CUADRO DE CARACTERISTICAS Y CONEXIONES DE SUMIDEROS CARRERA xxxx DE SUMIDERO

A POZO

 A  A

2A 2B

 A  A  A

6 8 10

SUMIDERO TIPO

RASANTE SUMIDERO POZO

AREA

INTEN.

CAUDAL

TV 3 m ESP T 1

ha 0.25 0.07

lps/Ha 137.8 137.8

lps 31.01 8.68

msnm 2711.73 2715.34

T TV V3 3m m TV 3 m

0 0..1 14 5 0.03

1 13 37 7..8 8 137.8

1 17 8..3 67 1 3.72

2 27 74 57 4..0 06 6 2758.62

LONG.

DIAM.

PEND.

msnm 2711.11 2716.43

m 3.93 21.26

m 0.40 0.30

% 9.5 0.3

msnm 2710.68 2714.73

msnm 2710.31 2714.67

msnm 2710.01 2714.62

% 9.83 9.83

m 1.05 0.61

m 0.80 1.76

2 27 74 55 3..5 58 8 2758.79

8 1..2 89 0 2.27

0 0..4 40 0 0.40

135.1

2 27 74 55 3..2 06 6 2758.02

2 27 74 54 2..1 97 7 2757.97

2 27 74 52 2..4 90 4 2757.93

15.05 7.10 7.10

1 1..8 00 0 0.60

1 0..4 61 1 0.82

15.56

743.91

2742.50 43.62

749.35 749.06

2

CLAVE SALIDA LLEGADA

C. CLAVE S. POZO

PEND. RECUBRIMIENTO VIA ENTRADA SALIDA

 

 EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP

SISTEMA PLUVIAL COLECTOR : Carrera xxxxxx NODO REPRESENTA REPRESENTATIVO TIVO

990.667 E

997.360 N

I = C1 * (d + X0)^

TR

C1

X0

C2

3.00

2443.30

24.50

-1.06

5.00

2857.40

23.00

-1.07

10.00

3547.10

22.30

-1.08

Pend %

Diam m,"

Q/Q0

Vr m/s

Y mts

F

D

0.03 0.71

1.33

0.03 0.14

2.56 0.80

0.03 0.13

EEnsepregcia.

Vm/2g ts

Yc m ts

Hw

Hc

0.13 0.18

0.09 0.04

0.06 0.12

0.10 0.22

0.09 0.18

PAG1 Nov-11

DISEÑO: De

A

 Area Ha

2B 2A

2A 2

0.06 0.17

De

A

Q0

2B 2A

2A 2

T. Concentra Tr Años Incr Total 3 3

0.68 0.30

15.00 15.00

Intens L/H/S 137.82 137.82

Coefic

Q Dis lt/s

0.90 0.90

7.4 21.0

Long m 54.31 15.84

8.28 0.93

0.30 0.20

0.89

2

V0 TCraaim dao SuCpoetar ClaInvefer

258.4 3.66 29.4 0.93

4.50 0 0..15

2714.62 2710.12 0.30 0.45

C Paoizdoa 2709.67

14.64

SCuoptaerRasaInntfeer

SRecubrimiento uper Infer

2716.43 2711.11

1.81 2710.66

2711.11 2710.10

0.99 2709.80

 

 EMPRESA DE ACUEDUC ACUEDUCTO TO Y ALCAN ALCANTARILLADO TARILLADO D DE E BOGOTA - ESP

DISEÑO Y REVISION DE CIMENTACION DE TUBERIAS CONDICION ZANJA Tipo de Relleno a utilizar: Tipo de Tuberia

 Arcilla plastica(saturada)

1

 Arcilla ordinaria(seca) Suelo nat. saturado(limo) Mez. arenas gravas(recebo)

2 3 Gres 4 Concreto simple 5 Concreto reforzado 6 7 4 Camion 7500 kg.|| Ku'

Mat. granular sin cohesion Turba-Tierra vegetal Greda-marga arcilla pobre

Tipo de relleno Pozo De 2B

2A

Diam

A

Nom (mm)

2A

300

2

200

Bd (m) 0.78

0.65

De (m) 0.38

0.25

Tipo de Zanja 1 2 3

Talud Vertical Talud 1:5

Colector: Carrera xxxx 1 Localida Ciudad Bolivar   Alcaldia: Fecha:

0.165 Peso unitario Tipo de zanja

1950 kg/m3 1

Cs

FS

PAG2 1.00 m.

Long. tubo

Altura Rell (m)

Nov-11

Tuberia Cd

Wd (kg/ml)

Wv Wt (kg/ml) (kg/ml)

CR o CF (kg/ml)

FCc

FCr  

Clase

Material

1.81

1.63

19 1907.0

0.05

38 382.4

2289.4

1.50

2650

1.30

1.5

1

2

1.40

1.36

15 1 593.8

0.08

61 6 12.1

2205.9

1.50

2650

1.25

1.5

1

2

0.99 2710.66

1.04 3.03

12 1220.8 24 2496.6

0.15 0.00

1109.3 0.0

2330.1 2496.6

1.50 1.50

2650 2243

1.32 1.67

1.5 1.9

1 1

2 2

2710.23

3.03

24 2 496.6

0.00

0.0

2496.6

1.50

2243

1.67

1.9

1

2

2709.80

3.03

24 2496.6

0.00

0.0

2496.6

1.50

2243

1.67

1.9

1

2

NOTA: Se recomienda utilizar un factor de Carga de 1.9.

 

 EMPRESA DE ACUEDUCTO Y ALCANTARILLADO DE BOGOTA - ESP

Colector:

Carrera xxxx PAG3

CUADRO CALCULO DE VOLUMENES

Nov-11  Aguas Lluvias Pozo De A 2B 2A

De 2B 2A

2A 2

A 2A 2

Long Diam (m) Pulg 54.31 12.0 15.84 8. 8.0

De 0.37 0.24

H med iam Ext Poz EXC. 2 Sup Inf 1.75 27 2 710.46

1.7 1.7

Diam Nom

Di 0.30 0.20

Lreal

1.7 52.79611 1.7 14.14071

300 200

Vexc Pozo 4.4 6152.7

F.C

Bd 0.77 0.64

Vexc Tub

1.5 1.9

V rell Base

87.4 2 24 4679.5

4.2 0.9

Cota Terreno S up Inf

Cota Clave Sup Inf

Recubrim S up Inf

2716.43 2711.11

2711.11 2710.10

27 2714.62 0.45

1.81 2710.66

V rell Atraq

Vexc.

2.0 0.8

91.9 30832.2

Vrell 1 6.2 1.7

2710.12 0.30

H med EXC. 1

0.99 27 2 709.80

1.75 2710.46

long inclinada 54.50

15.84

Vrell Volumen V exc V conc. Recub Tubería bajo caj 80.1 30829.8

5.5 0.7

V Rell T5 70.8 12.1287 24677.0 2.73131

Cantidades de obra Volumen de excavación Total Volumen de material para cimentación de tubería t ubería Volumen de recebo para cubrir tubería Volumen de concreto Volumen de sobrantes Volumen de Sub-base Volumen de Base Volumen de Rotura y reconstrucción de pavimento

De 2B 2A

Diam (" , m)

A 2A 2

0.3 0.2

Long real 53.3 14.6

Clase 1 1

Material 2 2

30924.1 7.9 30870.3 30924.1 24.8 14.9

14.86

 

 EMPRESA DE ACUEDU ACUEDUCTO CTO Y ALCANT ALCANTARILLADO ARILLADO D DE E BOGOTA - E ESP SP

SISTEMA PLUVIAL PLUVIAL COLECTOR : Carrera xxxx xxxxxx NODO REPRESENTATIVO REPRESENTATIVO

990.667 E

997.360 N

I = C1 * (d + X0)^

TR

C1

X0

C2

3.00

2443.30

24.50

-1.06

5.00

2857.40 3547.10

23.00 22.30

-1.07 -1.08

10.00

PAG1

DISEÑO:

Nov-11

De

A

 Area Ha

6 6A 6B  A

6A 6B 5B 6

0.32 0.47 0.47 0.14

De

A

6 6A 6B  A

6A 6B 5B 6

Q0 430.6 426.9 360.3 699.9

Tr T. Concentra Años Incr Total 3 3 3 3

V0 6.09 6.04 5.10 5.57

0.29 0.14 0.14 0.07

15.00 15.00 15.00 15.00

Intens L/H/S 137.82 137.82 137.82 137.82

Caida Cota Clave Tramo Super Infer 12.58 6.55 4.27 1.09

2742.50 2729.22 2722.19 2745.26

2729.92 2722.67 2717.92 2744.17

Coefic

Q Dis lt/s

0.90 0.90 0.90 0.90

39.7 58.3 58.3 17.4

Caida Pozo 0.70 0.48

Long m 54.68 28.98 26.53 8.29

Cota Rasante Super Infer 2745.58 2730.88 2723.39 2747.06

2730.88 2723.39 2719.33 2745.58

Pend % 23.00 22.60 16.10 13.10

Diam m," 0.30 0.30 0.30 0.40

Recubrimiento Super Infer 3.08 1.66 1.20 1.80

0.96 0.72 1.41 1.41

Q/Q0

Vr m/s

Y mts

F

D

0.09 0.14 0.16 0 0..02

3.15 3.51 3.12 1.94

0.07 0.08 0.09 0.04

4.64 4.55 3.82 3.41

0.05 0.06 0.07 0.03

Energia Espec.

V2/2g mts

Yc mts

Hw

Hc

0.57 0.71 0.59 0.23

0.50 0.63 0.50 0.19

0.15 0.19 0.19 0.09

0.26 0.33 0.33 0.15

0.21 0.27 0.27 0.12

 

 EMPRESA DE ACUEDUCTO ACUEDUCTO Y ALCANTARILLAD ALCANTARILLADO O DE BOGOTA - ESP

DISEÑO Y REVISION DE CIMENTACION DE TUBERIAS CONDICION ZANJA Tipo de Relleno a utilizar: Tipo de Tuberia

Tipo de Zanja

 Arcilla plastica(saturada) plastica(saturada)  Arcilla ordinaria(seca) ordinaria(seca) Suelo nat. saturado(limo)

1 2 3

Gres

1

Talud Vertical

Mez. arenas gravas(recebo) Mat. granular sin cohesion Turba-Tierra vegetal Greda-marga arcilla pobre

4 Concreto simple 5 Concreto reforzado 6 7 4 Camion 7500 kg.|| Ku'=

2 3

Talud 1:5

Tipo de relleno Pozo De

A

Diam Nom (mm)

Bd (m)

De (m)

6 6A

300

0.78

0.38

6A

6B

300

0.78

0.38

6B

5B

300

0.78

0.38

400

0.90

0.50

 A

6

Altura Rell (m)

Cd

Wd (kg/ml)

Colector: 1 Localida Ciudad Bolivar   2 Alcaldia: Fecha:

0.165 Peso unitario Tipo de zanja

1950 kg/m3 1

Cs

FS

Wv Wt (kg/ml) (kg/ml)

CR o CF (kg/ml)

Nov-11

PAG2 1.00 m.

Long. tubo

FCc

FCr  

Tuberia Clase

Material

3.08 2.02 0.96 1.66 1.19 0.72 1.20 1.30 1.41

2.21 1.75 1.02 1.54 1.20 0.80 1.21 1.29 1.37

25 2 592.9 2047.5 11 1 190.9 17 1 798.7 1410.9 937.1 14 1 420.0 1513.1 16 1 602.1

0.02 0.04 0.16 0.06 0.11 0.24 0.11 0.09 0.08

13 138.1 311.1 1166.1 44 449.0 8 81 14.6 1986.7 80 802.9 6 69 93.5 60 604.4

2731.0 2358.6 2356.9 2247.8 2225.4 2923.8 2222.8 2206.6 2206.4

1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50

2650 2650 2650 2650 2650 2650 2650 2650 2650

1.55 1.34 1.33 1.27 1.26 1.66 1.26 1.25 1.25

1 .9 1 .5 1 .5 1 .5 1 .5 1 .9 1 .5 1 .5 1 .5

1 1 1 1 1 1 1 1 1

2 2 2 2 2 2 2 2 2

1.80 1.60 1.41

1.46 1.35 1.22

23 2 312.5 2129.2 19 1 932.2

0.07 0.08 0.11

51 511.7 631.7 79 797.2

2824.3 2760.9 2729.4

1.50 1.50 1.50

3059 3059 3059

1.38 1.35 1.34

1 .5 1.5 1 .5

1 1 1

2 2 2

actor e arga e .9. NOTA: e recom en a ut zar un actor

 

 EMPRESA  EMPRES A DE ACUEDU ACUEDUCTO CTO Y ALCANTARILLA ALCANTARILLADO DO DE BOGOTA BOGOTA - ESP

Colector: PAG3

CUADRO CALCULO DE VOLUMENES

Nov-11  Aguas Lluvias Pozo De A

Long (m)

Diam Pulg

De

Diam Nom

Di

Bd

Cota Terreno Sup Inf

F.C

Cota Clave Sup Inf

Recubrim Sup Inf

H med EXC. 1

long inclinada

6

6A

54.68 12.0

0.37

0.30

300

0.77

1.9

2745.58

2730.88

2 27 742.50

2729.92

3.08

0.96

2.37

56.11

6A 6B

6B 5B

28.98 12.0 26.53 12.0

0.37 0.37

0.30 0.30

300 300

0.77 0.77

1.9 1.5

2730.88 2723.39

2723.39 2719.33

2 27 729.22 2 27 722.19

2722.67 2717.92

1.66 1.20

0.72 1.41

1.54 1.66

 A

6

8.29 16.0

0.49

0.41

1.5

2747.06

2745.58

2745.26

2744.17

1.80

1.41

2.07

98.8 33.0 31.9 12.3

29.71 26.87 8.36 V Rell T5 12.499 6.435 5.783 1.774

232.4

26.49

De 6 6A 6B  A

A 6A 6 A 6B 5B 6

H med iam Ext Poz EXC. 2 Sup Inf 2.37 1.54 1.66 2.07

1.7 1.7 1.7 1.7

1.7 1.7 1.7 1.7

Lreal 54.40846 28.01099 25.17143 6.661352

400

Vexc Pozo 5.9 4.0 4.2 5.2

0.89

Vexc Tub

V rell Base

115.9 41.9 39.8 15.5

V rell Atraq

4.4 2.2 2.0 0.6

5.2 2.7 0.9 0.3

Vexc. 12 1 21.8 45.8 44.1 20.7

Vrell 1 9.6 4.9 2.9 0.9

Vrell Volumen V exc V conc. Recub Tubería bajo caj 106.5 38.0 38.5 18.5

Cantidades de obra Volumen de excavación Total Volumen de material para cimentación de tubería Volumen de recebo para cubrir tubería Volumen de concreto Volumen de sobrantes Volumen de Sub-base Volumen de Base Volumen de Rotura y reconstrucción de pavimento

De 6 6A 6B  A

Diam (" , m)

A 6A 6B 5B 6

0.3 0.3 0.3 0.4

Long re rea al 54.9 28.5 25.7 7.2

Clase 1 1 1 1

Material 2 2 2 2

5.7 2.9 2.6 1.2

18.4 143.4 232.4 31.6 26.5