Estimate

February 11, 2017 | Author: mmabee | Category: N/A
Share Embed Donate


Short Description

DPWH Estimate Lecture...

Description

NVPILAR 2008

GENERAL GUIDELINES THIS DEPARTMENT ORDER SETS THE FORMULATION OF POLICIES, RULES AND PROCEDURES RELATIVE TO THE PREPARATION OF THE “APPROVED BUDGET FOR THE CONTRACT” (ABC) ISSUED FOR THE GUIDANCE OF ALL CONCERNED. ALL THE ITEMS OF WORK TO BE USED SHALL BE IN ACCORDANCE WITH DPWH STANDARD SPECIFICATIONS.

NVPILAR 2008

COST ESTIMATES (D0 57 S.2002)

INDIRECT COST

DIRECT COST

A. OVERHEAD EXPENSES – (6-7% CEILING) DIRECT COST. 1. ENGINEERING & ADMINISTRATIVE SUPERVISION 2. TRANSPORTATION ALLOWANCES 3. OFFICE EXPENSES (EQPT & SUPPLIES) 4. CONTRACTORS ALL RISK INSURANCE 5. FINANCING COST INCL. -PREMIUM ON BID SECURITY -PREMIUM ON PERFORMANCE SECURITY -PREMIUM/CHARGES ON CREDIT LINES -COST OF MONEY TO FINANCE THE PROJ.

A. COST OF MATERIALS

1. COST AT SOURCE, INCL. PROCESSING ROYALTIES, LOCAL TAXES & ETC. 2. EXPENSES FOR HAULING TO PROJ. SITE 3. HANDLING EXPENSES 4. STORAGE 5. ALLOWANCE FOR WASTE/OR LOSSES

B. COST OF LABOR

1. SALARIES & WAGES AS AUTHORIZED BY DOLE 2. FRINGE BENEFITS SUCH AS VACATION & SICK LEAVES, GSIS & SSS CONTR. ALLOWANCES, BONUSES AND ETC.

C. EQUIPMENT EXPENSES

1. RENTAL RATE SHALL BE BASED ON ACEL RATE AS APPRVD BY DPWH . OPERATED RENTAL RATE ARE PREFERRED OVER BARE RENTAL RATE 2. MOB./DEMOB OF EQUIPMENT SHALL BE ON CASE TO CASE BASIS BUT IN NO CASE EXCEED 1% OF TOTAL CIVIL WORK ITEMS.

B. CONTINGENCY – 3-5% OF DC. C. MISCELLANEOUS – 1% OF DC. INCLUDES LABORATORY TEST. D. CONTRACTORS PROFIT EST. DIRECT COST

OCM

PROFIT MOB/DEMOB MAX. TOTAL

UP TO P1M.

13

15

1

29

ABOVE P1M-5M

12

14

1

27

ABOVE P5M-10M

12

13

11

12

1 1

26

ABOVE P10M-20M ABOVE P20M-50M

11

11

1

23

ABOVE P50M

10

10

1

21

VAT

24

3-5% PM Fee NVPILAR 2008

“ THOSE WHO PREPARED/REVIEWED/CHECKED THE ESTIMATES SHALL SEE TO IT THAT IN CASE THEY ARE CALLED UPON TO MAKE GOOD THEIR ESTIMATES, THEY CAN PERFORM THE JOB THEMSELVES AT THE COST THEY HAVE GENERATED.”

NVPILAR 2008

PURPOSE THIS DEPARTMENT ORDER SETS THE GUIDELINES, RULES AND PROCEDURES, TO BE FOLLOWED BY ALL CONCERNED IN THE IMPLEMENTATION OF DEPARTMENT OF LABOR AND EMPLOYMENT D.O. No. 13(DOLE D.O. No.13), SERIES OF 1998 OTHERWISE KNOWN AS THE “GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND HEALTH IN THE CONSTRUCTION INDUSTRY”, WITH EMPHASIS GIVEN ON THE METHODOLOGY TO BE USED IN ESTIMATING THE COST OF CONSTRUCTION SAFETY AND HEALTH PROGRAM AS REQUIRED IN SECTION 17. GENERAL GUIDELINES IN COMPLIANCE WITH SECTION 17 OF DOLE D.O. No. 13, THE IMPLENTATION OF CONSTRUCTION SAFETY SHALL BE CONSIDERED IN ALL STAGES OF PROJECT PROCUREMENT ( DESIGN, ESTIMATE, AND CONSTRUCTION ) AND ITS COST SHALL BE INTEGRATED TO THE OVERALL PROJECT COST UNDER PAY ITEM “SPLCONSTRUCTION SAFETY AND HEALTH” AS A LUMPSUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED ESTIMATE. LIKEWISE, ALL REQUIREMENTS, PROVISIONS, AND INSTRUCTIONS PERTAINING TO THE IMPLEMENTATION OF CONSTRUCTION SAFETY AND HEALTH IN EVERY PROJECT SHALL BE INCLUDED IN THE PROJECT BIDDING DOCUMENTS SPECIFICALLY UNDER THE INSTRUCTION TO BIDDERS.

NVPILAR 2008

CONCTRUCTION PROJECT (D.O. No. 56 S. 2005) CONSTRUCTION SAFETY AND HEALTH PROGRAM ( CSHP ) THE REQUIRED CSHP FOR SPECIFIC PROJECT SHALL INCLUDE BUT NOT LIMITED TO THE FF : 1. COMPOSITION OF SAFETY & HEALTH PERSONNEL RESPONSIBLE FOR THE IMPLENTATION OF CSHP; 2. SPECIFIC SAFETY POLICIES W/C SHALL BE UNDERTAKEN IN THE CONSTRUCTION SITE INCLUDING FREQUENCY OF & PERSONS RESPONSIBLE FOR CONDUCTING TOOL BOX AND GANG MEETING; 3. PENALTIES AND SANCTIONS FOR VIOLATIONS OF THE CSHP; 4. FREQUENCY, CONTENT AND PERSONS RESPONSIBLE FOR ORIENTING, INSTRUCTING AND TRAINING ALL WORKERS AT THE SITE WITH REGARD TO THE CSHP WHICH THEY OPERATE; & 5. THE MANNER OF DISPOSING WASTE ARISING FROM THE CONSTRUCTION.

MANPOWER

1. SAFETY ENGINEER / OFFICER 2. SAFETY MAN / OFFICER -AS RECOMMENDED BY DOLE, FOR EVERY CONST. PROJ. W 100 & ABOVE WORKERS, AN ACCREDTED SAFETY OFFICER BY DOLE-BWC SHALL BE EMPLOYED. ONLY THE COST FOR THE CONST. SAFETY & HEALTH OFICER , WHETHER ON FULL OR PART TIME BASIS ASSIGNED ON SITE SHALL BE INCLUDED IN THE ESTIMATE. 3. HEALTH PERSONNEL -ONLY THE MEDICAL AND DENTAL PRACTITIONERS ACTUALLY ASSIGNED IN THE PROJECT SHALL BE INCLUDED IN THE COST OF SAFETY.

EQUIPMENT/FACILITIES

1. PERSONAL PROTECTIVE EQUPMENT (PPE) -FOR GENERAL CONST. THE REQUIRED BASIC PPE FOR ALL WORKERS SHALL BE SAFETY HELMET, SAFETY GLOVES AND SAFETY SHOES. SPECIALTY PPE SHALL BE PROVIDED IN ADDITION TO OR IN LIEU OF THE CORRESPONDING PPE AS THE WORK ACTIVITY REQUIRES. 2. SIGNAGES AND BARRICADES -SHALL BE PROVIDED AS A PRECAUTION TO ADVICE THE WORKERS & THE GENERAL PUBLIC OF THE HAZARDS EXISTING AT THE WORKSITE. 3. FACILITIES - W ADEQUTE SAFE DRINKING WATER; SANITARY & WASHING FACILITIES: LIVING ACCOMODATIONS FOR WORKERS.

COSTING PAY ITEM “SPL – CONSTRUCTION SAFETY AND HEALTH” AS A LUMP SUM AMOUNT, TO BE QUANTIFIED IN THE DETAILED ESTIMATE.

NVPILAR 2008

SAFE CONDITION

CAUTION OR RISK

NOTE : DERIVED FROM CPES MANUAL

MANDATORY ACTION

TRAFFIC AND HOUSEKEEPING

ALERT

STOP OR PROHIBITION

RADIATION

NVPILAR 2008

REFERENCE : SPECIFICATIONS DPWH STD.SPECS., VOL. I, 1988, ED. DPWH STD.SPECS.,VOL.II, 2004 ED. DPWH STD.SPECS.,VOL.III, 1995 ED.

BOOKS 1. ESTIMATING BILL OF MATERIALS BY VICENTE TAGAYUN 2. SIMPLIFIED CONSTRUCTION ESTIMATE BY MAX B. FAJARDO JR. 3. HANDBOOK OF CONSTRUCTION ESTIMATE BY RHENO A. VELASCO 4. PLUMBING DESIGN & ESTIMATE BY MAX B. FAJARDO JR. 5. ELECTRICAL LAYOUT & ESTIMATE BY MAX B. FAJARDO JR.

NVPILAR 2008

OTHER CODES AND SPECIFICATIONS: P.D.1096 – NATIONAL BUILDING CODE R.A. 7160 – LOCAL GOVT. CODE OF 1991 DOLE D.O. 13 SERIES 1998 – CONSTRUCTION SAFETY DPWH D.O. 56 SERIES 2005 – CONSTRUCTION SAFETY B.P. 344 – ACCESSIBILITY LAW NATIONAL STRUCTURAL CODE OF THE PHILIPPINES AMERICAN CONCRETE INSTITUTE ( ACI ) AMERICAN SOCIETY OF TESTING MATERIALS ( ASTM ) ELECTRICAL CODE OF THE PHILIPPINES PLUMBING CODE OF THE PHILIPPINES PHILIPPINE MECHANICAL ENGINEERING CODE ALL MATERIALS QUALITY TESTING CODE

NVPILAR 2008

NATIONAL BUILDING CODE

( P.D. 1096 ) 5 MAJOR DIVISIONS IN BUILDING PLANS SUBJECT TO ESTIMATE ARCHITECTURAL ARCHITECTURAL

AESTHETIC AESTHETIC

ARCHITECT ARCHITECT

STRUCTURAL STRUCTURAL

STRENGTH STRENGTH

CIVIL CIVILENGR ENGR

ELECTRICAL/ ELECTRICAL/ ELECTRONIC ELECTRONIC

POWER, POWER,LIGHTING LIGHTING & COMMUNICATION & COMMUNICATION

ELECTL ELECTLENGR/ ENGR/ ELECTRONIC ELECTRONICENGR ENGR

SANITARY/ SANITARY/ PLUMBING PLUMBING

HEALTH HEALTHAND AND SANITATION SANITATION

SANITARY SANITARYENGR/ ENGR/ MASTER MASTERPLUMBER PLUMBER

MECHANICAL MECHANICAL

NECESSITIES NECESSITIES

MECHANICAL MECHANICALENGR ENGR

NVPILAR 2008

CLASSIFICATION OF BUILDING STRUCTURES RESIDENTIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR USE OF OWNER, “ON CAMPUS” DORMITORIES, RECTORIES, CONVENTS AND MONASTERIES, RESIDENTIAL CONDOMINIUMS OWNED BY OCCUPANTS, ARMY BARRACKS, ETC. COMMERCIAL – SINGLE DETACHED DWELLINGS AND DUPLEXES FOR LEASE, BOARDING HOUSES, APARTMENTS, ACCESORIAS, HOTELS AND INNS, “OFF CAMPUS” DORMITORIES, TRANSPORTATION TERMINALS AND STATIONS, NIGHT CLUBS AND DANCE HALLS, RESTAURANTS, MARKETS AND SHOPPING CENTERS, THEATERS, SPORTS STADIA, GRANDSTANDS, GASOLINE SERVICE STATIONS, PARKING GARAGES, FUNERAL PARLORS, ETC. INDUSTRIAL – FACTORIES, PLANTS, MILLS, ARSENALS, BREWERIES, PROCESSING PLANTS, GAS GENERATING PLANTS, SHIPYARDS, AIRCRAFT HANGARS, SLIPWAYS, DRYDOCKS AND PIERS, LUMBER MILLS, WAREHOUSE, STORAGE TANKS, GRAIN AND CEMENT SILOS, ETC.

NVPILAR 2008

INSTITUTIONAL



EDUCATIONAL INSTITUTIONS, LIBRARIES, MUSEUMS, CLUBHOUSES, HOSPITALS, SANITARIA, ASYLUMS, HOMES FOR THE AGED, JAILS, POLICE AND FIRE STATIONS, PLACES OF WORSHIP, ETC.

RECREATIONAL



CINEMAS, BILLIARD HOUSES, ETC.

HALLS,

DISCO

PADS,

AGRICULTURAL



BARNS, POULTRY HOUSES, HATCHERIES, STABLES, GREENHOUSES, GRANARIES, ETC.

AMUSEMENT PIGGERIES,

ANCILLARY – GARAGES, CARPORTS, TANKS, TOWERS, SMOKESTACKS AND CHIMNEYS, VAULTS, SWIMMING POOLS, PELOTA COURTS, AVIARIES, AQUARIUMS, ZOO STRUCTURES, FIERE WALLS AND FENCES OVER 1.8O METERS IN HEIGHT, ETC. TEMPORARY – FIELD OFFICES, LABORERS’ QUARTERS, CANOPIES AND RAILINGS, PROTECTIVE FENCINGS, ETC. OTHERS – CEMETERY STRUCTURES AND MOUSOLEUMS, TOMBS, MULTI-LEVEL NICHES, ETC.

NVPILAR 2008

TYPES OF CONSTRUCTION ( P.D. 1096, CHAPTER 4, SECTION 401 )

TYPE I - TYPE I BUILDING SHALL BE OF WOOD CONSTRUCTION. THE STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE. TYPE II - TYPE II BUILDING SHALL BE OF WOOD CONSTRUCTION WITH PROTECTIVE FIRE RESISTANT MATERIALS AND ONE-HOUR FIRE RESISTIVE THROUGHOUT: EXCEPT, THAT PERMANENT NON-BEARING PARTITIONS MAY USE FIRE-RETARDANT TREATED WOOD WITHIN THE FRAMING ASSEMBLY. TYPE III – TYPE III BUILDING SHALL BE OF MASONRY AND WOOD CONSTRUCTION, STRUCTURAL ELEMENTS MAY BE ANY OF THE MATERIALS PERMITTED BY THIS CODE: PROVIDED, THAT THE BUILDING SHALL BE ONE-HOUR FIRE – RESISTIVE THROUGHOUT. EXTERIOR WALLS SHALL BE INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION TYPE IV – TYPE IV BUILDING SHALL BE OF STEEL, IRON, CONCRETE OR MASONRY CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL BE OF INCOMBUSTIBLE FIRE RESISTIVE CONSTRUCTION: EXCEPT, THAT PERMANENT NON-BEARING PARTITIONS OF ONE-HOUR FIRE RESISTIVE CONSTRUCTION MAY USE FIRE RETARTANT TREATED WOOD WITHIN THE FRAMING ASSEMBLY. TYPE V - TYPE V BUILDING SHALL BE FIRE-RESISTIVE. THE STRUCTURAL ELEMENTS SHALL BE OF STEEL, IRON, CONCRETE, OR MASONRY CONSTRUCTION. WALLS, CEILING AND PERMANENT PARTITIONS SHALL BE OF INCOMBUSTIBLE FIRE-RESISTIVE CONSTRUCTION.

NVPILAR 2008

BURJ DUBAI ( DUBAI TOWER ) THE BURJ DUBAI IS A SUPERTALL SKYSCRAPER CURRENTLY UNDER CONSTRUCTION IN DUBAI, UNITED ARAB EMIRATES. IT IS CURRENTLY THE TALLEST FREE STANDING STRUCTURES IN THE WORLD HAVING AN EXPECTED HEIGHT OF 818 METERS BUT COULD REACH UP TO 940 METERS UPON THE SCHEDULED COMPLETION IN SEPTEMBER 2009. THE BUILDING IS BEING BUILT BY A JOINT VENTURE OF THE SOUTH KOREAN COMPANY SAMSUNG, THE BELGIAN COMPANY BESIX AND THE UAE COMPANY ARABTEC. IT WAS DESIGN BY ADRIAN SMITH OF SKIDMORE, OWING AND MERRIL CONSULTANCY. THE TOTAL BUDGET FOR THE BURJ DUBAI PROJECT IS ABOUT 4.1 BILLION DOLLARS. *PICTURE & INFO FROM INTERNET

NVPILAR 2008

SCOPE OF WORKS IN BUILDING CONSTRUCTION PART -

A-

MOBILIZATION

PART -

B-

EARTHWORKS

PART -

C-

TERMITE CONTROL & WOOD PRESERVATIONS

PART -

D-

FOUNDATION WORKS

PART -

E-

DAMP PROOFING / MOISTURE CONTROL

PART -

F-

CONCRETE WORKS

PART -

G-

MASONRY WORKS

PART -

H-

CARPENTRY WORKS

PART -

I -

FABRICATED MATERIALS AND HARDWARE

PART -

J-

ROOF FRAMING WORKS

PART -

K-

ROOFING WORKS

PART -

L-

FINISHES

PART -

M - PAINTING / VARNISHING

PART -

N-

WATER PROOFING

PART -

O-

SANITARY WORKS

PART -

P-

ELECTRICAL WORKS

PART -

Q-

MECHANICAL WORKS

PART -

R-

CONSTRUCTION SAFETY AND HEALTH (DO. 56)

NVPILAR 2008

PROJECT: ONE(1) STOREY (7X7 MODIFIED) CLASSROOM SCHOOL BUILDING

ARCHITECTURAL PLAN 1

2

2

3

3

GA 26 CORR. G I. ROOFING

D-1 W-1

2

W-2

W-2

B

A

D-1

W-1

B D-1

CORRIDOR

FLOOR PLAN *PLANS BY BOD

2

W-2

1

3

CROSS SECTION 2

3

SCH. OF DOORS & WINDOWS

C

C

CLASSROOM W-1

1

W-2 CLASSROOM

REAR ELEVATION

3

W-2

C

D-1

FRONT ELEVATION 1

B

GA 26 CORR. G I. ROOFING

D-1 W-1

C

A

1

EXPOSED STEEL ‘C’ PURLINS AND RAFTERS

SLOPE

B SLOPE

A

A REFLECTED CEILING

D-1

FLUSH TYPE HOLLOW CORE DOOR W MARINE PLYWOOD FACING ON WOOD FRAME

W-1 & W-2

GLASS JALOUSIE WINDOWS ON ALUMINUM HOUSIG

ROOF PLAN NVPILAR 2008

STRUCTURAL PLAN B

A

RAFTER

C

ANGULAR BRACE CORR. GI SHEETS C1-F1

COL. FTG.

C1-F1

CLASSROOM WELL COMPACTED GRAVEL FILL

DETAIL CROSS SECTION

FGL NGL

WF-1

CORRIDOR DOWEL

W-2

SLAB ON FILL

WF-1

D-1

WF-1

LB

BASE PLATE W LONG ANCHOR BOLTS ROOF INSULATION CEILING FIN. COMPRESSED BETWEEN PURLINS AND RAFTER

WF-1

FFL

WALL FTG

*PLANS BY BOD

COLUMN

WF-1 C1-F1

C1-F1

C1-F1

FOUNDATION PLAN

LINTEL BEAM FOOTING

WF-1

WF-1

WF-1

LB

C1-F1

C1-F1

C1-F1

C-PURLINS

WALL FOOTING

SPOT DETAIL LINTEL BEAMS NVPILAR 2008

PLUMBING AND SANITARY CYCLE ( ONE STOREY STRUCTURE ) HORIZONTAL VENT PIPE

VENT PIPE THRU ROOF

LAVATORY

WATER CLOSET

KITCHEN SINK

SHOWER

IN-HOUSE WATER SUPPLY PIPE

ROOF GUTTER

DOWNSPOUT

WATER METER

CATCH BASIN

GATE VALVE

SEPTIC VAULT

METER SHUT-OFF WATER PIPE CONN. TO WATER MAIN

TO DRAINAGE CANAL/SEWER CORPORATION COCK

CATCH BASIN

CLEANOUT

SOIL/WASTE PIPE

STORM DRAINAGE PIPE

WATER MAIN

*PICTURE FROM BOOKS OF TAGAYUN

NVPILAR 2008

PLUMBING SYSTEM

WATER LINE INCLUDING DRAINAGE, WASTE AND VENTILATION SYSTEM OF BUILDING VENTILATION THROUGH ROOF ( VTR ) DRY VENT

SHOWER W/ ACCESORIES

MAIN VENT

BATH TUB

HOT WATER RETURN

LAVATORIES FIXTURES

WATER CLOSET FLOOR DRAIN

KITCHEN SINK FIXTURES COLD WATER LINE W/ ACCESORIES HOT WATER LINE W/ ACCESSORIES WATER HEATER

*PICTURE FROM BOOKS OF FAJARDO.

WET VENT

FITTINGS CLEAN OUT WASTE / SOIL PIPE

NVPILAR 2008

ELECTRICAL SYSTEM LAYOUT ( ONE STOREY STRUCTURES )

LIGHTING LAYOUT

CONVENIENCE OUTLET LAYOUT

PANEL BOARD & CABINETS

*PICTURE FROM BOOKS OF FAJARDO.

NVPILAR 2008

PREPARATION OF PROGRAM OF WORKS CONST. OF ONE STOREY SCHOOL BUILDING 2

3

GA 26 CORR. G I. ROOFING

GA 26 CORR. G I. ROOFING

D-1

D-1

W-2

CLASSROOM

CROSS SECTION

2

3

C

W-2

B

CLASSROOM

A

CORRIDOR

FLOOR PLAN

2.29

6,870.00

III. SOIL POISONING

0.56

1,680.00

IV. DAMPROOFING WORKS

0.47

1,410.00

29.65

88,950.00

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

VIII. FAB. MATERIALS & HARDWARE

9.08

27,240.00

IX. ROOF FRAMING WORKS

9.87

29610.00

X.

7.20

21,600.00

12.23

36,690.00

XII. PAINTING WORKS

6.50

19,500.00

XIII. SANITARY / PLUMBING WORKS

4.06

12,180.00

XIV. ELECTRICAL WORKS

5.34

16,020.00

XV. MECHANICAL WORKS

5.00

15,000.00

SLAB ON FILL WF-1

C1-F1

WF-1

C1-F1

C1-F1

SCH. OF DOORS & WINDOWS

W-2

D-1 W-1 W-1 D-1

EARTHWORKS

P3,000.00

VI. MASONRY WORKS

FOUNDATION PLAN 1

II.

1.0

V.

C1-F1

C

MOBILIZATION / DEMOBILIZATION

AMOUNT

C1-F1 C1-F1 C1-F1 WF-1 WF-1 WF-1

B

REAR ELEVATION

WF-1

FRONT ELEVATION A

W-2

W-2

WF-1

W-1

W-1

I.

%

C1-F1

D-1

SCOPE OF WORKS

1

2

3

WF-1

1

D-1

W-1 & W-2

FLUSH TYPE GLASS JALOUSIE HOLLOW CORE WINDOWS ON DOOR W MARINE ALUMINUM HOUSING PLYWOOD FACING ON WOOD FRAME

CONCRETE WORKS

ROOFING WORKS

XI. FINISHES

TOTAL

100.00

300,000.00

NVPILAR 2008

BUILDING CONSTRUCTION METHODOLOGY ( BY PERT/CPM DIAGRAM)

PROJECT: ONE(1) STOREY (7m X 7m) MODIFIED SCHOOL BUILDING PROCUREMENT/DELIVERY OF CONSTRUCTION MATERIALS

D

26 ELECTRICAL/SANITARY ROUGH-IN

14

J

16

INST. ELECT/ MECH/SANITARY FIXTURES

12

CARPENTRY WORKS

1

2

MOVEIN

A

2

EARTH WORKS

B

2

6

4

CONCRETE WORKS

C

WAIT

F

5

MASONRY WORKS

3

WAIT

E

8

H

ROOF FRAMING

5

1

SOIL POISONING

5

3

INST. OF PURLINS WAIT

I

ROOFING

4

2

K

2

BACKFILL

M

W

3

9

O

1

13

1O

N

15

FINISHES WAIT

WAIT

WAIT

G

P

2

4

PAINTING

3

4

R

2

Q

T

S

17

MOVE OUT

2

V

U

INST. FAB. MATLS & HARDWARE

INST. GUTTER & FLUSHING

14

11

DAMPROOFING/SLAB ON FILL

7

1

2

3

4

5

6

7

8

9

10

LEGEND: NETWORK -

ES

A

LS

EF

B

11

12

13

14 15 16 17 CALENDAR DAYS

18

19

20

21

22

23

24

25

26

27

28

29

30

LF

ACTIVITY EVENT -

ES

A

LS

DUMMY CRITICAL PATH -

NVPILAR 2008

SCOPE OF WORKS

WT.(%)

AMOUNT (PHP)

I. MOBILIZATION/DEMOB

1.00

3,000.00

II. EARTHWORKS

2.29

6,870.00

III. SOIL POISONING

0.56

1,680.00

IV. DAMP PROOFING WORKS

0.47

1,410.00

V. CONCRETE WORKS

29.65

88,950.00

VI. MASONRY WORKS

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

VIII. FAB. MATLS & H’WARE

9.08

10,620.00

IX. ROOF FRAMING WORKS

9.87

27,240.00

X. ROOFING WORKS

7.20

29,610.00

12.23

21,600.00

XII. PAINTING WORKS

6.50

36,690.00

XIII. SANITARY WORKS

4.06

19,500.00

XIV. ELECTRICAL WORKS

5.34

16,020.00

XV. MECHANICAL WORKS

5.00

15,000.00

100.00

300,000.00

XI. FINISHES

TOTAL

CALENDAR DAYS 5

10

15

20

25

30

PROJECTED CASH FLOW (P) PROJECTED ACCPLMENT (%) CUMMULATIVE CASH FLOW(P) CUMMULATIVE ACCPLMNT(%) - CRITICAL ACTIVITY - PARALLEL ACTIVITY

NVPILAR 2008

SCOPE OF WORKS

WT.(%)

CALENDAR DAYS

AMOUNT (PHP)

5

I. MOBILIZATION/DEMOB

1.00

3,000.00

1,500.00

II. EARTHWORKS

2.29

6,870.00

3,435.00

III. SOIL POISONING

0.56

1,680.00

1,680.00

IV. DAMP PROOFING WORKS

0.47

1,410.00

10

15

20

25

30 1,500.00

3,435.00 1,410.00

88,950.00 11,118.75 44,475.00 33,356.25

V. CONCRETE WORKS

29.65

VI. MASONRY WORKS

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

10,620.00

VIII. FAB. MATLS & H’WARE

9.08

10,620.00

13,620.00 13,620.00

IX. ROOF FRAMING WORKS

9.87

27,240.00

17,766.00

11,844.00

X. ROOFING WORKS

7.20

29,610.00

16,200.00

5,400.00

12.23

21,600.00

XII. PAINTING WORKS

6.50

36,690.00

XIII. SANITARY WORKS

4.06

19,500.00

676.67

3,383.33

3,383.33

3,383.33

1,353.34

XIV. ELECTRICAL WORKS

5.34

16,020.00

890.00

4,450.00

4,450.00

4,450.00

1,780.00

XV. MECHANICAL WORKS

5.00

15,000.00

833.33

4,166.67

4,166.67

4,166.67

1,666.66

100.00

300,000.00

XI. FINISHES

TOTAL

3,210.00

6,420.00

36,690.00 19,500.00

PROJECTED CASH FLOW (P)

17,733.75 53,520.00

PROJECTED ACCPLMENT (%)

30.06 17.84 17.73 15.32 13.14 5.91 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00

CUMMULATIVE CASH FLOW(P) CUMMULATIVE ACCPLMNT(%)

5.91

23.75

53,186.25 45,966.00 90,174.00 39,420.00

41.48

56.80

86.86

100.00

NVPILAR 2008

SCOPE OF WORKS

WT.(%)

AMOUNT (PHP)

I. MOBILIZATION/DEMOB

1.00

3,000.00

II. EARTHWORKS

2.29

6,870.00

III. SOIL POISONING

0.56

1,680.00

IV. DAMP PROOFING WORKS

0.47

1,410.00

V. CONCRETE WORKS

29.65

88,950.00

VI. MASONRY WORKS

3.21

9,630.00

VII. CARPENTRY WORKS

3.54

10,620.00

VIII. FAB. MATLS & H’WARE

9.08

10,620.00

IX. ROOF FRAMING WORKS

9.87

27,240.00

X. ROOFING WORKS

7.20

29,610.00

12.23

21,600.00

XII. PAINTING WORKS

6.50

36,690.00

XIII. SANITARY WORKS

4.06

19,500.00

XIV. ELECTRICAL WORKS

5.34

16,020.00

XV. MECHANICAL WORKS

5.00

15,000.00

100.00

300,000.00

XI. FINISHES

TOTAL

CALENDAR DAYS 5

10

15

20

25

30

100%

86.86 75%

ACTUAL ACCOMPLISHMENT 56.80

50% 41.48

TIME ELAPSED

SCHEDULED ACCOMPLIHMENT

25%

23.75

5.91

PROJECTED CASH FLOW (P)

17,733.75 53,520.00

PROJECTED ACCPLMENT (%)

30.06 17.84 17.73 15.32 13.14 5.91 17,733.75 71,253.75 124,440.00 170406.00 260,580.00 300,000.00

CUMMULATIVE CASH FLOW(P) CUMMULATIVE ACCPLMNT(%)

5.91

23.75

53,186.25 45,966.00 90,174.00 39,420.00

41.48

56.80

86.86

100.00

NVPILAR 2008

MANPOWER RES. ENGINEER CONST. FOREMAN

RATE/DAY

TOTAL AMOUNT

CALENDAR DAYS 10 15

5

25

30

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

CARPENTER

1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2

MASON

1 1

LEADMAN

20

STEEL MAN

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2

2 2

2 2 2 2 2 2 2 2 2 2 2 2

2 2 2

2 2 2 2

2 2 2 2 2 2 2

WELDER TINSMITH

2 2 2 2 2 2 2

PAINTER

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

PLUMBER

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

ELECTRICIAN LABORER

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

SAFETY OFFICER FIRST AIDER NURSES TOTAL

8 8 6 6

131313 1314 10 10 10 1616 101010 10 10 101012121212121210 8 6

NVPILAR 2008

EQUIPTMENT MINOR TOOL ACC. C0NCRETE MIXER

RATE/DAY

TOTAL AMOUNT

5

CALENDAR DAYS 10 15

30

1 1 1 1

CONC. VIBRATOR BAR BENDER

1 1 1 1 1 1 1 1 1

WELDING MACHINE

25

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

BAR CUTTER

20

1 1 1

1 1 1 1 1

TOTAL

NVPILAR 2008

MANPOWER REQUIREMENT

TECHNICAL

PROJECT ENGINEER RESIDENT ENGINEER

SAFETY & HEALTH (DO 56 S.2005)

SAFETY ENGINEER SAFETY OFFICER FIRST AIDER NURSES

SKILLED / UNSKILLED

CONST. FOREMAN LEADMAN

ELECTRICAL ENGINEER

CARPENTER MASON STEEL MAN WELDER TINSMITH

MECHANICAL ENGINEER

INSTALLER

MTQC ENGINEER QTY./COST ENGINEER SANITARY ENGINEER

PAINTER PLUMBER ELECTRICIAN LABORER

NVPILAR 2008

NVPILAR 2008

PILE FOUNDATION DRILLING, DRIVING, BORING, GRABBING EQUIPMENT

SMALL DRILLING EQPT. USE FOR MICRO PILES

EXCAVATOR-USE IN LARGE DIMENSION EXCAVATION & DIGGING

DROP HAMMER DRIVING HEAVY BORING RIG W/ VIBRO RIG FOR PRE CAST PILES HAMMER FOR BORED PILES

TRUCK MIXER TANDEM WITH PUMPCRETE USE IN POURING OF HEAVY FOUNDATIONS.

WHEEL LOADER TANDEM W/ DUMP TRUCK -USE FOR HAULING & DISPOSAL OF DEBRIS AND OTHER EXCAVATED MATERIALS.

HEAVY CABLE GRAB FOR BARRETTE PILES

TRUCK MOUNTED/CRAWLER CRANE -USE TO CARRY & MANEUVER PRE CAST PILE & STEEL CAGES.

GENERATOR SET / WELDING MACHINE – USE AS CONNECTORS ON HEAVY STRUCTURAL STEEL MEMBERS. NVPILAR 2008

MOBILE CRANES – USE TO MANEUVER AROUND & OUTSIDE THE BUILDING TO HOIST MATERIALS & EQUIPMENT FROM VARIOUS LOCATIONS

WHEEL LOADER TANDEM W/ DUMP TRUCK-USE FOR HAULING & DISPOSAL OF DEBRIS AND OTHER MATERIALS WITHIN THE PERIPHERAL OF THE BUILDINGS

TRUCK MIXER TANDEM WITH PUMPCRETE USE IN POURING OF HEAVY SUPERSTRUCTURE MEMBERS.

TOWER CRANE – USE AS CIRCUMFERENTIAL LIFTING MECHANISM TO TRANSPORT VITAL CONSTRUCTION MATERIALS & EQUIPMENT

FORMS & SCAFFOLDING – USE AS GUIDE & SUPPORT SYSTEM IN FORMING & CHECKING ALIGNMENT OF STRUCTURAL MEMBERS IN & AROUND THE BUILDINGS.

GENERATOR SET / WELDING MACHINE – USE AS CONNECTORS ON HEAVY STRUCTURAL STEEL MEMBERS.

NVPILAR 2008

WHEEL LOADER

ROLLER

EXCAVATOR/BREAKER

TRUCK MIXER

BULLDOZER

TRAILER TRUCK

GRADER

DUMP TRUCK

NVPILAR 2008

SAMPLING MOLD

BAR CUTTER

1- BAGGER CONCRETE MIXER

2 – BAGGER CONCRETE MIXER

PLATE COMPACTOR

CONCRETE VIBRATOR

TAMPING RAMMER

PORTA LIFT

RING AND BAR BENDER

HOLLOW BLOCK MACHINE

WALK BEHIND ROLLER

SUBMERSIBLE PUMP NVPILAR 2008

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

A. MOBILIZATION / DEMOB. B. EARTHWORKS a) Excavation / Backfill

%LABOR OF MAT’LS. (APPROXIMATE)

MANDAYS

1% OF DC

-

b) Earth fill

30 %

c) Gravel

30 %

C. TERMITE CONTROL / WOOD PRESERVATION a) Soil Poisoning

30 %

b) Wood Preservation

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MAT’LS. (APPROXIMATE)

MANDAYS

D. FOUNDATION WORKS 1. SHALLOW FOUNDATION a) Spread

30 %

b) Mat

30 %

c) Raft

30 %

2. DEEP FOUNDATION a) Micro Piles

30 %

b) Pre-Cast Driven Piles

30 %

c) Bored Piles

30 %

d) Barrette Piles

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

E. DAMP PROOFING / MOISTURE CONTROL a) On Ground b) Below Ground F. CONCRETE WORKS a) Concrete a.1) Ready Mix a.2) Job Mix

%LABOR OF MAT’LS. (APPROXIMATE)

MANDAYS

30 % 30 %

10 – 15 % 30 %

b) Re-bars

30 %

c) Formworks

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MAT’LS. (APPROXIMATE)

G. MASONRY WORKS a) Concrete Hollow Blocks

30 %

H. CARPENTRY WORKS a) Ceiling

30 %

b) Partitions

30 %

c) Wooden Framing

30 %

d) Stairs

30 %

e) Cabinets

30 %

MANDAYS

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

H. FABRICATED MAT’LS AND HARDWARES a) Doors b) Windows

%LABOR OF MAT’LS. (APPROXIMATE)

MANDAYS

30% Fab. + 10% Inst. 30% Fab. + 10% Inst.

c) Hardware Accessories 30% I. ROOF FRAMING WORKS 1. Timber Trusses

30%

2. Steel Trusses a) Fabrication

30%

b) Installation/Erection

20%

c) Equipment

10 - 25 %

d) Consumables e) Painting

8% 7%

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MAT’LS. (APPROXIMATE)

K. ROOFING WORKS a) Roofing Mat’ls & acc.

30 %

L. FINISHES

30 - 35 %

MANDAYS

M. PAINTING / VARNISHING a) Masonry Paint

30 %

b) Wooden Paint

30 %

c) Metal Paint

30 %

d) Varnishing

30 %

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

N. WATERPROOFING a) Cement Base (Integral)

%LABOR OF MAT’LS. (APPROXIMATE)

30 %

b) Membrane Waterproofing

30 %

c) Liquid Waterproofing

30 %

d) Hydrolithic Waterproofing

30 %

O. SANITARY WORKS a) Plumbing Lines

MANDAYS

30 %

b) Drainage, Waste & Vent

30 %

c) Fixtures & Accessories

15 %

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MAT’LS. (APPROXIMATE)

MANDAYS

P. ELECTRICAL WORKS a) Wires & wiring

30 %

b) Conduit works

30 %

c) Panel boards & Cabinets

5%

d) Fixtures & Accessories

10 %

NVPILAR 2008

LABOR COST DISTRIBUTION (BUILDING ESTIMATE)

SCOPE OF WORKS

%LABOR OF MAT’LS. (APPROXIMATE)

MANDAYS

Q. MECHANICAL WORKS a) Airconditioning & Refrigeration System

10% - Labor(Acc.) 15% - Inst. of units

b) Water Pump

30% - Labor (Pipes & fit.) 15% - Inst. of units

c) Automatic Water Sprinkler System

30% - Labor (Pipes & fit.) 15% - Inst. Of units

d) Electric Elevators

30%

e) Electric Dumbwaiter

30%

NVPILAR 2008

SCOPE OF WORKS IN BUILDING CONSTRUCTION PART -

A-

MOBILIZATION

PART -

B-

EARTHWORKS

PART -

C-

TERMITE CONTROL & WOOD PRESERVATIONS

PART -

D-

FOUNDATION WORKS

PART -

E-

DAMP PROOFING / MOISTURE CONTROL

PART -

F-

CONCRETE WORKS

PART -

G-

MASONRY WORKS

PART -

H-

CARPENTRY WORKS

PART -

I -

FABRICATED MATERIALS AND HARDWARE

PART -

J-

ROOF FRAMING WORKS

PART -

K-

ROOFING WORKS

PART -

L-

FINISHES

PART -

M - PAINTING / VARNISHING

PART -

N-

WATER PROOFING

PART -

O-

SANITARY WORKS

PART -

P-

ELECTRICAL WORKS

PART -

Q-

MECHANICAL WORKS

PART -

R-

CONSTRUCTION SAFETY AND HEALTH (DO. 56)

NVPILAR 2008

DPWH STD. SPECS., VOL. I, 1988, ED. DPWH STD.SPECS.,VOL.II, 2004 ED. DPWH STD.SPECS.,VOL.III, 1995 ED.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART A – MOBILIZATION - M0VING IN OF MANPOWER, EQUIPTMENT & MATERIALS AT THE PROJECT SITE PART A – FACILITIES F0R THE ENGINEER A.1.1- OFFICES & LABORATORIES

- L.S.

A.1.2- VEHICLES FOR THE ENGINEER

- MO./ EACH

A.1.3- ASSISTANCE TO THE ENGINEER

- MONTHS

A.1.4- PHOTOGRAPHS

- EACH

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART B - EARTHWORKS ITEM 800 – CLEARING & GRUBBING

- CU. M.

ITEM 801 – REMOVAL OF STRUCTURES & OBSTRUCTIONS

- CU. M.

ITEM 802 – EXCAVATION

- CU. M.

ITEM 803 – STRUCTURE EXCAVATION

- CU. M.

ITEM 804 – EMBANKMENT

- CU. M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART C – TERMITE CONTROL & WOOD PRESERVATION ITEM 1000(A) – SOIL POISONING

- LITER

ITEM 1000(B) – WOOD PRESERVATION

- LITER

ITEM 1000(C) – POWDER TERMICIDE

- KILOGRAMS

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART D – FOUNDATION WORKS

ITEM 400(1) – UNTREATED TIMBER PILES, FURNISHED

- METER

ITEM 400(2) – TREATED TIMBER PILES, PRESERVATIVE, FURNISHED

- METER

ITEM 400(3) – STEEL H-PILES, FURNISHED

- METER

ITEM 400(4) – PRECAST CONCRETE PILES, FURNISHED

- METER

ITEM 400(5) – PRECAST, PRESTRESSED CONCRETE PILES, FURNISHED

- METER

ITEM 400(6) – STRUCTURAL STEEL SHEET PILES, FURNISHED

- METER

ITEM 400(7) – PRECAST CONCRETE SHEET PILES, FURNISHED

- METER

ITEM 400(8) – UNTREATED TIMBER PILES, DRIVEN

- METER

ITEM 400(9) – TREATED TIMBER PILES, DRIVEN

- METER

ITEM 400(10) – STEEL H-PILES, DRIVEN

- METER

ITEM 400(11) – STEEL PIPES PILES

- METER

ITEM 400(12) – STRUCTURAL STEEL SHEET PILES, DRIVEN

- METER

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 400(13) – PRECAST CONCRETE SHEET PILES, DRIVEN

- METER

ITEM 400(14) – PRECAST CONCRETE PILES, DRIVEN

- METER

ITEM 400(15) – PRECAST, PRESTRESSED CONCRETE PILES, DRIVEN

- METER

ITEM 400(16) – TEST PILES, FURNISHED AND DRIVEN

- METER

ITEM 400(17) – CONCRETE PILES CAST IN DRILLED HOLES

- METER

ITEM 400(18) – CONCRETE PILES CAST IN STEEL SHELLS

- METER

ITEM 400(19) – CONCRETE PILES CAST IN STEEL PIPES

- METER

ITEM 400(20) – PILE SHOES

- METER

ITEM 400(21) – SPLICES

- METER

ITEM 400(22) – LOAD TEST

- METER

ITEM 400(23) – BORED PILES (DIA___ M)

- METER

ITEM 400(24) – PERMANENT CASING (DIA___M)

- METER

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART E – DAMP PROOFING/MOISTURE CONTROL SPL (1) – POLYETHELENE SHEETS

- SQ. M.

SPL (2) – HYDROLITHIC WATER PROOFING

- SQ. M.

NVPILAR 2006

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART F - CONCRETE WORKS ITEM 404 –

REINFORCING STEEL

- KGS.

ITEM 406(1) – PRE STRESSED STRUCTURAL CONC. MEMBERS - EACH ITEM 406(2) – PRE STRESSED CONCRETE ITEM 900 R. C. CONCRETE***

- L.S. -CU.M.

***- Such prices and payment shall be full compensation for furnishing all materials, including metal water stops, joint fillers, weep holes, and rock backing and timber bumpers; for all form and false work; for mixing, placing, furnishing, and curing the concrete; and for all labor, materials, equipment, tools and incidentals necessary to complete the item…

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART G – MASONRY WORKS

ITEM 506(1)A- MASONRY UNIT (CHB)

- SQ. M.

PART H – CARPENTRY AND JOINERY WORKS ITEM 1OO3(A) – WOODEN CEILING

- BD. FT.

ITEM 1OO3(B) – WOODEN PARTITION

- BD. FT.

ITEM 1OO3(C) – WOODEN CABINETS

- BD. FT.

ITEM 1OO3(D) – WOODEN STAIRS & OTHERS AS SPECIFIED ON PLANS

- BD. FT.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART I – FABRICATED MATERIALS & HARDWARE

ITEM 1004 – HARDWARE

-

ITEM 1004.2.1 – ROUGH HARDWARE

- PCS/KILO

ITEM 1004.2.2 – FINISHING HARDWARE

- PCS/SET

ITEM 1005 – STEEL WINDOWS ITEM 1005(A) – RESIDENTIAL CASEMENT

- SQ.M.

ITEM 1005(B) – HEAVY DUTY SIDE HINGED VENTILATOR - SQ.M. ITEM 1005(C) – PROJECTED VENTILATOR

- SQ.M.

ITEM 1005(D) – AWNING VENTILATOR

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1006 – STEEL DOORS AND FRAMES ITEM 1006(A) – HOLLOW STEEL DOORS

- SQ.M./SET

ITEM 1006(B) – FLUSH DOOR

- SQ.M./SET

ITEM 1006(C) – GRILLE DOOR

- SQ.M./SET

ITEM 1006(D) – STEEL LOUVER DOOR

- SQ.M./SET

ITEM 1007 – ALUMINUM GLASS DOORS

-

ITEM 1007 – ALUMINUM GLASS DOOR, SLIDING TYPE, DESIGNATED AS D – ON THE SCHEDULE

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1008 – ALUMINUM GLASS WINDOWS ITEM 10O8(1) – ALUMINUM SLIDING WINDOWS

- SQ.M.

ITEM 1008(2) – ALUMINUM CASEMENT WINDOWS

- SQ.M.

ITEM 1008(3) – ALUMINUM AWNING WINDOWS

- SQ.M.

ITEM 1009 – JALOUSIE WINDOWS

-

ITEM 1009(1) – GLASS JALOUSIE WINDOWS

- SQ.M.

ITEM 1009(2) – WOOD JALOUSIE WINDOWS

- SQ.M.

ITEM 1010 – WOODEN DOORS AND WINDOWS

-

ITEM 1010(A) – FRAMES(JAMBS, SILLS, HEAD, TRANSOMS AND MULLIONS - SET ITEM 1010(B) – DOOR(FLUSH OR PANEL)

- SQ.M.

ITEM 1010(C) – WINDOW SACHES

- SQ.M.

ITEM 1010(D) – DOOR LOCKS

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1011 – ROLLING UP DOORS

-

ITEM 1011(A) – ROLLING UP DOOR(INDICATE METAL SIZE AND TYPE OF CURTAIN SLATE) ITEM 1012 – GLASS AND GLAZING

- UNIT/SET -

ITEM 1012(A) – FLOAT GLASS

- SQ.M.

ITEM 1012(B) – ORDINARY WINDOW & SHEET GLASS

- SQ.M.

ITEM 1012(C) – PLATE GLASS (MIRROR)

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART J – ROOF FRAMING WORKS ITEM 402(1) – TIMBER STRUCTURES

- SPAN

ITEM 402(2) – TIMBER TRUSSES

- BD. FT.

ITEM 403(1) – STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED

- KGS

ITEM 403(2) – STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED

- KGS

ITEM 403(3) – STRUCTURAL STEEL ,FURNISHED & FABRICATED

- KGS

ITEM 403(4) – STRUCTURAL STEEL ,FURNISHED & FABRICATED

- KGS

ITEM 403(5) – STRUCTURAL STEEL ,ERECTED

- KGS

ITEM 403(6) – STRUCTURAL STEEL ,ERECTED

- KGS

ITEM 403(7) – STRUCTURAL STEEL ,FURNISHED, FABRICATED AND ERECTED

- KGS

* - Where separate payment is to be made for certain metals or for certain particular components, other than under the general provision for structural steel, designations of those particular cases shall be inserted in the space provided in the pay names for Item 403(2), 403(4) or 403(6), as the case may be.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART K – ROOFING WORKS -

ITEM 1013 – CORRUGATED METAL ROOFING ITEM 1013(A) – ROOF INSULATION ITEM 1013.2.1 – CORRUGATED ROOFING GAUGE 26

- SQ.M. - SQ.M .

ITEM 1013.2.2 – FABRICATED METAL ROOFING ACCESSORIES (A) – RIDGED/HIP ROLLS, FLASHING, GUTTER & DOWNSPOUT GAUGE 26

- L.M.

(B) – VALLEYS, COUNTER FLASHING GUTTER & DOWNSPOUT GAUGE 24 ITEM 1013.2.3 – ROOF VENTILATORS

- L.M. - EACH

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1014 – PRE-PAINTED METAL SHEETS ITEM 1014(A) – PRE-PAINTED METAL SHEETS ITEM 1015 – CLAY ROOF TILES

- SQ.M. -

ITEM 1015(A) – CLAY ROOF TILES

- SQ.M.

ITEM 1017 – ROOF DRAINS WITH STRAINERS

- PCS/SET

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART L - FINISHES ITEM 1018 – CERAMIC TILES ITEM 1018.2.1.1 – GLAZED TILES AND TRIMS

- SQ.M.

ITEM 1018.2.1.2 – UNGLAZED TILES ITEM 1019 – WOOD TILES

- SQ.M

ITEM 1019(A) – NARRA WOOD TILES

- SQ.M.

ITEM 1019(B) – TANGUILE WOOD TILES

- SQ.M.

ITEM 1019(C) – OTHER SPECIES AS SPECIFIED

- SQ.M.

ITEM 1020 – VINYL FLOOR TILES

- SQ.M. OR L.M OR # OF PCS.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1021 - CEMENT FLOOR FINISH ITEM 1021(A) – PLAIN CEMENT FLOOR FINISH

- SQ.M.

ITEM 1021(B) – COLORED CEMENT FLOOR FINISH

- SQ.M.

ITEM 1021(A) – CEMENT FLOOR FINISH W/FLOOR HARDINER

- SQ.M.

ITEM 1022 - STUCCO FINISH ITEM 1022(A) - STUCCO FINISH ITEM 1023 – GRANOLITHIC MARBLE WORKS ITEM 1023(A) – CORRIDORS ITEM ITEM ITEM ITEM

1023(B) – STAIRS LANDING, RISERS, ETC. 1023(C) – ROOMS AND OTHERS 1024 – PEA GRAVEL WASHOUT FINISH 1024(A) – PEA GRAVEL WASHOUT FINISH

- SQ.M. - SQ.M. - SQ. M. OR L.M. - SQ.M. - SQ.M. - SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1025 – BUSH HAMMERED FINISH ITEM 1025(A) – BUSH HAMMERED FINISH ITEM 1025(B) – FLUTED BUSH HAMMERED FINISH

- SQ.M. - SQ.M.

ITEM 1026 – PEBBLE WASHOUT FINISH ITEM 1026(A) – PEBBLE WASHOUT FINISH

- SQ.M.

ITEM ITEM ITEM ITEM ITEM

1027 – CEMENT PLASTER FINISH 1027(A) – CEMENT PLASTER FINISH 1027(B) – SIMULATED RED BRICKS, pn. 142 1028 – SYNTHETIC ADOBE 1028(A) – BUSH HAMMERED SYNTHETIC ADOBE FINISH

ITEM 1028(B) – FLUTTEDBUSH HAMMERED SYNTHETIC ADOBE FINISH

ITEM 1028(C) - PIQUETA TOOL FINISH / SYNTHETIC FINISH

- SQ.M. - SQ.M. - SQ.M. - SQ.M.

- SQ.M.

NVPILAR 2006

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM ITEM ITEM ITEM

1O29 – GRANATITE WASHOUT FINISH 1O29(1) – GRANATITE WASHOUT FINISH 1030 – ACCOUSTICAL CEILING 1030(A) – ACCOUSTICAL CEILING PANEL

- SQ.M., LM - SQ.M OR # OF PCS.

ITEM 1031 – ACCOUSTICAL TREATMENT ITEM 1031.2.1 – ACCOUSTICAL TILE/BOARD/PANEL ITEM 1031.2.2 – SPRAYED-ON ACCOUSTICAL MATERIALS

- SQ.M. - SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART M – PAINTING, VARNISHING & OTHER RELATED WORKS ITEM ITEM ITEM ITEM ITEM

1032 1032 1032 1032 1032

A – PAINTING WOKS A(1) – PAINTING WOKS (MASONRY PAINT) A(2) – PAINTING WOKS (WOOD PAINT) A(1) – PAINTING WOKS (ROOF PAINT) B – VARNISHING

ITEM 1032 C – SEA-MIST FINISH ITEM 1032 D – DUCCO FINISH ITEM 1032 E – TEXTURE FINISH

- SQ.M. - SQ.M. - SQ.M. - SQ.M. - SQ.M. - SQ.M. - SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART N – WATERPROOFING WORKS ITEM 1016 - WATERPROOFING ITEM 1016(A) – CEMENT BASE WATERPROOFING

- SQ.M.

ITEM 1016(B) – LIQUID WATERPROOFING

- SQ.M.

ITEM 1016(C) – BUILT-UP AND PREFORMED MEMBRANE

- SQ.M.

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART O – SANITARY WORKS ITEM 1001 – STORM DRAINAGE AND SEWERAGE SYSTEM ITEM ITEM ITEM ITEM ITEM ITEM ITEM

1001.2(A) – PIPE (KIND AND SIZE) 1001.2(B) – FITTINGS (KIND AND SIZE) 1001.2(C) – CONCRETE GUTTER 1001.2(D) – CONCRETE CANAL 1001.2(E) – W.I. GRATING 1001.2(F) – CATCH BASIN 1001.2(G) – JUNCTION BOX

- METER - EACH - METER - METER - METER - EACH - EACH

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART P – ELECTRICAL WORKS

ITEM 1100 – CONDUITS, FOXES & FITTINGS (1)-RSC CONDUIT PIPE- MM DIA W/ COUPLING (2)-LOCKNUT & BUSHING (3)-CONDULET TYPE (4)-CONDUIT PIPE ELBOW (5)-CONNECTOR (6)-CONDUIT CLAMP (7)-PVC ADAPTER (8)-G.I. WIRE G.A. #14 (9)-HACKSAW BLADE (10)-PVC TAPE 19MM DIA X 18MM (11)-RUBBER TAPE 19MM DIA X 227G (12)-PVC SOLVENT CEMENT @ 400 CC. (13)-PVC END BALL (14)-OCTAGONAL JUNCTION BOX (15)-UTILITY BOXES (16)-METAL PULL BOX (17)-SQUARE BOX (18)-TELEPHONE CABINET (19)-REINFORCED CONCRETE PEDESTAL POLE (20)-RED LEAD PAINT (21)-WEATHER HEAD W/ TYPE F CONDULET (22)-GROUNDING ROD COPPERWELD 20MM DIA. X 3.00M (23)-APITONG OR APPROVED EQUAL CRESOTED WOOD POLE (24)-ANCHOR ROD__ MM DIA (25)-ANCHOR LOG__ MM DIA (26)-POWERLOAD STUDS WITH NUTS

- LENGTH - PAIRS - PIECES - PIECES - PIECES - PIECES - PIECES - KILOS - PIECES - ROLLS - ROLLS - CANS - PIECES - PIECES - PIECES - PIECES - PIECES - SET - LOT - LOT - PIECES -LENGTH - PIECES - PIECES - PIECES - PIECES NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1101 – WIRES AND WIRING DEVICES (1)- ELECTRIC WIRE - METER OR ROLLS (2)- SINGLE POLE TUMBLER SWITCH - PIECES (3)- TWO-GANG TUMBLER SWITCH - PIECES (4)- THREE-GANG TUMBLER SWITCH - PIECES (5)- THREE-WAY TUMBLER SWITCH - PIECES (6)- DUPLEX CONVENIENCE RECEPTACLES - SET (7)- HEAVY DUTY CONVENIENCE RECEPTACLES - SET (8)- STD. TELEPHONE OUTLET BAKELITE COVER W/ 9.52 CENTER HOLE - PIECES (9)- WDO TYPE AIRCONDITIONING OUTLET 3- PRONG POLARIZED TYPE - PIECES (10)- BARE COPPER WIRE METERS (11)- GROUNDING CLAMPS FOR ELECTRIC WIRES - PIECES (12)- MESSENGER WIRE METERS (13)- GUY WIRE METERS (14)- VIBRATING BELL - SET (15)- TRAFFIC LIGHT CONTROL PANEL - SET (16)- TRAFFIC LIGHT METAL ENCLOSURES COMPLET WITH RED & GREEN LIGHT PROVIDED WITH REFLECTORS & 152MM DIAMETER VIBRATING BELL - SET NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1102 – POWER LOAD CENTER, SWITCHGEAR & PANEL BOARDS (1)- PANEL BOARD (CIRCUIT BREAKER TYPE) (2)- PANEL BOARD (SAFETY SWITCH TYPE) (3)- LOW-VOLTAGE SWITCHGEAR (LVS) COMPLETE W/ METERING DEVICES AND ACCESSORIES (4)- POWER FUSES PIECES (5)- LIGHTING ARRESTERS (6)- AIR BREAK SWITCH (7)- ENCLOSED ACB NEMA TYPE 1 (8)- ENCLOSED ACB NEMA TYPE 3R (9)- AUTOMATIC TRANSFER SWITCH (10)- MANUAL TRANSFER SWITCH WITHOUT FUSES (11)- MOTOR CONTROLLER

- SET - SET - SET - PIECES - SET - SET - SET - SET - PIECES - SET

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART Q – MECHANICAL WORKS ITEM 1200 – AIR CONDITIONING AND REFRIGERATION SYSTEM (A)- COMPRESSOR, CONDENSER AND EVAPORATOR (B)- DIFFUSSER, GRILLES AND VALVES (C)- PIPES (D)- DUCTS AND INSULATIONS (E)- PIPE INSULATIONS

ITEM 1201 – WATER PUMPING (A)(B)(C)(D)-

PUMP AND WATER TANK AIR COMPRESSOR PIPES VALVES AND FITTINGS

- SET - PIECES - LENGTH - SQ.M. - METER

- SET - SET - LENGTH - PIECE

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1202 – AUTOMATIC WATER SPRINKLER SYSTEM (A)- FIRE AND JOCKEY PUMPS (B)- SPRINKLER HEAD, VALVES AND FITTINGS (C)- PIPES

ITEM 1203 – ELECTRIC ELEVATOR

(A)- TRACTION OR HYDRAULIC MACHINE AND CAR (B)- HOISTWAY DOORS, COUNTER WEIGHT, GUIDE RAILS, ANNUNCIATORS, AND HALL POSITION INDICATORS (C)- ELECTRICAL WIRES AND CONDUITS

ITEM 1204 – ELECTRIC DUMPWAITER (A)- MACHINE (B)- CAR, DOOR AND CABLE (C)- ELECTRICAL WIRES AND CONDUITS

- SET - PIECE - LENGHT - SET - PIECE - LENGTH - SET - PIECE - LENGHT

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

ITEM 1205 – OXYGEN, NITROUS OXIDE, VACUUM & FUEL GAS SYSTEM (A)- OXYGEN, NITROUS OXIDE, GAS MANIFOLD AND DUPLEX VACUUM PUMP (B)- HUMIDIFIER, VACUUM TRAP BOTTLE, OUTLETS, VALVES (C)- PIPES AND TUBINGS LENGHT

- SET - PIECE -

ITEM 1206 – HEATING SYSTEM

(A)- BOILERS, FUEL PUMP, STORAGE TANKS AND FUEL DAY TANK INCLUDING FOUNDATION (B)- PIPES (C)- VALVES AND FITTINGS

- SET - LENGTH - PIECES

ITEM 1207 - BOILERS

(A)- STEAM BOILERS, AIR COMPRESSOR, HEAT EXCHANGER AND FUEL PUMP (B)- PIPES WITH INSULATION (C)- VALVES AND FITTINGS

- SET - LENGTH - PIECE

NVPILAR 2008

COST ESTIMATION SYSTEM FOR BUILDINGS ITEMS OF WORKS IN BUILDING CONSTRUCTION (BASED ON DPWH STD. SPECS.)

PART R- CONSTRUCTION SAFETY AND HEALTH (DO 56) SPL -1 – PERSONAL PROTECTIVE EQUIPTMENT (PPE)

- PCS.

SPL -2 – SAFETY AND HEALTH PERSONNEL

- NOS.

SPL -3 – SIGNAGES AND BARRICADES

- PCS.

NVPILAR 2008