HH SERIES DRILLING RIGS

Equipment for drilling deep wells

Evolution of drill rigs Igeneration

IIgeneration

IIIgeneration

IVgeneration

TARGETS OF HH DRILL RIGS

TECHNOLOGY

EFFICIENCY COST CUTTING SAFETY ENVIRONMENT PROTECTION

Hydraulic control of all functions and equipment installed on the drill rigs HH

TECHNOLOGY

TELESCOPIC MAST

TOP DRIVE WITH HORISONTAL STROKE

TECHNOLOGY

AUTOMATIC PIPE HANDLER, AUXILIARY HOIST AND JIB CRANE

TECHNOLOGY

VERTICAL RACK SYSTEM AND PIPE HANDLER

TECHNOLOGY

HYDRAULIC POWER TONG AND CASING SPIDER

BUILD IN SERVICE CRANE

TECHNOLOGY

DRILLERS’ CABIN AND ERGONOMIIC CONTROL CONSOLE

SAFETY

REQUIRED NUMBER OF PERSONNEL

Standard drill rig

Automatization reduces size of the drill crew almost by 50%: • Driller - 1 • Driller’s assistant - 2 • Maintenance worker - 1

Automatic drill rig

ENVIRONMENT PROTECTION

DRILLMEC HH drill rig in comparison with the standard rig

ENVIRONMENT PROTECTION

Max Dimensions of the site:

HH 200 HH 220 HH 300 Гидравлическая буровая установка

Standard Drill rig

85 m х 75 m G

200

75 m х 75 m G 102 HH 102 50 m х 50 m

ENVIRONMENT PROTECTION

VISUAL IMPACT Reduced site for location of the drill rig and height of the mast (30 m instead of 50 m of standard drill rig)

NOISEPROOFING Diesel generator block, ventilation system of HPU cooling are fully noiseproofing

OPERATIONAL EFFICIENCY

Speed of tripping operations

OPERATIONAL EFFICIENCY

IMPROVED PERFORMANCE FIGURES WHILE DRILLING

OPERATIONAL EFFICIENCY

IMPROVED CONTROL OF THE PARAMETERS OF DRILLING AND PRODUCTIVITY

OPERATIONAL EFFICIENCY

HН-102 drilling rig

25

Days

15

0

Total

Drilling

Standard drilling rig

5

H- 102

H- 102

10

Standard drilling rig

20

Standard drilling rig

OPERATIONAL EFFICIENCY

CAMPO GUANDO field, Columbia

H- 102

Moving

Penetration

90

45

30 15 0

Standard

m/day.

60

HH-102

75

drill rig

OPERATIONAL EFFICIENCY

CAMPO GUANDO field, Columbia

HН-102

Well cost

HН-102 HH-102

Standard

drill rig

DRILLING COST REDUCTION

CAMPO GUANDO field, Columbia

COST CUTTING

TECHNOLOGY INNOVATION AND AUTOMATION OF DRILLING OPERATIONS significantly reduce costs and operating time

Fast moving and assembly / disassembly

COST CUTTING

Derrick substructure and mast are raised by hydraulic cylinders

HH drill rig while moving to the new point

OPERATIONAL DATA

South America

HH-102

Argentina Peru Venezuela

ICELAND HH-200

JARDBORANIR COMPANY GEOTHERMAL WELLS

HH-220

ITALY

USA Texas

HH-300

Wyoming Colorado

ADVANTAGES

НН rigs advantages in comparison with traditional rigs  Automatic drilling is operated by one person – driller; bit load automatic control;  Possibility to create additional vertical load (down/ on the bit) up to 40 t by the use of the main working cylinder;  Drilling equipment RIH/POOH operations are operated by one person – driller (one assistant is needed while casing running);  Drill-pipe connection speed - 3 minutes;  HH rig does not require winch refrigeration brake sheaves;  HH rig does not require electromagnetic or hydraulic auxiliary brakes and respectively their cooling;  There is no wear of drawworks brake straps and pads in case of its absence;  НН hydraulic rig has efficiency ratio of utilization of engine and hook capacity not less than 0,8;  With the use of top drive there is a possibility of simultaneous direct and reverse RIH/POOH operations with pipes and their circulation;  HH drilling rig mast is much lower than standard ones, in this case the wind loads and the stresses arising in the mast frame due to them are reduced;  Absence of the derrick man balcony excludes upstairs operations and thereby increases the safety of work;  Automated operations with drill pipes reduces the number of necessary staff and thus reduce injuries and improve safety conditions;  Maximum noise level at HH rig work floor does not exceed 60 dB.  HH drill rig placing requires up to 2 times less territory compares to the traditional rig placing.

4-th Generation Arctic Drilling Rigs

НН-375 Arctic «Echelon» Drilling rig

НН-375 «Echelon»

НН-375 Arctic «Standard» Drilling rig

Arctic derrick block НН-375

Arctic derrick block НН-375 (side view)

HH DRILLING RIGS IN THE WORLD ITALY

ENGLAND

UKRAINE

ICELAND

RUSSIA

USA

SYRIA

EGYPT

CHINA COLUMBIA VENEZUELA BRAZIL INDIA

PERU ARGENTINA

NORTH AFRICA

CONGO

AUSTRALIA

Guarantee of quality

RELIABILITY

 All DRILLMEC rigs components are of high-quality and of western production;  DRILLMEC uses top quality high strength steel for production of drilling rig frames;

 All DRILLMEC equipment is produced in Italy and USA and is fully tested before shipment to the Customer;  DRILLMEC company has local spare parts warehouses and provides service engineers in places of operation of DRILLMEC equipment;  DRILLMEC company provides due date order performance and delivery of the equipment.

THANK YOU FOR ATTENTION!