QUALITY MANAGEMENT PROCEDURE ELECTRICAL MAINTENANCE

Doc. No. : F Q MNT 02 P Page No. :

1 of 8

1. PURPOSE: To establish the system for the maintenance of electrical equipments and to ensure that the equipments are available continuously for preventive maintenance. 2. SCOPE: This is applicable to the preventive & breakdown Maintenance of electrical equipment of Foil. 3. DEFINITIONS: Dy.General Manager Asst.Manager PMI I.D. No. P.M -

Deputy General Manager Assistant Manager Preventive Maintenance Incharge Identification Number Preventive Maintenance

4. RESPONSIBILITY: 4.1 4.2 4.3

Head of department is over all responsible for implementing this procedure. Personal performing breakdown maintenance shall not carry out preventive maintenance. Individual responsibilities of specific activities are described here after.

5. PROCESS INPUT: 5.1 5.2 5.3 5.4 5.5 5.6

Work instruction for carrying out maintenance activities. Intimation of breakdown by work order P.M.Slippage Record P.M.Schedule PM Checklist P.M.Schedule cum check sheet

6. PROCESS DESCRIPTION & INTERFACES: Approved By:

Issued By:

Edition No. 01

Date: 01. 12. 2001

Date: 01.12. 2001

Revision No. 02

QUALITY MANAGEMENT PROCEDURE

Doc. No. : F Q MNT 02 P

ELECTRICAL MAINTENANCE A.

Page No. :

2 of 8

Preventive maintenance: -

Sr. No.

Activity

Responsibility

Ref. Doc.

1

All the equipments requiring periodic maintenance will be identified and a list will be prepared.

Asst.Manager

FQMNT02F01

2

A unique I.D.No. Will be given to them.

Asst.Manager

FQMNT02F01

3

4

5

6

7

8

The frequency of maintenance will be decided on the basis of • Manufacture recommendation Decided by maintenance Department The P.M. schedule/P.M.Schedule cum check sheet will be made as per the identified frequency above. The equipment will be spared and the preventive maintenance will be carried out as per P.M check list/ P.M.Schedule cum check sheet & relevant work instruction. The P.M. checklist / P.M.Schedule cum check sheet will be filled up after completing maintenance. In case of any schedule getting delayed due to any reasons or preventive action if not carried out, should be recorded in the P.M slippage record. Review the P.M. schedule at least Six monthly for types of checks & frequency on the basis of its effectiveness.

9

Review the P.M.slippage record monthly & to avoid the frequency of slippage.

10

In a case of overhauling required, for the

Asst.Manager

Operation & Maintenance Manual FQMNT02F06

Asst.Manager

FQMNT02F06 FQMNT02F18

Asst.Manager/PMI/ Sr.Formen/ Foreman

FQMNT02F07, FQMNT02W03, FQMNT02W10, FQMNT02W12 FQMNT02F18, FQMNT02W05

PMI

FQMNT02F07, FQMNT02F18

PMI

FQMNT02F08

Asst.Manager/PMI

FQMNT02F03, FQMNT02F04

Asst.Manager/ PMI

FQMNT02F08

Sr. Foreman/

Operating and

Approved By:

Issued By:

Edition No. 01

Date: 01. 12. 2001

Date: 01.12. 2001

Revision No. 02

QUALITY MANAGEMENT PROCEDURE ELECTRICAL MAINTENANCE

equipment, follow the respective work instruction/Vendor instruction manual and filled the over hauling check list.

11

B.

Operation of DG SET, Circuit breaker, 66KVSwithyard,HT Capacitor bank and power changeover done as per work instruction.

Doc. No. : F Q MNT 02 P Page No. :

Foreman

3 of 8 maintenance manual, FQMNT02W09, FQMNT02W07

FQMNT02F19 Shift foreman

FQMNT02W01 FQMNT02W02 FQMNT02W04 FQMNT02W08 FQMNT02W11

BREAKDOWN: -

Sr. No.

Activity

Responsibility

Receiving work order from user department Shift Incharge regarding breakdown of any equipment. Review the problem and allocate the job to Asst.Manager/ 2 concern person. Shift Incharge Carry out the breakdown maintenance. As Sr.Forman/ Shift 3 per work instruction. Incharge/Foreman Prepare daily breakdown report and sent Sr.Forman 4 copy to Dy.GM (Mech) & GM (F&A). /Foreman Prepare monthly breakdown report and sent Sr.Forman 5 copy to V.P. (foils), all Deptt. Heads, MIS /Foreman & PPC. 7. PROCESS OUT PUTS: 7.1. Continue availability of machine. 7.2. Relevant reports & records of equipments. 7.3 P.M.Slippage Record.

Ref. Doc.

1

FQMNT02W06 FQMNT02F03 FQMNT02F04

8. PROCESS MONITORING: Sr. No.

Description

Frequency

Responsibility

Approved By:

Issued By:

Edition No. 01

Date: 01. 12. 2001

Date: 01.12. 2001

Revision No. 02

QUALITY MANAGEMENT PROCEDURE

Doc. No. : F Q MNT 02 P

ELECTRICAL MAINTENANCE

1

Review of P.M. schedule.

2

Review P.M.slippage record.

Page No. :

4 of 8

Six monthly

Asst.Manager

Monthly

Asst.Manager

9. RECORDS: Sr.No.

Record No.

1

FQMNT02F01

2

FQMNT02F02

3

FQMNT02F03

4

FQMNT02F04

5

FQMNT02F05

6

FQMNT02F06

Record Title COMPREHENSIV E EQUIPMENT LIST EQUIPMENT HISTORY RECORD DAILY BREAKDOWN REPORT MONTHLY BREAKDOWN REPORT MAJOR BREAKDOWN ANALYSIS REPORT PM SCHEDULE

Retention period Till the equipment Last Till the equipme nt Last

ELECTRICAL SHOP FLOOR, MSDS&ERS

Six Months

ELECTRICAL SHOP FLOOR

1Year

ELECTRICAL SHOP FLOOR

1Year

ELECTRICAL SHOP FLOOR

Dy. General Manager

1Year

ELECTRICAL SHOP FLOOR/MSDS

Dy. General Manager

Location ELECTRICAL SHOP FLOOR

Approved By:

Issued By:

Edition No. 01

Date: 01. 12. 2001

Date: 01.12. 2001

Revision No. 02

Disposal authority Dy. General Manager Dy. General Manager Dy. General Manager Dy. General Manager

QUALITY MANAGEMENT PROCEDURE

Doc. No. : F Q MNT 02 P

ELECTRICAL MAINTENANCE

7

FQMNT02F07

P.M.CHECK LIST:-

FQMNT02F07/ 01 FQMNT02F07/ 02 FQMNT02F07/ 03 FQMNT02F07/ 04 FQMNT02F07/ 05 FQMNT02F07/ 06 FQMNT02F07/ 07 FQMNT02F07/ 08 FQMNT02F07/ 09 FQMNT02F07/ 10 FQMNT02F07/ 11 FQMNT02F07/ 12 FQMNT02F07/ 13 FQMNT02F07/ 14 FQMNT02F07/ 15 FQMNT02F07/ 16 FQMNT02F07/ 17 FQMNT02F07/ 18 FQMNT02F07/ 19 FQMNT02F07/ 20 FQMNT02F07/ 21 FQMNT02F07/ 22 FQMNT02F07/ 23 FQMNT02F07/ 24 FQMNT02F07/ 25 FQMNT02F07/ 26 FQMNT02F07/ 27 FQMNT02F07/ 28 FQMNT02F07/ 29 FQMNT02F07/ 30 FQMNT02F07/ 31

MILL M50 MILL M51 MILL M52 MILL Q4 MILL Q5 CRANE # 1 CRANE # 2 CRANE # 3 CRANE # 4 CRANE # 5 CRANE # 6 CRANE # 7 CRANE # 8 CRANE # 4A REWIND LINE # 1 REWIND LINE # 2 REWIND LINE # 3 BAILING PRESS ROLL GRINDER ANN. FURNACE # 1 ANN. FURNACE # 2 ANN. FURNACE # 3 ANN. FURNACE # 4 OVEN # 1 OVEN # 2 OVEN # 3 SEPARATOR # 25 SEPARATOR # 26 DOWN ENDER FUME EXH. SYSTEM H G SLITTER

1Year

Page No. :

5 of 8

ELECTRICAL SHOP FLOOR/MSDS

Approved By:

Issued By:

Edition No. 01

Date: 01. 12. 2001

Date: 01.12. 2001

Revision No. 02

Dy. General Manager

QUALITY MANAGEMENT PROCEDURE

Doc. No. : F Q MNT 02 P

ELECTRICAL MAINTENANCE

14

15 8 16 9 17 10 18 11 12

13

FQMNT02F07/ 32 M G SLITTER 1 Year FQMNT02F07/ 33 L G SLITTER FQMNT02F07/ 34 DOCTOR REWINDER FQMNT02F07/ 35 DRY BOND LAM. FQMNT02F14 STATEMENT FQMNT02F07/ 36 PRINTING MACHINE 1Year FQMNT02F07/ 37SHOWING EXTRUDER COATER ENERGY FQMNT02F07/ 38GENERATED MAIN PUMP&HOUSE FQMNT02F07/ 39CONSUMED COOLING TOWER FQMNT02F07/ 40INCLUDING NITROGEN GEN. FQMNT02F07/ 41CONSUMPTION FIRE HYDRANT OF FQMNT02F07/ 42 W.T.P. DIESEL FQMNT02F07/ 43 VENT. SYSTEM FQMNT02F15 LOG BOOK 1Year FQMNT02F07/ 44DG COMP. HOUSE

P.M.SLIPPAGE FQMNT02F08 RECORDOF FQMNT02F16 ANALYSIS MOTOR FAILURE FQMNT02F09 WORK ORDER FQMNT02F17 ELECTRICAL POWER FQMNT02F10 CONSUMPTION WORK PERMIT REPORT FQMNT02F18 PM SCHEDULE CUM OVERHAULING CHECK SHEET: FQMNT02F11 LT air circuit breaker FQMNT02F18/ SCHEDULE 01 FQMNT02F18/ 02 FQMNT02F12 FQMNT02F18/ 03 FQMNT02F18/ 04 FQMNT02F13

FQMNT02F18/ 05 FQMNT02F18/ 06 FQMNT02F18/ Approved By: 07 FQMNT02F18/ 08 FQMNT02F18/ Date:09 01. 12. 2001 FQMNT02F18/ 10 FQMNT02F18/ 11

66 kv CT, PT, CVT & LA LT APFC panel, SHIFT LOGHT BOOK capacitor bank & reactor Battery bank & DAILY ENERGY battery charger GENERATION 11 kv & 132 kv MOCB /CONSUMPTION 11 kv T.M.G. ACB REPORT 11 kv ABB (indoor & outdoor) & Siemens VCB 66 kv Sf6 circuit breaker Issued By: 22 kv Sf6 circuit breaker 11 kv, 22 kv & 66 kv isolators 11 kv, 1500 kva DG Date: 01.12. 2001 set

Page No. :

6 of 8

ELECTRICAL SHOP FLOOR/MSDS

Dy. General Manager

MSDS

Dy. General Manager

MSDS

Dy. General Manager Dy.

ELECTRICAL 1Year SHOPFLOOR/ General 1Year ERS Dy. General MSDS Manager Manager Dy. ECR Q4/Q5, 3 Month General ERS& MSDS Dy. General 1Year ELECTRICAL Manager SHOP FLOOR Manager Dy. ECR Q4/Q5, 3Month General ERS& MSDS Manager 1Year MSDS Dy. General Dy. Manager 1 Year MSDS / ERS General Manager Q4/Q5 Dy. 1YEAR CONTROL General ROOM Manager Six Months

MSDS

Edition No. 01

Revision No. 02

Dy. General Manager

QUALITY MANAGEMENT PROCEDURE ELECTRICAL MAINTENANCE FQMNT02F18/ 12 FQMNT02F18/ 13 FQMNT02F18/ 14 FQMNT02F18/ 15

19

FQMNT02F19

Power & distribution transformer 415 v, 125 kva DG set Sub- station (monthly) Sub- station (fortnight)

OVER HAULING CHECK LIST

Doc. No. : F Q MNT 02 P Page No. :

7 of 8

1Year

MSDS

Dy. General Manager

3 Years

ERS

Dy. General Manager

10. REFERENCE : Sr.No. 1 2 3 4 5 6 7 8 9 10 11 12

Document no. FQMNT 02W01 FQMNT 02W02 FQMNT 02W03 FQMNT 02W04 FQMNT 02W05 FQMNT 02W06 FQMNT 02W07 FQMNT 02W08 FQMNT 02W09 FQMNT 02W10 FQMNT 02W11 FQMNT 02W12

Work instruction OPERATION OF D.G.SET OPERATION OF 66KV SWITCH YARD OPERATION AND MAINTENANCE OF BATTERY BANK OPERATION OF H.T CAPACITOR BANK OPERATION AND MAINTENANCE OF TRANSFORMER BREAKDOWN MAINTENANCE OVER HAULING OF D.C. MOTOR POWER CHANGE OVER OVER HAULING OF A.C. SLIPRING MOTOR MAINTENANCE OF DIESEL GENERATOR OPERATION OF CIRCUIT BREAKER PREVENTIVE MAINTENANCE

Approved By:

Issued By:

Edition No. 01

Date: 01. 12. 2001

Date: 01.12. 2001

Revision No. 02