=

0.96

=

9.81 m/s2

g If the Afflux, h < Dd /4, the Orifice Formula is applicable. By Orifice Formula, the Discharge is given as, Q = C0 (2g) 0.5 L Dd { h+(1+e)u2 /2g } 0.5 2

0.5

0.5

or,

{ h+( 1+e )u /2g}

or,

2 0.5 L Dd } ] 2 { h+( 1+e )u /2g } = [ Q / { C0 (2g)

= Q / { C0 (2g)

L Dd }

Substituting values, we have h+

0.058

u

2

0.549

=

(i)

Also at U/S of the Bridge, Q = W ( Dd + h ) u

h = Q / Wu -Dd

or,

Substituting values, we have h

= (

35.518

/ u

)

-

(ii)

12.120

Combining ( I ) & ( ii ) , u

-

0.00455

u

3

=

2.804

(iii)

u ( by trial & error )

=

2.917

LHS Equation

=

2.804

Substituting " u " in equation ( i ), we get h The Afflux as per Orifice Formula ,

h h < Dd / 4, OK

=

0.058 m

=

0.058 m

Hydrological Calculation for Bridge at Chandloi River at Proposed CH 11+596

By Weir Formula, the Discharge is given as Q = 1.706 Cw L H 3/2 H = {Q / (1.706 Cw L)} 2/3 ( Refer IRC - SP : 13 - 2004, Clause : 15.2 ) Cw for Narrow Bridge Opening

=

H

=

0.98 8.050 m

2 Also, Du = H - u / 2g

Assume, Du = H

=

8.050 m

u = Q / W Du

=

4.412 m/s

Now, Du = H - u2 / 2g

=

7.057 m

Dd ( as above )

=

12.120 m

=

-5.063 m

Afflux, h = Du - Dd

Since h < Dd / 4, Orifice formula will be applicable The Afflux as per Weir Formula,

h

=

-5.063 m

The Afflux adopted,

h

=

0.058 m

0.071 m

( ii ) Afflux Calculation as per Molesworth Formula

2 Afflux, h =

V

2

+ 0.01524

X

17.88

A

-

1

a

where, h

=

Afflux

=

V

=

Velocity in Un-obstructed Stream

=

2.92 m/s

A

=

Un-obstructed Sectional Area of the River

=

7817.63 Sq. m

a

=

Sectional Area of the River at Obstruction

=

7308.60 Sq. m

So, Afflux adopted =

0.071 m

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

Case 1 :

HFL including afflux for proposed span arrangement at bridge site

251 247

HFL

243 239 235 Bed level

231 0

200

400

600

800

1000

1200

1400

1600

1800

1200

1400

1600

1800

Scale 1 : 2 Case 2 :

HFL excluding afflux at bridge site

251 247

HFL

243 239 235 Bed level

231 0

200

400

600

800

1000

Scale 1 : 2

Case 3 :

HFL excluding afflux at up stream of river

251 247 HFL 243 239 235 Bed level

231 0

200

400

600

800

Scale 1 : 2

1000

1200

1400

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596

Case 4 :

HFL excluding afflux at down stream of river

250 246 HFL 242 238 234 Bed level

230 0

200

400

600

800

Scale 1 : 2

1000

1200

1400

Hydrological Calculation for Bridge at Chambal River at Proposed CH 11+596 L-Section at U/S :

Slope = 0.0014

233.0

y = -0.001x + 232.5 232.5

232.0

231.5

231.0 200

240

280

320

360

400

Slope = 0.0029

L-Section at Proposed Bridge Site :

233.0

y = -0.002x + 233.1 232.0

231.0

230.0

229.0 300

350

L-Section at D/S :

400

450

500

550

600

650

700

Slope = 0.0054

233.0

y = -0.0054x + 234.62 232.0

231.0

230.0

229.0 600

650

700

750

800

850

900

950

PRDC

GAS

&

CE

PETROL

PRDC

PIPE

TF

LINE

CE

TW

CE

CE CE CE CE

CE CE

CE CE

TW PRDC

TF

TW

TW PRDC CE CE

CE CE

PRDC TW

TW TF

PRDC

TF

TW

PRDC

PRDC

PRDC

PRDC

HPCL

PRDC

GAS

PETROL

PRDC

&

PRDC

PIPE

PRDC

LINE

CE CE

PRDC

PRDC

PRDC TF

CE

CE

TW CE

CE CE

PRDC

CE

TF TF

CE

CE

PRDC CE

CE

PRDC CE

CE

PRDC CE

FIELD CE

CE CE

PRDC CE

CE CE

TW PRDC TW PRDC

TW PRDC

PRDC PRDC

PRDC

PRDC TW

TW TF

TF

PRDC TF

TF

TF

PRDC

PRDC TW

TW

TW PRDC

TF

TF

HPCL

GAS

PRDC

LINE & PETROL

PIPE GAS

& PETROL HPCL

PRDC

PIPE

LINE

PRDC TF

PRDC

PRDC PRDC

PRDC

PRDC

PRDC PRDC

PRDC

PRDC

PRDC

TF

TW PRDC

TF

TW PRDC PRDC

TW

TW

TF

PRDC PRDC TW

PRDC

TW

PRDC PRDC

PRDC

PRDC

PRDC

TW PRDC

TW PRDC

PRDC

PRDC

TW

TF

PRDC

TW PRDC

MACHIYAN

HPCL

DEVLI

TW

PRDC

TO

PRDC

TF TF

TF

HPCL

GAS

& PETROL

WIREM

TW

HEAD

PIPE

LINE

OVER HEIGHT=7.60

PRDC

PRDC

PRDC TF

PRDC

TF

PRDC

PRDC

PRDC

PRDC

TW

LAND PRDC

PRDC

PRDC

TF

TW

S GA

CHANNEL PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

TW

TW

N

PRDC

PRDC TF

TF

PRDC

TF

PRDC

WIRE M

TW

HEAD

CHANNEL

OVER HEIGHT=7.60

FIELD

TW

HPCL

GAS PRDC

PRDC

& PETROL

PIPE PRDC

LINE TW

PRDC

TF

PRDC

PRDC

HPCL PRDC

GAS

PIPE PRDC

& PETROL PRDC

TW

LINE CHANNEL

PRDC

FIELD

LOCAL DISTRIBUTOR PRDC

PRDC

PRDC

CHANNEL

PRDC

PRDC

FIELD

TF

PRDC PRDC

TF

PRDC

TW

TF

PRDC TW TF

PRDC

PRDC

PRDC

CHANNEL

CHANNEL

FIELD

FIELD

N

PRDC

PRDC

PRDC

PRDC

DRAIN TW

PRDC

PRDC

TW

PRDC

WIRE M

TW

TW

PRDC

HEAD OVERHEIGHT=7.60

PRDC

DRAIN TF

TW TF

PRDC

TW

TW

PRDC

TW

PRDC

PRDC

PRDC

PRDC

TF

PRDC

TW

TF

WIRE M

TF

PRDC

PRDC

HEAD OVER HEIGHT=7.60

A

TW

G

LAND

A

TO

G

JABALPUR

LAND

TF

AG

LAND

NH-76

S GA

L

PRDC PRDC TW

PRDC

PRDC PRDC

TW

LINE PRDC

TF

PRDC PRDC

N

CE

TF

PRDC

TF

PRDC PRDC

CHANNEL

PRDC

FIELD

PRDC

PRDC

PRDC

PRDC

TW

PRDC TF

PRDC

PRDC

TW

CHANNEL

CE

FIELD

CE

PRDC

TF

PRDC

TW

TW

PRDC

PRDC

CE

PRDC

M WIRE

PRDC

CE

HEAD

TO RANGPUR

OVERHEIGHT=7.60

TW

CE

PRDC

PRDC

TW

CE

CE

=1 PRDC

PRDC

CANAL

CE

CE

PRDC

N

MINOR

PRDC

CE

PRDC

FIELD CHANNEL

PRDC

WIREM

TW

CE

TW PRDC

TF

PRDC

PRDC

HEAD OVER HEIGHT=7.60

PRDC

CE

TW PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

TW

WIRE M

TF

CE

PRDC

PRDC

PRDC

FIELD CHANNEL

PRDC

PRDC

VILLAGE

PRDC

LAND

CE

TW PRDC

PRDC

PRDC

PRDC

PRDC

HEAD

RAJARAMPURA

AG

CE

TW

CANAL

N

TW

TF

OVER HEIGHT=7.60

TO

PRDC

CE

PRDC

PRDC

PRDC

TF

M WIRE

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

PRDC

HEAD OVERHEIGHT=7.60

PRDC

PRDC

PRDC

A G LAND

PRDC

LAND AG

RANGPUR TO

LAND AG

LAND AG

WIRE M

PRDC

PRDC

PRDC

PRDC

LAND

PRDC

PRDC

PRDC

TW

TW PRDC PRDC PRDC

CANAL PRDC TW

PRDC TW

TW

TW 4

TW

TW PRDC

ROW

OFC ROW

ROW

ROW

249.267

OFC OFC OFC

OFC OFC PRDC

OFC

TO

HEAD OVER HEIGHT=7.60

PRDC

PRDC

PRDC

TF

AG

LAND

CHANNEL

PRDC

PRDC

PRDC

PRDC

PRDC

LAND

G

FIELD

PRDC

PRDC

PRDC

PRDC

CANAL

AG

A

N

REP10/2

CE

PRDC

N

PRDC

PRDC

A G LAND

N

PRDC

PRDC

REP10/1

CE

PRDC

TW

PRDC

PRDC

PRDC

CE

REP9/18

PRDC

CE

TW

TF

PRDC

PRDC

CE

TW

CE

PRDC

LAND AG

CHANNEL

LAND AG

LAND AG

OFC

CHANNEL

HOUSES

FIELD FIELD

TF

CANAL

PRDC PRDC

CHANNEL

CE

PRDC

DISTRIBUTO

REP9/17

MINOR PRDC

CE

N

PRDC

PRDC

MINOR

CANAL

FIELD

CE

PRDC

LAND

TW

OFC

M WIRE

PRDC

PRDC

CE

PRDC

G

NH-76

DRAIN

CHANNEL

CE

PRDC

HEAD OVER HEIGHT=7.60

TW

MINOR

PRDC

PRDC

A

CE

CE

SHOP

LAND AG

PRDC

CHANNEL

N

FIELD

WIREM

PRDC

PRDC CE

PRDC

GAS LAND

FIELD

DISTRIBUTOR

CE

PRDC

FIELD CHANNEL

TO KESHORAIPATAN NO OF PIPE DIA OF PIPE = = 1 600 MM

TO KOTA

ROW ROW

PRDC

PRDC

N

PRDC

TF

PRDC

G

& PETROL A

TF

TW

PRDC

PRDC

HEAD OVER HEIGHT=7.60

PRDC

LAND

REP9/16

TW

HPCL

LOCAL

CE

OFC

PRDC

PRDC

S CE

CE

CE

AG

REP9/15

PRDC

PRDC

PRDC

PRDC

PRDC PRDC

CE

TW

=1 NO OF PIPE = 900 MM DIA OF PIPE

PRDC

BRIDGE MINOR TW

CHITTAURGARH PRDC

PRDC

PRDC

WIRE M

PRDC

LAND

PRDC

REP9/14

PRDC

PRDC

PIPE PRDC

CE

PRDC

PRDC

PRDC

= 600 MM DIA OF PIPE

PRDC

PRDC

LAND AG

CHANNEL FIELD

PRDC

SH-33

TW

AG

TO KISHANPURA

WIRE M

PRDC

LAND AG LAND

FIELD

HOUSES

KISHAN VILLAG

LAND AG

CHANNEL FIELD

Ch.11596 PRDC

Main Stream

=1 NO OF PIPE

LAND AG TW

HEAD OVER HEIGHT=7.60

HEAD OVER HEIGHT=7.60

CE

PIPE

= 4 MM PIPE = 900

G

PRDC

LAND

CE

CE

PRDC

M

PRDC

CE

OF

OF

A

N

AG

CHANNEL

PRDC CE

TF

CE

CE

N

PRDC

900 MM PIPE =

DIA OF

=1 150 MM PIPE =

11.00

FIELD

LAND AG

LAND AG

TO KOTA

PIPE NO OF

KW

TF

KHANNA FARM

LAND AG

DIA OF

33000 POLE=

TF

PRDC

GA

LAND AG

LAND

PRDC

AG A G LAND

LAND AG

PRDC

r

CHAMBAL

RIVER

CHAMBAL

RIVER

l Rive Chamba

NO OF PIPE

LINE OF

PRDC

LAND

AG

LAND AG

TW PRDC

LAND AG

=1 900 MM

=

HT

DIA NO OF OF PIPE PIPE

LAND AG

PRDC

HEIGHT

PRDC

CE

NO DIA

PRDC

PRDC

LAND

FIELD

LAND

CE

CE

PRDC

KOTA

Kota Barrage

TO

BARAN

45 O/16,45 P/9,13, 54 C/4

G.T. Sheet No.

LAND AG CE

LAND AG

LAND AG

LAND AG

AG

N

PRDC

CE

PRDC

PRDC

PRDC

G

G

CE

Location

11596 Longitude-E

75°54'26" Latitude-N

25°16'03" Type of Structure

MJBR Catchment Area (Sq.Km)

129.40 41.552 Length of Stream-L(Km)

LAND AG

CHANNEL CE

VILLAGE

CE

CE

MM

CE CE

CE

PRDC

CE

OF

PRDC PRDC

RIVER

PRDC

S

NO

DIA

OF PIPE PIPE = = 900 37

CHANDROLI

PRDC

GA

RAMKHERI

TW

PRDC

PRDC

A

MINOR DISTRIBUTOR DRAIN

9/12

A

CE

LAND

CE

TO

ROW

TO

LAND

DRAIN

9/11

TF

POLE ELEC. RAILWAY M HEIGHT=8.0

PRDC

CANAL

DRAIN R

PRDC

TW

S G

DISTRIBUTOR

LAND

REP9/9

LAND

DISTRIBUTOR

AG

REP9/7

G

LOCAL

PRDC

CE

RIVER

GA

A

LOCAL

TO CHANDRESAL

A

G

TW

CANAL PRDC

TW

A

CE

391

TF

WIRE M HEAD OVER HEIGHT=7.60

LAND

CE

N

AG

CE

PRDC PRDC

WIREM HEAD OVER HEIGHT=7.60

M

VILLAGE

KM

11.00

JALIPURA

CE

KW

TO

33000POLE= OF

LINE HT HEIGHT

KOTA TO

WIRE HEAD M OVER HEIGHT=7.60

TW

CE

Catchment Area Plan

Catchemnt Area Boundary

FIELD CHANNEL

CANAL

PRDC

DIA OF PIPE = 900 MM

NO OF PIPE = 1

ROW

PRDC

NO OF SPAN= 3 X 7.3 M

ROW

PRDC

CANAL

CANAL

PRDC

TO KESHORAIPATAN

PRDC

PRDC

PRDC

PRDC

A G LAND

SH-33

TO KESHORAIPATAN

A G LAND

FIELD CHANNEL

FIELD

CHANNEL

PRDC

PRDC

PRDC

CANAL

PRDC

NO OF PIPE =1 DIA OF PIPE = 600 MM

FIELD CHANNEL

PRDC

FIELD CHANNEL

PRDC

PRDC

PRDC

A G LAND

TF

HOUSES

PRDC

PRDC

TW

TF

TO KISHANPURA

TW

A G LAND

PRDC

PRDC

PRDC

HOUSES

CHANNEL

PRDC

DIANO OFOF PIPE PIPE

=1 = 600

MM

PURA E

HOUSES

HOUSES

TAKIYA

HOUSES

HOUSES

PRDC

CHANNEL

A G LAND

FIELD

CANAL

A G LAND

HOUSE

PRDC

PRDC

PRDC

PRDC

A G LAND

FIELD

CHANNEL

PRDC

CHANDROLI

PRDC

CE

FIELD

CHANNEL

PRDC

Northern Kota Bypass

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF