Proposed Two-Storey Residential Building with Roofdeck II. Rebar Works
I. Concreting Works PRICE LIST MATERIAL LAFARGE REPUBLIC PORTLAND PLUS 40KG
WASHED SAND CRUSHED GRAVEL 1"
₱ ₱ ₱
PRICE 203.00 600.00
MATERIAL /bag /m³
10 mm 12 mm
850.00
/m³
16 mm
Concreting of Column Footing
#16 G.I. WIRE 5.4
WIDTH
1.5
LENGTH HEIGHT/THICKNESS
1.5 0.2
NUMBER OF CF
12 CEMENT
₱
48.6
40 kg./bag Portland Cement
MATERIAL COST
LABOR COST
9865.8
₱
2959.74
TOTAL COST
₱ ₱
12825.54 2375.1
REINFORCEMEN
Total Length for of RSB for Colu
DIMENSIONS
DIMENSIONS
CONCRETE MIXTURE CLASS A
Total Volume of Column Footing (m³)
16 mmØ x 6
/m³ 105.6
SAND 2.7 MATERIAL COST
₱
TOTAL COST
m³ of Washed Sand
1620
LABOR COST
₱
486
₱
MATERIAL COS
LABOR COST
2106
₱
390
COST /m³
NUMBER OF INTERSEC
GRAVEL
₱
5.4
m³ of Crushed Gravel 1"
MATERIAL COST
LABOR COST
4590
₱
1377
NUMBER OF FOOT
TOTAL COST
₱
LENGTH OF TIE W
5967
₱
1105
302.4
MATERIAL COS LABOR COST
/m³
Concreting of Column 11.56
DIMENSIONS
WIDTH
0.25
LENGTH
0.4
CONCRETE MIXTURE CLASS A
Total Volume of Column (m³)
TOTAL COST ₱
REINFORCEMEN
Total Length for of RSB for Colu
6.8
NUMBER OF COLUMN
17
CONCRETE MIXTURE CLASS A
DIMENSIONS
HEIGHT/THICKNESS
₱
104.04
40 kg./bag Portland Cement
MATERIAL COST
LABOR COST
21120.12
₱
6336.036
DIMENSIONS
CEMENT TOTAL COST
₱ ₱
Total Length for of RSB for Colu
27456.156 2375.1
/m³
16 mmØ x 6
SAND 5.78
m³ of Washed Sand
MATERIAL COST
₱
LABOR COST
₱
3468
1040.4
9.9
TOTAL COST
₱
MATERIAL COS
4508.4
₱
LABOR COST
390
COST
/m³
GRAVEL 11.56
TOTAL COST
m³ of Crushed Gravel 1"
MATERIAL COST
₱
NUMBER OF INTERSEC
LABOR COST
₱
9826
2947.8
₱
NUMBER OF FOOT
LENGTH OF TIE W
12773.8
24.3
₱
1105
/m³
MATERIAL COS
Concreting of Wall Footing
LABOR COST
DIMENSIONS
CONCRETE MIXTURE CLASS A
Total Volume of Wall Footing (m³)
4.4925
WIDTH
0.5
THICKNESS
0.15
LENGTH OF WF1
59.9
TOTAL COST ₱
REINFORCE Total Length for of RSB for
CEMENT 40 kg./bag Portland Cement
MATERIAL COST
LABOR COST
8207.7975
₱
2462.33925
TOTAL COST
₱ ₱
10670.13675 2375.1
/m³
SAND 2.24625
₱
1347.75
LABOR COST
₱
404.325
16 mmØ x 6 119.68
TOTAL COST
m³ of Washed Sand
MATERIAL COST
DIMENSIONS
₱
40.4325
₱ ₱
MATERIAL COS
1752.075 390
LABOR COST /m³
COST
NUMBER OF LATERA
GRAVEL 4.4925 MATERIAL COST
₱
TOTAL COST
m³ of Crushed Gravel 1"
3818.625
LABOR COST
₱
1145.5875
₱ ₱
NUMBER OF RS
NUMBER OF COLU
4964.2125 1105
LENGTH OF TIE W
/m³
1180.8
Concreting of Beam
MATERIAL COS 16.9425 0.5 0.15
WIDTH
DIMENSIONS
CONCRETE MIXTURE CLASS A
Total Volume of Beam (m³)
THICKNESS LENGTH OF FTB-1
225.9 34.95
LENGTH OF RCB-1
190.95
LENGTH OF BEAMS
₱
152.4825
40 kg./bag Portland Cement
MATERIAL COST
LABOR COST
30953.9475
₱
9286.18425
TOTAL COST
₱ ₱
40240.13175 80480.2635
₱
5082.75
LABOR COST
₱
1524.825
₱ ₱
₱
14401.125
LABOR COST
₱
4320.3375
MATERIAL COS
LABOR COST
6607.575 13215.15
COST /m³
TOTAL COST
LENGTH OF COLUMN LATE
₱ ₱
NUMBER OF COLU
NUMBER OF LATERA
18721.4625 37442.925
NUMBER
/m³
Concreting of Slab (GF)
SPACING REMAINING LENGTH
SPACING
14.3445
DIMENSIONS
THICKNESS
0.15
TOTAL AREA
95.63
CONCRETE MIXTURE CLASS A
Total Volume of Slab (m³)
16 mmØ x 6
PERIMETER OF COL
m³ of Crushed Gravel 1"
MATERIAL COST
Total Length for of RSB for
TOTAL COST
GRAVEL 16.9425
REINFORCE
9.97
m³ of Washed Sand
MATERIAL COST
₱
/m³
SAND 8.47125
TOTAL COST
DIMENSIONS
CEMENT
LABOR COST
10 mmØ x 6 166.12
MATERIAL COS LABOR COST
COST
CEMENT 40 kg./bag Portland Cement
86.067 MATERIAL COST
₱
LABOR COST
₱
17471.601
5241.4803
TOTAL COST
₱ ₱
NUMBER OF LATERA
22713.0813
NUMBER OF RS
1583.4
NUMBER OF COLU
/m³
LENGTH OF TIE W
SAND 7.17225
m³ of Washed Sand
MATERIAL COST
₱
LABOR COST
₱
4303.35
1291.005
98.4
TOTAL COST
₱
MATERIAL COS
5594.355
₱
LABOR COST
390
/m³
TOTAL COST ₱
GRAVEL
₱
14.3445
m³ of Crushed Gravel 1"
MATERIAL COST
LABOR COST
₱
12192.825
3657.8475
REINFORCE
TOTAL COST
₱ ₱
15850.6725
Total Length of RSB for Wal
1105
/m³
35.23545
DIMENSIONS
THICKNESS
0.15
TOTAL AREA
234.903
CONCRETE MIXTURE CLASS A
Total Volume of Slab (m³)
CEMENT 317.11905
40 kg./bag Portland Cement
MATERIAL COST
₱
64375.16715
LABOR COST
₱
19312.550145
₱ ₱
₱
10570.635
LABOR COST
₱
3171.1905
MATERIAL COS
LABOR COST
83687.717295 2375.1
COST
m³ of Crushed Gravel 1"
10 mmØ x 6
/m³
TOTAL COST
₱
13741.8255
₱
390
GRAVEL 35.23545
32.95
18.49
m³ of Washed Sand
MATERIAL COST
12 mmØ x 6
TOTAL COST
SAND 17.617725
DIMENSIONS
Concreting of Slab (2F and RD)
MATERIAL COS
LABOR COST COST /m³
NUMBER OF HOOP B
NUMBER OF RS
TOTAL COST
LENGTH OF TIE W
₱
35.23545
m³ of Crushed Gravel 1"
MATERIAL COST
LABOR COST
29950.1325
₱
8985.03975
₱
38935.17225
₱
1105
180.6
MATERIAL COS
/m³
LABOR COST
Concreting of Stairs
TOTAL COST 0.9
LENGTH HEIGHT/THICKNESS NUMBER OF STEPS
CEMENT 40 kg./bag Portland Cement
8.1 MATERIAL COST
₱
1644.3
LABOR COST
₱
493.29
TOTAL COST
₱
₱
REINFORCEMENT
Total Length of RSB fo DIMENSIONS
1.5 0.2 0.2 15
WIDTH
DIMENSIONS
CONCRETE MIXTURE CLASS A
Total Volume of Column (m³)
12 mmØ x 6
2137.59 41.94
₱
2375.1
/m³
MATERIAL COS
SAND 0.45
m³ of Washed Sand
MATERIAL COST
LABOR COST
₱
270
₱
81
LABOR COST TOTAL COST
₱ ₱
COST
351 390
Total Length of Stirrups
PERIMETER OF FT 10 mmØ x 6
/m³
GRAVEL 0.9
m³ of Crushed Gravel 1"
MATERIAL COST
₱
765
LABOR COST
₱
229.5
61.16
TOTAL COST
₱ ₱
MATERIAL COS
994.5 1105
LABOR COST COST
/m³
NUMBER OF STIRR NUMBER OF RS
LENGTH OF TIE W 550.4625
MATERIAL COS
LABOR COST TOTAL COST ₱
REINFORCEMENT
REINFORCEMENT
Total Length of RSB fo DIMENSIONS
16 mmØ x 6 305.52
MATERIAL COS
LABOR COST COST
Total Length of Stirrups f
PERIMETER OF RC 10 mmØ x 6 334.16
MATERIAL COS
LABOR COST COST
NUMBER OF STIRR NUMBER OF RS
LENGTH OF TIE W 4009.95
MATERIAL COS
LABOR COST TOTAL COST ₱
REINFORCEM
Total Length of RSB for A B
LENGTH OF RS ALONG A ALONG B
12 mmØ x 6 257.91
MATERIAL COS
LABOR COST COST
NUMBER OR INTERSE
LENGTH OF TIE W
1310.4
MATERIAL COS
LABOR COST TOTAL COST ₱
REINFORC
Total Length of 12mm
NUMBER OF STEEL
AREA 12 mmØ x 6 144.74
MATERIAL COS
LABOR COST COST
Total Length of 10mm
NUMBER OF STEEL
AREA 10 mmØ x 6 144.74
MATERIAL COS
LABOR COST COST
NUMBER OR INTERSE
LENGTH OF TIE W
80.886
MATERIAL COS
LABOR COST TOTAL COST ₱
II. Rebar Works
III. Masonry Works PRICE LIST
PR
MATERIAL
₱ ₱ ₱
REINFORCEM ENT BARS
10 mm 12 mm 16 mm
₱
#16 G.I. WIRE
PRICE 125.00 192.00
MATERIAL /pc /pc
CONCRETE HOLLOW BLOCK 5" T
315.00
/pc
LAFARGE REPUBLIC PORTLAND PLUS 40
180.00
/kg
CONCRETE HOLLOW BLOCK 4" T
WASHED SAND CRUSHED GRAVEL 1"
REINFORCEMENT BARS FOR COLUMN FOOTING (F1)
CONCRETE HOLLOW B 633.6
LENGTH
3.3
NUMBER OF RSB
ALONG (B)
1.5
9
ALONG (L)
1.5
7
12
NUMBER OF FOOTING (F1)
16 mmØ x 6m REINFORCEMENT STEEL BAR
Total Length for of RSB for Column Footing (m)
Total Area of Exterior Walls (m² GROUND FLOOR SECOND FLOOR
CONCRETE HOLLOW BLOCK 5" T
CEMENT M
16 mmØ x 6m REINFORCEMENT STEEL BAR 105.6
pcs
MATERIAL COST LABOR COST COST ₱
CEMENT
TOTAL COST
₱ ₱ ₱
SAND
43243.2 33264 9979.2
19219.2
PLASTERING @
AREA OF WALLS (TWO SIDES CEMENT /m
SAND TOTAL COST MATERIAL COST
#16 G.I. WIRE NUMBER OF INTERSECTIONS
63
NUMBER OF FOOTING
16
LENGTH OF TIE WIRE
302.4
meters
CHB 5" THK
0.3
m
5.71
kg.
MATERIAL COST LABOR COST
₱ ₱
1027.0188679245 308.1056603774
TOTAL COST
₱
1335.1245283019
SAND
CHB 5" THK CEMENT SAND
CONCRETE HOLLOW B
/m²
593.3886792453
Total Area of Interior Walls (m²
REINFORCEMENT BARS FOR COLUMN FOOTING (F2) 59.4
16 mmØ x REINFORCEME BAR
Total Length for of RSB for Column Footing (m)
CEMENT
GROUND FLOOR
59.4
LENGTH
3.3
NUMBER OF RSB
ALONG (B)
1.5
9
ALONG (L)
1.5
9
1
NUMBER OF FOOTING (F1)
16 mmØ x 6m REINFORCEMENT STEEL BAR
Total Length for of RSB for Column Footing (m)
SECOND FLOOR
CONCRETE HOLLOW BLOCK 4" T
CEMENT M CEMENT SAND
PLASTERING @
16 mmØ x 6m REINFORCEMENT STEEL BAR 9.9
pcs
MATERIAL COST LABOR COST COST ₱
AREA OF WALLS (TWO SIDES
TOTAL COST
₱ ₱ ₱
CEMENT
4054.05 3118.5 935.55
SAND TOTAL COST MATERIAL COST
68.25
/m
CHB 5" THK
#16 G.I. WIRE
CEMENT
NUMBER OF INTERSECTIONS
81
NUMBER OF FOOTING
1
LENGTH OF TIE WIRE
24.3
meters
SAND
CHB 5" THK
0.3
m
0.46
kg.
CEMENT SAND
Total Length of RSB for Vertical B
MATERIAL COST
₱
82.5283018868
LABOR COST
₱
24.758490566
TOTAL WIDTH OF WALLS
TOTAL COST
₱
107.2867924528
SPACING
/m²
47.6830188679
LENGTH 12 mmØ x 6m REIN
REINFORCEMENT BARS FOR COLUMN (C1)
67.5229166667 16 mmØ x 6m REINFORCEMENT STEEL BAR
Total Length for of RSB for Column (m)
718.08
LENGTH OF COLUMN
6.8
NUMBER OF RSB/COLUMN
6
NUMBER OF COLUMN 16 16 mmØ x 6m REINFORCEMENT STEEL BAR 119.68
₱ ₱ ₱
LABOR COST COST ₱
12964.4 COST
Total Length of RSB for Horizontal HEIGHT OF WALL
WIDTH 10 mmØ x 6m REIN
49008.96 37699.2 11309.76 68.25
#16 G.I. WIRE
₱
TOTAL COST
pcs
MATERIAL COST
MATERIAL COST
8.98 /m
MATERIAL COST LABOR COST
NUMBER OF LATERAL TIES
41
NUMBER OF RSB
6
NUMBER OF COLUMN
16
LENGTH OF TIE WIRE
1180.8
meters
COST
0.3
/m
22.28
kg.
MATERIAL COST
₱
4010.2641509434
LABOR COST
₱ ₱
1203.079245283
TOTAL COST
5213.3433962264
766.6681465039
/m
REINFORCEMENT BARS FOR COLUMN (C2) 16 mmØ x 6m REINFORCEMENT STEEL BAR
Total Length for of RSB for Column (m)
59.84
LENGTH OF COLUMN
6.8
NUMBER OF RSB/COLUMN
8
1 NUMBER OF COLUMN 16 mmØ x 6m REINFORCEMENT STEEL BAR 9.97
pcs
MATERIAL COST LABOR COST COST ₱
TOTAL COST
₱ ₱ ₱
4084.08 3141.6 942.48 68.25
/m 996.71
LENGTH OF COLUMN LATERAL TIES (m)
m
1.3
PERIMETER OF COLUMN NUMBER OF COLUMN
17
NUMBER OF LATERAL TIES
40.5
NUMBER
11
SPACING
0.1
REMAINING LENGTH
5.7
SPACING
TOTAL NUMBER OF LATERAL TIES
41
0.2 10 mmØ x 6m REINFORCEMENT STEEL BAR
166.12 MATERIAL COST LABOR COST
pcs
TOTAL COST
₱ ₱ ₱
26994.2291666667 20764.7916666667 6229.4375
₱
COST
27.0833333333
/m
#16 G.I. WIRE NUMBER OF LATERAL TIES
41
NUMBER OF RSB
8 1
NUMBER OF COLUMN LENGTH OF TIE WIRE
98.4
meters
0.3
/m
1.86
kg.
₱ ₱ ₱
MATERIAL COST LABOR COST TOTAL COST
334.1886792453 100.2566037736 434.4452830189
63.8890122087
/m
REINFORCEMENT BARS FOR WALL FOOTING 197.67
NUMBER OF RSB
3
LENGTH OF WALL FOOTING
59.9
Total Length of Hoop Bars (m)
110.92
SPACING OF HOOP BARS
0.3
12 mmØ and 10 mmØ REINFORCEMENT STEEL BARS
Total Length of RSB for Wall Footing (m)
0.5 12 mmØ x 6m REINFORCEMENT STEEL BAR
WIDTH OF HOOP BARS
32.95
TOTAL COST
pcs
₱ ₱ ₱
MATERIAL COST LABOR COST COST ₱
8223.072 6325.44 1897.632 41.6
/m
10 mmØ x 6m REINFORCEMENT STEEL BAR 18.49
TOTAL COST
pcs
₱ ₱ ₱
MATERIAL COST LABOR COST COST ₱
3003.9930555556 2310.7638888889 693.2291666667
27.0833333333
/m
#16 G.I. WIRE NUMBER OF HOOP BARS
200.67
NUMBER OF RSB
3
LENGTH OF TIE WIRE
0.3
m
180.6
meters
3.41
kg.
LABOR COST
₱ ₱
184.0075471698
TOTAL COST
₱
797.3660377358
MATERIAL COST
613.358490566
13.3116199956
/m
REINFORCEMENT BARS FOR CONCRETE BEAM (FTB-1) Total Length of RSB for FTB-1
251.64
NUMBER OF RSB
m
TOP BARS
6 3
BOTTOM BARS
3 m
TOTAL LENGTH OF FTB-1 34.95 12 mmØ x 6m REINFORCEMENT STEEL BAR 41.94
pcs
MATERIAL COST LABOR COST COST ₱
TOTAL COST
₱ ₱ ₱
10468.224 8052.48 2415.744 41.6
Total Length of Stirrups for FTB-1
/m 366.975
1.2 PERIMETER OF FTB-1 10 mmØ x 6m REINFORCEMENT STEEL BAR 61.16
pcs
MATERIAL COST LABOR COST COST ₱
m
TOTAL COST
₱ ₱ ₱
9938.90625 7645.3125 2293.59375
284.375
/m
#16 G.I. WIRE NUMBER OF STIRRUPS NUMBER OF RSB
305.8125 6
LENGTH OF TIE WIRE
0.3
550.4625
meters
MATERIAL COST LABOR COST TOTAL COST 810.1146226415
10.39
₱ ₱ ₱
kg.
1869.4952830189 560.8485849057 2430.3438679245 /m
REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1)
REINFORCEMENT BARS FOR CONCRETE BEAM (RCB-1) Total Length of RSB for RCB-1
1833.12
m
2 3 3
WEB BARS TOP BARS BOTTOM BARS
m
TOTAL LENGTH OF RCB-1 190.95 16 mmØ x 6m REINFORCEMENT STEEL BAR 305.52
pcs
MATERIAL COST LABOR COST COST ₱
TOTAL COST
₱ ₱ ₱
125110.44 96238.8 28871.64 68.25
Total Length of Stirrups for RCB-1
/m 2005.0
1.2 PERIMETER OF RCB-1 10 mmØ x 6m REINFORCEMENT STEEL BAR 334.16
pcs
MATERIAL COST LABOR COST COST ₱
m
TOTAL COST
₱ ₱ ₱
54301.40625 41770.3125 12531.09375
284.375
/m
#16 G.I. WIRE NUMBER OF STIRRUPS NUMBER OF RSB
1670.8125 8
LENGTH OF TIE WIRE
0.3
4009.95
meters
75.66
₱ ₱ ₱
MATERIAL COST LABOR COST TOTAL COST
kg.
13618.6981132075 4085.6094339623 17704.3075471698
92.7169811321
/m
REINFORCEMENT FOR GROUND FLOOR SLAB Total Length of RSB for GF Slab 7.05
m
13.5
m
SPACING 0.15
1547.46
m
ALONG A
48
ALONG B
91 m
LENGTH OF RSB ALONG A
1289.55 648
ALONG B
641.55
m m
12 mmØ x 6m REINFORCEMENT STEEL BAR 257.91
TOTAL COST
pcs
₱ ₱ ₱
MATERIAL COST LABOR COST COST ₱
64374.336 49518.72 14855.616
14.7377142857
/m
#16 G.I. WIRE 4368
NUMBER OR INTERSECTIONS LENGTH OF TIE WIRE
1310.4
meters
0.3
m
24.72
kg.
₱ ₱ ₱
MATERIAL COST LABOR COST TOTAL COST
4450.4150943396 1335.1245283019 5785.5396226415
1.3245283019
/m
REINFORCEMENT FOR 2F AND RD SLAB Total Length of 12mmØ RSB
868.45 3.221
m
AREA 269.62 12 mmØ x 6m REINFORCEMENT STEEL BAR
m²
NUMBER OF STEEL BARS
144.74
TOTAL COST
pcs
₱ ₱ ₱
MATERIAL COST LABOR COST COST ₱
36127.354432 27790.27264 8337.081792
133.9936
/m
Total Length of 10mmØ RSB
868.45 3.221
m
AREA 269.62 10 mmØ x 6m REINFORCEMENT STEEL BAR
m²
NUMBER OF STEEL BARS
144.74
TOTAL COST
pcs
₱ ₱ ₱
MATERIAL COST COST
LABOR COST ₱
23520.4130416667 18092.6254166667 5427.787625
87.2354166667
/m
#16 G.I. WIRE NUMBER OR INTERSECTIONS LENGTH OF TIE WIRE
269.62 0.3
m
80.886
meters
MATERIAL COST LABOR COST TOTAL COST 1.3245283019
1.53
₱ ₱ ₱
kg.
274.7071698113 82.4121509434 357.1193207547 /m²
orks
III. Formworks PRICE LIST
PRICE LIST
MATERIAL
RETE HOLLOW BLOCK 5" THK
RETE HOLLOW BLOCK 4" THK
GE REPUBLIC PORTLAND PLUS 40KG
WASHED SAND
₱ ₱ ₱ ₱ ₱
CRUSHED GRAVEL 1"
PRICE 9.00 8.00
MATERIAL /pc /pc
Form Lumber 2" x 3" x 12' Coco Lumber
203.00
/bag
1/2"x4'x8' Ordinary Plywood
600.00
/m³
850.00
/m³
Form Lumber 2" x 2" x 12' Coco Lumber
FORMS FOR COLUMN SIDES OF THE COLUMN SHORTER SIDE
CONCRETE HOLLOW BLOCKS FOR WALL (EXTERIOR)
l Area of Exterior Walls (m²)
LONGER SIDE
167.929
LATERAL PERIMETER OF THE COLUMN
GROUND FLOOR
85.3155
COLUMN HEIGHT
SECOND FLOOR
82.6135
NUMBER OF COLUMNS
2099.1125
RETE HOLLOW BLOCK 5" THK
TOTAL AREA
pcs.
1/2"x4'x8' Ordinary Plywood
CEMENT MORTAR (CLASS C) CEMENT
1601.62
bag
TOTAL COST
SAND
177.17
m³
MATERIAL COST
PLASTERING @ 12mm THK (CLASS B)
A OF WALLS (TWO SIDES) CEMENT SAND TOTAL COST MATERIAL COST
₱ ₱ ₱
18892.0125 334947.2370685 108717.23
CHB 5" THK CEMENT SAND
LABOR COST
335.86
m²
48.36
bag
4.03
m³
₱
42.651 WOOD FRAME OF COLUMNS
₱
601323.43 LABOR COST
₱ ₱ ₱ ₱ ₱ ₱
5667.60375
MATERIAL COST
100484.17112055
LABOR COST
Form Lumber 2" x 2" x 12' Coco Lumber TOTAL COST
₱
32615.17038 146.25 2592.94945 841.62
CONCRETE HOLLOW BLOCKS FOR WALL (INTERIOR)
/m² /m² /m²
29.000
SCAFFOLDING FOR COLUMNS HORIZONTAL BRACES VERTICAL BRACES DIAGONAL BRACES
al Area of Interior Walls (m²) GROUND FLOOR
150.005 65.2
Form Lumber 2" x 2" x 12' Coco Lumber
SECOND FLOOR
84.805 1875.0625
RETE HOLLOW BLOCK 4" THK
TOTAL COST MATERIAL COST
pcs.
LABOR COST
₱
CEMENT MORTAR (CLASS C) CEMENT
1430.67
bag
SAND
158.26
m³
Form Lumber 2" x 3" x 12' Coco Lumber
PLASTERING @ 8mm THK (CLASS B)
A OF WALLS (TWO SIDES)
1675.960
TOTAL COST
300.01
m²
MATERIAL COST
CEMENT
28.80
bag
LABOR COST
SAND TOTAL COST
2.40
m³
₱
MATERIAL COST
₱ ₱ ₱
529966.92 LABOR COST
₱ ₱ ₱ ₱ ₱ ₱
15000.5 296273.1504425 96393.21
CHB 5" THK CEMENT SAND
ength of RSB for Vertical Bars
4500.15
TWO SIDE FORMS
88881.94513275
BOTTOM FORM
28917.9639
LENGTH OF BEAM
130
/m²
2567.61505
/m²
835.38
/m² m
OTAL WIDTH OF WALLS
107.77
m
SPACING
0.8
m
LENGTH 3.00 12 mmØ x 6m REINFORCEMENT STEEL BAR
m
229166667
₱
MATERIAL COST
1/2"x4'x8' Ordinary Plywood TOTAL COST MATERIAL COST LABOR COST
₱
Form Lumber 2" x 3" x 12' Coco Lumber
16853.72
₱
TOTAL COST
ngth of RSB for Horizontal Bars
LABOR COST /m
53.885
HEIGHT OF WALL
MATERIAL COST
3889.32
156.3860072376
m 3
WIDTH 107.77 10 mmØ x 6m REINFORCEMENT STEEL BAR pcs
TOTAL COST
₱ ₱ ₱
42.651 WOOD FRAME OF COLUMNS
LABOR COST
12964.4 ₱
MATERIAL COST LABOR COST
TOTAL AREA
TOTAL COST
pcs.
66.733 FORMS FOR BEAM PERIMETER OF TWO SIDES FORM
405.1375
8.98
₱
1459.3854166667 1122.6041666667 336.78125
₱
55.126
SCAFFOLDING FOR COLUMNS HORIZONTAL BRACES VERTICAL BRACES
Form Lumber 2" x 2" x 12' Coco Lumber TOTAL COST MATERIAL COST LABOR COST
₱
27.0833333333
/m
₱
47.165 Form Lumber 2" x 3" x 12' Coco Lumber TOTAL COST MATERIAL COST LABOR COST
₱
90.316
PRICE LIST
MATERIAL
" x 3" x 12' Coco Lumber
" x 2" x 12' Coco Lumber
Ordinary Plywood
₱ ₱ ₱
PRICE 132.00 88.00
/pc /pc
320.00
/pc
FORMS FOR COLUMN
OF THE COLUMN
0.65
m
ORTER SIDE
0.25 0.4
m m
1.5
m
NGER SIDE
METER OF THE COLUMN
UMN HEIGHT
6.8
R OF COLUMNS
17
OTAL AREA
Ordinary Plywood
OTAL COST
ERIAL COST
BOR COST
m
173.4
m²
17.7780511811
pcs
₱ ₱ ₱
7395.67 5688.98 1706.69
42.651
/m²
WOOD FRAME OF COLUMNS
ERIAL COST
BOR COST
pcs
x 2" x 12' Coco Lumber OTAL COST
43.956
₱ ₱ ₱
5028.59 3868.15 1160.44
29.000
/m²
SCAFFOLDING FOR COLUMNS
ICAL BRACES
809.2
ONAL BRACES
1352.52
x 2" x 12' Coco Lumber
2540.310
bd. Ft. bd. Ft.
2427.6
bd. Ft. bd. Ft.
ONTAL BRACES
OTAL COST
ERIAL COST
BOR COST
₱ ₱ ₱
290611.46 223547.28 67064.18
1675.960
/m²
OTAL COST
ERIAL COST
BOR COST
bd. Ft.
67.433
x 3" x 12' Coco Lumber
₱ ₱ ₱
11571.56 8901.20 2670.36
66.733 FORMS FOR BEAM
/m² 0.95
m
0.25
m
TTOM FORM
0.35
m
GTH OF BEAM
225.9
m
214.605
m²
22.003
pcs
OF TWO SIDES FORM SIDE FORMS
OTAL AREA
Ordinary Plywood
OTAL COST
ERIAL COST
BOR COST
₱ ₱
9153.10 7040.85 2112.25
₱
42.651
/m²
WOOD FRAME OF COLUMNS
OTAL COST
ERIAL COST
BOR COST
bd. Ft.
68.942
x 3" x 12' Coco Lumber
₱ ₱ ₱
11830.38 9100.29 2730.09
55.126
/m²
SCAFFOLDING FOR COLUMNS 88.4775
ICAL BRACES
112.95
BOR COST
pcs
88.478
x 2" x 12' Coco Lumber
OTAL COST ERIAL COST
bd. Ft. bd. Ft.
ONTAL BRACES
₱ ₱ ₱
10121.83 7786.02 2335.81
47.165
/m²
OTAL COST ERIAL COST
BOR COST 90.316
bd. Ft.
112.950
x 3" x 12' Coco Lumber
₱ ₱ ₱
19382.22 14909.40 4472.82 /m²
TWO STOREY RESIDENTIAL BUILDIN
BILL OF MATERIAL I.D. NO
DESCRIPTION GENERAL REQUIREMENTS Mobilization/Temporary Structures, Utilities and Services/Demobilization/Permits
UNIT
lot
Sub-total 1.00 1.01 1.02 1.03 1.04 1.05 1.06
Earthworks Clearing and Grubbing Structural Excavation Backfilling and Compaction Gravel Bedding G-1 Select Fill Soil Poisoning Sub-Total
2.00
Concreting Works Column Footing Portland Cement Crushed Gravel 1" Washed Sand Wall Footing Portland Cement Crushed Gravel 1" Washed Sand Column Portland Cement Crushed Gravel 3/4"" Washed Sand Beams Portland Cement
2.01 2.02 2.03 2.01 2.02 2.03 2.01 2.02 2.03 2.01 2.02 2.03 2.01 2.02 2.03
Crushed Gravel 3/4"" Washed Sand Slab on Grade Portland Cement Crushed Gravel 1" Washed Sand Stairs
sq.m cu.m cu.m cu.m cu.m sq.m
bag cu.m cu.m bag cu.m cu.m bag cu.m cu.m bag cu.m cu.m bag cu.m cu.m
2.01 2.02 2.03
Portland Cement Crushed Gravel 1" Washed Sand Sub-total
3.00
Rebar Works Footings
3.01 3.02 3.01 3.02 3.03 3.01 3.02 3.03 3.01 3.02 3.03 3.04 3.01 3.02 3.03 4.00 4.01 4.02 4.03 4.01
4.02 4.01 4.02
Column Footings 16 mm #16 G.I. Wire Wall Footings 12 mm 10 mm #16 G.I. Wire Column 16 mm 10 mm #16 G.I. Wire Roof beams & Tie beams 16 mm 12 mm 10 mm #16 G.I. Wire Slabs 12 mm 10 mm #16 G.I. Wire Sub-total Forms and Scaffoldings Column form Good lumber ( 2" x 2" x 12') Plywood Ordinary, 1/4" x 4" x 8' CWN, Assorted Column & Roof beam Scaffolding Vertical Support ( 2" x 3" x 12' Good lumber) Horizontal Support (2" x 2" x 12' Good lumber) Diagonal braces (2" x 2" x 12' Good lumber) CWN, Assorted Beam form Good lumber ( 2" x 2" x 12') Plywood Ordinary, 1/4" x 4" x 8'
bag cu.m cu.m
pc kg pc pc kg pc pc kg pc pc pc kg pc pc kg
pc pc kg pc pc pc kg pc pc
4.03
CWN, Assorted Sub-total
5.00
Masonry Works
5.01 5.02 5.03 5.04 5.05 5.06 5.01 5.02
Masonry wall CHB 5" THK CHB 4" THK Portland Cement Washed Sand 12mm x 6m RSB #61 G.I. Tie wire Plastering Portland Cement Washed Sand Sub-total
kg
pcs. pcs. bag cu.m pc kg bag cu.m
6.00
Doors And Windows
6.01
D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb
set
6.02
D-2, Panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb
set
6.03
D-3, Panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb
set
6.04
W-1, 12mm thk. bronze glass on powder coated aluminum frame
set
6.05
W-2, 6mm thk. bronze glass on powder coated aluminum frame
set
6.07
W-3, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
set
6.08
W-4, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
set
6.09
W-5, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
set
6.1
W-6, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
set
6.12
W-7, 12mm thk. bronze glass on powder coated aluminum frame
set
6.13
W-8, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs. Sub-total Electrical Works Roughing-ins Electrical Conduit uPVC, 15mmØ
set
7.00 7.01
pc
7.02
RSC 60mmØ
pc
Entrance Cap 60mm dia. 7.03
pc Junction Box , 4" x 4" G.I
7.04
pc Utility Box, 2" x 4" x G.I
7.05
pc Grounding Rod, 2.4m x 16mm dia.
7.06
pc Wires and Fixtures 3.5 mm2 THW wire , Stranded
7.01
box Duplex C.O. with Plate
7.02
pc 3 Way Switch With Plate
7.03
pc 40 watts Flourescent Lamp
7.04
pc Single Switch with Plate
7.05
pc 2-Gang Switch with Plate
7.06
pc
7.07
Incandescent Bulb 50W
set
7.08 7.09 7.10 7.11
Panel Box, Flush Type, 4 Branches
set set set pc
8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10
Circuit Breaker, 20A 2P Main Circuit Breaker, 175A 2P Electrical Tape Sub-total Plumbing Works Water Closet 1.6gpf with Accessories Kitchen Sink Faucet , Hose Bibb , Brass 3/4"Ø G.I Coupling, 3/4"Ø G.I Tee, 3/4"Ø G.I. Pipe 3/4" Sch.40 G.I. Elbow 90° x 3/4"Ø Gate Valve , 3/4"dia. Check Valve , 3/4"dia. S.S. Floor Drain 4' x 4" Sub-total
set set pc pc pc pc pc pc pc pc
9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09
Sanitary works uPVC Sanitary Pipe 4"Ø x 10' uPVC Wye 4" x 4" uPVC Wye 4" x 2"
10.03 10.04
Acri Color
10.01 10.02
11.00 11.01 11.02 11.03 11.04 11.05 11.06
11.01 11.02 11.03
pc
uPVC Sanitary Pipe 2"Ø uPVC P-TRAP 2"Ø uPVC P-TRAP 4"Ø uPVC Elbow 45° x 4 "Ø uPVC Cleanout 4" diameter PVC Cement Sub-total Painting Works Concrete surfaces Neutralizer Latex, Flat Latex, Semi Gloss
10.00
pc pc pc pc pc pc pc can
sq.m qrt gal gal qrt
Sub-total TileWorks Wall Unglazed Wall Tiles 20cm x 30cm T&B Unglazed Wall Tiles 20cm x 20cm KITCHEN Tile Trim 6mm. Lining 2" X 20cm (T&B and KITCHEN) Tile Adhesive 25kg/bag Tile Grout 5 kg/bag Flooring
pc pc pc pc bag bag sq.m
Glazed Floor Tiles 20cmx 20cm (INTERIOR )
pc
Tile Adhesive 25kg/bag Tile Grout 5 kg/bag Sub-total
bag bag
TOTAL BUILDING COST (LABOR AND MATERIAL)
PRICE FOR BIDDING LABOR AND MATERIALS
Y RESIDENTIAL BUILDING WITH ROOFDECK BILL OF MATERIALS QTY
UNIT COST MATERIAL
TOTAL COST LABOR
MATERIAL
LABOR
1.00
30,000.00
9,000.00
30,000.00
9,000.00
140.00 75.80 50.00 5.00 13.00 140.00
0.00 0.00 150.00 850.00 150.00 50.00
50.00 250.00 50.00 255.00 45.00 15.00
0.00 0.00 7,500.00 4,250.00 1,950.00 7,000.00
7,000.00 18,950.00 2,500.00 1,275.00 585.00 2,100.00
48.60 5.40 2.70
203.00 850.00 600.00
66.00 255.00 180.00
9,865.80 4,590.00 1,620.00
3,207.60 1,377.00 486.00
40 2.25 4.5
203.00 850.00 600.00
66.00 255.00 180.00
8,120.00 1,912.50 2,700.00
2,640.00 573.75 810.00
105.00 11.56 5.78
203.00 850.00 600.00
66.00 255.00 180.00
21,315.00 9,826.00 3,468.00
6,930.00 2,947.80 1,040.40
153.00 16.94 8.47
203.00 850.00 600.00
66.00 255.00 180.00
31,059.00 14,399.00 5,082.00
10,098.00 4,319.70 1,524.60
417.00 50.85 25.40
203.00 850.00 600.00
66.00 255.00 180.00
84,651.00 43,225.90 15,240.60
27,522.00 12,967.77 4,572.18
8.00 0.90 0.45
203.00 850.00 600.00
66.00 255.00 180.00
1,624.00 765.00 270.00
528.00 229.50 81.00
164.00 4.28
315.00 180.00
10.00 10.00
51,660.00 770.40
1,640.00 42.80
33.00 18.50 3.41
192.00 125.00 180.00
10.00 10.00 10.00
6,336.00 2,312.50 613.80
330.00 185.00 34.10
130.00 167.00 24.14
315.00 125.00 180.00
10.50 10.00 10.00
40,950.00 20,875.00 4,345.20
1,365.00 1,670.00 241.40
306.00 41.94 395.00 86
315.00 192.00 125.00 180.00
10.50 10.00 10.00 10.00
96,390.00 8,052.48 49,375.00 15,480.00
3,213.00 419.40 3,950.00 860.00
403.00 144.74 26.25
192.00 125.00 180.00
10.00 10.00 10.00
77,376.00 18,092.50 4,725.00
4,030.00 1,447.40 262.50
44.00 18.00 30.00
88.00 320.00 80.00
26.40 96.00 24.00
3,872.00 5,760.00 2,400.00
1,161.60 1,728.00 720.00
180.38 209.67 112.71 35.00
132.00 88.00 88.00 80.00
39.60 26.40 26.40 24.00
23,810.16 18,450.96 9,918.48 2,800.00
7,143.05 5,535.29 2,975.54 840.00
69.00 22.00
88.00 320.00
26.40 96.00
6,072.00 7,040.00
1,821.60 2,112.00
30.00
80.00
24.00
2,400.00
720.00
2,100.00 1,875.00 3,032.00 275.43 76.50 20.00
9.00 8.00 203.00 600.00 192.00 180.00
2.55 2.55 57.00 168.00 9.60 19.50
18,900.00 15,000.00 615,496.00 165,258.00 14,688.00 3,600.00
5,355.00 4,781.25 172,824.00 46,272.24 734.40 390.00
77.16 56.32
203.00 600.00
54.00 168.00
15,663.48 33,792.00
4,166.64 9,461.76
1
10,800.00
3,240.00
10,800.00
3,240.00
5
4,500.00
1,350.00
22,500.00
6,750.00
3
2,495.00
748.50
7,485.00
2,245.50
1
8,700.00
2,610.00
8,700.00
2,610.00
9
7,500.00
2,250.00
67,500.00
20,250.00
6
7,000.00
2,100.00
42,000.00
12,600.00
7
5,625.00
1,687.50
39,375.00
11,812.50
2
5,500.00
1,650.00
11,000.00
3,300.00
5
4,200.00
1,260.00
21,000.00
6,300.00
1
3,145.00
943.50
3,145.00
943.50
1
3,000.00
900.00
3,000.00
900.00
50.00
58.00
14.50
2,900.00
725.00
11.00
1,000.00
250.00
11,000.00
2,750.00
11.00
80.00
20.00
880.00
220.00
34.00
20.00
5.00
680.00
170.00
12.00
20.00
5.00
240.00
60.00
14.00
200.00
50.00
2,800.00
700.00
12.00
3,750.00
937.50
45,000.00
11,250.00
14.00
108.00
27.00
1,512.00
378.00
4.00
250.00
62.50
1,000.00
250.00
10.00
150.00
37.50
1,500.00
375.00
10.00
68.00
17.00
680.00
170.00
13.00
108.00
27.00
1,404.00
351.00
14.00
40.00
10.00
560.00
140.00
3.00 4.00 1.00 35.00
320.00 350.00 3,000.00 25.00
80.00 87.50 750.00 6.25
960.00 1,400.00 3,000.00 875.00
240.00 350.00 750.00 218.75
4.00 2.00 7.00 11.00 11.00 13.00 8.00 5.00 12.00 4.00
4,500.00 600.00 250.00 17.00 17.00 370.00 17.00 360.00 300.00 200.00
1,125.00 150.00 62.50 4.25 4.25 92.50 4.25 90.00 75.00 50.00
18,000.00 1,200.00 1,750.00 187.00 187.00 4,810.00 136.00 1,800.00 3,600.00 800.00
4,500.00 300.00 437.50 46.75 46.75 1,202.50 34.00 450.00 900.00 200.00
11.00 11.00
525.00 160.00
131.25 40.00
5,775.00 1,760.00
1,443.75 440.00
14.00
97.00
24.25
1,358.00
339.50
14.00 11.00 17.00 8.00 5.00 6.00
205.00 50.00 110.00 97.00 110.00 120.00
51.25 12.50 27.50 24.25 27.50 30.00
2,870.00 550.00 1,870.00 776.00 550.00 720.00
717.50 137.50 467.50 194.00 137.50 180.00
646.52 8.62 21.55
130.00 450.00
32.50 112.50
1,120.60 9,697.50
280.15 2,424.38
22.00
440.00
110.00
9,680.00
2,420.00
4.20
123.00
30.75
516.60
129.15
168.00 45.00 21.00 54.00 8.00 8.00
40.00 32.00 50.00 25.00 270.00 165.00
10.00 8.00 12.50 6.25 67.50 41.25
6,720.00 1,440.00 1,050.00 1,350.00 2,160.00 1,320.00
1,680.00 360.00 262.50 337.50 540.00 330.00
15,530.00
13.00
3.25
201,890.00
50,472.50
134.00
270.00
67.50
36,180.00
9,045.00
134.00
185.00
46.25
24,790.00
6,197.50
431.39
T (LABOR AND MATERIAL)
2,993,117.44
PRICE FOR BIDDING 31506.50
GRAND TOTAL
I.D. NO
39,000.00 39,000.00 1.00 7,000.00 18,950.00 10,000.00 5,525.00 2,535.00 9,100.00 53,110.00
1.01 1.02 1.03 1.04 1.05 1.06
2.00 13,073.40 5,967.00 2,106.00
2.01 2.02 2.03
10,760.00 2,486.25 3,510.00
2.01 2.02 2.03
28,245.00 12,773.80 4,508.40
2.01 2.02 2.03
41,157.00 18,718.70 6,606.60
2.01 2.02 2.03
112,173.00 56,193.67 19,812.78
2.01 2.02 2.03
2,152.00 994.50 351.00 303,686.45
2.01 2.02 2.03
3.00
53,300.00 813.20
3.01 3.02
6,666.00 2,497.50 647.90
3.01 3.02
42,315.00 22,545.00 4,586.60 99,603.00 8,471.88 53,325.00 16,340.00 81,406.00 19,539.90 4,987.50 417,044.48
5,033.60 7,488.00 3,120.00 30,953.21 23,986.25 12,894.02 3,640.00 7,893.60 9,152.00
3.01 3.02 3.03
3.01 3.02 3.03 3.01 3.02 3.03
3.01 3.02 3.03 3.01 3.02 3.03
3.01 3.02 3.01
3,120.00 107,280.68
3.02 3.03 4.00
24,255.00 19,781.25 788,320.00 211,530.24 15,422.40 3,990.00 19,830.12 43,253.76 1,236,783.45
4.01 4.02 4.03 4.01
4.02 4.01
14,040.00
4.02
29,250.00
4.03
9,730.50 11,310.00
5.00
87,750.00 54,600.00
5.01
51,187.50
5.02
14,300.00
5.03
27,300.00
5.04
4,088.50
5.05
3,900.00
5.06
307,456.50 5.01 5.02 3,625.00
13,750.00
6.00
1,100.00
6.01
850.00
6.02
300.00
6.03
3,500.00
6.04 6.05
56,250.00
6.07
1,890.00
6.08
1,250.00
6.09
1,875.00
6.1
850.00
6.12
1,755.00
6.13
700.00 1,200.00 1,750.00 3,750.00 1,093.75 95,488.75 22,500.00 1,500.00 2,187.50 233.75 233.75 6,012.50 170.00 2,250.00 4,500.00 1,000.00 40,587.50
7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08
7,218.75 2,200.00
7.09 7.10 7.11
1,697.50 3,587.50
8.00
687.50 2,337.50 970.00 687.50 900.00 20,286.25
8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10
1,400.75 12,121.88 12,100.00 645.75
9.00
26,268.38
9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09
8,400.00 1,800.00 1,312.50 1,687.50 2,700.00 1,650.00
252,362.50
10.00
45,225.00 30,987.50
10.01 10.02
346,125.00
10.03 10.04
2,993,117.44
11.00
/m²
11.01 11.02 11.03 11.04 11.05
11.06 11.01 11.02 11.03
TWO STOREY RESIDENTIAL BUILDING WITH ROOFD
DETAILED ESTIMATES COST (MATERIALS AND LABOR AND LABOR ONL DESCRIPTION
MATERIALS AND LA
GENERAL REQUIREMENTS Mobilization/Temporary Structures, Utilities and Services/Demobilization/Permits Earthworks Clearing and Grubbing Structural Excavation Backfilling and Compaction Gravel Bedding G-1 Select Fill Soil Poisoning
Concreting Works Concreting of Column Footing (F1) Portland Cement Crushed Gravel 1" Washed Sand Concreting of Wall Footing (WF1) Portland Cement Crushed Gravel 1" Washed Sand Column (C1 & C2) Portland Cement Crushed Gravel 3/4"" Washed Sand Beams (FTB-1, RCB-1 & RFB-1) Portland Cement Crushed Gravel 3/4"" Washed Sand Slab on Grade (S-1) Portland Cement Crushed Gravel 1" Washed Sand Stairs
Php
278.
Php Php Php Php Php Php Php
379 50 135 71 39 18 65
Php Php Php Php Php
63,257 3,916 2,421 1,105 390
Php
3,103
Php Php Php
1,992 460 650
Php
8,430
Php Php Php
5,230 2,365 834
Php
12,311
Php Php Php
7,621 3,466 1,223
Php
34,848
Php Php Php
20,772 10,406 3,669
Php
647
Portland Cement Crushed Gravel 1" Washed Sand
Php Php Php
398 184 65
Rebar Works
Php
8,162
Reinforcing Steel Bars in Footings Column Footing (C1F1) 16 mm #16 G.I. Wire Column Footing (C2F1) 16 mm #16 G.I. Wire Wall Footings 12 mm 10 mm #16 G.I. Wire
Php Php
3,582 1,651
Php Php
1,601 49
Php
1,849
Php Php Php Php Php Php
1,801 47 81 41 27 13
Php Php
1,629 731
Php Php Php
450 233 47
Php
898
Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php
600 233 63 1,686 653 300 284 69 1,032 655 284 93 1,263 738 677 60 525 275
Reinforcing Steel Bars in Column Column (C1F1) 16 mm 10 mm #16 G.I. Wire Column (C2F1) 16 mm 10 mm #16 G.I. Wire Reinforcing Steel Bars in Roof Beams FTB-1 12 mm 10 mm #16 G.I. Wire RCB-1 and RFB-2 16 mm 10 mm #16 G.I. Wire Reinforcing Steel Bars in Slabs Ground Floor Slab 12 mm #16 G.I. Wire S-1 12 mm
10 mm #16 G.I. Wire
Php Php
174 75
Installation of Forms and Scaffoldings
Php
15,776
Column form Good lumber ( 2" x 2" x 12') Plywood Ordinary, 1/4" x 4" x 8' CWN, Assorted Column & Roof beam Scaffolding Vertical Support ( 2" x 3" x 12' Good lumber) Horizontal Support (2" x 2" x 12' Good lumber) Diagonal braces (2" x 2" x 12' Good lumber) CWN, Assorted Beam form Good lumber ( 2" x 2" x 12')
Php
2,300
Php Php Php
740 1,101 458
Php
10,510
Php Php Php Php Php Php
4,551 3,527 1,896 535 2,965 1,160
Plywood Ordinary, 1/4" x 4" x 8'
Php
1,345
CWN, Assorted
Php
458
Masonry Works
Php
3,690
Masonry wall
Php
3,491
CHB 5" THK
Php
144
CHB 4" THK
Php
131
Portland Cement
Php
2,486
Washed Sand
Php
667
12mm x 6m RSB
Php
48
#61 G.I. Tie wire
Php
12
Plastering Portland Cement Washed Sand
Php Php Php
199 62 136
Installation of Doors And Windows
Php
3,236
D-1, Double swing panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb
Php
147
D-2, Panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb
Php
307
D-3, Panel door with 2" x 6" wooden frame & 2" x 6" wooden door jamb
Php
102
W-1, 12mm thk. bronze glass on powder coated aluminum frame
Php
119
W-2, 6mm thk. bronze glass on powder coated aluminum frame
Php
923
W-3, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
Php
574
W-4, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
Php
538
W-5, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
Php
150
W-6, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
Php
287
W-7, 12mm thk. bronze glass on powder coated aluminum frame
Php
43
W-8, 6mm thk. bronze glass on powder coated aluminum frame with open back, screen & lock accs.
Php
41
Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php
1,005 243 38 144 11 8 3 36 761 592 19 13 19 8 18 7 12
Electrical Works Installation of Roughing-ins Electrical Conduit uPVC, 15mmØ RSC 60mmØ Entrance Cap 60mm dia. Junction Box , 4" x 4" G.I Utility Box, 2" x 4" x G.I Grounding Rod, 2.4m x 16mm dia. Wires and Fixtures 3.5 mm2 THW wire , Stranded Duplex C.O. with Plate 3 Way Switch With Plate 40 watts Flourescent Lamp Single Switch with Plate 2-Gang Switch with Plate Incandescent Bulb 50W Panel Box, Flush Type, 4 Branches
Circuit Breaker, 20A 2P Main Circuit Breaker, 175A 2P Electrical Tape
Php Php Php
18 39 11
Plumbing Works
Php Php Php Php Php Php Php Php Php Php Php
427 236 15 23 2 2 63 1 23 47 10
Php Php Php Php Php Php Php Php Php Php
213 75 23 17 37 7 24 10 7 9
Php
87
Php Php Php Php
4 40 40 2
Php Php Php Php Php Php Php
3,643 184 88 18 13 17 28
Water Closet 1.6gpf with Accessories Kitchen Sink Faucet , Hose Bibb , Brass 3/4"Ø G.I Coupling, 3/4"Ø G.I Tee, 3/4"Ø G.I. Pipe 3/4" Sch.40 G.I. Elbow 90° x 3/4"Ø Gate Valve , 3/4"dia. Check Valve , 3/4"dia. S.S. Floor Drain 4' x 4" Sanitary works uPVC Sanitary Pipe 4"Ø x 10' uPVC Wye 4" x 4" uPVC Wye 4" x 2" uPVC Sanitary Pipe 2"Ø uPVC P-TRAP 2"Ø uPVC P-TRAP 4"Ø uPVC Elbow 45° x 4 "Ø uPVC Cleanout 4" diameter PVC Cement Painting Works Concrete surfaces Neutralizer Latex, Flat Latex, Semi Gloss Acri Color TileWorks Wall Unglazed Wall Tiles 20cm x 30cm T&B Unglazed Wall Tiles 20cm x 20cm KITCHEN Tile Trim 6mm. Lining 2" X 20cm (T&B and KITCHEN) Tile Adhesive 25kg/bag
Tile Grout 5 kg/bag Flooring Glazed Floor Tiles 20cmx 20cm (INTERIOR ) Tile Adhesive 25kg/bag Tile Grout 5 kg/bag
Php Php
17 3,458
Php
2,656
Php Php
476 326
ESIDENTIAL BUILDING WITH ROOFDECK
DETAILED ESTIMATES IALS AND LABOR AND LABOR ONLY) COST
MATERIALS AND LABOR
LABOR
Php
278.57
per m²
Php
64.29
per m²
Php Php Php Php Php Php Php
379.36 50.00 135.36 71.43 39.46 18.11 65.00
per m² per m² per m² per m² per m² per m² per m²
Php Php Php Php Php Php Php
231.50 50.00 135.36 17.86 9.11 4.18 15.00
per m² per m² per m² per m² per m² per m² per m²
Php Php Php Php Php
63,257.24 3,916.00 2,421.00 1,105.00 390.00
per m³
3,103.01
Php Php Php
1,992.59 460.42 650.00
Php
8,430.96
Php Php Php
5,230.56 2,365.52 834.89
Php
12,311.54
Php Php Php
7,621.67 3,466.43 1,223.44
Php
34,848.05
Php Php Php
20,772.78 10,406.24 3,669.03
Php
647.69
15,393.39 1,174.00 594.00 255.00 90.00 745.14 488.89 106.25 150.00 2,021.89 1,283.33 545.89 192.67 2,952.28 1,870.00 799.94 282.33 8,344.81 5,096.67 2,401.44 846.70 155.28
per m³
Php
Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php
per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³
per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³ per m³
Php Php Php
398.52 184.17 65.00
per m³ per m³ per m³
Php Php Php
97.78 42.50 15.00
per m³ per m³ per m³
Php
8,162.37
Php
2,448.71
Php Php
3,582.52 1,651.05
Php Php
1,601.60 49.45
Php
1,849.48
Php Php Php Php Php Php
1,801.80 47.68 81.99 41.60 27.08 13.31
Php Php Php Php Php Php Php
1,074.76 495.32 480.48 14.84 554.84 540.54 14.30
Php
24.60
Php Php
1,629.87 731.87
Php Php Php
450.45 233.51 47.91
Php
898.00
Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php
600.60 233.51 63.89 1,686.46 653.88 300.00 284.35 69.53 1,032.58 655.20 284.38 93.00 1,263.52 738.52 677.62 60.90 525.00 275.13
per m² per m² per m² per m² per m² per m² per m² per m² per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m² per m² per m² per m² per m² per m²
Php Php Php Php Php Php Php Php Php Php Php Php
12.48 8.12 3.99 488.96 219.56 135.14 70.05 14.37 269.40 180.18 70.05 19.17
Php
505.94
Php Php Php Php Php Php Php Php Php Php Php Php Php Php
196.16 90.00 85.31 20.86 309.77 196.56 85.31 27.90 379.06 221.56 203.29 18.27 157.50 82.54
per m² per m² per m² per m² per m² per m² per m² per m² per m² per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m per m² per m² per m² per m² per m² per m²
Php Php
174.87 75.00
per m² per m²
Php Php
52.46 22.50
per m² per m²
Php
15,776.57
Php
4,732.97
Php
2,300.24
Php Php Php
740.24 1,101.18 458.82
Php
10,510.81
Php Php Php Php Php Php
4,551.94 3,527.39 1,896.18 535.29 2,965.53 1,160.82
per m per m per m per m per m per m per m per m per m per m per m per m
Php Php Php Php Php Php Php Php Php Php Php
690.07 222.07 330.35 137.65 3,153.24 1,365.58 1,058.22 568.85 160.59 889.66 348.25
per m per m per m per m per m per m per m per m per m per m per m per m
Php
1,345.88
per m
Php
403.76
per m
Php
458.82
per m
Php
137.65
per m
Php
3,690.59
per m²
Php
1,107.18
per m²
Php
3,491.59
per m²
Php
1,047.48
per m²
Php
144.38
per m²
Php
43.31
per m²
Php
131.88
per m²
Php
39.56
per m²
Php
2,486.81
per m²
Php
746.04
per m²
Php
667.29
per m²
Php
200.19
per m²
Php
48.65
per m²
Php
14.60
per m²
Php
12.59
per m²
Php
3.78
per m²
Php Php Php
199.00 62.56 136.45
per m² per m² per m²
Php Php Php
59.70 18.77 40.93
per m² per m² per m²
Php
3,236.38
per m²
Php
970.92
per m²
Php
147.79
per m²
Php
44.34
per m²
Php
307.89
per m²
Php
92.37
per m²
Php
102.43
per m²
Php
30.73
per m²
Php
119.05
per m²
Php
35.72
per m²
Php
923.68
per m²
Php
277.11
per m²
Php
574.74
per m²
Php
172.42
per m²
Php
538.82
per m²
Php
161.64
per m²
Php
150.53
per m²
Php
45.16
per m²
Php
287.37
per m²
Php
86.21
per m²
Php
43.04
per m²
Php
12.91
per m²
Php
41.05
per m²
Php
12.32
per m²
Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php
1,005.14 243.42 38.16 144.74 11.58 8.95 3.16 36.84 761.72 592.11 19.89 13.16 19.74 8.95 18.47 7.37 12.63
per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m²
Php
301.54
Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php Php
73.03 11.45 43.42 3.47 2.68 0.95 11.05 228.52 177.63 5.97 3.95 5.92 2.68 5.54 2.21 3.79
per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m²
Php Php Php
18.42 39.47 11.51
per m² per m² per m²
Php Php Php
5.53 11.84 3.45
per m² per m² per m²
Php Php Php Php Php Php Php Php Php Php Php
427.24 236.84 15.79 23.03 2.46 2.46 63.29 1.79 23.68 47.37 10.53
per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m²
Php
128.17
Php Php Php Php Php Php Php Php Php Php
71.05 4.74 6.91 0.74 0.74 18.99 0.54 7.11 14.21 3.16
per m² per m² per m² per m² per m² per m² per m² per m² per m² per m² per m²
Php Php Php Php Php Php Php Php Php Php
213.54 75.99 23.16 17.87 37.76 7.24 24.61 10.21 7.24 9.47
per m² per m² per m² per m² per m² per m² per m² per m² per m² per m²
Php
64.06
Php Php Php Php Php Php Php Php Php
22.80 6.95 5.36 11.33 2.17 7.38 3.06 2.17 2.84
per m² per m² per m² per m² per m² per m² per m² per m² per m² per m²
Php
87.56
per m²
Php
26.27
per m²
Php Php Php Php
4.67 40.41 40.33 2.15
per m² per m² per m² per m²
Php Php
1.40 12.12
Php
12.10
Php
0.65
per m² per m² per m² per m²
Php Php Php Php Php Php Php
3,643.42 184.74 88.42 18.95 13.82 17.76 28.42
per m² per m² per m² per m² per m² per m² per m²
Php Php Php
1,093.03 55.42 26.53
Php
5.68
Php Php Php
4.14 5.33 8.53
per m² per m² per m² per m² per m² per m² per m²
Php Php
17.37 3,458.68
per m² per m²
Php Php
5.21 1,037.61
per m² per m²
Php
2,656.45
per m²
Php
796.93
per m²
Php Php
476.05 326.18
per m² per m²
Php Php
142.82 97.86
per m² per m²