Expoproy Vilavilani II - Fase i(05092009)

July 27, 2020 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download Expoproy Vilavilani II - Fase i(05092009)...

Description

RÍO ANCOAQUE

OJOS COPAPUJO

POZOS EL AYRO

 AGOSTO - 2009

ESQUEM ESQ UEMA A HID HIDR R ULI ULICO CO DEL PRO PROYEC YECTO TO VIL VILAVI AVILAN LANII II  ETAPA I  – 

BOCATOMA VILACHAULLANI Qd=1000 l/s Qp=353 l/s

L. Vil aco acota ta

OJOS COPAPUJO Qd=300 l/s Qp=227 l/s

Río LINEA DE CONDUCCION VILACHAULLANI Qd=1000 l/s L=17,91 Km D=1200 mm.

B  P   O E  L  R I  V   U I  A 

L a  Casir Casir i

L. CONDUC. CALACHACA  – CHUAPALCA TRAMO I Qd=1000 l/s L=35,24 Km D=1300 mm.

CANAL CALACHACA TRAMO II L = 13 Km

Represa Paucarani V = 10.5 MMC

POZOS EL AYRO Qd=530 lts/s

TRAMO II CANAL

CHUAPALCA-UCHUSUMA L=48,10 Km. Qd=3,5 m3/s.

Uchusuma

POZOS EL AYRO Qd=470 l/s CANAL UCHUSUMA BAJO (PESCHAY-OVALO CUZCO)

L a . Blanca

POBLACION TACNA 282 056 hab.

TRAMO III CANAL

UCHUSUMA-HUAYLILLAS SUR Qd=4,5 m3/s. Qp=2183 l/s BOCATOMA CHUSCHUCO

CANAL MAGOLLO

TACNA AMPLIACIÓN FRONTERA AGRÍCOLA A = 2 850 ha. Ir rig. Magollo

EST. PIEDRAS BLANCAS Qp=1771 l/s RESERVORIOS CERRO BLANCO TUBERIA DE CONDUCCION

L=30,29 Km. Qd=1,2 m3/s. I rri g. La Yarada Yarada

BOCATOMA UCHUSUMA

PROYECTADO EN EJECUCION OBRAS EXISTENTES PERDIDAS POR CONDUCCIÓN

ESQUEMA DE ABASTECIMIENTO DE AGUA DE CIUDAD Y VALLE DE TACNA ESCENARIO SIN PROYECTO L . Vilacota  Chiliculco 

TUNEL KOVIRE

L a Casiri  Represa Paucarani 

P  E  R  U

PATAPUJO Q=164 l/s POZOS EL AYRO Q=200 l/s

B   O L  I    V  I    A 

CHUAPALCA-ELAYRO

L=47,40 Km.

Uchusuma 

BOCATOMA UCHUSUMA

Q=793 l/s

PUENTE EL AYRO

Q=1 176 l/s

MINSUR POBLACIÓN TACNA 276 444 hab. BOCATOMA

CHUSCHUCO

TACNA I rrig. Magollo 

PVT-01 PVT-02

PIEDRAS BLANCAS Q = 870 l/s

POZOS VIÑANI

Q=150 l/s

I rri g. La Yarada 

LEYENDA

SITUACIÓN ACTUAL CANAL EXISTENTE

BALANCE HÍDRICO SIN PROYECTO DE CIUDAD DE TACNA Y SECTORES DE RIEGO UCHUSUMA Y MAGOLLO OFERTA DE AGUA (m 3/s) Año

DEMANDAS DE AGUA (m 3/s)

BALANCE HÍDRICO (m 3/s)

Para Uso Poblacional

Para Uchusuma y Magollo

Total

Poblacional

Uchusuma Magollo

Total

Poblacional

Uchusuma Magollo

Total

0

2009

0,620

0,370

0,990

0,816

0,472

1,288

-0,196

-0,102

-0,298

1

2010

0,620

0,370

0,990

0,833

0,472

1,305

-0,213

-0,102

-0,315

2

2011

0,620

0,370

0,990

0,850

0,472

1,322

-0,230

-0,102

-0,332

3

2012

0,620

0,370

0,990

0,867

0,472

1,339

-0,247

-0,102

-0,349

4

2013

0,620

0,370

0,990

0,884

0,472

1,356

-0,264

-0,102

-0,366

5

2014

0,620

0,370

0,990

0,902

0,472

1,374

-0,282

-0,102

-0,384

6

2015

0,620

0,370

0,990

0,921

0,472

1,393

-0,301

-0,102

-0,403

7

2016

0,620

0,370

0,990

0,939

0,472

1,411

-0,319

-0,102

-0,421

8

2017

0,620

0,370

0,990

0,958

0,472

1,430

-0,338

-0,102

-0,440

9

2018

0,620

0,370

0,990

0,978

0,472

1,450

-0,358

-0,102

-0,460

10

2019

0,620

0,370

0,990

0,998

0,472

1,470

-0,378

-0,102

-0,480

11

2020

0,620

0,370

0,990

1,018

0,472

1,490

-0,398

-0,102

-0,500

12

2021

0,620

0,370

0,990

1,039

0,472

1,511

-0,419

-0,102

-0,521

13

2022

0,620

0,370

0,990

1,060

0,472

1,532

-0,440

-0,102

-0,542

14

2023

0,620

0,370

0,990

1,081

0,472

1,553

-0,461

-0,102

-0,563

15

2024

0,620

0,370

0,990

1,103

0,472

1,575

-0,483

-0,102

-0,585

Promedio

2016

0,620

0,370

0,990

0,944

0,472

1,416

-0,324

-0,102

-0,426

Máxima

2024

0,620

0,370

0,990

1,103

0,472

1,575

-0,180

-0,102

-0,282

ESQUEMA HIDR ULICO DEL PROYECTO VILAVILANI II  ETAPA I  – 

BOCATOMA VILACHAULLANI Qd=1000 l/s Qp=353 l/s

L. Vil acota

OJOS COPAPUJO Qd=300 l/s Qp=227 l/s

Río LINEA DE CONDUCCION VILACHAULLANI Qd=1000 l/s L=17,91 Km D=1200 mm.

B  P   O E  L  R I  V   U I  A 

L a  Casir i

L. CONDUC. CALACHACA  – CHUAPALCA TRAMO I Qd=1000 l/s L=35,24 Km D=1300 mm.

CANAL CALACHACA TRAMO II L = 13 Km

Represa Paucarani V = 10.5 MMC

POZOS EL AYRO Qd=530 lts/s

TRAMO II CANAL

CHUAPALCA-UCHUSUMA L=48,10 Km. Qd=3,5 m3/s.

Uchusuma

POZOS EL AYRO Qd=470 l/s CANAL UCHUSUMA BAJO (PESCHAY-OVALO CUZCO)

L a . Blanca

POBLACION TACNA 282 056 hab.

TRAMO III CANAL

UCHUSUMA-HUAYLILLAS SUR Qd=4,5 m3/s. Qp=2183 l/s BOCATOMA CHUSCHUCO

CANAL MAGOLLO

TACNA AMPLIACIÓN FRONTERA AGRÍCOLA A = 2 850 ha. Ir rig. Magollo

EST. PIEDRAS BLANCAS Qp=1771 l/s RESERVORIOS CERRO BLANCO TUBERIA DE CONDUCCION

L=30,29 Km. Qd=1,2 m3/s. I rri g. La Yarada

BOCATOMA UCHUSUMA

PROYECTADO EN EJECUCION OBRAS EXISTENTES PERDIDAS POR CONDUCCIÓN

OFERTA HÍDRICA INCREMENTADA CON PROYECTO VILAVILANI DERIVACIÓN ANCOAQUE-COPAPUJO-EL AYRO Año

Oferta Hídrica Sin Proyecto

Oferta Hídrica Con Proyecto

Oferta Hídrica Incrementada Poblacional

Uchusuma-Magollo

Yarada Alta

Total

m3 /s

MMC

m3 /s

MMC

m3 /s

%

m3 /s

%

m3 /s

%

m3 /s

MMC

0

0,990

31,221

0,990

31,221

-

-

-

-

-

-

0,000

0,000

1

0,990

31,221

1,464

46,169

0,213

44,9

0,102

21,5

0,159

33,5

0,474

14,948

2

0,990

31,221

1,639

51,688

0,230

35,4

0,102

15,7

0,317

48,8

0,649

20,467

3

0,990

31,221

1,824

57,522

0,247

29,6

0,102

12,2

0,485

58,2

0,834

26,301

4

0,990

31,221

2,010

63,387

0,264

25,9

0,102

10,0

0,654

64,1

1,020

32,167

5

0,990

31,221

2,028

63,955

0,282

27,2

0,102

9,8

0,654

63,0

1,038

32,734

6

0,990

31,221

2,047

64,554

0,301

28,5

0,102

9,6

0,654

61,9

1,057

33,334

7

0,990

31,221

2,065

65,122

0,319

29,7

0,102

9,5

0,654

60,8

1,075

33,901

8

0,990

31,221

2,084

65,721

0,338

30,9

0,102

9,3

0,654

59,8

1,094

34,500

9

0,990

31,221

2,104

66,352

0,358

32,1

0,102

9,2

0,654

58,7

1,114

35,131

10

0,990

31,221

2,124

66,982

0,378

33,3

0,102

9,0

0,654

57,7

1,134

35,762

11

0,990

31,221

2,144

67,613

0,398

34,5

0,102

8,8

0,654

56,7

1,154

36,393

12

0,990

31,221

2,165

68,275

0,419

35,7

0,102

8,7

0,654

55,7

1,175

37,055

13

0,990

31,221

2,186

68,938

0,440

36,8

0,102

8,5

0,654

54,7

1,196

37,717

14

0,990

31,221

2,207

69,600

0,461

37,9

0,102

8,4

0,654

53,7

1,217

38,379

15

0,990

31,221

2,229

70,294

0,483

39,0

0,102

8,2

0,654

52,8

1,239

39,073

RESUMEN DE PRESUPUESTO FACTIBILIDAD PROYECTO VILAVILANI II FASE I DESCRIPCION



1.00.00

COMPONENTE 01: INFRAESTRUCTURA E IMPLEMENTACIÓN Estudios

1.10.00

  Expedientes Técnicos

2.00.00

Canal de Conducción Vilachaullani-Calachaca-Chuapalca Bocatoma y Canal de Conduc ción Vi lachaullani -Calacha ca-Chuapalc a

I

2.10.00 2.10.10 2.10.20 2.10.30 2.10.40

3.00.00 3.10.00

  B ocatoma Vilachaullani Canal de Conducción Vilachaullani-Calachaca-Chuapalca Túnel Azangallani Cruce de Bofedales

Planta de Bombeo Copapujo Planta de Bombeo Ojos Copapujo Planta de Bombeo L.inea de Impulsión

3.10.10 3.10.20

3.20.00

Línea de Transmisión 33 Kv Tarata-Copapujo Suministro Electromecánico Montaje Electromecánico

3.20.10 3.20.20

4.00.00 4.10.00

Explotación de Aguas Subterraneas El Ayro Campo de Bombeo el Ayro Viejo - Picanani Construcción de caminos de acceso y plataformas de perforación Co nst ruc ci ón poz os nuev os 250m c/ tub . ace ro inox ida bl e D iam . 14" y 10" Rehabilitación de Pozos  Adquisición y montaje de equipos de bombeo Construcción de Casetas de Bombeo E qu ip am ie nt o e In st al ac ió n d e E qu ip os de mo ni to re o y co nt ro l a di st an ci a Sistema de conducción Pozo - Canal

4.10.01 4.10.02 4.10.03 4.10.04 4.10.05 4.10.05 4.10.05 4.20.00

Línea de transmisión y Electrificación de Pozos Suministro Electromecánico Montaje Electromecánico

4.20.01 3.20.02

5.00.00 5.10.00

5.10.03

Infraestructura de Alimentación y Regulación Línea matriz Sector "A" Línea matriz Sector "B" Línea matriz Sector "C"

5.20.11 5.20.12 5.20.13

II 1.00.00

Mitigación Impacto Ambiental Supervisión y/o Inspección COMPONENTE 02: PROGRAMA DE ASISTENCIA T CNICA Y CAPACITACI N Sensibilización Plan de Sensibilización

1.10.00

2.00.00

Asistencia Técnica

2.10.00

2.40.00

       

3.00.00

Eventos de capacitación

3.10.00

  Talleres

2.20.00 2.30.00

1.00

Precio Unitario

COSTO DIRECTO  

ml Und ml ml ml

52,867.77 1.00

3,928,336.80

  1,203.38  

 

63,619,853.31   63,619,853.31  

392,833.68

 

6,361,985.33 6,361,985.33  

SUB-TOTAL

IGV (19%)

196,416.84  

4,517,587.31  

196,416.84

4,517,587.31

 

3,180,992.67 3,180,992.67  

858,341.59

TOTAL 5,375,928.90

 

858,341.59

5,375,928.90

73,162,831.31  

13,900,937.95 13,900,937.95

87,063,769.25 87,063,769.25

73,162,831.31  

2,022,749.73

 

2,022,749.73

 

202,274.97

 

101,137.49

 

2,326,162.19

 

441,970.82

2,768,133.01

52,055.29

1,045.52

 

54,425,066.75

 

5,442,506.68

 

2,721,253.34

 

62,588,826.76

 

11,891,877.08

74,480,703.85

452.00

10,413.89

 

4,707,077.65

 

470,707.77

 

235,353.88

 

5,413,139.30

 

1,028,496.47

6,441,635.76

360.48

6,837.99

 

2,464,959.18

 

246,495.92

 

123,247.96

 

2,834,703.06

 

538,593.58

3,373,296.64

730,711.35 386,253.96  

16,461,903.71

3, 127,761.70 1,687,929.81

19,589, 665.41 10,571,770.91

14,614,227.04 7,725,079.22  

1,116,965.31 772,507.92  

ml

3,677.75 1.00 3,677.45

ml

37,600.00

183.22  

6,889,147.82  

344,457.39  

ml ml

37,600.00

120.66

 

4,536,904.41

 

226,845.22

 

37,600.00

62.56

 

2,352,243.41

 

117,612.17

 

2,100.49  

8,883,841.10  

3,015,512.58

 

3,015,512.58

 

301,551.26

 

150,775.63

 

3,467,839.47

 

658,889.50

4,126,728.97

1,280.66

 

4,709,566.64

 

470,956.66

 

235,478.33

 

5,416,001.64

 

1,029,040.31

6,445,041.95

344,457.39  

7,578,062.60  

1,439,831.89

9,017,894.50

226,845.22

 

4,990,594.85

 

948,213.02

5,938,807.87

117,612.17

 

2,587,467.75

 

491,618.87

3,079,086.62

37,551,384.14   31,342,869.28  

7,134,762.99 5,955,145.16

44,686,147.13 37,298,014.44

   

32,898,773.36   27,254,668.94  

3,007,672.11   2,725,466.89  

1,644,938.67   1,362,733.45  

Pozos

23.00

Km P ozo Pozo Equipo Caseta E qu ip o Und

38.00

2,411.40

 

91,633.18

 

9,163.32

 

4,581.66

 

105,378.15

 

20,021.85

125,400.00

17.00

631,016.30

 

10,727,277.02

 

1,072,727.70

 

536,363.85

 

12,336,368.57

 

2,343,910.03

14,680,278.60

ml

4.00

378,708.89

 

1,514,835.54

 

151,483.55

 

75,741.78

 

1,742,060.87

 

330,991.57

2,073,052.44

21.00

242,530.43

 

5,093,139.13

 

509,313.91

 

254,656.96

 

5,857,110.00

 

1,112,850.90

6,969,960.90

21.00

43,843.62

 

920,716.11

 

92,071.61

 

46,035.81

 

1,058,823.53

 

201,176.47

1,260,000.00

1.00

822,067.96

 

822,067.96

 

82,206.80

 

41,103.40

 

945,378.15

 

179,621.85

1,125,000.00

21.00

385,000.00

 

8,085,000.00

 

808,500.00

 

404,250.00

 

9,297,750.00

 

1,766,572.50

11,064,322.50

1,179,617.82

7,388,132.69

625,249.11

3,916,033.88

25,600.00

220.47  

5,644,104.42  

282,205.22  

282,205.22  

6,208,514.87  

25,600.00

116.86

 

2,991,622.52

 

149,581.13

 

149,581.13

 

3,290,784.78

 

25,600.00

103.61

 

2,652,481.90

 

132,624.10

 

132,624.10

 

2,917,730.09

 

554,368.72

3,472,098.81

77,552,423.03   51,492,452.93  

14,734,960.38 9,783,566.06

92,287,383.40 61,276,018.99 23,858,997.24

2.00 Und ml ml Und ml ml ml

2.00

  22,388,023.02  

67,436,889.59   44,776,046.03  

6,743,688.96   4,477,604.60  

3,371,844.48   2,238,802.30  

8,717,207.62

 

17,434,415.23

 

1,743,441.52

 

871,720.76

 

20,049,577.51

 

3,809,419.73

17,500.00

78.53

 

1,374,240.24

 

137,424.02

 

68,712.01

 

1,580,376.28

 

300,271.49

1,880,647.77

32,585.85

796.89

 

25,967,390.56

 

2,596,739.06

 

1,298,369.53

 

29,862,499.14

 

5,673,874.84

35,536,373.98

1.00

1,818,405.38  

4,951,394.32

31,011,364.41

3.00

1,818,405.38

 

5,455,216.13

 

545,521.61

 

272,760.81

 

6,273,498.55

 

1,191,964.72

7,465,463.27

16,790.00

393.78

 

6,611,584.67

 

661,158.47

 

330,579.23

 

7,603,322.37

 

1,444,631.25

9,047,953.62

13,980.00

444.11

 

6,208,622.02

 

620,862.20

 

310,431.10

 

7,139,915.32

 

1,356,583.91

8,496,499.23

9,870.00

444.32

 

4,385,420.74

 

438,542.07

 

219,271.04

 

5,043,233.85

 

958,214.43

22,660,843.56  

6,001,448.28

2,823,416.60   6,486,252.38  

282,341.66 648,625.24

3,388,099.92   7,459,190.24  

643,738.98 1,417,246.15

4,031,838.90 8,876,436.39

Servicios Servicios

1.00 1.00

2,823,416.60   6,486,252.38  

Servicios

1.00

22,235.29

Servicios Servicios Servicios galones

12.00

2,500.00

30,000.00

12.00

800.00

9,600.00

1.00

6,000.00

6,000.00

480.00

15.60

7,488.00

Eventos

2.00

2,266,084.36  

 

22,235.29  

2,223.53

 

22,235.29

2,223.53

 

TOTAL (S/.)

3,928,336.80

Utilidades

392,833.68

3,928,336.80  

 

Técnico Practicante Materiales Combustible

Gastos Generales (10 %)

und ml

Infraestructura de Riego Mayor Ampliación de Frontera Agrícola La Yarada Alta

5.20.10

7.00.00

Estudio

ml ml

Construcción Reservorios Cerro Blanco (02) Mejoramiento y Adecuación Canal Uchusuma (Km 0+000 a Km 17+500) Linea Conducción Tuberia (Cerro Blanco - Yarada Alt a) (L=32,792ml)

5.10.02

6.00.00

Metrado

Conducción Cerro Blanco - La Yarada, Mejoramiento y Sistema de Riego Línea de conducción Cerro Blanco - La Yarada

5.10.01

5.20.00

Unidad de Medida

2,656.80

 

1,133,042.18  

282,341.66 324,312.62

25,570.59  

1,111.76  

1,111.76

26,059,970.09  

 

25,570.59

 

4,858.41

30,429.00

4,858.41

30,429.00

53,088.00

53,088.00

5,313.60

5,313.60

5,313.60

 

191,888,385.97  

18,556,335.83  

9,732,670.05  

220,177,391.85  

41,822,608.15

262,000,000.00

CRONOGRAMA FISICO ITEM

METAS

Unida d Canti dad

0 mes Ago

2009 2 mes Oct

1 mes Set

2010 3 mes Nov

4 mes Dic

5 mes Ene

6 mes Feb

7 mes Mar

8 mes Abr

9 mes May

10 m es Jun

1 1m es Jul

1 2m es Ago

1 3m es Set

1 4m es Oct

1 5m es Nov

1 6m es Dic

2011 1 9m es Mar

1 7m es Ene

1 8m es Feb

-

-

-

-

-

2,330.00   1,645.00   0.02 0.03  

2,330.00   1,645.00   0.03  

2,330.00   1,645.00   0.03  

1.00 1.00 0.08 40.00

1.00 1.00 0.08 40.00

1.00 1.00 0.08 40.00

2 0m es Abr

2 1me s May

22 me s Jun

2,330.00   1,645.00   0.03  

2,330.00 1,645.00 0.03

2,330.00 1,645.00 0.03

1.00 1.00 0.08 40.00

1.00 1.00 0.08 40.00

1.00 1.00 0.08 40.00

I COMPONENTE01:INFRAESTRUCTURAE IMPLEMENTACIÓN 1.00.00 Estudios 1.10.00 Expedientes Técnicos

Estudio   1.00

2.00.00 Canalde Conducción Vilachaullani-Calachaca-Chuapalca 2.1 0.0 0Bocat omayCanaldeConducció nVil achaull ani- Cala chaca-C huapalc a

ml 52,867.77

2.10.10 Bocatoma Vilachaullani

Und

 

0.25

0.25

 

0.25

0.25

1.00

-

-

-

 

-

 

0.10  

0.20  

0.30  

0.30

0.10

-

-

-

-

-

-

-

2 1. 0. 20 C an al d e Co nd uc ci ón V lia ch au la ni C- al ac ha ca -C hu ap al ca

m l 52,055.29

-

-

-

 

-

 

2,602.76  

2,602.76  

2,602.76  

5,205.53  

5,205.53  

5,205.53  

5,205.53  

5,205.53  

5,205.53  

5,205.53  

5,205.53

2,602.76

2.10.30 Túnel Azangallani

ml

452.00

-

-

-

-

-

-

45.20  

90.40  

90.40  

90.40

90.40

ml

360.48

-

-

-

-

-

-

-   -  

45.20  

2.10.40 Cruce de Bofedales

36.05  

72.10  

72.10  

72.10  

72.10

36.05

-

-

-

3.00.00 Plantade BombeoCopapujo 3.10.00 Planta de Bombeo OjosCopapujo

ml

3,677.75

3.10.10 Planta de Bombeo

und   1.00

0.15  

0.30  

0.30

0.25

3.10.20 Linea de Impulsión

ml

  3,677.45

 

919.36  

919.36  

919.36

919.36

3.20.00 Línea de Transmisión 33 Kv Tarata-Copapujo

ml

37,600.00

3.20.10 S uministro Electromecánico

ml

37,600.00

-

-

-

-

-

3.20.20 Montaje Electromecánico

ml

 37,600.00

7,520.00  

7,520.00  

7,520.00  

7,520.00

7,520.00

4.00.00 ExplotacióndeAguasSubterraneasElAyro 4.10.00 Campo de Bombeo el Ayro Viejo - Picanani 4.10.01 C on str uc ció n de c am ni osd e a c es o ypl at afo rm asd e p erf or ac ói n 4.10.02 Constr ucció npozosnuevos 250mc/t ub. aceroinoxidable Diam. 14" y 10" 4.10.03 Rehabilitación de Pozos 4.10.04 Adquisición ymontaje de equipos de bombeo 4.10.05 Construcción de Casetas de Bombeo 4.10.05 Equip amie nto eInsta la cióndeEquipos demonit oreoy contr ol adistancia 4.10.05 Sistema de conducción Pozo - Canal 4.20.00 Línea de transmisión y Electrificación de Pozos

Pozos

 

-

37,600.00  

23.00  

9.50  

9.50  

Pozo   17.00 Pozo   4.00

 

1.00  

1.00  

 

Equipo   21.00 Caseta   21.00

4.20.01 S uministro Electromecánico

ml

 25,600.00

3.20.02 Montaje Electromecánico

ml

 25,600.00

Und

2.00

9.50

9.50

2.00  

3.00  

1.00

1.00  

 

Equip o   1.00 Und   21.00

25,600.00

1.10.00 PlandeSensibilización

-

K m   38.00

ml

5.00.00 Conducción Cerro Blanco -La Yarada, Mejoramiento ySistema deRiego 5.10.00 LíneadeconducciónCerroBlanco- LaYarada 5.10.01 Construcción Reservorios Cerro Blanco (02) 5.10.02 M ej or am ei nt o y A de cu ac ói n Ca na lU ch us um a (K m 0+ 00 0a K m 17 +5 00 ) 5.10.03 L ni ea C on du cc ói n Tu be ri a( Ce r o Bl an co - Y ar ad a Al at ) (L =3 2, 79 2m )l 5.20.00 InfraestructuraRiego Mayor Ampliación FronteraAgrícola LaYarada Alta 5.20.10   Infraestructura de Alimentación yRegulación 5.20.11 Línea matriz Sector "A" 5.20.12 Línea matriz Sector "B" 5.20.13 Línea matriz Sector "C" 6.00.00 Mitigación Impacto Ambiental 7.00.00 Supervisión y/o nI spección II COMPONENTE02:PROGRAMADE ASISTENCIATÉCNICAY CAPACITACIÓN 1.00.00 Sensibilización

 

2.00  

4.00  

4.00

2.00  

3.00  

3.00  

3.00  

3.00

3.00

2.00  

3.00  

3.00  

3.00  

3.00

3.00

5,120.00  

5,120.00  

5,120.00  

11.00

4.00 10.00

2.00   1.00

 

2.00  

2.00   25,600.00  

5,120.00

5,120.00

 

0.20  

0.30   3,258.59  

0.30     6,517.17  

0.30   4,375.00   6,517.17  

0.30   4,375.00   6,517.17  

0.30 4,375.00 3,258.59

0.30 4,375.00 3,258.59

 

3,258.59      

0.50   2,798.33  

0.50   2,798.33  

0.50   2,798.33  

0.50   2,798.33  

0.50 2,798.33

0.50 2,798.33

m l 17,500.00 m l 32,585.85 Und

3.00

ml

16,790.00

ml

13,980.00

ml

9,870.00

Servicios   1.00 Servicios   1.00

Servicios

1.00

Servicios Servicios Servicios galones

12.00

480.00

Eventos

2.00

     

0.03  

-

0.03  

0.03  

0.03  

0.06  

  0.06  

0.08   0.06  

0.10   0.06  

0.10   0.06  

0.10   0.06  

0.10   0.06  

0.10   0.06  

0.10   0.06  

0.10   0.06  

0.10   0.06  

0.10 0.06  

1.00 1.00 0.09 40.00

1.00 1.00 0.09 40.00

1.00 1.00 0.09 40.00

1.00 1.00 0.09 40.00

1.00 1.00 0.08 40.00

       

1.00 1.00 0.08 40.00

 

1.00

1.00

2.00.00 AsistenciaTécnica 2.10.00 Técnico 2.20.00 Practicante 2.30.00 Materiales 2.40.00 Combustible

12.00 1.00

       

       

       

       

       

       

       

       

       

       

3.00.00 Eventosde capacitación 3.10.00 Talleres

1.00

CRONOGRAMAVALORIZADO 2009 ITEM

METAS

I COMPONENTE01:INFRAESTRUCTURAEIMPLEMENTACIÓN 1.00.00 Estudios

TOTAL

SET 1 mes

OCT 2mes

2010 NOV 3mes

DIC 4 mes

ENE 5mes

FEB 6mes

MAR 7 mes

ABR 8mes

MAY 9 mes

JUN 10mes

2011 JUL 11 mes

AGO 12mes

SET 13 mes

OCT 14mes

NOV 15mes

DIC 16 mes

ENE 17mes

FEB 18 mes

MAR 19mes

ABR 20mes

MAY 21 mes

JUN 22mes

5,375,928.90

-

-

-

-

-

-

5,375,928.90

-

-

-

-

-

2.00.00 Canalde ConducciónVilachaullani-Calachaca-Chuapalca 2.10.00 B ocatoma yCanal de Conducción Vilachaullani-Calachaca-Chuapalca

1,343,982.23 1,343,982.23 1,343,982.23 1,343,982.23 1,343,982.23 1,343,982.23 1,343,982.23 1,343,982.23 - 4,000,848.49 4,277,661.79 4,554,475.09 9,260,003.53 9,043,706.59 9,411,056.87 9,411,056.87 9,411,056.87 9,073,727.20 7,448,070.38 7,448,070.38 3,724,035.19 87,063,769.25 87,063,769.25 - 4,000,848.49 4,277,661.79 4,554,475.09 9,260,003.53 9,043,706.59 9,411,056.87 9,411,056.87 9,411,056.87 9,073,727.20 7,448,070.38 7,448,070.38 3

2.10.10 2.10.20 2.10.30 2.10.40

2,768,133.01 74,480,703.85 6,441,635.76 3,373,296.64

-

3.00.00 Plantade BombeoCopapujo 3.10.00 Planta deBombeo Ojos Copapujo

19,589,665.41 10,571,770.91

-

3.10.10 Plantade Bombeo 3.10.20 L.ineadeImpulsión

4,126,728.97 6,445,041.95

-

1.10.00 ExpedientesTécnicos

BocatomaVilachaullani Canalde ConducciónVilachaullani-Calachaca-Chuapalca TúnelAzangallani CrucedeBofedales

-

-

-

-

-

-

-

-

-

-

-

-

830,439.90 7,448,070.38 644,163.58 337,329.66

276,813.30 7,448,070.38 644,163.58 674,659.33

7,448,070.38 1,288,327.15 674,659.33

619,009.34 -

1,611,260.49

5,938,807.87

615,817.32

615,817.32

615,817.32

615,817.32

5,938,807.87 -

615,817.32

615,817.32

615,817.32

615,817.32

549,613.11 3,450,449.71 13,005,961.29 5,322,347.96 5,909,220.46 9,228,249.46 2,455,037.26 2,455,037.26 1,760,617.50 549,613.11 3,450,449.71 9,089,927.41 4,627,928.20 5,214,800.70 8,533,829.70 1,760,617.50 1,760,617.50 1,760,617.50

125,400.00 14,680,278.60 2,073,052.44 6,969,960.90 1,260,000.00 1,125,000.00 11,064,322.50

31,350.00 518,263.11 -

31,350.00 518,263.11 -

4.20.01 SuministroElectromecánico 3.20.02 MontajeElectromecánico

3,916,033.88 3,472,098.81

-

5.00.00 Conducción Cerro Blanco -La Yarada, Mejoramiento ySistema de Riego 5.10.00 LíneadeconducciónCerroBlanco-La Yarada 5.10.01   ConstrucciónReservoriosCerroBlanco(02) 5.10.02 MejoramientoyAdecuaciónCanalUchusuma(Km0+000aKm17+500) 5.10.03 LineaConducciónTuberia(CerroBlanco- YaradaAlta)(L=32,792ml) 5.20.00 InfraestructuraRiegoMayorAmpliación FronteraAgrícolaLa YaradaAlta

92,287,383.40 61,276,018.99

-

-

-

-

-

-

-

23,858,997.24 1,880,647.77 35,536,373.98

-

-

-

-

-

-

-

31,011,364.41

-

-

-

-

-

-

-

7,465,463.27 9,047,953.62 8,496,499.23 6,001,448.28

-

-

-

-

-

-

-

Infraestructura de Alimentación yRegulación Línea matriz Sector "A" Línea matriz Sector "B" Línea matriz Sector "C"

6.00.00 MitigaciónImpactoAmbiental 7.00.00 Supervisióny/oInspección II COMPONENTE02:PROGRAMADEASISTENCIATÉCNICAY CAPACITACIÓN 1.00.00 Sensibilización

4,031,838.90 8,876,436.39

-

-

-

-

-

248,540.22

-

-

248,540.22

-

31,350.00 2,590,637.40 518,263.11 3,650,931.90 120,000.00 1,125,000.00 1,053,745.00

3,454,183.20 120,000.00 1,053,745.00

3,454,183.20 180,000.00 1,580,617.50

3,454,183.20 3,319,029.00 180,000.00 1,580,617.50

3,916,033.88

694,419.76

694,419.76

694,419.76

3,916,033.88 -

694,419.76

694,419.76

694,419.76

-

248,540.22

-

-

1,611,260.49

549,613.11 549,613.11

31,350.00 1,727,091.60 518,263.11 120,000.00 1,053,745.00

-

1,031,682.24 -

44,686,147.13 37,298,014.44

-

7,448,070.38 1,288,327.15 674,659.33

1,238,018.69 -

4.00.00 Explotación de AguasSubterraneas ElAyro 4.10.00 CampodeBombeoelAyroViejo-Picanani 4.10.01 Construccióndecaminosdeaccesoy plataformasde perforación 4.10.02 Construcciónpozosnuevos250mc/tub.aceroinoxidableDiam.14"y10" 4.10.03 RehabilitacióndePozos 4.10.04 Adquisiciónymontajedeequiposdebombeo 4.10.05 ConstruccióndeCasetasdeBombeo 4.10.05 EquipamientoeInstalacióndeEquiposdemonitoreoycontroladistancia 4.10.05 SistemadeconducciónPozo-Canal 4.20.00 Línea de transmisióny Electrificaciónde Pozos

-

-

1,238,018.69 -

9,017,894.50

-

7,448,070.38 1,288,327.15 674,659.33

-

-

-

248,540.22

532,586.18

532,586.18

180,000.00 1,580,617.50

694,419.76 694,419.76

-

180,000.00 1,580,617.50

-

322,547.11 403,183.89 532,586.18 532,586.18

-

-

403,183.89 403,183.89 532,586.18 532,586.18

-

-

-

-

-

-

-

2,416,324.5 -

-

-

-

-

-

-

-

-

-

2,416,324.59 -

2,416,324.59 -

2,416,324.59 -

-

-

-

3,578,849.59 470,161.94 3,553,637.40

3,578,849.59 470,161.94 3,553,637.40

2,752,236.15

2,752,236.15

2,752,236.15

2,752,236.15

2,752,236.15

2,752,236.15

2,416,324.59

2,416,324.59

2,416,324.59

2,416,324.59

2,416,324.59

2,416,324.59

1,244,243.88 1,507,992.27 -

1,244,243.88 1,507,992.27 -

1,244,243.88 1,507,992.27 -

1,244,243.88 1,507,992.27 -

1,244,243.88 1,507,992.27 -

1,244,243.88 1,507,992.27 -

1,416,083.21 1,000,241.38

1,416,083.21 1,000,241.38

1,416,083.21 1,000,241.38

1,416,083.21 1,000,241.38

1,416,083.21 1,000,241.38

1,416,083.21 1,000,241.38

403,183.89 532,586.18

-

-

403,183.89 403,183.89 532,586.18 532,586.18

-

-

-

-

30,429.00

-

-

-

-

-

-

30,429.00

-

-

-

2.00.00 AsistenciaTécnica

53,088.00

-

-

-

-

-

-

-

-

-

4,464.00

4,464.00

2.10.00 2.20.00 2.30.00 2.40.00

Técnico Practicante Materiales Combustible

30,000.00 9,600.00 6,000.00 7,488.00

-

-

-

-

-

-

-

-

-

-

2,500.00 800.00 540.00 624.00

3.00.00 Eventosdecapacitación

5,313.60 5,313.60

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

403,183.89 403,183.89 532,586.18 532,586.18 -

-

-

221,975,366.58

80,636.78 248,540.22 -

248,540.22 -

248,540.22

248,540.22

248,540.22

248,

-

-

-

-

-

-

-

-

-

-

-

-

-

4,464.00

4,464.00

4,404.00

4,404.00

4,404.00

4,404.00

4,404.00

4,404.00

4,404.00

4,404.00

2,500.00 800.00 540.00 624.00

2,500.00 800.00 540.00 624.00

2,500.00 800.00 540.00 624.00

2,500.00 800.00 480.00 624.00

2,500.00 800.00 480.00 624.00

2,500.00 800.00 480.00 624.00

2,500.00 800.00 480.00 624.00

2,500.00 800.00 480.00 624.00

2,500.00 800.00 480.00 624.00

2,500.00 800.00 480.00 624.00

2,500.00 800.00 480.00 624.00

-

-

-

-

-

-

-

-

-

-

-

403,183.89 532,586.18

-

-

2,656.80 -

2,656.80

262,0 00,0 00.0 0 2,1 42,1 35.5 5 2,1 42,1 35.5 5 5,0 42,9 72.1 5 14,598,48 3.74 10,47 4,791.98 11,957,48 7.13 21, 845,11 3.41 14,29 8,310.43 14,661,59 1.74 20,27 4,059. 37 22,463, 091.88 26,016,72 9.28 23,92 2,483.75 22,296,82 6.93 18,74 3,12 9.53 15,02 1,751.14 23,925,727.00

-

-

-

3,578,849.59 470,161.94 7,107,274.80

-

TOTAL

-

-

3,578,849.59 470,161.94 7,107,274.80

-

-

-

3,578,849.59 7,107,274.80

-

-

-

-

3,578,849.59 3,553,637.40

-

-

-

-

2,385,899.72 3,553,637.40

30,429.00

-

-

-

-

30,429.00

3.10.00 Talleres

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5,939,537.12 9,884,723.13 13,438,360.53 13,908,522.47 13,908,522.47 10,354,885.08 10,354,885.08 5,939,537.12 7,132,486.98 10,686,124.38 11,156,286.32 11,156,286.32 7,602,648.93 7,602,648.93

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

694,419.76

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

3,724,035.19 -

-

-

615,817.32

7,448,070.38 -

-

615,817.32

-

7,448,070.38 -

-

1,611,260.49

-

180,000.00 1,580,617.50

694,419.76

-

1,611,260.49

1.10.00 Plan de Sensibilización

-

7,448,070.38 1,288,327.15 337,329.66

619,009.34 1,238,018.69 7,176,826.56 1,647,499.57 2,227,077.81 2,227,077.81 2,227,077.81 2,227,077.81 619,009.34 1,238,018.69 1,238,018.69 1,031,682.24 1,611,260.49 1,611,260.49 1,611,260.49 1,611,260.49

5,938,807.87 3,079,086.62

7,388,132.69

-

830,439.90 3,724,035.19 -

3.20.10 SuministroElectromecánico 3.20.20 MontajeElectromecánico

-

-

-

553,626.60 3,724,035.19 -

3.20.00 Línea de Transmisión33 Kv Tarata-Copapujo

5.20.10 5.20.11 5.20.12 5.20.13

-

276,813.30 3,724,035.19 -

-

-

-

-

-

2,656.80 -

2,656.80

2,7 49,9 05.5 8 2,6 69,2 68.8 1 2,6 69,2 68.8 1 2,6 69,2 68.8 1 2,6 69,2 68.8 1 2,6 71,9 25.6 1 16,098,906.41

EVALUACION ECONOMICA A PRECIOS SOCIALES

Costos

Beneficios

Costos Incrementales Año

Inversión

O&M Generados

Incremento ingresos tarifarios Reposición

Total 

Incremento VNP Venta Tierras -

2008

1

2010 168 312 108,99

1 180 207,79

-

2

2011

-

2 124 244,08

-

2 124 244,08

- 40 604 445,00

-

158 691,61

3

2012

-

2 619 078,83

-

2 619 078,83

- 24 901 676,40

-

4

2013

-

2 772 147,34

-

2 772 147,34

2 247 859,80

5

2014

-

2 822 110,14

12900,00

2 835 010,14

6

2015

-

2 923 048,41

25800,00

7

2016

-

2 806 492,08

8

2017

-

9

2018

10

41 977 392, 03

-

-

-

-

-

Flujo de Caja

(11%)

-

-

-

2 288 312,50 - 38 157 440,89 - 40 281 684,96

0,81 - 32 693 519,17

170 420,99

-

4 187 125,00 - 20 544 130,41 - 23 163 209,24

0,73 - 16 936 738,96

-

182 150,37

-

6 037 250,00

8 467 260,17

5 695 112,83

0,66

3 751 547,22

23362 281,60

-

194 569,72

-

6 037 250,00

29 594 101,32

26759 091,17

0,59

15880 218,20

2 948 848,41

56570 308,90

-

207 679,02

-

6 037 250,00

62 815 237,92

59866 389,51

0,53

32007 016,54

-

2 806 492,08

86 014 908,10

-

220 098,37

-

6 037 250,00

92 272 256,47

89 465 764,38

0,48

43 091 937,90

2 930 452,83

-

2 930 452,83

109 765 707,60

-

233 207,67

-

6 037 250,00

116 036 165,27

113 105 712,45

0,43

49 079 565,51

-

2 570 168,11

-

2 570 168,11

119 835 196,60

-

247 006,94

-

6 037 250,00

126 119 453,54

123 549 285,44

0,39

48 298 476,17

2019

-

2 500 331,08

12900,00

2 513 231,08

119 516 647,60

-

260 806,21

-

6 037 250,00

125 814 703,81

123 301 472,73

0,35

43424 864,91

11

2020

-

2 283 658,26

2 380 289,94

4 663 948,20

113 475 489,40

-

274 605,48

-

6 037 250,00

119 787 344,88

115 123 396,68

0,32

36526 732,84

12

2021

-

2 832 188,45

780 278,00

3 612 466,45

108 105 571,00

-

289 094,72

-

6 037 250,00

114 431 915,72

110 819 449,26

0,29

31676 722,65

13

2022

-

2 674 821,03

-

2 674 821,03

108 105 571,00

-

303 583,95

-

6 037 250,00

114 446 404,95

111 771 583,92

0,26

28 782 776,22

14

2023

-

3 073 878,13

-

3 073 878,13

108 105 571,00

-

318 073,19

-

6 037 250,00

114 460 894,19

111 387 016,06

0,23

25 841 211,27

15

2024

-

2 698 223,55

2 711 123,55

108 105 571,00

-

333 252,38

-

6 037 250,00

114 476 073,38

111 764 949,83

0,21

23359 360,32

82 557,60

-

Actualizado

0,90 - 160 030 440,76

146 962,23

-

Total

1,00 - 41 977 392,03

18 237 150,00

-

Uchusuma-Magoll o Nuevos Usuario s

- 177 633 789,24

169 492 316,77 - 27727 954,80

-

-

Actualización Flujo de Caja

- 41 977 392, 03

12900,00

41 977 392,03

-

EPS

0

2009

Factor

1 119 812,50 - 8 141 472,47

VNA TIR

130 082 338,85 16,60%

EVALUACION ECONOMICA A PRECIOS PRIVADOS

Costos

Beneficios

Costos Incrementales Año 0

Invers ió n

O&M Generados

Incremento ingresos tarifarios Reposic ió n

Total 

2008 2009

Factor

49 128 080,99

49 128 080,99

Incremento VNP Venta Tierras

EPS

Actualizació

Uchusuma-Magoll o Nuevos Usuario s

-

-

-

-

-

-

-

-

-

-

Flujo de Caja Actualizado

-

-

- 49 128 080,99

1,00 -

49 128 080,99

1 119 812,50 - 13 422 987,67 - 227 667 241,31

0,90 -

205 105 622,80

1 372 334,64

214 244 253,64 - 33 009 470,00

2

2011

2 470 051,25

2 470 051,25 - 48 338 625,00

-

158691,61

-

2 288 312,50 - 45 891 620,89 - 48 361 672,14

0,81 -

39 251 418,02

3

2012

3 045 440,51

3 045 440,51 - 30 662 710,00

-

170420,99

-

4 187 125,00 - 26 305 164,01 - 29 350 604,51

0,73 -

21 460 909,06

4

2013

3 223 427,14

3 223 427,14 - 1 019 205,00

-

182 150,37

-

6 037 250,00

5 200 195,37

1 976 768,23

0,66

1 302 158,46

5

2014

3 281 523,42

15.000,0

3 281 523,42

19 621 340,00

-

194569,72

-

6 037 250,00

25 853 159,72

22 571 636,30

0,59

13 395 167,54

6

2015

3 398 893,50

30.000,0

3 398 893,50

52 246 622,50

-

207679,02

-

6 037 250,00

58 491 551,52

55 092 658,02

0,53

29 454 784,75

7

2016

3 263 362,89

3 263 362,89

81 080 202,50

-

220 098,37

-

6 037 250,00

87 337 550,87

84 074 187,98

0,48

40 495 039,78

8

2017

3 407 503,29

3 407 503,29

104 470 290,00

-

233 207,67

-

6 037 250,00

110 740 747,67

107 333 244,38

0,43

46 574 738,67

9

2018

2 988 567,57

2 988 567,57

114 329 415,00

-

247 006,94

-

6 037 250,00

120 613 671,94

117 625 104,38

0,39

45 982 567,04

10

2019

2 907 361,72

15.000,0

2 907 361,72

113 950 190,00

-

260806,21

-

6 037 250,00

120 248 246,21

117 340 884,49

0,35

41 325 638,24

11

2020

2 655 416,58 2.767.779,0

2 655 416,58

106 758 335,00

-

274605,48

-

6 037 250,00

113 070 190,48

110 414 773,90

0,32

35 032 765,40

12

2021

3 293 242,39

3 293 242,39

100 365 575,00

-

289094,72

-

6 037 250,00

106 691 919,72

103 398 677,33

0,29

29 555 563,09

13

2022

3 110 257,01

3 110 257,01

100 365 575,00

-

303583,95

-

6 037 250,00

106 706 408,95

103 596 151,94

0,26

26 677 485,94

14

2023

3 574 276,89

3 574 276,89

100 365 575,00

-

318073,19

-

6 037 250,00

106 720 898,19

103 146 621,29

0,23

23 929 482,33

15

2024

3 137 469,25

3 137 469,25

100 365 575,00

-

333252,38

-

6 037 250,00

106 736 077,38

103 598 608,14

0,21

21 652 559,41

45 129 128,04

3 540 202,87 7,844607295

82 557,60

(11%)

2010 212 871 919,01

15.000,0

146 962,23

Flujo de Caja

1

907.300,0

18 237 150,00

Total

82 557,60 0,182936401

80 042 250,00 177,3627222

VNA TIR

40 431 919,79 12,56

COSTOS DEL PROYECTO

El proyecto  “Mejoramiento y Ampliación del suministro de agua para el Valle de Tacna  –  Vilavilani II, representa una inversión de S/. 262 000 000,00. Los costos de operación y mantenimiento incrementales generados por la ejecución del proyecto a lo largo de los 15 años del horizonte de planeamiento serán financiados durante ese mismo tiempodel siguiente modo: La EPS a partir de la mayor dotación de recursos abonará (en razón al tarifario no agrario existente) un valor  total de S/. 3 540 202,87. •

Los usuarios de las Comisiones de Regante de Uchusuma y Magollo por la recepción de 102 l/s adicionales (sólo durante el 1º año) a los actualmente recibidos pagarán en razón a la tarifa actualmente existente en la zona un monto aproximado de S/. 82 557,60. •

El restante valor será asumido a través del pago tarifario identificado en el proyecto por los nuevos usuarios a instalarse en la zona de La Yarada Alta por un monto de hasta S/. 53 932 272,49. •

Los costos por reposición de equipos y la amortización de la inversión son también incorporados en el pago tarifario de los nuevos usuarios en un valor acumulado de hasta S/. 36 749 180,46 a lo largo de los 15 años de horizonte de planeamiento .

RESULTADOS DE LA EVALUACIÓN SOCIAL 



Estimamos en este punto formular análisis y revisión de los niveles de rentabilidad del proyecto. Valorizamos ahora los indicadores de rentabilidad dimensionando los mismos en base a los precios y costos expresados a nivel social, así tenemos: Los resultados obtenidos nos reflejan indicadores favorables frente a los flujos de costos e ingresos calculados en un horizonte de 15 años.



Valor Actual Neto es S/. 130 082 338,85



Tasa Interna de Retorno del 16,60%

EVALUACIÓN PRIVADA Planteamos aquí realizar el análisis costo beneficio desde el punto de vista privado, con el fin de evaluar la potencial participación del sector privado en el financiamiento de la ejecución y operación del proyecto. La evaluación se expresa en torno a la obtención de indicadores de rentabilidad como el TIR, VAN y B/C obtenidos en base a los flujos expresado en precios de mercado. Los resultados obtenidos nos reflejan indicadores favorables frente a los flujos de costos e ingresos calculados en un horizonte de 15 años.

Valor Actual Neto es S/. 40 431 919,79 Nuevos Soles, Tasa Interna de Retorno del 12,56%,

TRAMO I: Bocatoma y Canal Vilachaullani - Chuapalca

UBICACIÓN POZOS PROYECTADOS SECTOR AYRO VIEJO-PICANANI

Cº Queñuta

Cº Huancune REPRESA PAUCARANI

Cº Quiquisana

Cº Condorpico

PA-17 PA-18 PA-15PA-16 PA-7 PA-5

PA-19 PA-25

PA-11

PA-20

PA-24

PA-3

PA-21

PA-14 PA-2

LAGUNA BLANCA

PA-4 PA-1

Cº Pacocahua

PA-10 PA-9

PA-6

PA-12

PA-13

Pozos tubular utilizable Pozo tubular no utilizable Pozo Proyectados

Explotacion Aguas Subterráneas

Manantial Copapujo

El Ayro

PA-22

PA-23

PK-8

PA-8

PROYECTO VILAVILANI II FASE I LINEA DE CONDUCCION Y ZONA DE AMPLIACION DE FRONTERA AGRICOLA LA YARADA ALTA (2850 Has)

GOBIERNO REGIONAL TACNA

Proyecto Especial Tacna

TRAMO II

CANAL CHUAPALCA – UCHUSUMA (PROG. KM 0+058.03  – 13+012.57)

Desencofrado y Solaqueo de Canal Trapezoidal entrada a bofedal Murmutane

Se procedió a la colocación de tuberías para drenaje

 Armado de Acero F Y=4200 KG/CM2, para transición por cambio de sección Trapezoidal a Rectangular. ´

Se observa la excavación y perfilado para la colocación de la tubería para sifón.

GOBIERNO REGIONAL TACNA

Proyecto Especial Tacna

TRAMO II CHUAPALCA - UCHUSUMA REVESTIMIENTO TÚNEL CHILUYO PROG. KM. 6+136.32 – 6+547.57

PRESUPUESTO 2009: PRESUP. ANALITICO 2009:

S/. S/.

2’346,406.77 1’750,141.19

OBJETIVO DE LA META: El objetivo general del Proyecto está orientado a   “ASEGURAR  EL  ABASTECIMIENTO DE AGUA PARA USOS POBLACIONAL, AGRICOLA, COMERCIAL E INDUSTRIAL DE LA CIUDAD Y VALLE DE  TACNA” 

METAS PROGRAMADAS: Movimiento de tierras en Subterráneo Construcción de sistema de drenaje Concreto Simple de Regulación F’c=100 Kg/cm2 Revestimiento de Túnel con concreto F’c=210 Kg/cm2







 Vista del interior del Túnel, Prog. Km. 6+136.32, se aprecia el terreno nivelado, así como la excavación de la zanja par a el sub dren.



TRABAJOS REALIZADOS A LA FECHA: Excavación y Refine de Piso de Túnel 62.80 M3 Excavación para Sub Dren en Material Suelto 0.90 M3 Colocación de Tubería de PVC para drenaje 422.00 ML Habilitación de acero de refuerzo 20.81 TN  Vaceado de solado de espesor E=0.10 cm para el piso del Túnel Relleno del sistema de sub dren con material filtrante 46.66 M3

• •

• •





FECHA DE INICIO: FECHA DE TERMINO: Se aprecia, el trabajo de excavación de zanja para el sistema de drenaje con equipo (martillo neumático)

 Abril 2009  Agosto 2009

GOBIERNO REGIONAL TACNA

Proyecto Especial Tacna

MEJORAMIENTO DEL CANAL PRINCIPAL MAGOLLO PRESUPUESTO 2009: PRESUP. ANALITICO 2009:

S/. S/.

4’305,783.65 3’849,391.00

OBJETIVO DE LA META: El objetivo general del Proyecto esta orientado a   “MEJORAR  LOS RENDIMIENTOS DE LOS   CULTIVOS”  que se desarrollan en el Valle de Tacna, especialmente dentro de la jurisdicción de la Comisión de Regantes de Magollo.

METAS PROGRAMADAS: Instalación de 7,42 Km de Tubería Perfilada PVC ø 600 mm. Construcción de 30 Buzones de Inspección. Construcción de 06 Cámaras de Amortiguación Construcción de 01 Toma Lateral.



• •

Excavación manual de Zanjas, para Cámara de  Amortiguación



FECHA DE INICIO: FECHA DE TERMINO:

Cámara de Amortiguación, terminada

Enero 2009  Agosto 2009

ENTREGA DEL ESTUDIO DE FACTIBILIDAD

PROYECTO  VILAVILANI II FASE I

VOLUMENES ESTUDIO DE FACTIBILIDAD 1. ESTUDIO DE FACTIBILIDAD 2. PLAN DE NEGOCIOS 3. CANAL DE CONDUCCION VILACHAULLANI – CALACHACA  – CHUAPALCA (MEMORIA) 4. CANAL DE CONDUCCION VILACHAULLANI – CALACHACA  – CHUAPALCA (PLANOS) 5. PLANTA DE BOMBEO COPAPUJO (MEMORIA) 6. PLANTA DE BOMBEO COPAPUJO (PLANOS) 7. EXPLOTACION DE AGUAS SUBTERRANEA EL AYRO (ESTUDIO HIDROGEOLOGICO) 8. EXPLOTACION DE AGUAS SUBTERRANEA EL AYRO ( INGENIERIA DE DETALLE) 9. EXPLOTACION DE AGUAS SUBTERRANEA EL AYRO ( PLANOS) 10. RESERVORIOS Y CONDUCCION CERRO BLANCO – LA YARADA ALTA (MEMORIA) 11. RESERVORIOS Y CONDUCCION CERRO BLANCO – LA YARADA ALTA (PLANOS) 12. MEJORAMIENTO DE LA CAPACIDAD DE CONDUCCION CANAL UCHUSUMA BAJO (BOCATOMA CHUSCHUCO  – PARTIDOR CERRO BLANCO) 13. INFRAESTRUCTURA HIDRAULICA MAYOR PARA RIEGO PRESURIZADO AREA DE AMPLIACION DE FRONTERA AGRICOLA LA YARADA 14. ALTA (MEMORIA – PLANOS) 14ESTUDIO DE IMPACTO AMBIENTAL ANEXOS 15. EVALUACION HIDROLOGICA 16. HIDROQUIMICA 17. GEOLOGIA - GEOTECNIA (MEMORIA) 18. GEOLOGIA - GEOTECNIA (MEMORIA-ANEXOS) 19. GEOLOGIA - GEOTECNIA (PLANOS) 20. ANALISIS DE RIESGO SISMICO 21. ESTUDIO DETERMINACION DE LA TARIFA DIFERENCIADA DE AGUA PARA LAS COMISIONES DE RIEGO UCHUSUMA – MAGOLLO, EPS – TACNA; NUEVA COMISION DE REGANTES LA YARADA ALTA 22. DETERMINACION DEL COSTO DE LAS TIERRAS HABILITADAS – AREA DE AMPLIACION DE FRONTERA AGRICOLA LA YARADA ALTA 23. MODALIDAD Y PROCEDIMIENTO DE SUBASTA DE TIERRAS HABILITADAS – AREA DE AMPLIACION DE FRONTERA AGRICOLA LA YARADA ALTA 24. DOCUMENTOS PARA CONSTITUCION DE UNA NUEVA COMISION DE REGANTES – LA YARADA ALTA