Experience from KRL KfW 1. Introduction During Final Inspection for KRL KfW the following major issues were observed. The potential root cause might be in - Design - Production Technology and - Production in combination with insufficient Quality Control. These experiences shall be implemented for improvement of KRL JAL. For more details please refer to Open Item Lists (including photos) for KRL KfW (TS1 to TS10). Please note that all photos are taken on trains that were reported ready for final inspection. 2. Major Findings 2.1. Door System All doors needed to be adjusted by grinding to open and close smoothly. 2.2. Corrosion 2.2.1. Underframe
Corrosion at drainage system and from inside underframe
Corrosion from inside underframe at footstep area
Corrosion between underframe and sidewall at door area
Experience from KRL KfW 2.2.2.Driver Door
Corrosion at driver door
2.2.3.Air Con Unit
Corrosion under Air Con frame
Corrosion under Air Con frame
2.2.4. Exterior Bolts, Nuts and Washers
Corrosion of screws for foot step cylinder
Experience from KRL KfW
Corrosion of screws and nuts of PA bos
Corrosion at gangway
Corrosion at pantograph
2.2.5.Others
Corrosion at footstep
Experience from KRL KfW
Corrosion at underframe
Corrosion between 2 parts of underframe
Corrosion at underframe
Corrosion from inside door indicator
2.3. Water Ingress
Experience from KRL KfW 2.3.1. Sealant of front windows and others
Insufficient sealing of front window
Insufficient sealing of front window
Condense water inside destination indicator
No adhesion of sealing between end- and sidewall
Experience from KRL KfW 2.3.2.Several boxes at Underframe not water proof
2.3.3.Cable Gland
Experience from KRL KfW 2.3.4. Drainage system not working
Dirt inside drainage system
2.4. Painting
Insufficient painting
2.5. Cleanliness
2.6. Quality Control 2.6.1. QC during Production and final inspection QC and QC Final refused to issue NCR according ISO 9001 and INKA. Therefore Production Technology and Engineering did not receive this information and were not able to
Experience from KRL KfW implement improvements. 2.6.2. Incoming Material Inspection Inspection insufficient 2.7. Engineering 2.7.1. No Tolerances in Engineering Drawings 2.7.2.Clearance Carbody / Bogie Frame
2.8. Production Technology 2.8.1. Lack of Process Instructions (i.e. doors, pantograph, footstep) 2.8.2.Applied tolerances for carbody not sufficient to assure function of door system 2.9. Internal Transport and Storage
Damages during transport
Corrosion because of incorrect storage
2.10. Quality Management System 2.10.1. Lack of Implementation 2.11. Continuous Improvement 2.11.1. No Learning Curve from 1st to 10th train set 2.11.2. Experience from KRL KfW not implemented in JAL
Experience from KRL KfW 3. Conclusion PT INKA is requested to prepare root cause analysis for all items and implement suitable mitigation measures until November 11, 2016.