EXECUTIVE SUMMARY
1.0
INTRODUCTION
The proposed project is entitled, ³ Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau No. 2, Julau, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kementerian Pelajaran Malaysia ´. In the course of this Environmental Impact Assessment (EIA), it will be referred to as ³ the Proposed Project ´. The proposed project is located south of Sg. Jikang and east of Julau Feeder Road encompassing an area of approximately 28.3 hectares (70 acres). The proposed project site is located approximately 4 km away (by road) from Julau Town and 55 km from Sarikei Town. The surrounding areas near the project site are either agricultural agricultural lands or rural developments developments compromising of residential residential settlements. settlements. The area is currently accessible by car via an existing tar -sealed Julau Feeder Road, which also serves as a vital link with the town and the surrounding countryside. Figure 2.1 shows the locality plan of Julau and proposed site; and Figure 2.2 shows
the site plan of the project site. The proposed project is part of Ministry of Education¶s plan to develop the undeveloped prime land into an education educational al centre of choice while assisting the government in providing quality education opportunities to fulfil the their obligation and and decentralize the growth growth at the other existing schools
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kementerian Pelajaran Malaysia EIA Report y
Dining Hall
y
Canteen
y
Male Dormitory
y
Female Dormitory
y
Class µµC¶ Quarters (1 block)
y y
Class µµD¶ Quarters (2 blocks) Class µµF¶
y
Guard House
y y
Bus Stand Courtyard
y
Bicycle Shed
y y
Motorcycle Bay Flag Pole
y
Garbage Centre
y
Children Playground
y
1 unit of Football Field
y
1 unit of Running Track
y
1 units of Basketball Court
y
1 unit of Volleyball Court
y
1 unit of Sepak Takraw Court
y
1 unit of Netball Court
y
1 unit of Badminton Court
y
1 unit of Elevated Water Tower 1 unit of Sewerage Treatment Plant
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kementerian Pelajaran Malaysia EIA Report
The proposed project consists of design, construct and complete the earthworks, engineering facilities and buildings on the proposed land for future education usage. It falls under Item 3 (i) definition and therefore requires the submission of an Environment Impact Assessment (EIA) report to the Natural Resources and Environment Board, Sarawak for approval. This assessment assessment and the grant grant ing of approval by the NREB are mandatory prior to the implementation of any component of the project.
2.0
PROJECT DESCRIPTION
The Project Proponent (Kementerian Pelajaran Malaysia ) and XYZ Sdn. Bhd. (project contractor) undertake the construction and completion of ³Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau No.2, Julau, (30BD) Di Atas Lot 353, Block 3, Jikang Land District District,, Sarawak Untuk Kementerian Pelajaran Pelajaran Malaysia ´. The proposed project site is located on the south of Sungai Jikang and east of Julau Feeder Road (an area of approx 28.3 ha or 70 acres). It is located slight outside or greater than 3 km radius from Julau Town, and in the midst of agricultural lands or rural settlements.
3.0
EXISTING ENVIRONMENT ENVIRON MENT
A description of the existing environment is included to establish the assessment of
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kementerian Pelajaran Malaysia EIA Report
the Proposed Project is rural residential, commercial and predominantly agricultural lands. The project proponent will build a network of internal and perimeter drains to provide sufficient drainage drainag e for the entire project project area. The original landscape (datu m) of project site is relatively high. However, certain locations locations of the project site will involve cuts and fills to desired designed levels. The climate over Julau area is generally similar to all other parts of western Sarawak. Its annual rainy season is between October to January, with scattered rainfall pattern or locally known as ³Landas´ or northeast monsoon. The average monthly rainfall for Jualu area over the 10 years period (1999-2008) was 303.54 mm. Water parameters at all sampling points conformed to Class IIB compliance limit with the exception of BOD (ranging from 6~7 mg/L) and COD levels (ranging from 25~32mg/L). Existing TSP levels at all monitoring locations were were well well within within the stipulated limits of 260 Qg/m3 recommended by the DOE. Noise levels (dBA) recorded all monitoring locations were within the World Health Organization (WHO) recommended noise exposure limits. b)
Biological Environment Flora
Within the boundary boundary of the Project site , a mixture of secondary forest especially along the banks of Sg . Jikang, The cocoa cocoa (Theobroma ( Theobroma cacao) cacao) farms, pepper (Piper (Piper nigrum) nigrum) and rubber (Hevea ( Hevea brasiliensis) brasiliensis ) gardens and small farmlands are predominant cultivated crops. These farms and gardens
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kementerian Pelajaran Malaysia EIA Report
Secondary forests, which is a result of land clearing are observed to be dominated by fast-growing trees, notably several Macaranga spp. (Benuak), Vitex pubescens (Leban), (Leban) , Alstonia angustiloba (Pelai), Callicarpa sp., Glochidion sp.(Mayam) sp .(Mayam), Timonius borneensis (Rentap), (Rentap), Artocarpus nitidus (Telakong) Eugenia sp., Cratoxylum glaucum (Gerangan), Dellenia suffruticosa (Buan), Euodia alba (Jampang), Vernonia arborea (Entepong) and Ficus sp (Tempan). In highly disturbed areas, such as along roadsides, Dillenia suffruticosa, Nauclea maingayi and Fagraea racemosa are dominant. dominant . In other heavily disturbed areas, a variety of grasses, shrubs, herbs and small trees (sparsely scattered). Sg. Jikang is only the river that passes through the proposed project site, and along the banks plants such as Asam Paya (Eleoidoxa conferta), Beluah (Macaranga triloba), Pandan Rasau (Pandanus affinis) and Engkabang and Engkabang (Shorea mycrophylla). Fauna More than fourteen types of wild mammal were observed or known to exist in the or in the vicinity of the proposed Project site, including Callossiurus notataus (CommonTupai), Ratufa affinis (Tupai Engkerabak), Tupaia glis (Tree Shrews), Sus barbatus (Babi Hutan), Cervus unicolor (Rusa), Macaca fascicularis (Monyet), Macaca nemestrina (Berok), Tragulus javanicus (Pelandok), Arctictis binturong ( binturong (Binturong) Paradoxurus hermaphroditus (Musang), Hystrx brachyura (Landak), Manis javanica (Tengiling) and Varanus salvator (Biawak). (Biawak). Besides mammals, some common insects and molluscs pests are present at the Project site.
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kementerian Pelajaran Malaysia EIA Report
Malays. Based on the recent surveys, about 61.3% of the sampled population were were young people at the age age group of 18 years years old and below . During the socio-econnomy survey, it was found that there was no medical clinic at the proposed Project Project Site. In fact, there is a Health Clinic Clinic (Klinik Kesihatan Julau) located in Julau town which is about 4.5 km away from the proposed Project Site. This clinic serves and caters for the minor medical needs of the local people and nearby rural residents, mainly from Entabai. For more severe severe medical conditions, they would seek medical attention at Sibu General Hospital Hospital , which is about 60 km away from Julau. Several education facilities are found in Julau area including kindergartens, primary schools, and secondary schools, which serve the local people to pursue their knowledge and mentality training. In the region under study, there is a secondary schools (SMK Julau No. 1, Sarikei) serving the communities, which is within 2 km from the proposed project site. About 58% of population who who were in the age group of 19-65 19 -65 years old involved in small-scaled farming. The remaining, especially the educated and the younger members of the communities were engaged in daily -paid jobs, served in government sectors, employed by private firms, operating small businesses, and worked as manual labourers on contract or daily paid basis. Julau town and its vicinity areas are served with potable water. Among four of the surveyed longhouses (Rh. Lanting Ak. Bangku, Rh. Rh. Edward, Rh. Mabong A k. Sagai,
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kementerian Pelajaran Malaysia EIA Report
Facilitating the decentralisation of urban development; Educational facilities to cater for the national secondary education capacity and development; Additional employment/business opportunities for the construction sector; and Optimal utilisation of existing resources. Primary activities associated with the implementation of the project, toge ther with their potential impacts and mitigation measures are shown in Table 1.
5.0
RESIDUAL IMPACTS
The environmental impacts that may persist after the implementation of the mitigation measures recommended in the EIA report are classified as residual impacts. The anticipated residual impacts are predicted to be insignificant, which include the permanent loss of vegetation cover and associated habitat, general increase in traffic traff ic and noise levels, and changes in ambient air and surface surface wate r quality.
6.0
CONCLUSIONS
The EIA study has established that the project can be implemented and occupied in an environmentally sound manner. Therefore, it is recommended that the project proponent, Ministry of Education , to be granted all the necessary environmental
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kement erian Pelajaran Malaysia EIA Report
Table 1: Project Activity
Summary of Project Activities, Environmental Impacts and Mitigation Measurement Nature of Impact
Cause of Impact
Adverse Impact
Mitigation Measurement
Beneficial Impact Investigation Stage
Felling of trees and clearing of undergrowth along traverse route.
None
Short-term employment
y
None, not necessary necessary
Development Stage Site Preparation: Site Clearing, Earthwork
Loss of vegetation cover
Construction of Excavation, Piling, Infrastructures Concreting, Pipe Laying and Surfacing of internal roads
ABC Sdn Bhd
y
Loss of habitats
y
Phasing the development.
y
Generation of bio-waste.
y
y
Soil erosion
y
Localised flooding
Construction of concrete retaining walls along platform¶s perimeter and areas prone to severe erosion.
y
Dust generation
y
y
Additional traffic nuisance & hazards to other road users.
Channeling of surface runoffs to network of internal drains.
y
Limit construction traffic to off-peak periods.
y
Transportation of materials during offpeak hours only.
y
Surface runoffs must be channelled to the internal drain network..
y
Immediate re-vegetation on exposed soil surfaces.
y
Good housekeeping and regular maintenance of machinery and equipments during construction construction activities.
y
Additional traffic
y
Soil erosion
y
Elevation of noise level
y
Health & safety of workers
Increase in commercial activities and job opportunities
xv
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kement erian Pelajaran Malaysia EIA Report
Project
Activity
Nature of Impact
Cause of Impact
Adverse Impact
Mitigation Measurement
Beneficial Impact Development Stage
Mobilization
Mobilization activities
y
affic congestion Tr affic
y
Smoke
y
Safety
t-ter m em ployment Shor t-te
y
and noise
Mobilization activities a r e conducted du r ing ing daytime only and vehicles used should be egular ly ly maintained. r egula
of the public y
elevant Station r elevant
per sonnel sonnel at st r ategic ategic locations
to guide/cont r ol ol tr affic. affic. Establishment of
Soil
wor ke ker s cam p(s)
and lubr icants icants
waste, engine oil, fuel
y
Br eeding eeding
y
Actual develop ment
y
y
constr uction uction
Pr ovide ovide r ubbish ubbish
Water contamination,
y
Pr ope oper handling
y
Pr ovide ovide
y
Same
Same
bins and a rr ange ange r egula egular
disposal.
deter io ior ation ation in water quality in eceiving r eceiving Gener al al
gr ound ound for pest/disease
vector s. s.
of used oil and g r ease. ease.
pou r -flou -flour toilet.
st r ea eams.
as for the constr uction uction of
inf r a str uctu uctu r e above rast
Incr ease ease in co mmer cial cial activities and job oppo r tunities. tunities.
as for the constr uction uction of inf r astr uctu uctur e r ast
above, plus the following additional y
Wor ke ker s
es: measur es:
should be equipped with r elevant elevant
per sonal sonal safety equip ment.
Disposal of constr uction uction wastes
Constr uction uction wastes
Adequate scr eening eening of for eign eign wor ke ker s. s.
y
To co m ply with the Occupational Safety and Health Act 1994.
y
Aesthetically unacceptable
y
Opti mal use of const r uction uction
y
Conta mination and clogging of
y
ovision Pr ovision
dr ains ains and str ea eams
y
Open bu r ning ning per mit/appr oval oval
y
ABC Sdn Bhd
y
Safety
hazar ds ds
ials. mater ials.
of adequate waste r eceptacles. eceptacles. must
be obtained
f r ning is an option). r om NREB (if bu r ning
xvi
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kement erian Pelajaran Malaysia EIA Report
Project
Activity
Nature of Impact
Cause of Impact
Adverse Impact
Mitigation Measurement
Beneficial Impact
Development Stage Landscaping
Modification of the landscape due to ea r thwo thwor ks ks
y y
Aesthetically unacceptable
A r eady eady mar ket ket for
y
oject must Pr oject
osion Soil er osion
landscape
y
The
ials mater ials
and site clea r ing ing
be i m plemented in phases.
layout design
elated matter s r elated y
must
take into conside r ation ation
to aesthetic aspects.
Landscaping activities must be a continual activity; integr al al par t of the const r uction uction
activities. Occupational
Occupational of
anspor tation tation Tr anspo
Commer cial cial units
items
Solid waste collection and
Solid
waste
disposal
of household
y
y
y
Stage
Accidental dislodging of load f r r om
y
Ensur e vehicles a r e not ove r loaded. loaded.
moving
y
anspor t household ite ms and per sonal sonal effects Tr anspo du r ing ing peak-hou r s. s.
vehicles
Deter io ior ation ation of su r face face quality of nea r by water cou cour ses. ses. Br eeding eeding
y
Sewage
Sewage
sludge
adequate units of pu r pose-built waste and a rr ange ange for r egula egular disposal at
appr oved oved du m psites.
gr ound ound for disease vector s y
gener ation ation and dischar ge ge
Pr ovide ovide
eceptacles r eceptacles The
must
be r egula egular ly ly ser viced. viced.
y
Odor or smell
y
Deter io ior ation ation in su r face face water quality of
be in com pliance with the r equi equi r ements of the
near by wate r cou cour ses. ses.
local author ity. ity.
y
y
The
co m pactor s
centr alize alize sewage t r eat eatment syste m
must
Regular de-sludging of sewage syste m, e.g. at least once eve r y two year s. s.
y
Incor por ate ate pr eventive eventive
y
Disposal of sewage sludge at app r oved oved municipal
ABC Sdn Bhd
maintenance.
sites.
xvii
Cadangan Pembangunan Projek Pendidikan Bagi SMK Julau NO.2, (30BD) Di Atas Lot 353, Block 3, Jikang Land District, Sarawak Untuk Kement erian Pelajaran Malaysia EIA Report
Project
Activity
Nature of Impact
Cause of Impact
Adverse Impact Occupational
affic Tr affic gener ation ation
esidents plying along The r esidents access r oute oute to-and-f r r o m the
y
Mitigation Measurement
Beneficial Impact Stage
Im pr ove ovement in ser vices vices
Additional t r affic affic
y
pr oject oject site Maintenance of
Maintenance activities
Not necessa r y since the additional t r affic affic gener ated ated by p r oject oject activities will not ser iously iously affect the Level of Ser vice vice along Julau Feeder Road.
y
Additional e m ployment
Not anticipated
utilities,
y
oppor tunities. tunities.
Maintenance pe r sonnel sonnel must be br iefed iefed on the safety p r ocedu ocedu r es es and equipped with
amenities and
per sonal sonal pr otective otective equip ment.
ser vices vices
y
Pr ovision ovision
of war ning ning signs along public
oads. r oads. y
visor s must be well tr ained, ained, Site super viso qualified and expe r ienced. ienced.
Abandonment Pr oject oject
Abandoned buildings and
abandon ment
equipment
y
Potential
site for illegal activities
y
All machiner y and physical st r uctu uctur es es must be r emoved f r ro m site.
y
Exposed ar eas eas must be r e-vegetated e-vegetated with indigenous species.
y
Constr uction uction wastes
must
be disposed off at
appr oved oved disposal sites.
ABC Sdn Bhd
xviii
View more...