FACH Congestion Solution(Result)_RNC Wisma Mulia 2_21st Jan
October 27, 2020 | Author: Anonymous | Category: N/A
Short Description
Download FACH Congestion Solution(Result)_RNC Wisma Mulia 2_21st Jan...
Description
FACH Congestion Solution (Result) –RNC Wisma Mulia Huawei NPI Team-15th Jan
HUAWEI TECHNOLOGIES CO., LTD.
Summary We take action to switch the FACH User Number from 30 to 60 on 11th Jan . There is a significant increase on FACH User Number ; For PS and HS Drop call rate decreased, CS drop call rate maintained . For Cell Update Success Rate improved . For VS.FACH.DTCH.CONG.TIME increased .
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 2
FACH User Numbers 1. Total trend from 4th to 14th
2. Include working days and weekend days 6th VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters , there is a significant improvement on FACH User Numbers .
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 3
Page 3
FACH Utilization
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 4
Cell Update Success Rate 1. Total trend from 4th to 14th
2. Include working days and weekend days 6th VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters , there is a significant improvement on Cell Update success Rate.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 5
Page 5
CS Drop Call Rate(%) 1. Total trend from 4th to 14th
2. Include working days and weekend days 6h VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters ,the CS drop call rate maintained.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 6
CS Drop Call Times 1. Total trend from 4th to 14th
2. Include working days and weekend days 6h VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters ,the CS drop call times maintained.
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 7
RAB Drop Call (PS) 1. Total trend from 4th to 14th
2. Include working days and weekend days 6h VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters ,the PS drop call rate decreased .
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 8
Page 8
Drop call times (PS) 1. Total trend from 4th to 14th
2. Include working days and weekend days 6h VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters ,the PS drop times decreased .
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 9
Drop Call HS 1. Total trend from 4th to 14th
2. Include working days and weekend days 6h VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters ,the HS drop call rate decreased .
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 10
Page 10
Call Drop times (HS) 1. Total trend from 4th to 14th
2. Include working days and weekend days 6h VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters ,the HS drop call times decreased .
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 11
VS.FACH.DTCH.CONG.TIME(S) 1. Total trend from 4th to 14th
2. Include working days and weekend days 46h VS 13th , 7th VS 14th
3. Conclusion : after we modify the parameters ,the VS.FACH.DTCH.CONG.TIME increased
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 12
Page 12
Thank you
HUAWEI TECHNOLOGIES CO., LTD. HISILICON SEMICONDUCTOR
Page 13
View more...
Comments