PROYECTO CONSTRUCCION DE CIMIENTOS

PRESUPUESTO HOJA DEL PRESUPUESTO UNIDAD 1 1.1 2 2.1 2.2 2.3 3 3.1 3.2

OBRAS PRELIMINARES TRAZO Y REPLANTEO MOVIMIENTO DE TIERRAS EXCAVACION EN MATERIAL SUELTO EXCAVACION EN MATERIAL COMPACTO ELIMINACION DE MATERIAL EXCEDENTE ESTRUCTURAS VACIADO DE CONCRETO CURADO

METRADO

m2

420

m3 m2 m3

130 80 283.5

m3 m2

210 420

ANALISIS DE COSTOS UNITARIOS 1.1 TRAZO Y REPLANTEO RENDIMIENTO MANO DE OBRA TOPOGRAFO OFICIAL PEON

UNIDAD h.h h.h h.h

EQUIPO NIVEL TOPOG. H.M.

h.m.

MATERIALES PINTURA ESMALTE

2.1 EXCAVACION EN MATERIAL SUELTO RENDIMIENTO MANO DE OBRA PEON EQUIPO H.M. MATERIALES

500 m2/dia CUADRILLA 1 1 2

1

gal

UNIDAD h.h

CANTIDAD 0.016 0.016 0.032

0.016 0.030

0.001

3 m3/dia CUADRILLA 1

CANTIDAD 2.667

0.030

2.2 EXCAVACION EN MATERIAL COMPACTO RENDIMIENTO MANO DE OBRA PEON

2 m3/dia CUADRILLA 1

UNIDAD h.h

EQUIPO H.M.

2.3 ELIMINACION DE MATERIAL EXCEDENTE D=5 km RENDIMIENTO MANO DE OBRA OFICIAL PEON

0.030

UNIDAD h.h h.h

EQUIPO CARGADOR FRONTAL CAMION VOLQUETE 15 m3 H.M.

3.1 VACIADO DE CONCRETO CICLOPEO 1:8 + 40% P.G. RENDIMIENTO MANO DE OBRA OPERARIO OFICIAL PEON

h.m. h.m.

UNIDAD h.h h.h h.h

EQUIPO H.M. MEZCLADORA DE CONCRETO DE 9 -11P3

h.m

MATERIALES CEMENTO PORTLAND TIPO I (42.5KG) HORMIGON PIEDRA GRANDE

bolsa m3 m3

3.2 CURADO RENDIMIENTO MANO DE OBRA PEON EQUIPO H.M.

CANTIDAD 4.000

UNIDAD h.h

850 m3/dia CUADRILLA 1 1

1 5

15 m3/dia CUADRILLA 2 3 10

1

CANTIDAD 0.009 0.009

0.009 0.047 0.030

CANTIDAD 1.067 1.600 5.333

0.030 0.533

3.220 0.720 0.540

100 m2/dia CUADRILLA 1

CANTIDAD 0.080

0.030

COSTO P.

COSTO T. S/. S/. 0.64

S/. 268.35

S/. 16.48 S/. 24.72 S/. 8.84

S/. 2,142.40 S/. 1,977.60 S/. 2,504.92

S/. 200.65 S/. 42,136.53 S/. 0.49 S/. 207.65 COSTO DIRECTO S/. 49,237.44 GASTOS GENERALES 15 % C.D. S/. 7,385.62 UTILIDAD 20% CD S/. 9,847.49 SUBTOTAL S/. 66,470.55 I.G.V. 19 % S/. 12,629.40 PRESUPUESTO S/. S/. 79,099.95

UNIDAD

m2 COSTO 10.000 8.000 6.000

TOTAL 0.16 0.128 0.192 0.48

8.403 0.480

0.134 0.014 0.149

10.084

0.010 0.639

total

UNIDAD

m3 COSTO 6.000

TOTAL 16.000 16.000

16.000

0.480 total

16.480

UNIDAD

m3 COSTO 6.000

TOTAL 24.000 24.000

24.000

0.720 0.720 24.720

total

UNIDAD

m3 COSTO 8.000 6.000

TOTAL 0.075 0.056 0.132

168.067 151.261 0.132

1.582 7.118 0.004 8.704 8.836

total

UNIDAD

m3 COSTO 10.000 8.000 6.000

TOTAL 10.667 12.800 32.000 55.467

55.467 6.723

1.664 3.586 5.250

21.849 58.824 50.420

70.354 42.353 27.227 200.650

total

UNIDAD

m2 COSTO 6.000

TOTAL 0.480 0.480

0.480

0.014 total

0.494