DWI-SBI-3.4.1-EM08.doc

September 15, 2017 | Author: s111_sunil | Category: Auto Cad, Computer Aided Design, Technology, Computing And Information Technology, Science
Share Embed Donate


Short Description

Download DWI-SBI-3.4.1-EM08.doc...

Description

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 1 of 26

Revision Description: ORIGINATOR

CHECKED BY

QA REVIEW

APPROVED

D. FAHY

S. SCHUURMANS

C. Fenner

P. Lunde

Reference Level 2 Working Procedures

WP 3.5.1 WP 3.5.3

Technical Document Numbering Document Filing and Issue

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 2 of 26

TABLE OF CONTENTS 1.0 2.0 3.0

PURPOSE AND SCOPE............................................................................................................................4 FONT / LETTER TYPE.............................................................................................................................4 WEIGHTS, COLORS AND LINE STYLES............................................................................................5 3.1 DESCRIPTION........................................................................................................................................5 3.2 PLOT DRIVERS......................................................................................................................................6 4.0 LEVEL/LAYER GUIDELINES................................................................................................................7 4.1 DESCRIPTION........................................................................................................................................7 4.2 COMMON LAYERS/LEVELS................................................................................................................9 4.3 PROCESS...............................................................................................................................................10 4.3.1 PROCESS FLOW DIAGRAM.......................................................................................................10 4.3.2 PIPING AND INSTRUMENT DIAGRAM....................................................................................10 4.4 PIPING...................................................................................................................................................11 4.4.1 PLANS AND ELEVATIONS..........................................................................................................11 4.4.2 PLOT PLAN...................................................................................................................................11 4.4.3 EQUIPMENT GENERAL ARRANGEMENT...............................................................................12 4.4.4 PIPING GENERAL ARRANGEMENT.........................................................................................12 4.5 INSTRUMENT AND ELECTRICAL....................................................................................................13 4.5.1 POWER DISTRIBUTION SINGLE LINE DIAGRAM.................................................................13 4.5.2 CONTROL SYSTEM SCHEMATIC..............................................................................................13 4.5.3 LIGHTING SINGLE LINE DIAGRAM.........................................................................................13 4.5.4 HEAT TRACE SINGLE LINE DIAGRAM....................................................................................14 4.5.5 ELECTRICAL TERMINATIONS..................................................................................................14 4.5.6 TRAY ARRANGEMENT...............................................................................................................14 4.5.7 PA/GA TELECOM LAYOUT.........................................................................................................15 4.5.8 INSTRUMENT LOCATION PLAN...............................................................................................15 4.5.9 LIGHTING LOCATION PLAN.....................................................................................................16 4.5.10 FIRE AND GAS LOCATION PLAN..............................................................................................16 4.5.11 ELECTRICAL EQUIPMENT ARRANGEMENT..........................................................................17 4.5.12 HOOK UP DETAILS......................................................................................................................17 4.6 STRUCTURAL......................................................................................................................................18 4.6.1 GENERAL ARRANGEMENT.......................................................................................................18 4.6.2 DETAIL SHEET.............................................................................................................................18 4.6.3 SECTIONS AND DETAILS...........................................................................................................19 4.6.4 LOADOUT AND LIFTING............................................................................................................19 4.6.5 INSTALLATION AIDS..................................................................................................................20 4.6.6 ACCESS AND EGRESS................................................................................................................20 4.6.7 GRATING.......................................................................................................................................21 4.6.8 LADDERS AND DETAILS............................................................................................................21 4.6.9 INTERFACE...................................................................................................................................22 4.6.10 CATHODIC PROTECTION...........................................................................................................22

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 3 of 26

4.6.11 EQUIPMENT SUPPORTS.............................................................................................................23 4.6.12 PIPE, ELECTRICAL AND INSTRUMENT SUPPORTS..............................................................23 4.6.13 MAIN STEEL /FABRICATION (CONSTRUCTION)...................................................................24 4.7 MARINE................................................................................................................................................24 4.7.1 PROCESS FLOW DIAGRAM.......................................................................................................24 4.7.2 PROCESS AND INSTRUMENT DIAGRAM................................................................................25 4.7.3 PIPING SCHEMATIC....................................................................................................................25 4.8 MECHANICAL......................................................................................................................................26 4.8.1 DETAILS........................................................................................................................................26 5.0 CELL LIBRARIES...................................................................................................................................26 6.0 WBLOCK DIRECTORIES.....................................................................................................................26 7.0 SCALED DRAWINGS.............................................................................................................................26 8.0 FILE MANAGEMENT............................................................................................................................27 8.1 GENERAL..............................................................................................................................................27

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

1.0

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 4 of 26

PURPOSE AND SCOPE The purpose of this document is to Standardize CAD drawings produced utilizing Autocad and Microstation software. Autocad (.DWG) and Microstation (.DGN) are the two deliverable formats of SBM-IMODCO. Plant Design Management System (PDMS) may be used on projects, but the deliverable will be one of the fore mentioned.

2.0

FONT / LETTER TYPE The following tables shall be followed for text placement in Autocad and Microstation. The tables depict text height and fonts. Text height and width for scaled drawings will have to be adjusted to maintain the correct height when plotted. Utilizing the SBM-IMODCO Toolbar for Microstation will ensure that all text on the drawing will be the correct font, text height and width, etc. Microstation Purpose All text Headers, Views, Sections, etc.

Font

Height Width Weight

“3”- Engineering 3.0 mm 2.0 mm “3”- Engineering 4.0 mm 3.0 mm

1 2

Autocad Purpose

All text Headers, Views, Sections, etc.

Font

Romans Romans

Width Scale

Color

Height 2.0 mm 5.0 mm

0.9 mm 0.9 mm

Red Green

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

3.0

WEIGHTS, COLORS AND LINE STYLES

3.1

DESCRIPTION

ISSUE DATE:

17 July 2003

Page 5 of 26

The following tables are for reference only and define weights, colors and line styles. In addition, the tables depict the correlation between Autocad and Microstation. Weights and Colors Line Thickness

LINE THICKNESS TABLE Color (Autocad)

Weight (Microstation)

.199 .450 .375 .263 .135 .65 .135 .050

1 (Red) 2 (Yellow) 3 (Green) 4 (Cyan) 5 (Blue) 6 (Magenta) 8 (Dark Grey) 9 (Light Grey)

1 4 2 2 0 6 0 0

Purpose

LINE STYLE TABLE Autocad

Microstation

Continuous Centerline Long Dash (future, hidden

Continuous Center Dashed

0 4 3

lines) Short Dash (hidden lines) Dash-dot Matchline

Dashed2 Dashdot Phantom

2 4 6

Line Styles

3.2

PLOT DRIVERS

Only the following plot drivers shall be used for plotting drawings at SBM-IMODCO. Copy the appropriate driver to your local Autocad or Microstation driver directory. Autocad

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

W:\Autocad\Drivers\SBMI.ctb W:\Autocad\Drivers\SBMIA3.ctb Microstation W:\Microstation\Drivers\SBMI.plt

REV.

C1

ISSUE DATE:

17 July 2003

Page 6 of 26

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

4.0

LEVEL/LAYER GUIDELINES

4.1

DESCRIPTION

REV.

C1

ISSUE DATE:

17 July 2003

Page 7 of 26

It is crucial when creating drawings in Autocad or Microstation that the level guidelines be followed. The following table defines level/layer guidelines and is grouped according to discipline.

DISCIPLINE LEVEL/LAYER GUIDELINES Microstation Level 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 20 20 20 20 20 26 27 28

Description Process/Piping - Primary Process/Piping - Secondary Process/Piping - Not Used Process/Piping - Not Used Process/Piping - Not Used Process/Piping - Not Used Process/Piping – Not Used Process/Piping - Access Process/Piping - HVAC Process/Piping - Equipment Electrical - General Electrical - Lighting Electrical - Tray Electrical - Not Used Electrical - Not Used Electrical - Not Used Electrical - Not Used Electrical - Not Used Electrical - Not Used Instrument - General Instrument - Capillary Instrument - Software Instrument - Sonic Instrument - Pneumatic Instrument - Hydraulic Instrument - Tray Instrument - Not Used Instrument - Not Used

Autocad Layer Pipe-P Pipe-S

Access HVAC Equipment Electrical Lighting E-Tray

Instrument Capillary Software Sonic Pneumatic Hydraulic I-Tray

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

29 Instrument - Not Used 30 Steel - Primary Steel-P 31 Steel - Secondary Steel-S 32 Steel - Tertiary Steel-T 33 Steel - Not Used 34 Steel - Not Used 35 Steel - Not Used 36 Mechanical - Primary (thick) Mech-P 37 Mechanical - Secondary (thin) Mech-S 38 Mechanical - Tertiary Mech-T 39 Mechanical - Not Used 40 Special Needs Special 41 Not Used 42 Not Used 43 Not Used 44 Common - Text, View Headings Text 45 Common - Symbols (blocks/cells) Symbols 46 Common - Dimensions Dimension 47 Common - Revisions/Clouds Revision 48 Common - Matchlines Matchlines 49 Common - Background Background * ACAD - HIDDEN Hidden * ACAD - HIDDEN2 Hidden2 * ACAD – Phantom, Existing Phantom * ACAD - Dashed Dashed * ACAD - Centerline Centerline * ACAD - Hatch Hatch * ACAD - Future Future 57 Not Used 58 Not Used 59 Border - Primary (thick) Border-Primary * Border - Secondary (thin) Border-Secondary 61 Border - Logos (SBM, Client) Border-Logos 62 Border - Text Border-Text 63 Border - Cut Line Border-Cut * Use with Autocad only, draw on same layer as subject in Microstation

Page 8 of 26

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 9 of 26

The following tables define requirements for each level/layer by drawing type. This is to ensure plotted drawing consistency and the ease of sharing objects between two drawing types. Project specific or “client” requests will be addressed on a per project basis. 4.2

COMMON LAYERS/LEVELS

Common Layers/Levels Microstation Format Level Weight Line Code Color Description 40 Special requirements 44 1 0 7 All Text 46 1 1 3 All dimensions 47 2 1 7 Revision Clouds and Triangles 48 6 6 5 Matchlines 49 0 9 Acad Miscellaneous background info 59 2 0 2 Border - Primary (thick) 61 2 0 2 Border - Logos (SBM, Client) 62 2 0 7 Border - Text 63 0 0 252 Border - Cut Line * 1 2 3 Acad hidden lines * 1 2 3 Acad hidden lines * All Blocks * 1 7 3 Centerlines * Acad hatching * 1 0 3 Border - Secondary (thin) * 0 9 Acad Phantom, Existing * 1 3 Acad Future * Denotes level to be the same as item drawn (I.e. equipment, piping, etc)

Layer Special Text Dimensions Clouds Matchline Background Border-P Border-Logos Border-Text Border-Cut Hidden Hidden2 Blocks Centerline Hatch Border-S Phantom Future

Autocad Style

Color

Continuous red Continuous red Continuous cyan Phantom2 magenta l. grey Continuous green Continuous green Continuous cyan Continuous l. grey Hidden red Hidden2 red cyan Center2 red Continuous red Continuous red Phantom l.grey Dashed red

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

4.3

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 10 of 26

PROCESS

4.3.1 PROCESS FLOW DIAGRAM

Process Flow Diagram Level 10 1 2 20 11 20 20 20 20 20

Microstation Weight Line Code 2 0 4 0 2 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0

Color 2 1 2 3 3 3 3 3 3 3

Format Description All Equipment Process/Piping - Primary Process/Piping - Secondary Instrument - General Electrical - General Instrument - Pneumatic Instrument - Capillary Instrument - Software Instrument - Sonic Instrument - Hydraulic

Layer Equipment Pipe-P Pipe-S Instrument Electrical Pneumatic Capillary Software Sonic Hydraulic

Autocad Style Continuous Continuous Continuous Continuous Hidden Continuous Continuous Continuous Continuous Continuous

Color green yellow green red red red red red red red

Autocad Style Continuous Continuous Continuous Continuous Hidden Continuous Continuous Continuous Continuous Continuous

Color green yellow green red red red red red red red

4.3.2 PIPING AND INSTRUMENT DIAGRAM

Process and Instrument Diagram Level 10 1 2 20 11 20 20 20 20 20

Microstation Weight Line Code 2 0 4 0 2 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0

Color 2 1 2 3 3 3 3 3 3 3

Format Description All Equipment Process/Piping - Primary Process/Piping - Secondary Instrument - General Electrical - General Instrument - Pneumatic Instrument - Capillary Instrument - Software Instrument - Sonic Instrument - Hydraulic

Layer Equipment Pipe-P Pipe-S Instrument Electrical Pneumatic Capillary Software Sonic Hydraulic

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

4.4

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 11 of 26

PIPING

4.4.1 PLANS AND ELEVATIONS

Plans and Elevations Level 1 2 8 10 11 20 30 31 32

Microstation Weight Line Code 4 0 2 0 1 0 2 0 1 0 1 0 1 0 1 0 1 0

Color 4 2 3 2 3 3 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment All Electrical All Instruments Steel - Primary Steel - Secondary Steel - Tertiary

Layer Pipe-P Pipe-S HVAC EQUIPMENT Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color yellow green red green red red red red red

Layer Pipe-P Pipe-S HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color green green red yellow red red red red red

4.4.2 PLOT PLAN

Plot Plan Level 1 2 8 10 11 20 30 31 32

Microstation Weight Line Code 2 0 2 0 1 0 4 0 1 0 1 0 1 0 1 0 1 0

Color 2 2 3 4 3 3 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment All Electrical All Instruments Steel - Primary Steel - Secondary Steel - Tertiary

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 12 of 26

4.4.3 EQUIPMENT GENERAL ARRANGEMENT

Equipment General Arrangement Level 1 2 8 10 11 20 30 31 32

Microstation Weight Line Code 2 0 2 0 1 0 4 0 1 0 1 0 1 0 1 0 1 0

Color 2 2 3 4 3 3 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment All Electrical All Instruments Steel - Primary Steel - Secondary Steel - Tertiary

Layer Pipe-P Pipe-S HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color green green red yellow red red red red red

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color yellow green red green red red red red red

4.4.4 PIPING GENERAL ARRANGEMENT

Piping General Arrangement Level 1 2 8 10 11 20 30 31 32

4.5

Microstation Weight Line Code 4 0 2 0 1 0 2 0 1 0 1 0 1 0 1 0 1 0

Color 4 2 3 2 3 3 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment All Electrical All Instruments Steel - Primary Steel - Secondary Steel - Tertiary

INSTRUMENT AND ELECTRICAL

4.5.1 POWER DISTRIBUTION SINGLE LINE DIAGRAM

Layer Pipe-P Pipe-S HVAC EQUIPMENT Electrical Instrument Steel-P Steel-S Steel-T

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 13 of 26

POWER SINGLE LINE DIAGRAM Level 11

Microstation Weight Line Code 1 0

Color 3

Format Description All Electrical

Layer Electrical

Autocad Style Continuous

Color red

4.5.2 CONTROL SYSTEM SCHEMATIC

Control System Schematic Level 20 11

Microstation Weight Line Code 1 0 1 0

Format Color Description 3 All Instruments 3 All Electrical

Autocad Layer INSTRUMENT Electrical

Style Continuous Continuous

Color red red

4.5.3 LIGHTING SINGLE LINE DIAGRAM

Lighting SINGLE LINE DIAGRAM Level 11

Microstation Weight Line Code 1 0

Color 3

Format Description All Electrical

Layer Electrical

Autocad Style Continuous

Color red

Autocad Style Continuous

Color red

4.5.4 HEAT TRACE SINGLE LINE DIAGRAM

Heat Trace Single Line Diagram Level 11

Microstation Weight Line Code 1 0

Color 3

Format Description All Electrical

Layer Electrical

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 14 of 26

4.5.5 ELECTRICAL TERMINATIONS

Electrical Terminations Level 11

Microstation Weight Line Code 1 0

Color 3

Format Description All Electrical

Layer Electrical

Autocad Style Continuous

Color red

4.5.6 TRAY ARRANGEMENT

Tray Arrangement Level 1 2 8 10 11 13 20 26 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 2 0 4 0 2 0 4 0 1 0 1 0 1 0

Color 1 1 3 1 2 4 2 4 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment Electrical Electrical Tray Instruments Instrument Tray All Steel Steel - Secondary Steel - Tertiary

Layer Pipe-P Pipe-S HVAC Equipment Electrical E-Tray Instrument I-Tray Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red green yellow green yellow red red red

Autocad Style Continuous Continuous Continuous Continuous

Color red red red red

4.5.7 PA/GA TELECOM LAYOUT

PA/GA Telecom Layout Level 1 2 8 10

Microstation Weight Line Code 1 0 1 0 1 0 1 0

Color 1 1 3 1

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment

Layer Pipe-P Pipe-S HVAC Equipment

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

11 20 30 31 32

DWI-SBI-3.4.1-EM08

4 2 1 1 1

0 0 0 0 0

4 2 3 3 3

REV.

C1

ISSUE DATE:

Electrical Instruments All Steel Steel - Secondary Steel - Tertiary

17 July 2003

Electrical Instrument Steel-P Steel-S Steel-T

Page 15 of 26

Continuous Continuous Continuous Continuous Continuous

yellow green red red red

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red green yellow red red red

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red yellow green red red red

4.5.8 INSTRUMENT LOCATION PLAN

Instrument Location Plan Level 1 2 8 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 2 0 4 0 1 0 1 0 1 0

Format Color Description 1 Piping - Primary 1 Piping - Secondary 3 All HVAC 1 All Equipment 2 Electrical 4 Instruments 3 All Steel 3 Steel - Secondary 3 Steel - Tertiary

Layer Pipe-P Pipe-S HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

4.5.9 LIGHTING LOCATION PLAN

Lighting Location Plan Level 1 2 8 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 4 0 2 0 1 0 1 0 1 0

Color 1 1 3 1 4 2 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment Electrical Instruments Steel - Primary Steel - Secondary Steel - Tertiary

Layer Pipe-P Pipe-S HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 16 of 26

4.5.10FIRE AND GAS LOCATION PLAN

Fire and Gas Location Plan Level 1 2 8 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 2 0 4 0 1 0 1 0 1 0

Color 1 1 3 1 2 4 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment Electrical Instruments Steel - Primary Steel - Secondary Steel - Tertiary

Layer Pipe-P Pipe-S HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red green yellow red red red

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red yellow green red red red

4.5.11ELECTRICAL EQUIPMENT ARRANGEMENT

Electrical Equipment Arrangement Level 1 2 8 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 4 0 2 0 1 0 1 0 1 0

4.5.12HOOK UP DETAILS

Color 1 1 3 1 4 2 3 3 3

Format Description Piping - Primary Piping - Secondary All HVAC All Equipment Electrical Instruments Steel - Primary Steel - Secondary Steel - Tertiary

Layer Pipe-P Pipe-S HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 17 of 26

Hook Up Details Level 20

4.6

Microstation Weight Line Code 1 0

Color 3

Format Description All Electrical

Layer Electrical

Autocad Style Continuous

Color red

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red green red red

Autocad Style

Color

STRUCTURAL

4.6.1 GENERAL ARRANGEMENT

General Arrangement Level 1 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 2 0 1 0 1 0

Color 3 3 3 3 3 4 2 2

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

4.6.2 DETAIL SHEET

Detail Sheet Level

Microstation Weight Line Code

Color

Format Description

Layer

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

1 9 10 11 20 30 31 32

DWI-SBI-3.4.1-EM08

1 1 1 1 1 2 1 1

0 0 0 0 0 0 0 0

3 3 3 3 3 4 2 2

REV.

C1

ISSUE DATE:

All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

17 July 2003

Page 18 of 26

Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

red red red red red green red red

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red green red red

Layer Piping HVAC Equipment Electrical Instrument Steel-P

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red green

4.6.3 SECTIONS AND DETAILS

Sections and Details Level 1 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 2 0 1 0 1 0

Color 3 3 3 3 3 4 2 2

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

4.6.4 LOADOUT AND LIFTING

Loadout and Lifting Level 1 9 10 11 20 30

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 2 0

Color 3 3 3 3 3 4

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

31 32

DWI-SBI-3.4.1-EM08

1 1

0 0

2 2

REV.

C1

ISSUE DATE:

Steel Secondary Steel Tertiary

17 July 2003

Steel-S Steel-T

Page 19 of 26

Continuous Continuous

red red

4.6.5 INSTALLATION AIDS

Installation Aids Level 1 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 2 0 1 0 1 0

Color 3 3 3 3 3 4 2 2

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red green red red

Layer Piping Access HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red green red red red red red red red

4.6.6 ACCESS AND EGRESS

Access and Egress Level 1 8 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 2 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0

Format Color Description 3 All Piping 4 Access 3 All HVAC 3 All Equipment 3 All Electrical 3 All Instruments 2 Steel Primary 2 Steel Secondary 2 Steel Tertiary

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 20 of 26

4.6.7 GRATING

Grating Level 1 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 1 0 1 0 2 0

Color 3 3 3 3 3 2 2 4

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red red red green

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red red red red

4.6.8 LADDERS AND DETAILS

Ladders and Details Level 1 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 1 0 1 0 2 0

Color 3 3 3 3 3 2 2 4

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

4.6.9 INTERFACE

Interface

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

Level 1 9 10 11 20 30 31 32

DWI-SBI-3.4.1-EM08

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 1 0 1 0 2 0

Color 3 3 3 3 3 2 2 4

REV.

C1

ISSUE DATE:

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

17 July 2003

Page 21 of 26

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red red red green

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red red red green

Layer Piping

Autocad Style Continuous

Color red

4.6.10CATHODIC PROTECTION

Cathodic Protection Level 1 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 1 0 1 0 2 0

Color 3 3 3 3 3 2 2 4

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

4.6.11EQUIPMENT SUPPORTS

Equipment Supports Level 1

Microstation Weight Line Code 1 0

Format Color Description 3 All Piping

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

9 10 11 20 30 31 32

DWI-SBI-3.4.1-EM08

1 1 1 1 1 2 1

0 0 0 0 0 0 0

3 3 3 3 2 4 2

REV.

C1

ISSUE DATE:

All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

17 July 2003

HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

Page 22 of 26

Continuous Continuous Continuous Continuous Continuous Continuous Continuous

red red red red red green red

Autocad Style Continuous Continuous Continuous Continuous Continuous Continuous Continuous Continuous

Color red red red red red red green red

Autocad Style Continuous Continuous Continuous Continuous Continuous

Color red red red red red

4.6.12PIPE, ELECTRICAL AND INSTRUMENT SUPPORTS

Piping, Electrical and Instrument Supports Level 1 9 10 11 20 30 31 32

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0 1 0 2 0 1 0

Color 3 3 3 3 3 2 4 2

Format Description All Piping All HVAC All Equipment All Electrical All Instruments Steel Primary Steel Secondary Steel Tertiary

Layer Piping HVAC Equipment Electrical Instrument Steel-P Steel-S Steel-T

4.6.13MAIN STEEL /FABRICATION (CONSTRUCTION)

Main Steel / Fabrication (Construction) Level 1 9 10 11 20

Microstation Weight Line Code 1 0 1 0 1 0 1 0 1 0

Format Color Description 3 All Piping 3 All HVAC 3 All Equipment 3 All Electrical 3 All Instruments

Layer Piping HVAC Equipment Electrical Instrument

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

30 31 32

4.7

DWI-SBI-3.4.1-EM08

2 1 1

0 0 0

4 2 2

REV.

C1

ISSUE DATE:

Steel Primary Steel Secondary Steel Tertiary

17 July 2003

Steel-P Steel-S Steel-T

Page 23 of 26

Continuous Continuous Continuous

green red red

Autocad Style Continuous Continuous Continuous Continuous Hidden Continuous Continuous Continuous Continuous Continuous

Color green yellow green red red red red red red red

Autocad Style Continuous Continuous Continuous Continuous Hidden Continuous Continuous Continuous

Color green yellow green red red red red red

MARINE

4.7.1 PROCESS FLOW DIAGRAM

Process Flow Diagram Level 10 1 2 20 11 20 20 20 20 20

Microstation Weight Line Code 2 0 4 0 2 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0

Format Color Description 2 All Equipment 4 Process/Piping - Primary 2 Process/Piping - Secondary 3 Instrument - General 3 Electrical - General 3 Instrument - Pneumatic 3 Instrument - Capillary 3 Instrument - Software 3 Instrument - Sonic 3 Instrument - Hydraulic

Layer Equipment Pipe-P Pipe-S Instrument Electrical Pneumatic Capillary Software Sonic Hydraulic

4.7.2 PROCESS AND INSTRUMENT DIAGRAM

Process and Instrument Diagram Level 10 1 2 20 11 20 20 20

Microstation Weight Line Code 2 0 4 0 2 0 1 0 1 0 1 0 1 0 1 0

Format Color Description 2 All Equipment 4 Process/Piping - Primary 2 Process/Piping - Secondary 3 Instrument - General 3 Electrical - General 3 Instrument - Pneumatic 3 Instrument - Capillary 3 Instrument - Software

Layer Equipment Pipe-P Pipe-S Instrument Electrical Pneumatic Capillary Software

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

20 20

1 1

DWI-SBI-3.4.1-EM08

0 0

3 3

REV.

C1

ISSUE DATE:

Instrument - Sonic Instrument - Hydraulic

17 July 2003

Page 24 of 26

Sonic Hydraulic

Continuous Continuous

red red

Layer Pipe-P Pipe-S Equipment Electrical Instrument Pneumatic Capillary Software Sonic Hydraulic

Autocad Style Continuous Continuous Continuous Hidden Continuous Continuous Continuous Continuous Continuous Continuous

Color yellow green green red red red red red red red

Layer Mech-P Mech-S Mech-T

Autocad Style Continuous Continuous Continuous

Color yellow green red

4.7.3 PIPING SCHEMATIC

Piping Schematic Level 1 2 10 11 20 20 20 20 20 20

4.8

Microstation Weight Line Code 4 0 2 0 2 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0

Color 4 2 2 3 3 3 3 3 3 3

Format Description Process/Piping - Primary Process/Piping - Secondary All Equipment Electrical - General Instrument - General Instrument - Pneumatic Instrument - Capillary Instrument - Software Instrument - Sonic Instrument - Hydraulic

MECHANICAL

4.8.1 DETAILS

DETAILS Level 36 37 38

Microstation Weight Line Code 2 0 1 0 0 0

Format Color Description 2 Mechanical - Primary 3 Mechanical - Secondary 1 Mechanical - Tertiary

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

5.0

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 25 of 26

CELL LIBRARIES

To maintain consistency, all drawings originated at SBM-IMODCO shall utilize cell libraries located in the discipline specific directory (W:\Microstation\discipline\cell_libraries). These libraries will be “Read” only and any additions will have to be approved by the discipline lead. Project specific or “client” cell libraries will be located within the project directories.

6.0

WBLOCK DIRECTORIES

To maintain consistency, all drawings originated at SBM-IMODCO shall utilize the wblock directories located in the directory W:\Autocad\discipline\block_libraries. These directories will be “Read” only and any additions will have to be approved by the discipline lead. Project specific “client” blocks will be located within the project directories.

7.0

SCALED DRAWINGS

All scaled drawings are to be drawn “full size”. Text sizes should be adjusted in order to get proper text sizes when plotted. Microstation drawings may utilize the Microstation SBM Toolbar for scale adjustment.

8.0

FILE MANAGEMENT

8.1

GENERAL All CAD drawings (electronic files) are located on the “W” drive under the project number (i.e. W:\12720\ACTIVE\”File.dgn”. All preliminary design files used in the upstart of a new project shall be renamed immediately after the project drawing list (DMS List) becomes available. See Document Numbering WP3.5.1. For none-DMS drawings (Sketches) the originator should use his login initials together with a keyword describing the content of the sketch (i.e. jkk_turret.dgn) as a personal record. Avoid the use of non-descriptive titles, such as jkk_sketch01.dgn. In the course of a project, each document will have various revisions. See Document Filing and Issue WP3.5.3.

DEPARTMENTAL WORK INSTRUCTION ENGINEERING PROJECT MANAGEMENT 2D CAD STANDARDS DWI NUMBER:

DWI-SBI-3.4.1-EM08

REV.

C1

ISSUE DATE:

17 July 2003

Page 26 of 26

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF