Engineer or Electrical Engineer or Distribution Engineer

December 23, 2016 | Author: api-77485678 | Category: N/A
Share Embed Donate


Short Description

Engineer, Electrical Engineer, Distribution Engineer with 35 years experience looking for a Direct Contributor position....

Description

Arthur T. Surges, P.E. Minooka, IL 60447 Phone: Home (815) 467-9132 [email protected]

OBJECTIVE: Apply past accomplishments in electrical distribution and telecom design to cont ribute to new electrical and telecom systems. Can apply talents as Licensed Pro fessional Engineer to create solutions to a given set of problems. SUMMARY: * From November 2008 - May 2009 was Telecom Design Engineer for Patrick Engineer ing. Determined where to place backboards and where to mount incoming telecom g ear to interface T1 and fiber cable to internal RJ45 connections to a router. S ketched designs for drafting and review prints before final QA. Wrote Bill-of-M aterial and Instructions to Contractors how to install equipment and where incom ing piping should be located. Lastly updated customer drawing list for new and modified drawings. Due to economy customer delayed projects. * Have five years experience with Patrick (2003-2008) as a totally independent C ustomer Project Engineer for ComEd in Joliet area. Reviewed & analyzed customer requirements and created design for distribution system additions or modificati ons. Oversee project from first customer call, to billing to finish, answering any construction concerns or questions. Provided safe design on-time, per speci fications at least cost to ComEd (and the external customer) ranging from small zero-billable jobs to $740,000 complex billable underground and relocation job. * Spent over twelve total years in ComEd Regional Engineering group in Chicago S outh designing 4KV, 12KV and 34KV distribution systems revisions or additions. As Senior Engineer for the last ten years managed and assigned workload and revi ewed schedules of eight engineers and three clerical support people. Work inclu ded all overhead, underground and duct work and some vault and station modificat ions. Most recent tour was from 1993-2003. * Ten years spent on computer hardware installation and repair, from PC's i for two different projects, MAINNET communication system (FERC regional and LaSalle & Braidwood Control Room Simulators (1981-1991). Started as t Engineer, ended as Senior Engineer after four years when management and ling duties began.

to min group) Projec schedu

o Did initial hardware and software testing at simulator factory over 18 months to improve speed of long-distance screen refresh rates. o Wired and installed panel and computer components at simulator factory to keep production on-schedule o Contacted vendor and did site design for 480 volt UPS installation, air condit ioning and electrical panel design, including contract creation and contract bid review. o Did testing, modification, installation and repair of all simulator panel and electronic hardware, as required. Included site visits to custom vendors to rev iew specifications and equipment. o Managed and scheduled work for five contractors and two technicians' workload for Power Plant simulators. Kept simulators up 99.9% on 24/7 clock during train

ing. o Fixed MAINENET hardware and communication problems from RS-232 to telephone li nes to RJ-45 10BaseT Ethernet and associated PC's and DEC VAX machines. Answer ed Help Desk phone 24/7 interfacing with seven electric utilities. * Trained people for one year on custom ComEd computer CAD program called TED (1 992) * Five years in ComEd Technical Group as go-to group as Engineer then Project En gineer when first scheduling duties began. Analyzed interference problems in RI /TVI/EMI and Acoustics taking field measurements, interpreting the results and i nstructing distribution, transmission, substation or generating station personne l how to fix the problems

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF