GAS ARABIAN SERVICES (FSD)

GAS/PEP/01 Revision 0 Page 1 of 14

PROJECT EXECUTION PLAN SAFCO/IBB CO2 PIPING PROJECT

PROJECT EXECUTION PLAN SAFCO/IBB CO2 PIPING PROJECT

0 R!*+

Initial Iss!

C,''!nts

DEC 0"# 20"$

%&a''a Sii!

Dat!

P-!.a-! 

C&!1! 

A..-,*! 

Cli!nt

GAS ARABIAN SERVICES (FSD) PROJECT EXECUTION PLAN SAFCO/IBB CO2 PIPING PROJECT

INDEX

"+

INTRODUCTION

2+

PURPOSE

3+

SCOPE

$+

FLO4 OF 4OR5S C6ART

7+

%ET6ODOLOG8

9+

SAFET8 INSTRUCTIONS

GAS/PEP/01 Revision 0 Page 2 of 14

GAS ARABIAN SERVICES (FSD) PROJECT EXECUTION PLAN SAFCO/IBB CO2 PIPING PROJECT

"+

GAS/PEP/01 Revision 0 Page 3 of 14

INTRODUCTION This project is intended to have bac!p "# 2  s!pp$% fro& 'nited (etering Station inside SA)"# to *++ 'rea P$ant,   Scope of this project inc$!des piping fabrication- "onstr!ction . erection- taggingtransportation- $oading- off$oading- inspection- testing- preco&&issioningco&&issioning of interconnection piping for S)/*++ "# 2 grid- press!re re$ief va$vesTieins inc$!ding b!t not $i&ited to a$$ necessar% and app$icab$e &echanica$civi$/str!ct!ra$- e$ectrica$ . instr!&entation ors, (/S Gas Arabian Services is co&&itted to eec!te the project safe$%- on ti&e and ithin b!dget hi$e satisf%ing a$$ the !a$it% and perfor&ance re!ire&ents hich res!$ts in c!sto&er satisfaction and creating a $ong ter& re$ationship ith SA)"#/*++ and SA+*",

2+

PURPOSE  This generic Project Execution Plan will help the client to understand the planning of M/S Gas Arabian Services (ield Service !ivision" to execute this project as per SA#$/%&& described scope of wor' schedule and )ualit* control+

3+

SCOPE Gas Arabian Services (S!" accepts the full responsibilit* to co,plete the SA#$/%&& #$- piping project in co,pliance with project.s re)uire,ents applicable design codes standards referred specication and other applicable local regulations+ %n case where wor' activities (in partial or co,plete" of the contracted wor's are sub0contracted b* Gas Arabian Services (S!" it is the Gas Arabian Services (S!".s responsibilit* to ensure that the co,plete pac'ages and wor's shall co,pl* with S A&%#/SA#$ re)uire,ents+  This docu,ent denes the scope of wor' to be perfor,ed b* the Gas Arabian Services (ield Service !ivision" in relation with the project+

The #R inc$!des +ron fie$d SA)"#/*++ "# 2 Piping insta$$ation a$&ost 1000 &eters on eisting pipe rac and insta$$ation of ne pipe rac and canti$ever s!pports for piping hich inc$!des fabrication- tagging- transportation- $oading- off$oadinginspection 567T 10089- testing- insta$$ation- pic$ing/passivation- preco&&issioningco&&issioning s!pport inc$!ding b!t not $i&ited to a$$ str!ct!ra$- piping- &echanica$ . Tiein or for sh!t don, Gas Arabian Services 5)S79 i$$ prepare a detai$ed tiein p$an in cons!$tation ith the c$ient:s representative i&&ediate$% at the start of t he site or and co&e !p ith a $ist

GAS ARABIAN SERVICES (FSD) PROJECT EXECUTION PLAN SAFCO/IBB CO2 PIPING PROJECT

GAS/PEP/01 Revision 0 Page 4 of 14

of an% additiona$ piping &ateria$ re!ired for s!ccessf!$ co&p$etion of the tiein joint, Gas Arabian Services 5)S79 i$$ &ae s!re that additiona$ bi$$ of &ateria$ is prepared and s!b&itted to Gas Arabian Services 5P(T9 e$$ in advance to a$$o eno!gh ti&e for the proc!re&ent and de$iver% of an% ;o!t of stoc< ite&s,

Gas Arabian Services 5)S79:s representative i$$ visit the Site and &eet the SA)"#/*++ Staff for fa&i$iari=ation ith eisting faci$it%- site detai$s- operation and &aintenance practices- verif% data presented b% Gas Arabian Services 5P(T9- c$arif% inconsistencies- obtain an% additiona$ infor&ation re!ired to co&p$ete the orchec- correct and s!pp$e&ent an% eisting data/draings and iso&etric re!ired as a basis of the or, (/S Gas Arabian Services 5)S79 i$$ verif% a$$ the data provided in the Tender and is f!$$% responsib$e for cond!cting necessar% site s!rve%, A$$ the project activities i$$ be carried o!t as per SA+*" and SA)"#/*++ approved proced!re,

GAS ARABIAN SERVICES (FSD) PROJECT EXECUTION PLAN SAFCO/IBB CO2 PIPING PROJECT

4.

FLO4 OF 4OR5S (Fl,: 1&a-t);

Shop draings 5Approved9

(ateria$

 Approved

7eter&ine pipe as per approved $ocation . $eve$

(aring

7efine position of s!pport  Approved *nsta$$ation of pipe 6ot approved

*nho!se *nspection  Approved

Engineer:s *nspection

 Approved

Proceed

GAS/PEP/01 Revision 0 Page > of 14

GAS ARABIAN SERVICES (FSD) PROJECT EXECUTION PLAN SAFCO/IBB CO2 PIPING PROJECT

7+

GAS/PEP/01 Revision 0 Page ? of 14

%ET6ODOLOG8



SITE %OBILI