Field Assembly HD787!7!7001 Up
Short Description
Download Field Assembly HD787!7!7001 Up...
Description
GEN00058-07
Field Assembly Instruction
DUMP TRUCK
HD785 -7 SERIAL NUMBERS
7001
and up
CONTENTS 1. Outline of division (Only main components)................................................................................................. 1 2. Dimensions of main components ................................................................................................................. 2 3. Layout of work space ................................................................................................................................... 3 4. Rough schedule of assembly and welding ................................................................................................... 4 5. List of jigs, tools, and consumables for field assembling............................................................................. 9
CONTENTS 6. Assembly process No. No.
Item
Page
0010 Oil, grease, and coolant
16
0020 Levels of oil, grease, and coolant
17
0030 Positioning rear axle assembly
18
0040 Slinging and moving of bare machine
19
0050 Connection of rod and rear suspension
20
0060 Positioning bare machine
21
0070 Connection of rear axle cooling hose
22
0080 Connection of rear axle brake hose
23
0085 Connection of rear axle brake hose (ASR specification: If equipped)
24
0086 Connection of valve sub-assembly wiring harness (ASR specification: If equipped)
25
0087 Connection and fixing of piping going to rear axle (Sand terrain/ASR specification: If equipped)
26
0090 Connection and fixing of rear grease piping and supply of grease
27
0100 Preparation for installing front axle
28
0110 Installation of front axle
29
0120 Connection of front axle suspension pressure sensor
30
0125 Connection of front axle wheel speed sensor (ABS specification: If equipped)
31
0130 Connection of steering cylinder and tie rod
32
0140 Connection of front axle brake cooling hoses
33
0150 Connection of front axle brake hoses
34
0160 Connection of front axle auto suspension piping
35
0165 Fixing of front axle auto suspension piping
36
0166 Fixing of front axle auto grease piping (If equipped: Auto grease specification)
37
0167 Connection of left front axle auto grease piping (If equipped: Auto grease specification)
38
0168 Connection of right front axle auto grease piping (If equipped: Auto grease specification)
39
0170 Installation of bumper and front axle steps
40
0171 Installation of front axle step (EU specification)
41
0180 Installation of tire and wheel assembly
42
0190 Installation of drive shaft
43
0200 Installation of oil quick charge box (If equipped: Oil quick charge specification)
44
0260 Installation of fuel tank wiring harness cover
45
0270 Installation of toolbox and tool kit
46
0275 Installation of fuel tank step (If equipped)
47
0280 Installation of rear support
48
0281 Installation of rear support (Muffler specification: If equipped)
49
0282 Installation of rear support (ABS specification: If equipped)
50
0283 Installation of rear support (Sand terrain specification: If equipped)
51
0290 Installation of muffler
52
0291 Installation of muffler (Body heating-less/Exhaust selector box specification: If equipped)
53
0300 Installation of fire prevention cover
54
0310 Installation of front support
55
0315 Installation of front support (Fog lamp specification: If equipped)
56
0317 Installation of front support (Fog lamp, beacon lamp, HID headlamp specification: If equipped)
57
0320 Installation of steering valve
58
0330 Preparation for installing cab
59
0340 Installation of cab
60
0345 Connection of ABS piping (If equipped)
61
0350 Connection of column
62
0355 Installation of washer tank
63
0360 Connection of cab piping
64
0370 Connection of cab wiring
65
0375 Connection of cab wiring (ASR/ABS specification: If equipped)
66
0376 Connection of engine prelubrication harness to cab (If equipped: Engine prelubrication specification)
67
0377 Connection and fixing of engine compartment lamp wiring harness (if equipped)
68
0378 Connection of auto grease harness to cab (If equipped: Auto grease specification)
69
0379 Connection of engine stop harness to cab (If equipped: Engine emergency stop specification)
70
0380 Installation and fixing of steering hoses
71
CONTENTS No.
Item
Page
0385 Fixing of air conditioner drain hose
72
0390 Installation of steering hose cover
73
0395 Connection of air conditioner and heater hoses
74
0400 Connection of cab floor wiring
75
0405 Fixing of ASR/ABS wiring harness (If equipped)
76
0406 Connection and fixing of ABS wiring harness (ABS specification: If equipped)
77
0410 Installation of cover under cab
78
0415 Wiring of front glass with heater wire (If equipped)
79
0420 Installation of cab seal
80
0430 Installation of ambient temperature sensor wiring harness
81
0440 Installation of undercab wiring harness connector
82
0445 Connection and fixing of rear view camera wiring harness (if equipped)
83
0450 Installation of R.H platform assembly
84
0470 Installation of right fender
85
0472 Installation of right fender (If equipped: Body heating-less muffler specification)
86
0475 Installation of fuel tank quick charge-less hose (If equipped)
87
0476 Installation of fuel tank quick chargeless hose: Muffler specification (If equipped: muffler specification)
88
0480 Installation of cab step
89
0481 Assembly of diagonal ladder (if equipped)
90
0482 Installation of cab step: Diagonal ladder specification (if equipped)
91
0483 Installation of diagonal ladder 1 (if equipped)
92
0484 Installation of diagonal ladder 2 (if equipped)
93
0485 Installation of diagonal ladder 3 (if equipped)
94
0486 Installation of diagonal ladder (EU specification)
95
0487 Installation of diagonal ladder-2 (EU specification)
96
0488 Installation of diagonal ladder-3 (EU specification)
97
0490 Installation of L.H underview mirror (If equipped)
98
0500 Installation of fire extinguisher (If equipped)
99
0510 Installing radio antenna and fixing its cable
100
0520 Installation of L.H fender
101
0530 Installation of left side mudguard
102
0540 Installation of grille guard
103
0550 Installation of left payload lamp (If equipped)
104
0555 Installation of left side lamp (If equipped)
105
0560 Installation of right payload lamp (If equipped)
106
0565 Installation of right side lamp (If equipped)
107
0570 Installation of left fender side lamp wiring harness (If equipped)
108
0580 Installation of right fender side lamp wiring harness (If equipped)
109
0581 Installation of right fender side lamp wiring harness (If equipped: Body heating-less muffler, exhaust gas selector box muffler specification) 110 0590 Installation of KOMTRAX (If equipped)
111
0595 Fixing of ORBCOMM antenna (If equipped)
112
0597 Connection and fixing of harness and hose going to auto grease pump - 1 (If equipped: Auto grease specification)
113
0598 Connection and fixing of harness and hose going to auto grease pump - 2 (If equipped: Auto grease specification)
114
0600 Removal of hoist cylinder fixing bracket
115
0610 Connection of hoist cylinder piping
116
0620 Welding of body
117
0630 Sticking of body decal
118
0640 Supply of oil
119
0650 Slinging of body
120
0660 Installation of hinge pin
121
0670 Connecting hoist cylinder
122
0680 Hoist cylinder grease piping
123
0685 Fixing of auto grease piping to body (If equipped: Auto grease specification)
124
0700 Installation of field welding protection cover
125
0710 Installation of body mount
126
0720 Procedure for adjusting body mount shim
127
0730 Field welding of exhaust tube
128
CONTENTS No.
Item
Page
0740 Assembly of body heater cover
129
0770 Installation of poke ejector
130
0780 Installation of poke ejector storage pin
131
0790 Installation of body mudguard
132
0800 Installation of body lock pin
133
0810 Installation of transmission underguard
134
0830 Installation of front handle
135
0850 Connection of dump sensor
136
0860 Procedure for adjusting dump sensor
137
0870 Calibrating dump control
138
0880 Adjustment of optical axis of light
139
0900 Bleeding air from brake
140
0901 Bleeding air from brake of ASR specification (ASR specification: If equipped)
141
0905 Bleeding air from ABS circuit (ABS specification: If equipped)
142
0910 Adjusting suspension
143
0920 Charging air conditioner with refrigerant
144
0930 Fitting of floating seal
145
0950 Painting
146
0960 Touchup
147
1000 Sticking of front axle decal
148
1020 Operating procedure of prelubrication system (If equipped: Engine prelubrication specification)
149
1100 Installation of chocks (If equipped)
151
1200 Installation of radiator curtain (If equipped)
152
1300 Installation and connection of beacon lamp (If equipped: Yellow beacon lamp specification)
153
7. Adjustment procedure No.
Item
Page
T-0010 Bleeding air from fuel circuit 1 (If equipped: Extra low-grade fuel specification)
154
T-0020 Bleeding air from fuel circuit 2 (If equipped: Extra low-grade fuel specification)
155
T-0030 Setting of machine monitor
156
T-0040 Selection of machine model
157
T-0050 Selection of optional component
158
T-0060 Selection of option
159
T-0070 Option setting/no-setting selection screen - Saving of change of option selection
160
T-0080 OFF setting of corrosion resistor with maintenance monitor
161
T-0090 Adjustment of body positioner sensor
162
T-0100 Deletion of electrical system fault history (1)
163
T-0110 Deletion of electrical system fault history (2)
164
8. Welding procedure No.
Item
Page
C-0010 Preparation of welding body
165
C-0020 Assembly of split body (1/2)
166
C-0030 Assembly of split body (2/2)
167
C-0040 Tack welding body
168
C-0050 Welding body (1/2)
169
C-0060 Welding body (2/2)
170
C-0070 Welding body instruction (1/2)
171
C-0080 Welding body instruction (2/2)
172
C-0090 Turn over the body
173
C-0100 Welding body protector (1/2)
174
C-0110 Welding body protector (2/2)
175
C-0120 Finishing and painting welded parts of body
176
C-0130 Welding front body mount bracket
177
Appendix Field assembly inspection report
1. Outline of division (Only main components) 1. Bare machine
2. Dump body (Divided into 3)
3. Front axle assembly
4. Rear axle and tire assembly
5. Front tire and wheel assembly
6. Cab assembly
1
2. Dimensions of main components Weight (kg)
Overall length (mm)
Overall width (mm)
Overall height (mm)
Bare machine
21,600
7,930
3,190
3,120
2
Dump body
15,400
7,250
3,100
3,100
3
Right and left front axle assembly
2,400
2,200
1,700
2,100
4
Rear axle and tire assembly
17,000
4,390
2,700
2,700
5
Front tire and wheel assembly (1 set)
2,000
2,700
750
2,700
6
Cab
3,000
2,760
2,010
2,190
No.
Unit name
1
Drawing of bare machine on trailer
3,800 150
1,680
G.L. 530 6,200 11,980
3,000
2,780
Reference Specifications of completed truck Specifications In selfpropelled travel
2
HD785-7
Related items Weight (kg)
Overall length (mm)
64,600 (Mass of machine)
10,290 (Front bumper – End of body)
Overall width (mm)
Overall height (mm)
5,528
5,047 (When empty)
3. Layout of work space (The work space should be wider for the ease of work and must be at least 30 m square.) Caution: The work space must be level and drained well.
30M
Tire and wheel assembly
CAB
Body
Front axle
Bare machine
50-t crane
Forklift
30M
Rear axle assembly and tire assembly
Light units keeping place Platform, front support, mudguard, rear support, fire prevention cover, poke ejector, drive shaft, etc.
Compressor parts and tools keeping place 50-t crane
3
4-1. Rough schedule of assembly and welding Day Hour
1st day 1
2
3
4
5
6
7
8
Condition of chassis
Rough contents of assem- Positioning rear axle bly work Positioning chassis
Installing front axle Installing tires
Crane 490 kN {50 ton}
245 kN {25 ton}
245 kN {25 ton} (98 kN {10 ton})
Forklift
Approx. 2 m
4 ton * Fork length: Approx. 2 m Number of workers
2
Day Hour
1st day 1
2
3
4
5
6
7
8
Condition of body
Contents of welding work
Unloading Removal of stands and fixing parts
Crane 245 kN {25 ton} Number of workers
4
245 kN {25 ton} 3
Positioning and fixing split body Welding back side
4-2. Rough schedule of assembly and welding Day Hour
2nd day 1
2
3
4
5
6
7
8
Condition of chassis
Rough contents of assem- Installing support bly work Installing cab
Piping and wiring
Crane 490 kN {50 ton}
490 kN {50 ton}
Forklift
Number of workers
2
Day Hour
2nd day 1
2
3
4
5
6
7
8
Condition of body
Contents of welding work
Positioning and fixing split body Welding back side
Turning over
Crane 245 kN {25 ton} Number of workers
3
5
4-3. Rough schedule of assembly and welding Day Hour
3rd day 1
2
3
4
5
6
7
8
7
8
Condition of chassis
Rough contents of assem- Installing platform bly work Painting
Supply of oil and coolant Starting engine
Crane
Forklift
Number of workers
2
Day Hour
3rd day 1
2
3
4
5
6
Condition of body
Contents of welding work
Welding inside of body
Crane 245 kN {25 ton} Number of workers
6
3
Welding protector
4-4. Rough schedule of assembly and welding Day Hour
4th day 1
2
3
4
5
6
7
8
Condition of chassis
Mounting body Rough contents of assemAdjusting shims bly work Field welding
Crane 490 kN {50 ton} Number of workers
245 kN {25 ton}
245 kN {25 ton} (98 kN {10 ton})
2
Day Hour
4th day 1
2
3
4
5
6
7
8
Condition of body
Contents of welding work
Crane
Number of workers
7
4-5. Rough schedule of assembly and welding Day Hour
5th day 1
2
3
4
5
6
7
8
7
8
Condition of chassis
Installing exterior parts Rough contents of assemPainting bly work
Maintenance, adjustment Inspection
Crane 245 kN {25 ton} (98 kN {10 ton}) Number of workers
2
Day Hour
Condition of body
Contents of welding work
Crane
Number of workers
8
4th day 1
2
3
4
5
6
5-1 List of jigs, tools, and consumables for field assembling (1/2) No.
Item
Specification
Q'ty
Remarks
1
Truck crane
25 tons
2
See Field Assembling Procedures
2
Truck crane
50 tons
2
See Field Assembling Procedures
3
Forklift
4 tons
1
See Field Assembling Procedures
1220N2
1
4
Gas cutting machine
5
Torch
6
Acetylene gas
7
Oxygen gas
8 9 10
1 1
For gas cutting machine
14.7 MPa {150kg/cm²}
1
For gas cutting machine
Grinder (round)
FG50L-1
1
Grindstone
SCW50 × 19 • 10
1
Grinder
LISG-7S
1
11
Grindstone
180ø × 6 × 22
3
For finishing
12
Dia. bar
CB7C105
1
13
Dia. bar blade
6GH
1
14
Semi-automatic welding machine
500A
3
15
Hand shield
GP-1S
3
16
Welding wire for semi-auto1.2 mm matic welding machine
17
Chipper scaling hammer
FCM-20F
2
18
Port power
300 mm for 10 tons
1
For adjustment of dump body deviation
19
Hydraulic jack
10 tons
1
For dump body
20
Hydraulic jack
5 tons
1
For dump body
21
Shaft
WJ-H46-74001-023
1
22
Refractory cloth
1 m × 10 m
1
Protection when field welding
23
Spacer
ATH-465-027
3
Use when welding exhaust flange in field
24
Nitrogen gas injector
7926-10-1000
1
25
Nitrogen gas bottle
14.7 MPa {150 kg/cm²}
1
26
Tire inflation gauge
No. 2252
1
27
Grease pump gun
For 20kg can
1
28
Grease
GL-2
5 kg
29
Footstool
3-step
1
30
Footstool
6-step
1
31
Blue sheet
5 m × 10 m
5
Protection for equipment
80kg
Injection into suspension
32
Wood block
300 mm square, 1 m long
12
* Quantity depends on using condition.
33
Oil jack
5l
1
For oil injection
34
Oil
See Field Assembling Procedures.
–
See Field Assembling Procedures.
35
Oil sump, washing can
36
Drained oil can
37
Cloth
38
Diesel fuel
39
Antifreeze
40
Air hose
2 Empty drum can
1 5kg
See Field Assembling Procedures.
For refilling fuel 5l
6ø × 1m
1
For adding in subtank (to change mixing ratio depending on local weather) For air bleeding
9
5-2 List of jigs, tools, and consumables for field assembling (2/2) No. 41
Item Sanding machine for scaling-off coating
Specification 914B
Q'ty
Remarks
1
42
Sandpaper
#80
100
43
Sandpaper
#180
10
44
Cup gun set
W87-20R2S
1
Use for coating
45
Brush
1
Use to repair coating.
46
Air compressor
Not less than 3.5 m³ or 7 kg/cm²
1
47
Air hose
With mouthpiece of ø12
5
48
Impact wrench
UW-13SK
2
49
Impact wrench
KW-3800P
1
50
Impact wrench
UW-9SK
2
51
Extension for impact wrench 38S
150 mm long
1
For impact grinder
52
Socket
1 inch × 46 mm
1
For tightening tire
53
Socket
1 inch × 30 mm
1
For tightening support
54
Torque-wrench
2800QL
1
For drive shaft and body pin
55
Torque-wrench
21000QLE
1
For tightening tire
56
Convex
5m
1
57
Locktite
LT-2
1
58
Vinyl tape
59
Standard tool (ISO specification)
700SX
2
60
Bar
1m
1
61
Pointed steel bar
62
Large hammer
10 lb
1
63
Axle pin installation guide
ATH-785-078
2
64
Shackle
BD10 for 500 kg
4
65
Shackle
BC40 for 10 tons
4
For mounting body
1
1
Use to bundle harnesses
For hole alignment
66
Chain
ATH-465-042
1
Multi purpose
67
Nylon shoe ring
100 mm wide × 5 m
2
For mounting fuel tank
68
Nylon shoe ring
60 mm wide × 3 m
2
For mounting support and small articles
69
Nylon shoe ring
100 mm wide × 12 m
1
For mounting front tires
70
Nylon shoe ring
30 mm wide × 2 m
3
For installing front axle
71
Nylon shoe ring
100 mm wide × 3 m
1
For installing front axle
72
Pin
ø60 × 250 mm
2
For slinging chassis, rear side (Safety pin can substiture)
73
Jig for slinging body
ATH-785-006
4
For mounting body
74
Lever block
3/4 tons, LB008
3
For installing front axle
75
Lever block
2 tons, LB020
1
For installing front axle
76
Wire
7m 28ø
2
For slinging chassis
77
Wire
4m 28ø
2
For mounting body
78
Wire
5m 28ø
2
For installing body
1 2 1
For mounting body For slinging chassis For slinging separated body
The following items may be substituted for No. 76 to 78. ATH-465-039 ATH-465-040 ATH-465-041
10
List of touch-up coating on body for overseas specifications No. 1
Part Name Retane GP primer
Unit
Q'ty
4kg
1
0.8kg
1
4l
1
2
Retane GO hardener
3
Retane GP thinner
4
AX Mightylacq G2KB type natural yellow
16kg
1
5
NAX Mightylacq G2KB type hardener
15kg
1
6
X Mightylacq G2 500 standard thinner
17l
1
7
Acryliquid cloud gray
Spray can
1
8
Heat-resistance silver
Spray can
1
11
5-3. Tools and consumables Note: Komatsu cannot accept any responsibility for special tools manufactured according to these sketches. Body alignment shaft
HEAT TREATMENT
MATERIAL
—
STKM13A
PART NAME
QTY
Shaft
1
WJ-H46-74001-023
Body lifting pin
HEAT TREATMENT
MATERIAL
—
SS400
PART NAME
QTY
Body lifting pin
4
AHT-785-006
12
Sketches of special tools Note: Komatsu cannot accept any responsibility for special tools manufactured according to these sketches. When welding by actually positioning exhaust flange on machine
HEAT TREATMENT
MATERIAL
PU-4
SS40
PART NAME
QTY
SPACER
3
ATH-465-027
Body assembly lifting tool
HEAT TREATMENT
MATERIAL
—
—
PART NAME
QTY
Body assembly lifting tool
1
ATH-465-039
13
Chassis lifting tool
HEAT TREATMENT
MATERIAL
—
—
PART NAME
QTY
Chassis lifting tool
2
ATH-465-040
Dump body lifting tool
HEAT TREATMENT
MATERIAL
—
—
PART NAME
QTY
Split dump body lifting tool
1
ATH-465-041
14
Universal lifting tool
HEAT TREATMENT
MATERIAL
—
—
PART NAME
QTY
Universal lifting tool
1
ATH-465-042
Front axle installation guide
HEAT TREATMENT
MATERIAL
—
—
PART NAME
QTY
Front axle installation guide
2
ATH-785-078
15
Assembly process No.
Oil, grease, and coolant
0010 Method of using fuel, lubricant, and coolant according to ambient temperature t Fuel, oil Use the correct type for the ambient temperature as shown in the table below. a Specified capacity: Total amount of oil including oil for components and oil in piping Refill capacity: Amount of oil needed to refill system during normal inspection and maintenance. a When starting the engine in an ambient temperature of less than 0°C, always use EOS0W30, or EOS5W40, even though the temperature goes up to 10°C during the daytime. t Coolant Komatsu genuine super coolant (AF-NAC) is added to the cooling water, so there is no need to change it for temperatures down to -10°C. If the temperature goes below -10°C, adjust the density. For details, see CLEANING INSIDE OF COOLING SYSTEM in the WHEN REQUIRED Section of the Operation and Maintenance Manual.
a For details of the notes (e.g., Note. 1, Note.2
16
) in the table, see the Operation and Maintenance Manual.
Assembly process No.
Levels of oil, grease, and coolant
0020
Lubrication point
Type of oil
Specified capacity (l)
Refill capacity (l)
Volume of refilled oil (l)
Engine oil pan
Engine oil
134
129
—
Transmission case (Including brake sub tank)
404
241
200
Steering and hoist oil tank
270
175
150
Front suspension
29.8 each on right and left sides
—
—
Rear suspension
16.5 each on right and left sides
—
—
Differential case
137
137
—
Power line oil
64 each on right and 64 each on right and left sides left sides
Final drive case
—
Fuel tank
Diesel fuel
1,308
—
—
Cooling system
Coolant
283
279
—
Caution) Before starting the engine, be sure to check each oil/coolant level. Do not steer the machine largely before adjusting the suspension (If it is steered largely, the piping may be damaged).
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
17
Assembly process No.
Positioning rear axle assembly
0030 Slinging of rear axle 1. Sling the rear axle and tire assembly with a 50 ton crane. Slinging position: Rod mounting portion on differential Weight: 20 ton (Including sling)
Positioning of rear axle 1. Position the rear axle. See the following figure. (Secure the ground clearance under the coupling section so that the rear axle assembly will be horizontal.) When positioning the rear axle on the ground, prevent slanting of the machine caused by subsidence of the ground. 2. Lock the wheels with chocks to prevent the rear axle from moving.
Wood block 1,200
Precautions
Necessary tools Name Lock the wheels with chocks to prevent the rear axle Nylon sling from moving. (250 mm wide × 5 m)
Other remarks
18
Necessary equipment Q'ty Name Q'ty 1 Crane (50 ton) 1
Assembly process No.
Slinging and moving of bare machine
0040 Sling of bare machine Front 12.5 ton (Including sling) Crane: 50 ton
Rear 10.8 ton (Including sling) Crane: 25 ton
Body lock pin
Slinging positions View f rom rear of bare machine
1. Apply cloths etc. to the body so that the body will not be damaged when it is slung. 2. Sling the bare machine with 2 cranes (Front side: 50 ton, Rear side: 25 ton). Sling : Chain sling (ATH-465-040) or ø28 wire Slinging position on front side : Frame slinging bracket Slinging position on rear side : Body lock pin installing position * Insert the body lock pin from inside of the machine (See the above figure). 3. Raise the differential upper part installing rod (upper rod).
Raised upper rod
Moving of bare machine 1. Move the bare machine to above the rear axle. Precautions Insert the body lock pin for slinging the rear side from inside of the machine. (If it is inserted from outside, it cannot be removed after the tire is installed.)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty Cranes (50 ton, 25 ton) 1 each Sling (ATH-465-040) 2 Pin (60 ø × 250 mm) 2 Wire (7 m, 28 ø) 2
Other remarks
19
Assembly process No.
Connection of rod and rear suspension
0050 Connection of rod and rear suspension Tack-weld nylon sling and lever block. (Used to fix lower arm)
* Carry out work simultaneously. 1. Connect A, B and C in order. Remove the pins installed temporarily and the spacers and bolts to be used in step 3. A (1) (2) (3) B (4) (5) (6) C (7) (8) (9)
2. 3. 4. 5. 6.
Part No. 561-52-81210 01010-81430 569-40-61710 561-52-81210 01010-81430 569-40-61710 561-52-81210 01010-81425 569-40-61710
Part name Pin Bolt Washer Pin Bolt Washer Pin Bolt Washer
Q'ty 2 2 2 2 2 2 2 2 2
Condition of parts Temporarily installed to rear axle A Temporarily installed to rear axle A Temporarily installed to rear axle A Temporarily installed to frame B Temporarily installed to frame B Temporarily installed to frame B Temporarily installed to rear axle C Temporarily installed to rear axle C Temporarily installed to rear axle C
Adjust the pin holes and remove the rod from the pin holes temporarily. Put the spacer in the rubber part of the spherical bushing. (See the figure at right.) Adjust the pin holes and insert the pin. Install the lock bolt and washer. Supply grease. Precautions
1. 2. 3. 4.
Necessary tools Name When adjusting the holes, take care not to catch Nylon sling your finger. If the spacer is installed forcibly, it is deformed. Take (60 mm wide × 3 m) care. Lever block When hitting the pin, take care not to crash the (2 ton, LB020) grease fitting. Clean the pins installed temporarily and parts A, B and C. Other remarks
20
3
Q'ty 2 2
Necessary equipment Name Q'ty
Assembly process No.
Positioning bare machine
0060
2,800
1,000
Wood block
Steel plate
Remove chock on front side.
Wood block
Sttel plate
1. Set the wooden blocks 1 m high under the vertical member as shown above. (If wooden blocks are set under the bumper, the machine is more stabilized.) When positioning the bare machine on the ground, place a steel plate under the wood blocks so that the bare machine will not sink and lean. 2. Remove the sling. 3. Discard the bolts and washers used to install the sling since they are not used any more. Precautions
Necessary tools Name Take care that the chassis will not move. Wood block Set the bare machine to proper height so that you can (300 mm square, 1 m) install the front tires. Steel plate
Q'ty 6
Necessary equipment Name Q'ty
1
Other remarks
21
Assembly process No.
Connection of rear axle cooling hose
0070 Connection of rear axle cooling hose Rear axle Hose plug on machine side, 2 pieces
Rear axle
Rear axle plug, 4 pieces
If flange is loosened a little and a plate is inserted before piping is disconnected, oil leakage is decreased (*1).
Fig.1
Plate
Flange
1. Remove all of the hose plugs on the machine side (2 pieces) and rear axle plugs (4 pieces). 2. Connect the hoses by using the following parts. (1) (2) (3) (4) (5) (6) (7) (8)
Part No. 07371-21465 07372-21245 01643-51232 07000-F3048 07371-32076 07372-21240 01643-51232 07000-F2060
Part name Flange Bolt Washer O-ring Flange Bolt Washer O-ring
Q'ty 4 8 8 2 4 8 8 2
Note) Do not damage the O-ring. Condition of parts Installed parts Installed parts Installed parts Installed parts Installed parts Installed parts Installed parts Installed parts
3. Clean the parts stained with oil. Precautions
Necessary tools Name When connecting each hose, check that no dirt is in the Impact wrench hose and the O-ring is fitted securely. (For M12 mm) When removing each plug, set an oil drain case to Socket (19 mm) receive the leaking oil. *1. Dimension of plate (See "Fig 1") Large pipe: W = 63 mm Small pipe: W = 55 mm
22
Other remarks
Q'ty 1 1
Necessary equipment Name Q'ty
Assembly process No.
Connection of rear axle brake hose
0080 Connection of rear axle brake hose
a
b
c
a b View Y c Connection: From block to front side of valve (Reuse O-ring)
b
c
View Z Connection: From tube to rear side of valve (Reuse O-ring)
1. Remove the plugs from each part. 2. Connect the 3 hoses. 3. Clean the parts stained with oil. Caution: Install the hoses horizontally.
Precautions 1. Take care extremely not to mistake the connecting positions.
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
2. When removing each plug, do not lose the O-ring.
Other remarks
23
Assembly process No.
0085
Connection of rear axle brake hose (ASR specification: If equipped)
Connection of rear axle brake hose
c
b
a a
View Y
b
Connection: From block to front side of valve (Reuse O-ring)
c
Connection: CNJ13
d
Connection: CNJ12
c
a
1. Remove the plugs from each part. 2. Connect the 3 hoses.
View Z
3. Connect connectors "CNJ12" and CNJ13".
Connection: From tube to rear side of valve (Reuse O-ring)
4. Clean the parts stained with oil. Caution: Install the hoses horizontally.
Precautions 1. Take care extremely not to mistake the connecting positions.
Necessary tools Name
2. When removing each plug, do not lose the O-ring.
Other remarks
24
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0086
Connection of valve sub-assembly wiring harness (ASR specification: If equipped)
Connection of valve sub-assembly wiring harness * Wiring harness length between a -- b: 600 mm Wiring harness length between c -- d: 600 mm
Rear view of machine body
Connect CN WSRR.
Connect CN WSRL.
Remove clip and bolt and fix wiring harness.
(1) (2) (3)
Part No. 04434-51512 01024-81016 08193-21012
View Z
View Y
Part name Clip Bolt, sems Clip
Q'ty 5 6 2
Condition of part (Parts list No.) Installed temporarily to machine Installed temporarily to machine Installed temporarily to machine
1. Remove the clips and bolts installed temporarily and fix the wiring harness. 2. Connect connectors "CN WSRR" and "CN "WSRL". 3. Fix the sensor on the back side of the valve sub-assembly. Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
25
Assembly process No.
0087
Connection and fixing of piping going to rear axle (Sand terrain/ASR specification: If equipped)
Connection and fixing of piping going to rear axle
Z
(190)
(225)
ASR valve Rear axle slack adjuster
Rear axle
View X
Connection
Rear axle
View Z
1. Fix the hose going to the rear axle to the rear axle tube. (See view X.) 2. Connect the hose fixed in step 1 to the rear axle.
(1) (2) (3) (4) (5) (6)
Part No. 416-88-11140 04434-52110 07095-20314 07283-32236 01643-31032 01580-11008 Precautions
Part name Plate Clip Cushion Clip Washer Nut
Q'ty 2 2 2 2 4 4
Condition of part (Parts list No.) Packed separately (HD785-7-087) Packed separately (HD785-7-087) Packed separately (HD785-7-087) Packed separately (HD785-7-087) Packed separately (HD785-7-087) Packed separately (HD785-7-087) Necessary tools Name
Other remarks
26
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0090
Connection and fixing of rear grease piping and supply of grease
Connection and fixing of rear grease piping and supply of grease
FWD
X
b
Y
c a
A
a b
View X
c
FWD 1. Connect 1 tube to part A (1 each on the right and left sides). (Left side: (2), Right side: (6)) b
2. Install elbows (4) to the ends of tubes (2) and (6) (directing them straight down) and connect them to the frame.
a
3. Fix tubes (2) and (6) with clips (8) and bolts (9).
c
4. Supply grease (G2-LI) through part A.
a A
b
View Y
c
5. Supply grease until it flows out of the lubricated spherical bushing, seal, or boot lip. 6. Grease must not ooze from the pipe joints
(2) (4) (6) (8) (9)
Part No. 561-52-82641 421-09-12540 561-52-82631 04434-50608 01024-80816
Part name Tube Elbow Tube Clip Bolt sems
Precautions 1. Take care extremely not to mistake the connecting positions.
Q'ty 1 2 1 4 4
Condition of part (Parts list No.) Packed separately (HD785-7-090) Packed separately (HD785-7-090) Packed separately (HD785-7-090) Packed separately (HD785-7-090) Packed separately (HD785-7-090) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
27
Assembly process No.
Preparation for installing front axle
0100 Preparation for installing front axle 1. Remove the packing materials for each part.
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Part No. 561-40-61550 561-40-61560 566-52-41950 01010-81425 569-40-61710 561-40-81540 566-52-61150 01010-81425 569-40-61710
Part name Pin Pin Spacer Bolt Washer Pin Spacer Bolt Washer
Q'ty 2 2 4 4 4 2 4 2 2
Condition of parts Temporarily installed to machine (L = 260 mm) Temporarily installed to machine (L = 290 mm) Temporarily installed to machine Temporarily installed to machine Temporarily installed to machine Temporarily installed to machine Temporarily installed to machine Temporarily installed to machine Temporarily installed to machine
2. Sling the front axle (See the attached photo).
Precautions
Necessary tools Name
Necessary equipment Q'ty Name Q'ty 1. Dimensions of pin vary on each portion. Place pins Nylon sling (30 mm wide × 2 m) 3 Crane (25 ton) 1 near relevant locations to install pins in place with Nylon sling (100 mm wide × 3 m) 1 ease. 2. Adjust sling so that suspension cylinder becomes Lever block (3/4 ton, LB008) 3 vertical against ground. Lever block (2 ton, LB020) 1 Hook slings at suspension cylinder assembly and hub stud portion. Other remarks
28
Assembly process No.
Installation of front axle
0110 Installation of frontxle
Fix with spacer, pin and lock bolt.
Move up.
o When installing steering cylinder
Move up.
How to sling
Fix with spacer, pin and lock bolt.
o When installing suspension cylinder
Lever block
1. Move up the A-arm mounting part with a Fix to fuel tank crane. bracket. 2. While adjusting the crane and lever block, adjust the A-arm to the pin holes of the frame once and then lower it with the lever block. 3. Insert the removed spacers (8 pieces) in the rubber covers of the spherical bushings of the A-arm (4 places on right and left sides) and then adjust the pin holes again with the lever block. (Adjust the horizontal direction with the lever block, too. See the right upper photo.) 4. Install the spacers and pins and fix them with the lock bolts. (If you use the guide as shown at right, you can install easily.) 5. Remove the sling from the A-arm. 6. While adjusting the crane, install the upper part of the suspension similarly to the A-arm. 7. Remove the sling and supply grease to each part. Precautions
Guide ATH-785-078
A-arm
Necessary tools Name
Necessary equipment Q'ty Name Q'ty 1. Check spacer for deviation. Nylon sling (30 mm wide × 2 m) 3 Crane (25 ton) 1 2. When making alignment, take care not to catch your Nylon sling (100 mm wide × 3 m) 1 fingers in it. Lever block (3/4 ton, LB008) 3 3. Check for O-ring on spherical bushing. Lever block (2 ton, LB020) 1 Guide pin (ATH-785-078)
Other remarks
29
Assembly process No.
Connection of front axle suspension pressure sensor
0120 Connection of front axle suspension pressure sensor
Z
Connection Suspension oil pressure sensor (Left) CN SUFL Suspension oil pressure sensor (Right) CN SUFR
1. After installing the front axle, connect the suspension oil pressure sensor wiring harness. 2. Fix the suspension oil pressure sensor wiring harness of the left front axle with clips (1) and bolts (2). 3. Fix the suspension oil pressure sensor wiring harness of the right front axle with clips (1) and bolts (2).
Suspension oil pressure sensor (Right) CN SUFR
A
A 2
Suspension oil pressure sensor (left) CN SUFL View Z
(1) (2)
Part No. 04434-50810 01024-81020 Precautions
Part name Clip Bolt, sems
Section A-A
Q'ty 3 3
Condition of parts Temporarily installed to machine Temporarily installed to machine Necessary tools Name
Necessary equipment Q'ty Name Q'ty Nylon sling (30 mm wide × 2 m) 3 Crane (25 ton) 1 Nylon sling (100 mm wide × 3 m) 1 Lever block (3/4 ton, LB008) 3 Lever block (2 ton, LB020) 1
Other remarks
30
Assembly process No.
0125
Connection of front axle wheel speed sensor (ABS specification: If equipped)
Connection of front axle wheel speed sensor 1. Fix and connect the wheel speed sensor wiring harness with the clip installed to the front axle.
Connection: CN WSFL Wheel speed sensor (FL)
Y
View Y Fixing with clip (installed to front axle)
30°
Left front axle
Fixing with clip (installed to front axle): Direct down 5°
Connecting: CN WSFR Wheel speed sensor (FR)
Z
Fixing with clip (installed to front axle)
View Z
50°
Right front axle Fixing with clip (installed to front axle): Direct down 5°
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
31
Assembly process No.
Connection of steering cylinder and tie rod
0130 Connection of steering cylinder and tie rod
L = 260mm
Reconnection
Reconnection
L = 240mm
(1) (2) (3) (4) (5)
Part No. 561-40-61531 561-40-61570 01010-81425 569-40-61710 561-40-61631
Part name Pin Pin Bolt Washer Boot
Q'ty 2 2 4 4 8
Condition of parts Temporarily installed to front axle Temporarily installed to front axle Temporarily installed to front axle Temporarily installed to front axle Temporarily installed to front axle
1. Take out the remote grease tube from the top of the pin of the front axle lever and remove pins (1) and (2) and bellows (5). Remove the air cylinder cover, too. 2 Set the lever in parallel with the ground by adjusting the crane. 3. Set boots (5), adjust the pin holes, and install the pins. 4. Tighten the lock bolts. 5. Connect the remote grease tube again. 6. Supply grease to each part.
Precautions
Necessary tools Name
Necessary equipment Q'ty Name Q'ty 1. Check that the O-rings are fitted to the steering cylNylon sling (30 mm wide × 2 m) 3 Crane (25 ton) 1 inder and tie rod spherical bushing. 2. Note that the lengths of the pins are different from Nylon sling (100 mm wide × 3 m) 1 Lever block (3/4 ton, LB008) 3 one another. Lever block (2 ton, LB020) 1
Other remarks
32
Assembly process No.
Connection of front axle brake cooling hoses
0140 Connection of front axle brake cooling hoses Connection
Connection
Connect rear side to rear side.
Connect rear side to rear side.
Connect front side to front side
Connect front side to front side.
Left side
Right side
1. Remove all of the hose plugs on the machine side (2 pieces) and front axle plugs (4 pieces). 2. Connect the hoses by using the following parts. (Connect the right and left side similarly.)
(1) (2) (3)
Part No. 07371-21465 07375-21240 07000-F3048
Part name Flange Bolt O-ring
Q'ty 8 16 4
Condition of parts Installed parts Installed parts Installed parts
3. Clean the parts stained with oil.
* Before connecting the front axle brake cooling hose, set the hose clamp as shown in the following figure.
(Flange face - center of clip width)
Frame seen from front Precautions When removing each pipe plug, prepare a drain case to receive the leaking oil.
Necessary tools Name
Q'ty
(Flange face - center of clip width)
Necessary equipment Name Q'ty
Other remarks
33
Assembly process No.
Connection of front axle brake hoses
0150 Connection of front axle brake hoses Connection
a
a
b
After connecting hose, reassemble.
a b
b
Left front axle
Connection
a
b
b a a
After connecting hose, reassemble.
b
Right front axle
1. Remove the plugs, clamps, cushions and bolts from each part. 2. Connect 4 hoses (2 pieces each on right and left sides) and install the clamps, cushions and bolts removed in step 1. 3. Clean the parts stained with oil. Precautions 1. Take care extremely not to mistake the connecting positions. 2. When removing each plug, do not lose the O-ring.
Necessary tools Name
Other remarks
34
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Connection of front axle auto suspension piping
0160 Color of SOL B-A band: Black Color of SOL B-B band: Green
Connection of front axle auto suspension piping
Color of SOL A-A band: Yellow
Color of SOL A-B band: Red
Section A-A Connection
Color of SOL A-A band: Yellow
Color of SOL A-B band: Red Color of SOL B-A band: Black
Color of SOL A-B band: White
SOL B-B
Color of SOL B-B band: Green
Left front axle
Color of SOL B-A band: Blue Color of SOL A-A band: Brown
Section B-B
Color of SOL A-A band: Brown Color of SOL A-B band: White
Connection
Color of SOL B-A band: Blue
SOL B-B
Right front axle
1. Remove the plugs from each part. 2. Connect 8 hoses (4 pieces on right side and 4 on left side). 3. Clean the parts stained with oil. Precautions 1. Take care extremely not to mistake the connecting positions. 2. When removing each plug, do not lose the O-ring.
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
35
Assembly process No.
Fixing of front axle auto suspension piping
0165 Fixing of front axle auto suspension piping 1. Fix the front axle and auto suspension piping. * For the clamp locations, see the following figure.
View Q
: 3 places
View P
: 8 places View Y: Right axle
View X: Left axle
107 (Actual length of center of brake hose)
420 (Actual length of center of brake hose) 193 (Actual length of center of brake hose)
466 (Actual length of center of brake hose)
532 (Actual length of center of auto suspension hose)
268 (Actual length of center of auto suspension hose)
Right axle seen from front
Left axle seen from rear
(1) (2) (3) (4) (5) (6) (7) (8)
Part No. 04434-53212 04434-53412 07095-00420 07095-00423 01024-81025 01580-11008 01024-81020 01643-31032 Precautions
Part name Clip Clip Cushion Cushion Bolt, sems Nut Bolt, sems Washer
Q'ty 8 4 1 3 4 4 4 4
Condition of part (Parts list No.) Packed separately (HD785-7-165) Packed separately (HD785-7-165) Packed separately (HD785-7-165) Packed separately (HD785-7-165) Packed separately (HD785-7-165) Packed separately (HD785-7-165) Packed separately (HD785-7-165) Packed separately (HD785-7-165) Necessary tools Name
Other remarks
36
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0166
Fixing of front axle auto grease piping (If equipped: Auto grease specification)
Fixing of front axle auto grease piping 1. Fix the front axle and auto grease piping. * For the clamp locations, see the following figure.
View Z
190 (Actual length of center of brake hose) 80 (Actual length of center of brake hose)
270 (Actual length of center of brake hose)
480 (Actual length of center of brake hose)
300 (Actual length of center of auto grease hose)
(1) (2) (3) (4) (5) (6)
Part No. 04434-52310 04434-53412 07095-00420 01024-81025 01643-31032 01580-11008 Precautions
600 (Actual length of center of auto grease hose)
View X: Left axle
Part name Clip Clip Cushion Bolt, sems Washer Nut
Q'ty 4 4 4 4 4 4
View Y: Right axle
Condition of part (Parts list No.) Packed separately (HD785-7-166) Packed separately (HD785-7-166) Packed separately (HD785-7-166) Packed separately (HD785-7-166) Packed separately (HD785-7-166) Packed separately (HD785-7-166) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
37
Assembly process No.
0167
Connection of left front axle auto grease piping (If equipped: Auto grease specification)
Connection of left front axle auto grease piping 1. Connect the left front axle and auto grease piping.
Connect: Band color "Yellow" L2 View Z Connect: Band color "Blue" L3
View W
Connect: Band color "Green" L6
Connect: Band color "Red" L1
Connect: Band color "White" L4 View Y
(1) (2) (3)
Part No. 561-95-63290 04434-51010 01024-81016 Precautions
Part name Elbow Clip Bolt, sems
Q'ty 3 1 1
Condition of part (Parts list No.) Installed to machine body Packed separately (HD785-7-167) Packed separately (HD785-7-167) Necessary tools Name
Other remarks
38
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Connection of right front axle auto grease piping (If equipped: Auto grease specification)
0168
Connection of right front axle auto grease piping 1. Connect the right front axle and auto grease piping.
Connect: Band color "Blue" R3
Section A-A
Connect: Band color "Black" R5
Connect: Band color "White" R4
Connect: Band color "Red" R1 Connect: Band color "Green" R6
View Y
View X
(1)
Part No. 561-95-63290
Precautions
Part name Elbow
Q'ty 3
Condition of part (Parts list No.) Installed to machine body
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
39
Assembly process No.
Installation of bumper and front axle steps
0170 Installation of bumper step
1. Remove bolts (1) from the bumper and install steps (2). 2. Install steps (4) with bolts (3). (1) (2) (3) (4)
Part No. 01024-81225 561-54-86871 01024-81230 561-54-31690
Part name Bolt, sems Step Bolt, sems Step
Q'ty 8 2 8 2
Condition of part (Parts list No.) Installed to bumper Packed separately (HD785-7-170) Packed separately (HD785-7-170) Packed separately (HD785-7-170)
Installation of front axle steps
1. Install the steps to the right and left front axles. (1) (2) (3) (4) (5)
Part No. 561-54-86751 561-54-86761 01024-81225 561-54-86740 01024-81030
Part name Bracket L. H Bracket R. H Bolt Step Bolt
Precautions There are right and left front axles. Since they are stamped as shown below, check the stamps when installing.
Q'ty 2 2 8 2 8
Condition of part (Parts list No.) Packed separately (HD785-7-170) Packed separately (HD785-7-170) Packed separately (HD785-7-170) Packed separately (HD785-7-170) Packed separately (HD785-7-170) Necessary tools Name
"R.H." Other remarks
40
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of front axle step (EU specification)
0171 Installation of front axle step
1. Install the steps to the right and left front axles.
(1) (2) (3)
Part No. 561-54-88300 561-54-88400 01024-81225
Part name Step assembly, R.H Step assembly, L.H Bolt
Precautions The right and left front axles are different. When installing them, confirm their part Nos.
Q'ty 1 1 4
Condition of part (Parts list No.) Packed separately (HD785-7-172) Packed separately (HD785-7-172) Packed separately (HD785-7-172)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sale code : 5AC11
41
Assembly process No.
Installation of tire and wheel assembly
0180 Installation of tire and wheel assembly Apply chock hitch.
Nylon sling
If forklift is available, you can work easily as shown below.
Place wooden blocks under front axle (under king pin) and place steel plate under them.
Weight of tire: 1,500 kg Wood block Steel plate
Secure tire with wire to prevent tire from falling. Installed to front axle temporarily
Note) If the block is projected out too much, it will interfere with the installed tire. Accordingly, set the block inside of the king pin.
3 : 1,519 -- 1,617 Nm
{154.9 -- 164.8 kgm}
(1) (2) (3)
Part No. 569-22-72870 426-09-11520 561-30-80000
Part name Nut Washer Tire assembly
Q'ty 40 40 2
Condition of part (Parts list No.) Temporarily installed to front axle Temporarily installed to front axle Packed separately (HD785-7-180)
1. Remove the nuts and washers installed to the front axle temporarily. 2. Install the tire with the forklift and install the nuts and washers in the order of the numbers shown at right. Note) Take care that the tire will not fall from the forklift. When positioning the tire, take care not to damage the valve for inflating the tire. 3. Tighten the nuts with the impact wrench temporarily. 4. Lift up the front part of the chassis with the crane and remove the wood blocks. 5. Tighten the tire mounting nuts with the torque wrench. (Tightening torque: 1,519 – 1,852 Nm {154.9 – 188.8 kgm}) 6. Touch up the tightened parts (to prevent rusting). (Use the yellow paint used for the body.) Precautions
1,11
Take care of position of air valve.
5
3 9
7
8
10 4
6
2
Necessary tools Necessary equipment Name Q'ty Name Q'ty 1. When carrying the tire, take care that it will not fall. Torque wrench 1 Crane (50 ton) 1 2 When positioning the tire, take care not to damage QLE21000 Forklift (4 ton) 1 the air valve. Nylon sling 1 Wire 1 (100 mm wide × 12 m) Socket (1 inch × 46 mm) 1
Other remarks
42
Assembly process No.
Installation of drive shaft
0190 Installation of drive shaft
Apply LT-2. 3: 343 -- 427 Nm {34.9 -- 43.5 kgm}
Install larger end to transmission.
(1) (2)
Part No. 561-20-72002 01050-61895
Part name Propeller shaft Bolt
Q'ty 1 8
Condition of part (Parts list No.) Packed separately (HD785-7-190) Packed separately (HD785-7-190)
1. Remove the drive shaft from the machine. 2. Sling the drive shaft with the crane and put it between the rear axle and transmission. 3. Lightly hit the drive shaft spider to fit the faucet joint securely. 4. Install and tighten the bolts in the diagonal order. (For the Fig. 1 tightening order, see Fig. 1. Apply LT-2 to the bolts.) 5. Tighten the bolt again with the torque wrench. Bolt (2) tightening torque: (Torque wrench: 343 – 627 Nm {34.9 – 43.5 kgm}) 343 – 427Nm 6. Install the guard again. {34.9 – 43.5kgm} Guard tightening torque: 7. Wipe off the grease from the mounting part and 1,180 – 1,470Nm degrease the bolts (coupling). {120 – 150kgm}
Precautions
Necessary tools Name Install drive shaft from the front side and transmission Nylon sling side for the ease of work. (Tighten the bolts on the front (60 mm wide × 3 m) side temporarily and fit the faucet joint securely.) Torque wrench, 2800QL When installing the rear side, install a chain block to the drive shaft to extend.
4
2
5,1
3
Necessary equipment Q'ty Name Q'ty 2 Crane (25 ton) 1 1
Other remarks
43
Assembly process No.
0200
Installation of oil quick charge box (If equipped: Oil quick charge specification)
Installation of oil quick charge box 1. Install box (1) with bolts (2).
Hydraulic tank
: 5 places
Transmission and brake cooling oil
Brake control oil Steering and H/T oil
Engine oil
Section A-A
(1) (2)
View Z
Part No. X251156860 01024-81225
Precautions
Part name Box, sub assembly Bolt, sems
Q'ty 1 5
Condition of part (Parts list No.) Packed separately (HD785-7-200) Packed separately (HD785-7-200)
Necessary tools Name
Other remarks
44
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of fuel tank wiring harness cover
0260
FUEL TANK
Wiring harness cover
Installation procedure for cover (1)
Installation of fuel tank wiring harness cover 1. Install cover (1) with the bolts installed to the fuel tank.
(1)
Part No. 561-04-81322
Precautions
Part name Cover
Q'ty 1
Condition of part (Parts list No.) Installed to fuel tank
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
45
Assembly process No.
Installation of toolbox and tool kit
0270 Installation of toolbox
(1) (2) (3)
Part No. 561-98-86110 01024-81225 09460-00000
Part name Tool box, sab assembly Bolt Lock
Q'ty 1 4 1
Condition of part (Parts list No.) Packed separately (HD785-7-270) Temporarily installed to fuel tank Packed separately (HD785-7-270)
1. Remove the toolbox sub-assembly mounting bolts (installed to the fuel tank temporarily). 2. Fix toolbox sub-assembly (1) with the bolts removed in step 1. 3. Install the attached tool kit. 4. Close the cover of box (1) and tighten the wing screw. 5. Install lock (3).
Precautions
Necessary tools Name
Other remarks
46
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of fuel tank step (If equipped)
0275 Installation of fuel tank step 1. Remove bolts (2) installed to the fuel tank. 2. Install ladder (1) with bolts (2) removed in step 1. 3. Install step (3) to ladder (1) with bolts (4).
EU specification
EU specification
(1) (2) (3) (4) (5) (6)
Part No. 561-54-8A981 01024-D1230 561-54-8A960 01024-D1230 561-54-8A982 561-54-8A900 Precautions
Part name Ladder Bolt Step Bolt Ladder Step
Q'ty 1 8 1 4 1 1
EU specification reference drawing
EU specification reference drawing
Condition of part (Parts list No.) Packed separately (HD785-7-275) Installed to fuel tank Packed separately (HD785-7-275) Packed separately (HD785-7-275) Packed separately (HD785-7-277) Packed separately (HD785-7-277) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 6HH68-A or 5AC11
47
Assembly process No.
Installation of rear support
0280 Installation of rear support 1. Remove the bolts and washers installed to the machine body temporarily. 2. Install the rear support assembly. * For adjustment, keep bolts (2) and (5) tightened temporarily until installing the right platform and cab. * Remove rust preventive paint from rear support ground face (on machine frame side).
* Remove rust preventive paint from rear support ground face (on machine frame side). (1) (2) (3) (4) (5) (6)
Part No. 561-46-80200 01010-82475 01643-32460 561-46-81791 01010-81850 01643-31845
Z
Part name Rear support LH Bolt Washer Rear support RH Bolt Washer
Q'ty 18 18 18 1 7 7
Condition of part (Parts list No.) Packed separately (HD785-7-280) Installed to frame Installed to frame Packed separately (HD785-7-280) Installed to frame Installed to frame
Part name Clip Bolt
Q'ty 18 18
Condition of part (Parts list No.) Packed separately (HD785-7-280) Packed separately (HD785-7-280)
Fixing of air tube 1. Fix the air tube. (7) (8)
Part No. 04434-51210 01024-81020
View Z
Diagonal front view
Precautions
Necessary tools Name Nylon sling (60 mm wide × 3 m) Torque wrench
Other remarks
48
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1 1
Assembly process No.
0281
Installation of rear support (Muffler specification: If equipped)
Installation of rear support 1. Remove the bolts and washers installed to the machine body temporarily. 2. Install the rear support assembly. * For adjustment, keep bolts (2) and (5) tightened temporarily until installing the right platform and cab. Muffler specification
* Remove rust preventive paint from rear support ground face (on machine frame side).
* Remove rust preventive paint from rear support ground face (on machine frame side). (1) (2) (3) (4) (5) (6)
Part No. 561-46-80200 01010-82475 01643-32460 561-84-84391 01010-81850 01643-31845
Z
Part name Rear support LH Bolt Washer Rear support RH Bolt Washer
Q'ty 18 18 18 1 7 7
Condition of part (Parts list No.) Packed separately (HD785-7-281) Installed to frame Installed to frame Packed separately (HD785-7-281) Installed to frame Installed to frame
Part name Clip Bolt
Q'ty 18 18
Condition of part (Parts list No.) Packed separately (HD785-7-281) Packed separately (HD785-7-281)
Fixing of air tube 1. Fix the air tube. (7) (8)
Part No. 04434-51210 01024-81020
View Z
Diagonal front view
Precautions
Necessary tools Name Nylon sling (60 mm wide × 3 m) Torque wrench
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1 1
Other remarks
49
Assembly process No.
0282
Installation of rear support (ABS specification: If equipped)
* Keep bolts (2) and (5) tightened lightly Installation of rear support for adjustment until the right platform and 1. Remove the bolts and washers installed to the machine. cab are installed. 2. Install the rear support assembly. (Before installing the left rear support assembly, install ABS assembly (9) with bolts (10). * Remove rust preventive paint from rear support grounding surface (on machine frame side).
View Y
* Remove rust preventive paint from rear support grounding surface (on machine frame side). (1) (2) (3) (4) (5) (6) (9) (10)
Part No. 561-46-80300 01010-82475 01643-32460 561-84-84391 01010-81850 01643-31845 561-88-80201 01024-81230
Part name Rear support LH Bolt Washer Rear support RH Bolt Washer ABS front sub assembly Bolt, sems
Q'ty 18 18 18 1 7 7 1 4
Condition of part (Parts list No.) Packed separately (HD785-7-282) Installed to frame Installed to frame Packed separately (HD785-7-282) Installed to frame Installed to frame Packed separately (HD785-7-282) Packed separately (HD785-7-282)
Part name Clip Bolt
Q'ty 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-282) Packed separately (HD785-7-282)
Fixing of air tube 1. Fix the air tube. (7) (8)
Part No. 04434-51210 01024-81020
Precautions
Necessary tools Name Nylon sling (60 mm wide × 3 m) Torque wrench
Other remarks
50
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1 1
Assembly process No.
0283
Installation of rear support (Sand terrain specification: If equipped)
Installation of rear support 1. Remove the bolts and washers installed to the machine. 2. Install the rear support assembly. * Keep bolts (2) and (5) tightened lightly for adjustment until the right platform and cab are installed. * Remove rust preventive paint from rear support grounding surface (on machine frame side).
* Remove rust preventive paint from rear support grounding surface (on machine frame side).
(1) (2) (3) (4) (5) (6)
Part No. 561-46-80200 01010-82475 01643-32460 X250783640 01010-81850 01643-31845
Part name Rear support LH Bolt Washer Rear support RH Bolt Washer
Q'ty 1 18 18 1 7 7
Condition of part (Parts list No.) Packed separately (HD785-7-283) Installed to frame Installed to frame Packed separately (HD785-7-283) Installed to frame Installed to frame
Part name Clip Clip Bolt
Q'ty 2 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-283) Packed separately (HD785-7-283) Packed separately (HD785-7-283)
Fixing of air tube 1. Fix the air tube. (7) (8) (9)
Part No. 04434-51210 04434-51010 01024-81020
Precautions
Necessary tools Name Nylon sling (60 mm wide × 3 m) Torque wrench
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1 1
Other remarks
51
Assembly process No.
Installation of muffler
0290 Installation of muffler Fire prevention cover * Before tightening the bolts permanently, install all the parts
Z
X 3: 8.8 – 9.8 Nm {0.9 – 1.0 kgm}
(1) (2) (3) (4) (5) (6)
Part No. 561-02-81210 6502-12-1722 01024-81235 561-02-81350 01580-11008 01643-31032
Part name Tube V coupling Bolt Band Nut Washer
* Tighten bolts to secure fire prevention cover. Q'ty 1 1 2 1 4 2
View Z
Condition of part (Parts list No.) Packed separately (HD785-7-290) Packed separately (HD785-7-290) Packed separately (HD785-7-290) Installed to frame Installed to frame Installed to frame
1. Remove the fire prevention cover installed to machine body (rear support). 2. Remove parts (4) – (6) installed to the frame temporarily and install tube (1) to the frame with parts (2) and (3). 3. Clamp tube (1) with parts (4) – (6) removed in step 2. See "Tightening procedure for exhaust pipe band" (below). 4. Reinstall the fire prevention cover removed step 1. Tightening procedure for exhaust pipe band Tighten the nuts of exhaust pipe band ((4) 561-02-81350) according to the following procedure (See view X). 1) Tighten nut "a" to 13.7 Nm {1.5 kgm}. 2) Tighten nut "b" to 59 – 74 Nm {6 – 7 kgm} and then return nut "a" slightly. Precautions
Necessary tools Name
Other remarks
52
a b Q'ty
View X Necessary equipment Name Q'ty
Assembly process No.
0291
Installation of muffler (Body heating-less/Exhaust selector box specification: If equipped)
Installation of muffler
a: 4 places
3: 8.8–9.8Nm {0.9–1kgm}
Front view of machine (Sectional view of rear support)
Rear view of machine
1. Install muffler sub-assembly (1) with bolts (2). 2. Install the exhaust pipe on the machine side and muffler sub-assembly (1) with V-coupling (3). See "Assembly procedure for exhaust pipe at muffler connecting part". (1) (2) (3) (4)
Part No. 561-84-80101 01024-81230 6502-12-1722 561-84-84341
Part name Muffler sub assembly Bolt, sem V coupling Tube
Q'ty 1 4 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-291) Packed separately (HD785-7-291) Packed separately (HD785-7-291) Installed to machine
Assembly procedure for exhaust pipe at muffler connecting part 1) When installing exhaust pipe (4) and muffler sub-assembly ((1)), 1. Install frame-side V-coupling (3) temporarily. * At this time, adjust the flexible pipe length to 336 ± 9 mm. * If the flexible pipe is tightened after extended, its sealing performance may lower and it may be disconnected. Take care. If the flexible pipe needs to be shortened, shorten it while twisting it to the left. (Twisting distance: 3 – 5 mm) 2. Permanently tighten V-coupling (3) on the frame side. Twisting distance to left: 3 – 5 mm Twisting distance to right: 0 mm
336±9
A
A-A A
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty 1
Other remarks
53
Assembly process No.
Installation of fire prevention cover
0300 Installation of fire prevention cover
* Install the fire prevention cover before installing the fender (for higher workability).
(1) (2) (3) (4)
Part No. 561-89-86111 561-89-86120 01024-81230 01024-81225
Part name Cover Cover Bolt, sems Bolt, sems
Q'ty 1 1 6 2
Condition of part (Parts list No.) Packed separately (HD785-7-300) Packed separately (HD785-7-300) Packed separately (HD785-7-300) Packed separately (HD785-7-300)
1. Install the fire prevention cover to the right rear support.
Precautions
Necessary tools Name
Other remarks
54
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of front support
0310 Installation of front support
3: 662 – 829 Nm {67.5 – 84.5 kgm}
3: 662 – 829 Nm {67.5 – 84.5 kgm}
Connection of headlamp wiring harness
(1) (2) (3) (4) (5) (6)
Part No. 561-54-80301 01010-82270 01643-32260 561-54-80401 01010-82255 01643-32260
Part name Front support sub assembly LH Bolt Washer Front support sub assembly RH Bolt Washer
Q'ty 1 11 11 1 5 5
Condition of part (Parts list No.) Packed separately (HD785-7-310) Packed separately (HD785-7-310) Packed separately (HD785-7-310) Packed separately (HD785-7-310) Packed separately (HD785-7-310) Packed separately (HD785-7-310)
1. Install front support assemblies (1) and (4) with bolts (2) and (5) and washers (3) and (6). 2. Fix the wiring harness to the clip and connect connector (CN-RP and CN-LP3). 3. After installing the front support, touch it up. Precautions
Necessary tools Name Nylon sling (60 mm wide × 3 m) Torque wrench
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1 1
Other remarks
55
Assembly process No.
0315
Installation of front support (Fog lamp specification: If equipped)
Installation of front support
3: 662 – 829 Nm {67.5 – 84.5 kgm}
3: 662 – 829 Nm {67.5 – 84.5 kgm}
Connection of headlamp wiring harness
(1) (2) (3) (4) (5) (6)
Part No. 561-54-80100 01010-82270 01643-32260 561-54-80200 01010-82255 01643-32260
Part name Front support sub assembly LH Fog Bolt Washer Front support sub assembly RH Fog Bolt Washer
Q'ty 1 11 11 1 5 5
Condition of part (Parts list No.) Packed separately (HD785-7-315) Packed separately (HD785-7-315) Packed separately (HD785-7-315) Packed separately (HD785-7-315) Packed separately (HD785-7-315) Packed separately (HD785-7-315)
1. Install front support assemblies (1) and (4) with bolts (2) and (5) and washers (3) and (6). 2. Fix the wiring harness to the clip and connect connector (CN-RP and CN-LP3). 3. After installing the front support, touch it up. Precautions
Necessary tools Name Nylon sling (60 mm wide × 3 m) Torque wrench
Other remarks
56
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1 1
Assembly process No.
0317
Installation of front support (Fog lamp, beacon lamp, HID headlamp specification: If equipped)
Installation of front support
3:
3:
Connection of headlamp harness
(1) (2) (3) (4) (5) (6)
Part No. 561-85-80V00 01010-82270 01643-32260 561-85-80W00 01010-82255 01643-32260
Part name Front support sub assembly LH Bolt Washer Front support sub assembly RH Bolt Washer
Q'ty 1 11 11 1 5 5
Condition of part (Parts list No.) Packed separately (HD785-7-317) Packed separately (HD785-7-317) Packed separately (HD785-7-317) Packed separately (HD785-7-317) Packed separately (HD785-7-317) Packed separately (HD785-7-317)
1. Install front support assemblies (1) and (4) with bolts (2) and (5) and washers (3) and (6). 2. Fix the harness to the clips and connect connectors (CN-RP and CN-LP3). 3. After installing, touch up the damaged surfaces.
Precautions
Necessary tools Name Nylon sling (60 mm wide × 3 m) Torque wrench
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1 1
Other remarks
57
Assembly process No.
Installation of steering valve
0320 Installation of steering valve 1. Remove the blind plugs and caps from the frame steering piping (5 places). 2. Install the steering valve to the left front support.
3 : 44.1 -- 58.8 Nm {4.5 -- 6.0 kgm}
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
Part No. 561-40-83300 561-40-42620 561-40-42630 561-40-42650 02010-20638 01643-31032 569-40-83470 569-40-83480 01024-80616 01643-30623 01580-10605
Part name Valve,steering Cushion Collar Plate Bolt Washer Bracket Seal Bolt, sems Washer Nut
Q'ty 1 4 4 4 4 4 2 1 2 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320)
3. Install the nipple to the steering valve.
View Z (12) (13) (14) (15) (16) (17)
Part No. 02896-21012 569-61-84770 437-40-22310 569-61-84780 418-62-11620 02896-21018
Part name O-ring Nipple O-ring Nipple O-ring O-ring
Precautions 1. Take care that the O-ring will not be projected.
Q'ty 1 2 2 2 2 4
Condition of part (Parts list No.) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Packed separately (HD785-7-320) Necessary tools Name
Other remarks
58
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Preparation for installing cab
0330 Preparation for installing cab 1. Adjust the dimensions between the viscous mounts with the left front support and rear support as shown below.
Dimension measuring method
Slinging of cab 1. Sling the cab assembly. (Use a sling having capacity of at least 3 ton.)
(1)
Part No. 561-54-83200 Precautions
Part name Cab assembly
Q'ty 1
Condition of part (Parts list No.) Packed separately (HD785-7-330)
Necessary tools Name Nylon sling (Capacity: Min. 3 ton)
Necessary equipment Q'ty Name Q'ty 1 Crane (50 ton) 1
Other remarks
59
Assembly process No.
Installation of cab
0340
Clearance (A) adjusted with shim (Standard: 0 mm)
Installation of cab
Section A-A
* After cab is installed, if clearance (A) is made, insert shims (7) and (8) by necessary quantity (up to 8 pieces for each place (t0.5 × 4, t1.0 × 4)). No shim may be used as standard.
(5) 3: 490 – 608 Nm {50 – 62 kgm}
* After the cab is mounted, if there is clearance (Standard: 0 mm), insert shims (4) as necessary [Number of shims prepared for each place: 4 (t1.0 x 4)]. No shim may be used as standard.
(1) 3: 245 – 309 Nm {25 – 31.5 kgm} (9) 3: 1,177 – 1,471 Nm {120 – 150 kgm}
Connect
Section B-B
1. Move the cab assembly to above the frame. 2. Remove parts (9) and (10) installed temporarily and then install the cab assembly with the following parts. (1) (2) (4) (5) (6) (7) (8) (9) (10)
Part No. 01010-81645 01643-31645 561-54-87221 01010-82055 01643-32060 561-54-87231 561-54-87241 01596-03024 01643-33080
Part name Bolt Washer Shim t=1.0 Bolt Washer Shim t=0.5 Shim t=1.0 Nut Washer
Q'ty 8 8 4 8 8 8 8 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-340) Packed separately (HD785-7-340) Packed separately (HD785-7-340) Packed separately (HD785-7-340) Packed separately (HD785-7-340) Packed separately (HD785-7-340) Packed separately (HD785-7-340) Installed to frame Installed to frame
3. Remove the sling. 4. Connect the ground wire to the rear of the cab assembly. (12) (13)
Part No. 08028-45025 01024-81016
Part name Cable Bolt, sems
Precautions 1. If there is clearance between the mount bracket and cab (clearance to be adjusted with shims), insert shims by necessary quantity (up to 8 pieces for each place). 2. The part to connect the ground wire must be free from stain or paint.
Q'ty 1 2
Condition of part (Parts list No.) Installed to cab assembly Packed separately (HD785-7-340)
Necessary tools Name
Other remarks
60
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Connection of ABS piping (If equipped)
0345 Connection of ABS piping 1. Remove the plugs of each hose and tube. 2. Check that the correct O-ring is fitted to each tube and connect the hose on the ABS front box side.
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
61
Assembly process No.
Connection of column
0350 Connection of column 1. Remove the bolt and washer and connect the column shaft to the steering valve. 2. Set the bolt removed in step 1 to the hollow of the steering valve joint and tighten it again. (See section A-A.)
Remove these bolt and washer.
A A
Bolt Set bolt to this "hollow".
Steering valve Section A-A
Precautions 1. Apply grease (LM-G) to the connecting parts.
Necessary tools Name
2. When installing the parts, do not hit them with a hammer etc. or installing them forcibly.
Other remarks
62
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of washer tank
0355 Installation of washer tank
1. Take washer tank assembly (1) out of the cab and install it to the cab with bolts (2). 2. Fix washer hose (A) coming out of the cab with washer tank clips (marked with a) at 2 places so that it will not be flattened and then connect it to the washer tank. 3. Connect wiring harness (B) going to the washer motor to the washer tank. (CN FL04) 4. Fix washer hose (A) and wiring harness (B) going to the washer motor with band (3) at 80 mm from the bracket end (on the cab side) so that the hose will not be flattened.
(1) (2) (3)
Part No. 569-06-6115A 01024-81020 08034-40521
Part name Washer tank Bolt, sems Band
Precautions 1. When fixing the washer hose, take care not to flatten it.
Q'ty 1 4 1
Condition of part (Parts list No.) Packed together with cab Packed together with cab Packed together with cab
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
63
Assembly process No.
Connection of cab piping
0360 Connection of cab piping
Z (View from below cab)
Path hoses through notches. Brake accumulator
A View Z (View from below cab)
1. 2. 3. 4. 5. 6
A
Remove the underside cover of the cab floor. Remove the plugs from each part. Connect the 7 hoses. Pass 5 hoses through the notches of rubber (3). Install the following parts. Clean the parts stained with oil. (1) (2) (3) (4) (5) (6)
Part No. 561-89-86241 561-89-86251 561-89-86232 424-54-14220 561-89-86262 01024-81025
Precautions
Part name Bracket Plate Rubber Washer Bracket Bolt, sems
Q'ty 1 1 1 2 2 10
Section A-A
Condition of part (Parts list No.) Packed separately (HD785-7-360) Packed separately (HD785-7-360) Packed separately (HD785-7-360) Packed separately (HD785-7-360) Packed separately (HD785-7-360) Packed separately (HD785-7-360)
Necessary tools Name
Other remarks
64
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Connection of cab wiring
0370 Connection of cab wiring
Procedure for connecting wiring harness
CN LP2: Left platform wiring harness junction
Z (View from below cab) CN LP1: Left platform wiring harness junction
CN J01: Wiring harness junction in cab
CN J06: Wiring harness junction in cab CN J05: Wiring harness junction in cab
CN PMLA: PLM and side lamp wiring harness junction
CN J03: Wiring harness junction in cab CN J02: Wiring harness junction in cab
Z (View from below cab)
(1) (2) (3) (4) (5) (6) (7) (9) (10) (11) (12)
Part No. 04434-52711 01024-81020 08193-21012 01024-81016 23S-62-25850 6152-51-5520 01024-81070 04434-52110 07095-20420 561-61-65530 561-61-65540
Z (View from below cab)
Part name Clip Bolt, sems Clip Bolt, sems Clip Spacer Bolt, sems Clip Cushion Clip Insulator
Q'ty 3 4 1 1 1 1 1 1 1 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370) Packed separately (HD785-7-370)
1. Connect the wiring harness in the cab. 2. Install the cab undercover removed in the previous step. 3. Fix the bracket installed in the previous step. Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
65
Assembly process No.
0375
Connection of cab wiring (ASR/ABS specification: If equipped)
Connection of cab wiring
CN LP2: Left platform wiring harness junction
Procedure for connecting wiring harness
CN J04: Wiring harness junction in cab CN LP1: Left platform wiring harness junction CN J06: Wiring harness junction in cab
Z (View from below cab)
CN J05: Wiring harness junction in cab
CN J01: Wiring harness junction in cab
CN J03: Wiring harness junction in cab
CN PMLA: PLM and side lamp wiring harness junction
CN J02: Wiring harness junction in cab
Z (View from below cab)
Z (View from below cab) : Fix lower wiring harness
Fix upper wiring harness :
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16)
Part No. 04434-52711 01024-81020 08193-21012 01024-81016 23S-62-25850 6152-51-5520 04434-52110 01024-81070 04434-52511 07095-20420 561-61-65530 561-61-65540 195-979-5190 04434-53411 07095-20625 01024-81075
Part name Clip Bolt, sems Clip Bolt, sems Clip Spacer Clip Bolt, sems Clip Cushion Clip Insulator Collar Clip Cushion Bolt, sems
Q'ty 3 3 4 4 1 1 1 1 1 1 1 1 1 1 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375) Packed separately (HD785-7-375)
1. Connect the wiring harness in the cab. 2. Install the cab undercover removed in the previous step. 3. Fix the bracket installed in the previous step. Precautions
Necessary tools Name
Other remarks
66
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0376
Connection of engine prelubrication harness to cab (If equipped: Engine prelubrication specification)
Connection of engine prelubrication harness to cab 1. Fix the engine prelubrication harness to the cab and connect it to the harness on the cab side.
View X
View Z
Section B-B
Connect: Cab relay connector PRE4
: Tighten together at 3 places.
View Y: Underside of cab
Section A-A
(1) (2) (3) (4) (5)
Part No. 6131-22-3750 04434-51210 198-06-53510 01024-81045 04434-50810 Precautions
Part name Boss Clip Cushion Bolt, sems Clip
Q'ty 1 1 1 1 3
Condition of part (Parts list No.) Packed separately (HD785-7-376) Packed separately (HD785-7-376) Packed separately (HD785-7-376) Packed separately (HD785-7-376) Packed separately (HD785-7-376) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
67
Assembly process No.
Connection and fixing of engine compartment lamp wiring harness (if equipped)
0377
Connection and fixing of engine compartment lamp wiring harness Pass wiring harness into cab.
Mark a: 4 places (Tighten with clip)
View Z: Cab seen from below
CAB
Remove cover in cab.
Section A-A 1. Lay the engine compartment lamp wiring harness from the machine to under the cab and fix it with clips (1). 2. Pass the engine compartment wiring harness into the cab. Remove the cover in the cab and connect the wiring harness to connector (SPARE4). 3. Install the cover in the cab again.
Connect: SPARE4
Inside of cab seen from front
(1)
Part No. 04434-50610 Precautions
Part name Clip
Q'ty 4
Condition of part (Parts list No.) Packed separately (HD785-7-377) Necessary tools Name
Other remarks
68
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0378
Connection of auto grease harness to cab (If equipped: Auto grease specification)
Connection of auto grease harness to cab 1. Fix the auto grease harness to the cab and connect it to the harness on the cab side. For other specifications, remove mounting bolt and install with it.
Section A-A Connect: Harness on cab side
View Y
View Z
(1) (2) (3)
Part No. 04434-51210 01024-81020 561-95-83210 Precautions
Part name Clip Bolt, sems Bracket
Q'ty 1 2 1
Condition of part (Parts list No.) Packed separately (HD785-7-378) Packed separately (HD785-7-378) Packed separately (HD785-7-378) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
69
Assembly process No.
0379
Connection of engine stop harness to cab (If equipped: Engine emergency stop specification)
Connection of engine stop harness to cab 1. Fix the engine stop harness to the cab and connect it to the harness on the cab side.
Install together with main harness clip mounting bolt.
View Y
Install together with cab under harness clip mounting bolt.
: 8 places
Section A-A
Section B-B Install together with cab under harness clip mounting bolt.
Section C-C
Remove used for standard and install with it.
Section D-D : 2 places Install together with main harness clip mounting bolt.
Connect View Z
View X
(1) (2) (3) (4) (5)
Part No. 04434-50610 04434-51210 198-06-53510 01024-81020 08193-21012 Precautions
Part name Clip Clip Cushion Bolt, sems Clip
Q'ty 8 1 1 2 1
Condition of part (Parts list No.) Packed separately (HD785-7-379) Packed separately (HD785-7-379) Packed separately (HD785-7-379) Packed separately (HD785-7-379) Packed separately (HD785-7-379) Necessary tools Name
Other remarks
70
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation and fixing of steering hoses
0380 Installation and fixing of steering hoses 1. Remove the cover from the front support. Install the 5 hoses to the steering valve. When installing the hoses, match the Nos. printed on them to the following figure. Port P: "2"
Port LS
Port RT: "5" Port R: "1" Port LT: "4"
View Z (1) (2) (3) (4) (5)
Part No. 02766-00423 561-61-82320 561-61-82350 561-61-82310 561-61-82340
Part name Hose Hose Hose Hose Hose
Q'ty 1 1 1 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-380) Packed separately (HD785-7-380) Packed separately (HD785-7-380) Packed separately (HD785-7-380) Packed separately (HD785-7-380)
Port R Port P Port LT
Port LS
Port RT
Port R: "1" Port P: "2" Port LS Port LT: "4" Port RT: "5"
(6) (7) (8) (9) (10)
Part No. 561-61-64510 561-61-64540 561-61-64530 561-61-64520 01024-81290 Precautions
Part name Clamp Plate Spacer Plate Bolt sems
2. Fix the 5 steering hoses to the front support. 3. Connect the hoses to the steering tubes of the frame. 4. Clean the parts stained with oil. Q'ty 6 3 6 3 6
Condition of part (Parts list No.) Packed separately (HD785-7-380) Packed separately (HD785-7-380) Packed separately (HD785-7-380) Packed separately (HD785-7-380) Packed separately (HD785-7-380) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
71
Assembly process No.
Fixing of air conditioner drain hose
0385 Fixing of air conditioner drain hose
1. Remove the cab undercover. 2. Remove wiring harness clamping bolts (2) of the front support LH. 3. Install the air conditioner drain hose to the wiring harness clamping position of the front support LH with clip (1) and bolts (2) removed in step 1. 4. Remove bolts (5) installed in field assembly procedure No. 0380. 5. Install the 2 air conditioner drain hoses together with clips (3) and (4) and bolts (5) removed in step 3.
(1) (2) (3) (4) (5)
Part No. 04434-51510 01024-81016 04435-51510 04435-51810 01024-81290 Precautions
Part name Clip Bolt, sems Clip Clip Bolt, sems
Q'ty 2 2 1 1 2
Condition of part (Parts list No.) Packed in cab Installed to front support LH Packed in cab Packed in cab Installed in No. 0380 Necessary tools Name
Other remarks
72
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of steering hose cover
0390 Installation of steering hose cover
1. Install the cover over the steering piping of the left front support
(1) (2) (3) (4)
Part No. 561-54-81490 01024-81220 561-54-81580 01024-81220
Precautions
Part name Cover Bolt, sems Cover Bolt, sems
Q'ty 1 4 1 4
Condition of part (Parts list No.) Packed separately (HD785-7-390) Packed separately (HD785-7-390) Packed separately (HD785-7-390) Packed separately (HD785-7-390)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
73
Assembly process No.
Connection of air conditioner and heater hoses
0395 Connection of air conditioner and heater hoses
1. Connect the 4 hoses to the cab piping. 2. Fix hose (d) going to the engine and hose (c) coming from the engine with clamps (1). (1) (2)
Part No. 09479-02400 01024-81020 Precautions
Part name Clamp Bolt, sems
Q'ty 2 1
Condition of part (Parts list No.) Installed to hose Packed separately (HD785-7-395) Necessary tools Name
Other remarks
74
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Connection of cab floor wiring
0400 Connection of cab floor wiring 1. Remove the cover in the cab floor.
Inside of cab floor
X 2. Connect the wiring coming from the following figure (View Z) inside the cab floor. * Each wiring harness is printed with a connector No. Take care not to connect them wrongly.
Z
CN HM-21B Exhaust temperature sensor connector (RF) CN HM-21A Exhaust temperature sensor connector (LF)
CN HM-21D Exhaust temperature sensor connector (RR))
View Z
(1)
Part No. 561-97-82250
Precautions
View X
CN HM-21C Exhaust temperature sensor connector (LR)
Part name Wiring harness
Connection
CN HM-22A
CN HM-23A
CN HM-22C
CN HM-23C
CN HM-22B
CN HM-23B
CN HM-22D
CN HM-23D
Q'ty 1
Inside of cab floor
Condition of parts Installed to frame
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
75
Assembly process No.
Fixing of ASR/ABS wiring harness (If equipped)
0405 Fixing of ASR/ABS wiring harness 1. Fix ASR/ABS wiring harness (1) to the cab with clip (1) and bolt (2). 2. Fix the connector with clip (3) and bolts (2). (CN J11)
CAB
X
Z
Fixing: CN J11
View X
CN ABSER: Ground
View Z
(1) (2) (3)
Part No. 04434-51910 01024-81016 08193-21012 Precautions
Part name Clip Bolt, sems Clip
Q'ty 1 2 1
Condition of part (Parts list No.) Packed separately (HD785-7-405) Packed separately (HD785-7-405) Packed separately (HD785-7-405) Necessary tools Name
Other remarks
76
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0406
Connection and fixing of ABS wiring harness (If equipped)
Connection and fixing of ABS wiring harness 1. Connect and fix the wiring harness with the installed clip and bolt.
X
ABS front box
View Z Wheel speed sensor wiring harness ABS/ASR wiring harness Fixing Connection and fixing: CN J11 Fixing
Section A-A
Precautions
Z View X
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
77
Assembly process No.
Installation of cover under cab
0410 Installation of cover under cab FWD
A A
B
B
Z View Z
Directed to inside of cover
Directed to inside of cover
Section A-A
Section B-B Installed position of (5), (6) and (7)
View Z
1. Install seals (3) and (4) to cover (1). 2. Install the cover under the cab. 3. Fix the 2 hoses with clamps (5), cushions (6) and bolt (7).
(1) (2) (3) (4) (5) (6) (7)
Part No. 561-54-82141 01024-81020 569-54-82260 569-54-82290 07094-30620 07095-00628 01024-81270
Precautions
Part name Cover Bolt, sems Seal Seal Clamp Cushion Bolt, sems
Q'ty 1 9 1 1 2 2 1
Condition of part (Parts list No.) Packed separately (HD785-7-410) Packed separately (HD785-7-410) Packed separately (HD785-7-410) Packed separately (HD785-7-410) Packed separately (HD785-7-410) Packed separately (HD785-7-410) Packed separately (HD785-7-410)
Necessary tools Name
Other remarks
78
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Wiring of front glass with heater wire (If equipped)
0415 Installation of cab undercover
a: 3 places
FWD
X
Z : 2 places (1 place: See view X)
: 3 places
CN BR-4 Connection : 2 places
View X
View Z
(Battery)
Connection: Secondary side (BR04)
1. Using clips (1) and bolts (2), connect the glass heater wiring harness coming from the cab. 2. Remove the bolts marked with a (3 places) and fix wiring harness with clips (1), collars (4) and bolts (5). (Discard the removed bolts.) 3. Open the battery box cover and connect the glass heater wiring harness to the battery relay. (View X) 4. Fix the wiring harness with bands (3) and (6).
(1) (2) (3) (4) (5) (6)
Part No. 04434-50610 01024-81016 08034-20823 22D-62-18450 01024-81055 08034-20519 Precautions
Part name Clip Bolt, sems Band Collar Bolt, sems Band
Q'ty 6 3 2 3 3 2
Condition of part (Parts list No.) Packed separately (HD785-7-415) Packed separately (HD785-7-415) Packed separately (HD785-7-415) Packed separately (HD785-7-415) Packed separately (HD785-7-415) Packed separately (HD785-7-415) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
79
Assembly process No.
Installation of cab seal
0420 Installation of cab seal
Z
1. Stick seal (1) to the clearance between the cab and radiator guard. (1) Degrease, clean and dry the seal sticking surface. (2) Thinly apply adhesive (LT-1A) to the seal sticking surface and sticking surface on the right side of the cab. Dry the surfaces coated with the adhesive for 3 - 5 minutes and then stick the seal.
(1)
Part No. 561-54-61290
Precautions
Part name Seal
Q'ty 1
Condition of part (Parts list No.) Packed separately (HD785-7-420)
Necessary tools Name
Other remarks
80
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0430
Installation of ambient temperature sensor wiring harness
Installation of ambient temperature sensor wiring harness
Connection: CN FL06
Front support (Left) Ambient temperature sensor wiring harness
1. Fix the wiring harness under the cab with clips (2) and bolts (3). 2. Fix the connector with clip (1) and bolts (3) and connect CN FL06. * Bolts (3) are those used in Assembly procedure No. 0480, however. Use them to fix the cab step, too.
(1) (2) (3)
Part No. 08193-21012 04434-50612 01024-81230
Precautions
Part name Clip Clip Bolt, sems
Q'ty 1 2 3
Condition of part (Parts list No.) Packed separately (HD785-7-430) Packed in cab Bolt (2) used in No. 0480
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 6HF55K (VHMS + PLM + ORB, overseas)
81
Assembly process No.
Installation of undercab wiring harness connector
0440 Installation of undercab wiring harness connector
Front support (Left)
1. Fix the wiring harness under the cab with clip (2) and bolts (3). 2. Fix the wiring harness with clip (1) and bolts (3) and connect connector (4) to its end. * Bolts (3) are those used in Assembly procedure No. 0480, however. Use them to fix the cab step, too.
(1) (2) (3) (4)
Part No. 08193-21012 04434-50612 01024-81225 08192-23830
Precautions
Part name Clip Clip Bolt, sems Connector
Q'ty 1 2 3 1
Condition of part (Parts list No.) Packed separately (HD785-7-440) Packed in cab Bolt (2) used in No. 0480 Packed separately (HD785-7-440)
Necessary tools Name
Other remarks
82
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0445
Connection and fixing of rear view camera wiring harness (if equipped)
Connection and fixing of rear view camera wiring harness Camera cable
Wiring harness rail
2-stage connection 1) Tighten the connector with the fingers. 2) Using 2 17mm spanner wrench, rotate the outer ring 180 degrees. Tighten to about 245 Nm {25 kgm} securely.
View X
Connect
View Y
Pass through backup lamp mounting hole and fix together with junction connector. Section A-A
Section B-B
Section C-C
Mark a: 9 places Mark u: 11 places
View Z
(1) (2) (3) (4)
Part No. 120-54-42430 04434-50610 01024-81050 08034-20823
Part name Spacer Clip Bolt, sems Band
Q'ty 9 9 9 11
Condition of part (Parts list No.) Installed temporarily to machine Installed temporarily to machine Installed temporarily to machine Packed separately (HD785-7-445)
1. Pull the camera cable out of the cab. (See view Z.) 2. Remove the wire harness rail cover and fix the camera cable with clips (2) installed temporarily. 3. Connect the rear view camera and camera cable and fix the wire harness with bands (4). Precautions
Necessary tools Name 17mm spanner wrench
Q'ty 1
Necessary equipment Name Q'ty
Other remarks
83
Assembly process No.
Installation of R.H platform assembly
0450 Installation of R.H platform assembly
3 : 319 – 608 Nm {32.5 – 62 kgm} Target : 460 Nm {47 kgm}
1. Remove bolts (2) installed temporarily. 2. Sling the right platform and install it with bolts (2) and (3). Install caps (5). Part No. 561-54-80602 01024-81235 01010-82045 01643-32060 09415-05016
(1) (2) (3) (4) (5)
Part name R.H platform assembly Bolt Bolt Washer Cap
Q'ty 1 8 2 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-450) Temporarily installed to machine body Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450)
Installation of R.H platform mirror 1. Install the mirror and underview mirror to the handrail. (See view Z) 2. Adjust the angle of the mirror.
Z
: 59 -- 74 Nm {6 -- 7.5 kgm}
: 59 -- 74 Nm {6 -- 7.5 kgm}
View Z
(1) (2) (3) (4) (6) (7) (8) (9) (10) (11)
Part No. 561-54-80900 07283-33442 01643-31032 01597-01009 07283-32236 07283-52232 01597-01009 01643-31032 23W-P86-2890 561-54-81871
Part name Mirror & rail assembly Clip Washer Nut Clip Seat Nut Washer Mirror Stay
Q'ty 2 4 8 8 2 2 4 4 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450) Packed separately (HD785-7-450)
Precautions
Necessary tools Name Tighten the mounting bolts of rear support No. 0280 perNylon sling manently. (250 mm wide × 5 m) (2) 3: 824 – 1,030 Nm {84 – 105} kgm (5) 3: 343 – 427 Nm {35 – 43.5} kgm
Other remarks
84
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1
Assembly process No.
Installation of right fender
0470 Installation of right fender
Set glossy side toward front of machine.
1. Install the right fender. 2. Install the guard to the right fender.
(1) (2) (3)
Part No. X251043130 01024-81230 561-54-87420
Part name Fender R.H Bolt sems Guard
Precautions Install guard (3) with its glossy side toward the front of the machine.
• Remove guard mounting plate and bolts installed to fender assembly. • Install the guard with the removed plate and bolts. 3 : 29.4 – 49.0 Nm {3 – 5 kgm}
Q'ty 1 6 1
Condition of part (Parts list No.) Packed separately (HD785-7-470) Packed separately (HD785-7-470) Packed separately (HD785-7-470)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
85
Assembly process No.
0472
Installation of right fender (If equipped: Body heating-less muffler specification)
Installation of right fender
: 6 places
• Remove the plate and bolts for the guard installed to the fender assembly temporarily. • Install the right fender with the removed plate and bolts. Tightening torque: 29.4 - 49.0 Nm {3 - 5 kgm} • Install the fender with the glossy side toward front of machine.
(1) (2) (3) (4)
Part No. X251039700 01024-81225 01024-81225 561-54-87420
Precautions
Part name Fender R, H Bolt, sems Bolt, sems Guard
Q'ty 1 6 2 1
Condition of part (Parts list No.) Packed separately (HD785-7-472) Installed to fender Packed separately (HD785-7-472) Packed separately (HD785-7-472)
Necessary tools Name
Other remarks
86
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0475
Installation of fuel tank quick charge-less hose (If equipped)
Installation of fuel tank quick charge-less hose Right fender
View X
Fuel tank
Fire prevention cover View Z
* To be installed to fire prevention cover.
: 3 places
Detail of part P
1. Fix bracket (1) to the fire prevention cover with bolts (2) installed to the fire prevention cover. (2 places) 2. Fix the hose going to the fuel tank breather to the bracket with clips (4) and bolts (5). (2 places) 3. Install cover (3) to the fire prevention cover with bolts (6). 4. Fix the hose going to the fuel tank breather to cover (3) with clip (4) and bolt (5). (1 place) (1) (2) (3) (4) (5) (6) (7)
Part No. 561-04-81530 01024-81020 561-04-81540 04434-51210 01024-81020 01024-81040 01024-81016 Precautions
Part name Bracket Bolt, sems Cover Clip Bolt, sems Bolt, sems Bolt, sems
Q'ty 2 4 1 5 3 2 2
Condition of parts Packed separately (HD785-7-475) Packed separately (HD785-7-475) Packed separately (HD785-7-475) Packed separately (HD785-7-475) Packed separately (HD785-7-475) Packed separately (HD785-7-475) Packed separately (HD785-7-475) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
87
Assembly process No.
0476
Installation of fuel tank quick chargeless hose: Muffler specification (If equipped: muffler specification)
Installation of fuel tank quick chargeless hose
Rear support
Right fender
Fuel tank
View X
View Y
* To be installed to rear support. L-plate
Detail of part Q
View Z
View P
Bolt
Bolt
1. Remove the L-plate and 2 bolts. (See view P.) 2. Install cover (1) and the hose going together to the fuel tank breather to rear support (1) with clips (2) and bolts (3). (See views Y and Q.) 3. Fix the hose going to the fuel tank breather with clips (7) and bolts (8). (3 places. See views X and Z.) 4. Install cover (4) with bolts (5) and (6). (See view Y.) (1) (2) (3) (4) (5) (6) (7) (8)
Part No. 561-04-81550 04434-51212 01024-81260 561-04-81560 01024-81045 01024-81035 04434-51210 01024-81016 Precautions
Part name Cover Clip Bolt, sems Cover Bolt, sems Bolt, sems Clip Bolt, sems
Q'ty 1 2 2 1 1 1 3 3
Condition of part (Parts list No.) Packed separately (HD785-7-476) Packed separately (HD785-7-476) Packed separately (HD785-7-476) Packed separately (HD785-7-476) Packed separately (HD785-7-476) Packed separately (HD785-7-476) Packed separately (HD785-7-476) Packed separately (HD785-7-476) Necessary tools Name
Other remarks
88
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of cab step
0480 Only machine equipped with radio
Detailed assembly of (7), (8) and (9) Scrape paint off ground part for radio antenna (Scrape paint off on left platform side, too).
CAB
Peel off masking tape.
Installation of front cab step 1. Install the step assembly to the front side of the cab. (1) (2)
Part No. 561-54-80103 01024-81230
Part name Front cab step assembly Bolt
Q'ty 1 12
Condition of part (Parts list No.) Packed separately (HD785-7-480) Packed separately (HD785-7-480)
Installation of side cab step 1. Install the step assembly to the front side of the cab. (3) (4) (5) (6) (7) (8) (9)
Part No. 561-54-80203 01024-81225 01024-81230 01024-81250 01024-81245 01643-31232 01580-11210 Precautions
Part name Side cab step assembly Bolt Bolt Bolt Bolt Washer Nut
Q'ty 1 8 2 2 1 1 1
Condition of parts Packed separately (HD785-7-480) Packed separately (HD785-7-480) Packed separately (HD785-7-480) Packed separately (HD785-7-480) Packed separately (HD785-7-480) Packed separately (HD785-7-480) Packed separately (HD785-7-480)
Necessary tools Name Nylon sling (250 mm wide × 5 m)
Necessary equipment Q'ty Name Q'ty 1 Crane (25 ton) 1
Other remarks
89
Assembly process No.
Assembly of diagonal ladder (if equipped)
0481 Assembly of diagonal ladder
Fig. 1
Up
Set edge side up.
1. Install the handrail to the platform. * When installing clamp (9), see "Fig. 1".
Set rear side down. Photo of clamp (9)
Weight: 125 kg
Weight: 45 kg (1) (2) (5) (6) (7) (8) (9) (10) (11)
Part No. 561-89-85810 561-89-85850 561-89-85831 561-89-85861 561-89-85821 561-89-85870 561-54-61910 01643-31645 01010-81635
Precautions
Weight: 75 kg Part name Step Guard Step Guard Step Guard Clamp Washer Bolt
Q'ty 1 1 1 1 1 1 8 16 16
Necessary tools Name
Other remarks
90
Condition of part (Parts list No.) Packed separately (HD785-7-481) Packed separately (HD785-7-481) Packed separately (HD785-7-481) Packed separately (HD785-7-481) Packed separately (HD785-7-481) Packed separately (HD785-7-481) Packed separately (HD785-7-481) Packed separately (HD785-7-481) Packed separately (HD785-7-481)
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0482
Installation of cab step: Diagonal ladder specification (if equipped)
Installation of cab step 1. Install the step assembly to the left side of the cab. Only machine equipped with radio
EU specification
Remove paint from radio antenna ground part (Remove paint from ground part on left platform side, too). Remove masking tape.
(1) (2)
Part No. 561-54-80203 01024-81225
Part name Side cab step assembly Bolt
Q'ty 1 8
Condition of part (Parts list No.) Packed separately (HD785-7-482) Packed separately (HD785-7-482)
Installation of cab step 1. Install the step assembly to the front side of the cab.
(3) (4) (5) (6) (7) (8) (9) (10)
Part No. Part name 561-89-80100 Step assembly 01024-81230 Bolt, sems 01024-81250 Bolt, sems 01024-81245 Bolt, sems 01643-31232 Washer 01580-11210 Nut X251271380 Front cab step sub A., kal X251271400 Side cab step sub A., kal Precautions
Q'ty Condition of part (Parts list No.) 1 Packed separately (HD785-7-481) 14 Packed separately (HD785-7-482) 2 Packed separately (HD785-7-482) 1 Packed separately (HD785-7-482) 1 Packed separately (HD785-7-482) 1 Packed separately (HD785-7-482) 1 Packed separately (HD785-7-487) 1 Packed separately (HD785-7-489) Necessary tools Necessary equipment Name Q'ty Name Q'ty Nylon sling 1 Crane (25t) 1 (250 mm wide * 5 m)
Other remarks Sales code: 6HB55 or 5AC11
91
Assembly process No.
Installation of diagonal ladder 1 (if equipped)
0483 Installation of diagonal ladder 1 1. Install the step assembly to the front side of the cab. 2. Install the rod.
Tightening torque (10):490 – 608 Nm {50 – 62 kgm}
*2 places
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
*2 places
Section A-A
Part No. 561-89-8583A 01011-82015 566-54-21931 566-54-21920 566-54-12212 566-54-21910 01643-32060 01580-02016 01597-02016 01583-12012 561-89-6A970 Precautions
Other than rod (11) Part name Step assembly Bolt Plate Plate Cushion Bushing Washer Nut Nut Nut Rod
Q'ty 1 2 2 8 8 4 6 2 2 4 1
Section B-B
Condition of part (Parts list No.) See field assembly procedure No. 0481. Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483) Packed separately (HD785-7-483)
Necessary tools Name Nylon sling (250 mm wide * 5 m)
Necessary equipment Q'ty Name Q'ty 1 Crane (25t) 1
Other remarks Sales code: 6HB55 or 5AC11
92
Assembly process No.
Installation of diagonal ladder 2 (if equipped)
0484 Installation of diagonal ladder 2 1. Install the step assembly to the front side of the cab. * 2 places
Detail of part A
(1) (2) (3) (4) (5)
Part No. 561-89-8581A 01024-81230 01024-81245 01643-31232 01580-11210
Precautions
Part name Step assembly Bolt, sems Bolt, sems Washer Nut
Q'ty 1 6 2 2 2
Condition of part (Parts list No.) See field assembly procedure No. 0481. Packed separately (HD785-7-484) Packed separately (HD785-7-484) Packed separately (HD785-7-484) Packed separately (HD785-7-484)
Necessary tools Name Nylon sling (250 mm wide * 5 m)
Necessary equipment Q'ty Name Q'ty 1 Crane (25t) 1
Other remarks
93
Assembly process No.
Installation of diagonal ladder 3 (if equipped)
0485 Installation of diagonal ladder 3 1. Install the step assembly to the front side of the cab. (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Part No. 561-89-8582A 01024-81230 01011-82015 566-54-21931 566-54-21920 566-54-12212 566-54-21910 0643-32060 01580-12016 09415-03614
Part name Step assembly Bolt, sems Bolt Plate Plate Cushion Bushing Washer Nut Cap
Q'ty 1 6 2 2 4 4 2 2 2 2
Condition of part (Parts list No.) See field assembly procedure No. 0481. Installed temporarily to machine Packed separately (HD785-7-485) Packed separately (HD785-7-485) Packed separately (HD785-7-485) Packed separately (HD785-7-485) Packed separately (HD785-7-485) Packed separately (HD785-7-485) Packed separately (HD785-7-485) Packed separately (HD785-7-485)
* 2 places
Section A-A
Installation of step 1. Install the step assembly to the front side of the cab. (11) (12)
Part No. 561-54-6A151 01024-81235 Precautions
Part name Step Bolt, sems
Q'ty 1 4
Necessary tools Name Nylon sling (250 mm wide * 5 m)
Other remarks
94
Condition of part (Parts list No.) Packed separately (HD785-7-485) Packed separately (HD785-7-485) Necessary equipment Q'ty Name Q'ty 1 Crane (25t) 1
Assembly process No.
Installation of diagonal ladder (EU specification)
0486 Installation of diagonal ladder 1. Install the handrails to the ladder and platform. * When installing clamp (7), see "Fig. 1".
Fig. 1
Up
Set edged end up
Set round end down Clamp figure
Weight: 125 kg
mark: 8 place
Weight: 45 kg
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Part No. 561-89-85810 561-89-85850 561-89-85831 561-89-85861 561-89-86820 561-89-86870 561-54-61910 01643-31645 01010-81635 Precautions
Weight: 75 kg
Part name Step Guard Step Guard Step Guard Clamp Washer Bolt
Q'ty 1 1 1 1 1 1 8 16 16
Condition of part (Parts list No.) Packed separately (HD785-7-487) Packed separately (HD785-7-487) Packed separately (HD785-7-487) Packed separately (HD785-7-487) Packed separately (HD785-7-487) Packed separately (HD785-7-487) Packed separately (HD785-7-487) Packed separately (HD785-7-487) Packed separately (HD785-7-487)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 5AC11
95
Assembly process No.
Installation of diagonal ladder-2 (EU specification)
0487 Installation of ladder-2 1. Install the step assembly to the front side of the cab.
* 2 places
Detail A
(1) (2) (3) (4) (5)
Part No. 561-89-8581A 01024-81230 01024-81245 01643-31232 01580-11210
Precautions
Part name Step assembly Bolt, sems Bolt, sems Washer Nut
Q'ty 1 6 2 2 2
Condition of part (Parts list No.) See Field assembly manual No. 0486. Packed separately (HD785-7-484) Packed separately (HD785-7-484) Packed separately (HD785-7-484) Packed separately (HD785-7-484)
Necessary tools Name Nylon sling (250 mm wide x 5 m)
Other remarks Sales code: 5AC11
96
Necessary equipment Q'ty Name Q'ty 1 Crane (25t) 1
Assembly process No.
Installation of diagonal ladder-3 (EU specification)
0488 Installation of ladder-3 1. Install the step assembly to the front side of the cab. (1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
Part No. 561-89-8682A 01024-81230 01011-82015 566-54-21931 566-54-21920 566-54-12212 566-54-21910 01643-32060 01580-12016 09415-03614
Part name Step assembly Bolt, sems Bolt Plate Plate Cushion Bushing Washer Nut Cap
Q'ty 1 6 2 2 4 4 2 2 2 2
Condition of part (Parts list No.) See Field assembly manual No. 0486. Temporarily Installed to machine Packed separately (HD785-7-488) Packed separately (HD785-7-488) Packed separately (HD785-7-488) Packed separately (HD785-7-488) Packed separately (HD785-7-488) Packed separately (HD785-7-488) Packed separately (HD785-7-488) Packed separately (HD785-7-488)
* 2 places
Section A-A
Installation of step 1. Install the step to the step assembly on the front side of the cab. (11) (12)
Part No. 561-54-88200 01024-81235 Precautions
Part name Step Bolt, sems
Q'ty 1 4
Condition of part (Parts list No.) Packed separately (HD785-7-488) Packed separately (HD785-7-488)
Necessary tools Name Nylon sling (250 mm wide x 5 m)
Necessary equipment Q'ty Name Q'ty 1 Crane (25t) 1
Other remarks Sales code: 5AC11
97
Assembly process No.
Installation of L.H underview mirror (If equipped)
0490 Installation of L.H underview mirror
3:
59 -- 74 Nm {6 -- 7.5 kgm}
1. Install the underview mirror to the cab step. 2. Adjust the angle of the mirror. (2) (3) (4) (5) (7) (8)
Part No. 07283-32236 07283-52232 01597-01009 01643-31032 23W-P86-2890 561-54-81871
Precautions
Part name Clip Seat Nut Washer Mirror Stay
Q'ty 2 2 4 4 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-490) Packed separately (HD785-7-490) Packed separately (HD785-7-490) Packed separately (HD785-7-490) Packed separately (HD785-7-490) Packed separately (HD785-7-490)
Necessary tools Name
Other remarks
98
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of fire extinguisher (If equipped)
0500 Installation of fire extinguisher (If equipped)
1. Remove the temporarily installed bolts and install fire extinguisher (1) with bolts (2). (1) (2)
Part No. 09495-00000 01435-00616
Precautions
Part name Extinguisher Bolt
Q'ty 1 4
Condition of part (Parts list No.) Packed separately (HD785-7-500) Packed separately (HD785-7-500)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 6ZZ01
99
Assembly process No.
Installing radio antenna and fixing its cable
0510 Perform this work only when the radio is installed.
View Z
Bind connector and cable
L.H.platform assembly
Conection
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11)
Part No. 561-54-87480 01225-40412 01023-10414 07270-51514 04434-51910 01435-01016 08037-11825 561-54-86941 01435-01016 08037-01008 08210-00610
Part name Antenna assembly Screw Screw Tube Clip Bolt Grommet Cover Bolt Grommet Spairal tube
Q'ty 1 1 1 1 6 6 1 1 2 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510) Packed separately (HD785-7-510)
1. Install antenna (1) to the handrail installed to the L.H platform assembly as shown in the above figure. 2. Connect the antenna cable coming from the cab to the cable coming from the antenna. 3. Fix the cable with the other parts as shown in the above figure. Precautions
Necessary tools Name
Other remarks
100
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of L.H fender
0520 Installation of L.H fender
Installed to
Set glossy side toward front of machine.
(1) (2) (3)
Part No. X251042740 01024-81230 561-54-87410
Part name Fender L.H Bolt sems Guard
Q'ty 1 6 1
Condition of part (Parts list No.) Packed separately (HD785-7-520) Packed separately (HD785-7-520) Packed separately (HD785-7-520)
1. Install the left fender. 2. Remove the bolts and plate installed temporarily to the left fender. 3. Install the guard with the bolts and plate removed in 2. (Install the guard with its glossy side toward the front of the machine.) 4. Tighten the guard mounting bolts to 29.4 – 49.0 Nm {3 – 5 kgm}.
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
101
Assembly process No.
Installation of left side mudguard
0530 Installation of left side mudguard
View from inside of cab
Z
3 : 29.4 -- 49.0 Nm {3 -- 5 kgm} r: 3 places
a: 6 places
View Z
(1) (2) (3) (4) (5) (6) (7) (8)
Part No. 561-54-86670 01024-D1025 561-54-86820 01024-D1220 569-54-81571 01024-D1030 417-43-16210 283-54-11470
Part name Bracket Bolt, sems Bracket Bolt, sems Guard Bolt, sems Washer Plate
Q'ty 1 2 1 3 1 6 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-530) Packed separately (HD785-7-530) Packed separately (HD785-7-530) Packed separately (HD785-7-530) Packed separately (HD785-7-530) Packed separately (HD785-7-530) Packed separately (HD785-7-530) Packed separately (HD785-7-530)
1. Install the left side mudguard. Precautions
Necessary tools Name
Other remarks
102
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of grille guard
0540 Installation of grille guard
(1)
Part No. 561-54-81763
Part name Guard
Q'ty 1
Condition of part (Parts list No.) Packed separately (HD785-7-540)
1. Remove the bolts installed temporarily to the grille. 2. Sling and move the guard over the grille. 3. Install the guard with the removed bolts.
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
103
Assembly process No.
Installation of left payload lamp (If equipped)
0550 Installation of left payload lamp 1. Install the payload lamp wiring harness to the rear of the cab. 2. Fix the wiring harness to the bottom of the cab. 3. Connect the payload lamp wiring harness to the frame wiring harness 4. If the side lamp is not installed, bind and fix the wiring harness with band (13).
Cab seen from rear
View Z Fix together with main wiring harness. Connection: CN.PMLA
Cab seen from below
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (12) (13)
Part No. 561-86-80100 569-86-87321 01024-81020 421-62-23710 421-62-18550 175-54-34170 01010-81235 561-86-87522 04434-50810 04434-51010 01024-81016 08034-20834 Precautions
Part name PLM lamp sub assembly L.H Bracket Bolt, sems Cushion Cushion Washer Bolt Wiring harness Clip Clip Bolt, sems Band
Q'ty 1 1 3 4 4 4 4 1 5 1 4 1
Necessary tools Name
Other remarks
104
Condition of part (Parts list No.) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Packed separately (HD785-7-550) Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of left side lamp (If equipped)
0555 Installation of left side lamp 1. Install side lamp wiring harness (1) to the rear of the cab. 2. Fix the wiring harness to the rear and underside of the cab. 3. Connect the wiring harness to the main wiring harness. (Connection: PMLA)
Fix together with main wiring harness.
Connection: CN. PMLA
Bottom view
(1) (2) (3)
Part No. 561-85-81211 04434-50810 01024-81016
Precautions
Part name Wiring harness Clip Bolt, sems
Q'ty 1 5 3
Condition of part (Parts list No.) Packed separately (HD785-7-555) Packed separately (HD785-7-555) Packed separately (HD785-7-555)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 5AC11 (EC Regulations)
105
Assembly process No.
Installation of right payload lamp (If equipped)
0560 Installation of right payload lamp 1. Install the payload lamp wiring harness to the right platform. 2. Remove the bolts marked with a on the right platform (3 places) and fix the wiring harness with them. Fix the other parts of the wiring harness, too. 3. Connect the payload lamp wiring harness to the frame wiring harness 4. If the side lamp is not installed, bind and fix the wiring harness with band (10).
Red
Orange
Green
View Y
Right platform seen from rear
3 : 59 -- 74 Nm
{6 -- 7.5 kgm} Connection: CN.PMRA
View Z
Right platform see from above
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Part No. 561-86-80201 421-62-23710 421-62-18550 175-54-34170 01010-81235 561-86-87531 01024-81016 04434-50810 08193-21012 08034-20834 561-54-86541 01024-81025 07283-33442 01643-31032 01597-01009 Precautions
Part name PLM lamp sub assembly R.H Cushion Cushion Washer Bolt Wiring harness Bolt, sems Clip Clip Band Cover Bolt, sems Clip Washer Nut
Q'ty 1 4 4 4 4 1 2 7 1 1 1 3 2 4 4
Necessary tools Name
Other remarks
106
Condition of part (Parts list No.) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Packed separately (HD785-7-560) Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of right side lamp (If equipped)
0565 Installation of right side lamp
3 : 59 -- 74 Nm {6 -- 7 kgm}
1. Connect side lamp wiring harness (1). (Connection: PMRA) 2. Fix wiring harness (1) with clip (3) and bolt (2). 3. Fix cover (6) and wiring harness (1) together with clip (3) and bolt (4). 4. Fix cover (6) and guard with clip (7), washer (8) and nut (9).
Right platform
Connection: CN-PMRA
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Part No. 561-85-81220 01024-81016 04434-50810 01024-81025 08193-21012 561-54-86541 07283-33442 01643-31032 01597-01009
Precautions
Part name Wiring harness Bolt, sems Clip Bolt, sems Clip Cover Clip Washer Nut
Q'ty 1 1 4 3 1 1 2 4 4
Condition of part (Parts list No.) Packed separately (HD785-7-565) Packed separately (HD785-7-565) Packed separately (HD785-7-565) Packed separately (HD785-7-565) Packed separately (HD785-7-565) Packed separately (HD785-7-565) Packed separately (HD785-7-565) Packed separately (HD785-7-565) Packed separately (HD785-7-565)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 5AC11 (EC Regulations)
107
Assembly process No.
0570
Installation of left fender side lamp wiring harness (If equipped)
Installation of left fender side lamp wiring harness 1. Remove the cover installed to the fender temporarily. 2. Remove the lamp cover and connect the wiring harness. (Side lamp wiring harness: CN. SLL) 3. Fix the side lamp wiring harness with the clips and bolts installed to the fender temporarily. 4. Install the cover removed in steps 1 and 2 again.
Fix with clips and bolts installed temporarily.
Connection: SLL
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 5AC11 (EC Regulations)
108
Assembly process No.
0580
Installation of right fender side lamp wiring harness (If equipped)
Installation of right fender
Z (1) (2) (3) (4) (5) (6)
Part No. 04434-50810 01024-81016 561-85-81170 01024-81020 561-85-81180 01024-81035
Part name Clip Bolt, sems Cover Bolt, sems Cover Bolt, sems
Q'ty 2 2 1 2 1 2
1. Remove the cover installed to the fender temporarily. 2. Remove the lamp cover and connect the wiring harness. (Side lamp wiring harness: CN. SLR) 3. Fix the side lamp wiring harness with the clips and bolts installed to the fender temporarily and clips (1) and bolts (2). 4. Install cover (5) with bolts (6). 5. Install the covers removed in steps 1 and 2 again.
Condition of part (Parts list No.) Packed separately (HD785-7-580) Packed separately (HD785-7-580) Installed temporarily to right fender Installed temporarily to right fender Packed separately (HD785-7-580) Packed separately (HD785-7-580)
View Z
Connection: SLR
Fix with clips and bolts installed temporarily.
Reinstallation of cover Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks Sales code: 5AC11 (EC Regulations)
109
Assembly process No.
0581
Installation of right fender side lamp wiring harness (If equipped: Body heating-less muffler, exhaust gas selector box muffler specification)
Installation of right fender
Z (1) (2) (3) (4) (5)
Part No. 561-84-81250 561-84-84250 04434-50810 01024-81016 01024-81045
Part name Cover Cover Clip Bolt, sems Bolt, sems
Q'ty 1 4 4 2 4
1. Remove the cover, clips and bolts installed to the fender temporarily. 2. Remove the lamp cover and connect the wiring harness. (Side lamp wiring harness: CN. SLR) 3. Pass clips 3 through the side lamp wiring harness. Fix the wiring harness with the clips and bolts removed in step 1. 4. Install cover (1) and clips together with bolts (5). 5. Install cover (2) with bolts (5). 6. Install the cover removed in steps 1 again together with the clips.
Precautions
Condition of part (Parts list No.) Packed separately (HD785-7-581) Packed separately (HD785-7-581) Packed separately (HD785-7-581) Packed separately (HD785-7-581) Packed separately (HD785-7-581)
Connection: SLR
View Z
Reinstallation of cover
View Z
Necessary tools Name
Other remarks
110
Fix with clips and bolts installed temporarily.
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of KOMTRAX (If equipped)
0590 Installation of KOMTRAX 3 : 59 -- 74 Nm {6 -- 7 kgm}
3 : 59 -- 74 Nm Apply LT-2 to threaded part.
{6 -- 7 kgm}
Right handrail
Cable supplied with cab (561-97-62250)
= 5 places
Z
Detail of assembly of antenna
3 : 59 -- 74 Nm {6 -- 7 kgm}
Right platform
Detail of fixing of pole (2 places)
View Z 1. Install the KOMTRAX antenna as shown above. (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
Part No. 561-97-82141 01010-81635 01643-31645 8A13-10-2100 561-97-62250 561-97-62150 07283-33442 07283-36155 01597-01009 01643-31032 04434-50610 01024-81016
Part name Pole Bolt Washer Antenna. sat Antenna cable Plate Clip Clip Nut Washer Clip Bolt, sems
Q'ty 1 2 2 1 1 2 4 2 12 12 5 5
Precautions
Condition of part (Parts list No.) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Packed separately (HD785-7-590) Necessary tools Name
LT-2
Q'ty 1
Necessary equipment Name Q'ty
Other remarks
111
Assembly process No.
Fixing of ORBCOMM antenna (If equipped)
0595 Fixing of ORBCOMM antenna
= 20 places
View Z
View Y
= 7 places
= 2 places
= 4 places
View X
Bind excessive part of antenna cable together with electrical intake air heater wiring harness.
1. Fix the wiring harnesses with clips (1) in the order of the above numbers. Fix them together at places where bolts (2) are not used. Fix Nos. 6 – 12 with spacers (5) and bolts (6) and (7). 2. After fixing the wiring harness, bind it with bands (3) and (4). 3. Bind the excessive part of the antenna cable together with electrical intake air heater wiring harness between Nos. 19 and 20. (1) (2) (3) (4) (5) (6) (7)
Part No. 04434-50610 01024-81016 08034-20823 08034-20519 175-79-83760 01024-81045 01024-81040 Precautions
Part name Clip Bolt, sems Band Band Spacer Bolt, sems Bolt, sems
Q'ty 20 4 1 3 8 7 1
Condition of part (Parts list No.) Packed separately (HD785-7-595) Packed separately (HD785-7-595) Packed separately (HD785-7-595) Packed separately (HD785-7-595) Packed separately (HD785-7-595) Packed separately (HD785-7-595) Packed separately (HD785-7-595) Necessary tools Name
Other remarks
112
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
0597
Connection and fixing of harness and hose going to auto grease pump - 1 (If equipped: Auto grease specification)
Connection and fixing of harness and hose going to auto grease pump - 1 1. Fix the harness and hose going to the auto grease pump with the parts installed temporarily to the right platform.
View Y
(When ORBCOMM antenna is installed) (When payload meter and ORBCOMM antenna are installed)
(When payload meter and ORBCOMM antenna are installed)
(When ORBCOMM antenna is installed)
(When payload meter is installed)
Section CA-CA Section BM-BM
(1) (2) (3) (4) (5) (6) (7)
Part No. 04434-51210 01024-81075 154-06-34790 01024-81095 175-79-83760 04434-52712 07095-20420
: 5 places
Part name Clip Bolt, sems Spacer Bolt, sems Spacer Clip Cushion
Q'ty 6 6 6 6 6 5 5
Precautions
(When payload meter is installed)
Condition of part (Parts list No.) Installed to right platform Installed to right platform Installed to right platform Installed to right platform Installed to right platform Installed to right platform Installed to right platform Necessary tools Name
LT-2
Q'ty 1
Necessary equipment Name Q'ty
Other remarks
113
Assembly process No.
Connection and fixing of harness and hose going to auto grease pump - 2 (If equipped: Auto grease specification)
0598
Connection and fixing of harness and hose going to auto grease pump - 2 1. Fix the harness and hose going to the auto grease pump with the parts installed temporarily to the right platform. 2. Connect the auto grease hose to the pump.
View WW
Connect
View Y
(When ORBCOMM antenna is installed)
(When payload meter and ORBCOMM antenna are installed)
Connect: GREASE PUMP A CONNECTOR
Connect:
PRESSURE SWITCH CONNECTOR
Section CD-CD Section CC-CC (When payload meter is installed)
Section CB-CB
(1) (2) (3) (4) (5) (6) (7) (8) (9)
Part No. 04434-51210 01024-81075 154-06-34790 01024-81085 561-46-43390 04434-52712 07095-20420 01024-81016 02896-21012 Precautions
Part name Clip Bolt, sems Spacer Bolt, sems Spacer Clip Cushion Bolt, sems O-ring
Q'ty 2 1 1 1 1 1 1 1 1
Condition of part (Parts list No.) Installed to right platform Installed to right platform Installed to right platform Installed to right platform Installed to right platform Installed to right platform Installed to right platform Installed to right platform Packed separately (HD785-7-598) Necessary tools Name
Other remarks
114
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Removal of hoist cylinder fixing bracket
0600 Removal of hoist cylinder fixing bracket
Hoist cylinder fixing jig Hoist cylinder
Right side of machine
Hoist cylinder
Hoist cylinder fixing jig
Left side of machine
1. Remove the right and left hoist cylinder fixing jigs and secure them with lever blocks. 2. Discard the jigs removed in step 1 above.
Precautions
Necessary tools Name Torque wrench
Q'ty 1
Necessary equipment Name Q'ty
Other remarks
115
Assembly process No.
Connection of hoist cylinder piping
0610 Connection of hoist cylinder piping 1. Remove hoist cylinder mounting bolts A and B and remove the parts marked with A. Since the parts marked with A are not used any more, discard them.
Hoist cylinder
A
A Reused
A
B (1) (2) (3) (4) (5)
Reused
Part No. 07372-21035 07000-F3038 01024-80845 07000-F3030 01643-51032
Part name Bolt O-ring Bolt O-ring Washer
Q'ty 8 2 8 2 8
Condition of part (Parts list No.) Packed separately (HD785-7-610) Packed separately (HD785-7-610) Packed separately (HD785-7-610) Packed separately (HD785-7-610) Packed separately (HD785-7-610)
2. Using bolt (1) and washer (5) instead of bolt (A) and using bolt (3) instead of bolt B, reconnect the hose. When reconnecting the hose, use O-rings (2) and (4) supplied loose. Precautions 1. When installing the piping, take care that O-ring will not be caught. 2. If the engine is started after this process is completed, the cylinder is extended automatically.
Necessary tools Name
Other remarks
116
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Welding of body
0620 Welding of body
*) For details of welding of body, see the separate manual.
(1)
Part No. 561-74-81102
Precautions
Part name Body U., assembly
Q'ty 1
Condition of part (Parts list No.) Packed separately (HD785-7-620)
Necessary tools Name Port power (300 mm for 10 ton) Hydraulic jack (10 ton) Hydraulic jack (5 ton)
Necessary equipment Q'ty Name Q'ty 1 Cranes (50 ton, 25 ton) Each one 1 1
Other remarks
117
Assembly process No.
Sticking of body decal
0630 Sticking of body decal
Left side of body
Right side of body 1. Stick the decals to the body. (1) (2) (3)
Part No. 561-93-81320 561-93-81310 561-93-81360
Part name Mark Mark Mark
Precautions 1. Eliminate blisters and fit each decal perfectly. 2. Remove all the oil and dust from the surfaces to stick the decals. 3. Stick the decal before installing the body.
Q'ty 2 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-630) Packed separately (HD785-7-630) Packed separately (HD785-7-630)
Necessary tools Name
Other remarks
118
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Supply of oil
0640 Supply of oil *) Referring to No. 0010, check the types of oil and supply proper oil. *) Before starting the engine, be sure to check the oil level in the brake oil tank. If the level is low, add new oil.
1. Before starting the engine, add oil through the filler tube of the transmission case to the H level and then add oil through the oil filler of the brake oil tank to the top (36 liters). 2. After starting the engine, run the engine at low idle and add oil until the oil pressure gauge indicates the maximum. 3. Bleed air from the brake system. Then, run the engine at low idle and adjust the oil level again. (Do not use the oil discharged during the air bleeding operation.) For details, see the Operation and Maintenance Manual. Retightening of hose clamps *) After starting the engine, retighten the clamps of the low-pressure hoses.
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
119
Assembly process No.
Slinging of body
0650 Slinging of body Body sling pin (ATH-785-006) Shackle BC40 for 10 ton
Chain sling (ATH-465-039) or ø28 wire
Inserting direction of body sling pin (ATH-785-006): Insert from outside of body.
1. Set the body sling pins from outside of the body side plate (4 pieces to holes of body). 2. Set the shackles and sling. 3. Check the center and sling the body.
Precautions
Necessary tools Name
Other remarks
120
Q'ty
Necessary equipment Name Q'ty Sling (ATH-465-039) 1 Sling (ATH-785-006) 4 Pin (BC40) 4 Crane (50 ton) 1
Assembly process No.
Installation of hinge pin
0660 Installation of hinge pin
A A
3:
245 -- 309 Nm {25 -- 31.5 kgm}
Clearance: Max. 1 mm Clearance: Max. 1 mm
Section A-A (1) (2) (3) (4) (5) (6) (7) (8)
Part No. 568-74-12650 568-74-11421 568-74-12660 568-74-12670 561-74-61740 01010-81635 01643-31645 421-70-11280
Part name Shim t = 6.0 Shim t = 2.3 Shim t = 1.0 Shim t = 4.5 Pin Bolt Washer Washer
Q'ty 2 8 8 2 2 2 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-660) Packed separately (HD785-7-660) Packed separately (HD785-7-660) Packed separately (HD785-7-660) Packed separately (HD785-7-660) Packed separately (HD785-7-660) Packed separately (HD785-7-660) Packed separately (HD785-7-660)
1. Operate the crane to set the pin holes of the frame to those of the body. 2. Insert shims to even the clearance and reduced to 1 mm or less and then insert pins (5). 3. Fix the pins with the lock bolts. Precautions
Necessary tools Name Q'ty Torque wrench (2800QL) 1
Necessary equipment Name Q'ty
Other remarks
121
Assembly process No.
Connecting hoist cylinder
0670 Connecting hoist cylinder
3
Hoist cylinder
:157 -- 196 Nm {16 -- 20 kgm}
Main frame
(1) (2) (3)
1. 2. 3. 4.
Part No. 561-52-61211 01010-81430 569-40-61710
Part name Pin Bolt Washer
Q'ty 2 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-670) Packed separately (HD785-7-670) Packed separately (HD785-7-670)
Match the hoist cylinder rod hole to the pin hole of the body mounting part. Insert pin (1) and fix it. Tighten set bolts (2) and (3). Install plug (4).
Precautions
Necessary tools Name
Other remarks
122
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Hoist cylinder grease piping
0680 Hoist cylinder grease piping
Install fitting (7) outward.
(1) (2) (3) (4) (5) (6) (7)
Part No. 421-09-12540 423-09-12110 561-52-82610 01024-80816 04434-50608 07042-20108 07020-00000
Part name Elbow Connector Tube Bolt, sems Clip Plug Fitting
Q'ty 2 2 2 2 2 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-680) Packed separately (HD785-7-680) Packed separately (HD785-7-680) Packed separately (HD785-7-680) Packed separately (HD785-7-680) Packed separately (HD785-7-680) Packed separately (HD785-7-680)
1. Install the grease tubes to the hoist cylinder. (Install the right and left tubes similarly.) 2. Supply grease.
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
123
Assembly process No.
0685
Fixing of auto grease piping to body (If equipped: Auto grease specification)
Fixing of auto grease piping to body 1.Fix the auto grease piping to the body.
: 9 places
Section A-A
View X
Section B-B Detail of part P
(1) (2) (3) (4)
Part No. 561-95-83250 04434-51010 01024-81020 01024-81016 Precautions
Part name Bracket Clip Bolt, sems Bolt, sems
Q'ty 1 11 3 9
Condition of part (Parts list No.) Packed separately (HD785-7-685) Packed separately (HD785-7-685) Packed separately (HD785-7-685) Packed separately (HD785-7-685) Necessary tools Name
Other remarks
124
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of field welding protection cover
0700 Installation of field welding protection cover
Part welded in field
Part welded in field
Part welded in field
1. Install the protection cover around each "part welded in field" shown in the above figure.
Precautions
Necessary tools Name Fireproof cloth (1 m × 10 m)
Q'ty 1
Necessary equipment Name Q'ty
Other remarks
125
Assembly process No.
Installation of body mount
0710 Installation of body mount 1. Install the body mount. 2. For the adjustment procedure, see the following section. 3 : (8) (12) 245 – 309 Nm {24.9 – 31.5 kgm}
Welded to frame For welding procedure, see C-0130. Welded to frame For welding procedure, see C-0130.
(1) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15)
Part No. 561-74-61531 561-83-69540 561-83-69550 561-83-69560 561-83-69570 561-74-61511 01010-81645 01643-31645 561-74-61521 561-74-61540 01010-81660 01643-31645 561-46-8A890 561-46-8A870
Part name Shim t = 1.0 Shim t = 1.0 Shim t = 1.0 Shim t = 1.0 Shim t = 1.0 Pad Bolt Washer Pad Shim t = 1.0 Bolt Washer Bracket (LH) Bracket (RH)
Precautions After welding in the field, touch up the welded parts.
Q'ty 70 8 8 8 8 8 32 32 2 18 8 8 1 1
Condition of part (Parts list No.) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Packed separately (HD785-7-710) Necessary tools Name
Other remarks
126
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Procedure for adjusting body mount shim
0720 Procedure for adjusting body mount shim
1. Procedure for adjusting shim for body mount Adjust the shim according to the following procedure. (1) Bottom mounts (Rubber mounts of body bottom plate) 1. Insert a spacer 43 mm thick (dimension marked with a) in the body end. 2. Measure distance b between the center of the body mount and the frame top (8 places on both sides). 3. Insert (b1 - 35), (b2 - 35), (b3 - 35) and (b4 - 35) pieces of shims (561-74-61531) in the points of b1, b2, b3 and b4 respectively. Omit the figures after the decimal fractions. 4. Install the bottom mounts and remove the spacers. 5. Lower the body and check that all of the 8 bottom mounts are in contact with the frame top. If not, adjust the shims. 6. Finish adjustment of the bottom mounts. * Before installing the frame temporarily, remove the paint from the grounding surface. (2) Front mounts (Rubber mounts of body front plate) 1. After the above adjustment of the bottom mounts, place and tack-weld brackets 561-468A890 and 561-46-8A870 on the frame so that the clearance between the body and bracket will be 57 mm. (See Fig. 1) 2. Raise the body and weld the brackets permanently. 3. Insert 7 shims 561-74-61540 7 mm in total and install rubber pad 561-74-61521. 4. Lower the body and check that the total thickness of the rubber pad is 50 mm. If it is not 50 mm, set it to 50 mm by adjusting the shim. 5. Finish adjustment of the front mounts. 2. After the body is assembled, the discrepancy between the protector and cab must be 59 ± 30 mm. If the discrepancy is not 59 ± 30 mm, adjust the shim of hinge pin (561-7461740) (See A-A).
Fig. 1
127
Assembly process No.
Field welding of exhaust tube
0730 1.
Field welding of exhaust tube
2.
Make the hook (part P) and weld it as shown in the figure. After finishing the work, cut the welded hook with gas and finish the cut surface smoothly with a grinder and the paint it yellow. Must be aligned.
Section A-A Procedure for assembling body exhaust inlet portion 1. Carry out the following work after adjusting the body mount. 2. Install spring (581-02-31360) and seal (582-02-11210) between tube (561-02-81170) and flange (561-02-61150) and then lock nut (0158011411) to dimension A shown in the figure. (4 places) 3. Fix the tube and flange with the jigs so that the distance between them will be the dimension show in the figure (188). 4. While the parts are fixed as explained in 2 and (3), insert plate (582-0211230) in the tube and insert them in the body exhaust inlet portion. 5. Align tube (561-02-81210) with flange (561-02-61150) at the flange mating face and then weld the plate and tube (561-02-81170). (Runout must be 3 mm or less.) 6. After steps 2 - 5 above, remove the jigs used in step 3. 7. Tighten the bolts according to KES 04.123.1.
(1) (2)
Part No. 561-74-80100 582-02-11230
Part name Exhaust box, sub assembly Plate
Precautions Runout must be 3 mm or less.
Q'ty 1 1
Necessary tools Name
Carry out the above work after adjusting the body mount shim.
Other remarks
128
Condition of part (Parts list No.) Packed separately (HD785-7-730) Packed separately (HD785-7-730) Q'ty
Necessary equipment Name Q'ty Spacer (ATH-465-027) 3
Assembly process No.
Assembly of body heater cover
0740 Assembly of body heater cover
3:
54 – 123 Nm
{5.5 – 12.5 kgm} 1. Install the heater cover to the body.
(1) (2)
Part No. 561-74-81470 01024-81220
Precautions
Part name Cover Bolt, sems
Q'ty 1 6
Condition of part (Parts list No.) Packed separately (HD785-7-740) Packed separately (HD785-7-740)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
129
Assembly process No.
Installation of poke ejector
0770 Installation of poke ejector
Weight: 40.4 kg
Bend end of pin. View from inside
(1) (2) (3)
Part No. 561-74-81620 581-74-11360 04050-18055
Part name Bar Pin Pin
Q'ty 2 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-770) Packed separately (HD785-7-770) Packed separately (HD785-7-770)
1. Install the poke ejector to the body.
Precautions
Necessary tools Name
Other remarks
130
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of poke ejector storage pin
0780 Installation of body lock pin
(1) (2)
Part No. 04205-11650 04052-11664
Part name Pin Pin
Q'ty 2 2
Condition of part (Parts list No.) Packed separately (HD785-7-780) Packed separately (HD785-7-780)
1. Install the poke ejector storage pin to the body.
Precautions
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
131
Assembly process No.
Installation of body mudguard
0790 Installation of body mudguard 1. Install the mudguard to the body.
Caution for installing guard
is curved, install it with * Since guard toward the rear of the machine. 3:
3:
29.4 -- 49.0 Nm {3.0 -- 5.0 kgm}
29.4 -- 49.0 Nm {3.0 -- 5.0 kgm}
Bolt between support and body
3:
29.4 -- 49.0 Nm
{3.0 -- 5.0 kgm} Guard fixing bolt
Set glossy side toward rear of machine.
Set glossy side toward rear of machine.
(1) (2) (3) (4) (5) (6) (7) (8)
Part No. 561-74-61631 561-74-61641 01010-81225 01643-31232 561-74-61661 561-74-61651 01010-81230 01643-31232 Precautions
Part name Support (L) Support (R) Bolt Washer Guard Plate Bolt Washer
Q'ty 1 1 14 14 2 2 16 16
Condition of part (Parts list No.) Packed separately (HD785-7-790) Packed separately (HD785-7-790) Packed separately (HD785-7-790) Packed separately (HD785-7-790) Packed separately (HD785-7-790) Packed separately (HD785-7-790) Packed separately (HD785-7-790) Packed separately (HD785-7-790) Necessary tools Name
Other remarks
132
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of body lock pin
0800 Installation of body lock pin 1. Store the hoist stopper pin in the axle housing.
View from rear of frame
(1)
Part No. 561-86-68141
Precautions
Part name Pin
Q'ty 2
Condition of part (Parts list No.) Packed separately (HD785-7-800)
Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
133
Assembly process No.
Installation of transmission underguard
0810 Installation of transmission underguard 1. Install the transmission underguard.
A
Thickness 1
Thickness 1
A
Section A-A
(1) (2) (3) (4) (5) (6)
Part No. 561-54-86201 561-54-66250 01010-82080 01580-12016 01643-32060 01010-82055
Precautions
Part name Guard sub assembly Collar Bolt Nut Washer Bolt
(Weight: 120 kg)
Q'ty 1 2 2 2 6 2
Condition of part (Parts list No.) Packed separately (HD785-7-810) Packed separately (HD785-7-810) Packed separately (HD785-7-810) Packed separately (HD785-7-810) Packed separately (HD785-7-810) Packed separately (HD785-7-810)
Necessary tools Name
Other remarks
134
View Z
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Installation of front handle
0830 Installation of front handle 1. Install the handle to the front axle cooling piping. (Install to the right and left similarly.)
3:
59 -- 74 Nm
{6.0 -- 7.5 kgm}
Front axle on right side of frame
Front axle on left side of frame
(1) (2) (3) (4) (5)
Part No. 561-54-86811 07283-34949 07283-34346 01597-01009 01643-31032 Precautions
Part name Grip Clip Clip Nut Washer
Q'ty 2 2 2 8 8
Condition of part (Parts list No.) Packed separately (HD785-7-830) Packed separately (HD785-7-830) Packed separately (HD785-7-830) Packed separately (HD785-7-830) Packed separately (HD785-7-830) Necessary tools Name
Q'ty
Necessary equipment Name Q'ty
Other remarks
135
Assembly process No.
Connection of dump sensor
0850 Connection of dump sensor
(1) (2) (3)
1. 2. 3. 4.
Part No. 01010-81035 566-40-11560 04245-4102A
Part name Bolt Washer Rod assembly
Q'ty 1 2 1
Condition of part (Parts list No.) Packed separately (HD785-7-850) Packed separately (HD785-7-850) Packed separately (HD785-7-850)
Install the rod. Check that the distance between the rod end centers is 484 mm (If not, adjust). Fix the dump sensor to the body with bolt (1). Adjust the dump sensor according to "Procedure for adjusting dump sensor" on the next page.
Precautions
Necessary tools Name
Other remarks
136
Q'ty
Necessary equipment Name Q'ty
Assembly process No.
Procedure for adjusting dump sensor
0860 Procedure for adjusting dump sensor Note) Be sure to perform the following adjustment after adjusting the shim of the body mount. 1. Seat the dump body. 2. Check that the difference between the centers of the lever hole and potentiometer hole (Positioning hole marked with a: ø 5) is below 1 mm. Caution) If the misalignment is larger than 1 mm, adjust it to 1 mm or less. If the adjustment dimension of the rod is reduced to 480 mm or less at this time, the potentiometer may be broken. Accordingly, never reduce it so. 3. Check the value of the "Body position" on the real-time monitor in the cab. Standard value of "Body position" when dump body is seated: 0.46 – 0.54 V Procedure for using real-time monitor (1). Press the "t" and "" and "" and "
View more...
Comments