TABLE

OF CONTENTS

OFFICE OF THE CITY/MUNICIPAL ENGINEER/BUILDING OFFICIAL

DISTRICT/CITY/MUNICIPALITY

LAND USE & ZONING

ARCHITECTURAL A-1

PERSPECTIVE VIEW & TABLE OF CONTENTS

A-2

GROUND, TYP. 2nd & 3rd FLOOR PLAN, FINISHES

A-3

FRONT, REAR ELEVATIONS

A-4

RIGHT, LEFT ELEV., LONGITUDINAL & CROSS SECTION

A-5

THIRD FLOOR REFLECTED CEILING & ROOF PLAN

A-6

TOILETS, STAIRS & RAMP DETAIL

A-7

TOILET SECTION DETAILS, FACADE PEDIMENTS

A-8

STAIR, HANDRAIL & MISC. DETAILS

A-9

DOOR & WINDOW SCHEDULE, DETAIL OF STEEL

LINE & GRADE

CASEMENT

ARCHITECTURAL

STRUCTURAL S-1

FOUNDATION PLAN, DET. OF FOOTING, TIE BEAM, STAIR ON GRADE & RAMP, ELEV. OF

STRUCTURAL

COL. SCH. FOOTING & COLUMN S-2

2nd & 3RD FLOOR FRAMING PLAN, TYP. DET. OF BEAM & SLAB, SCH. OF BEAMS & SLABS

1 A-1

S-3

PERSPECTIVE VIEW SCALE

:

N T

S-4

STAIR PLAN & SECTION DETAIL, MISC. DETAILS ROOF FRAMING PLAN, TRUSS DIAGRAM DETAILS OF STEEL CONNECTION

S

SANITARY

ELECTRICAL E-1

GENERAL NOTES, SINGLE LINE DIAGRAM, LOAD SCHEDULE, LEGEND & RISER DIAGRAM

E-2

GROUND & TYP. 2nd & 3rd FLOOR POWER

ELECTRICAL

LAYOUT E-3

GROUND & TYP. 2nd & 3rd FLOOR LIGHTING LAYOUT

P-1

DRAINAGE AND SANITARY SYSTEM LAYOUT

P-2

DARINAGE AND SANITARY SYSTEM ISOMETRIC VIEW

REPUBLIC OF THE PHILIPPINES

D PE

IN

MCMXCIX

G

A

EN

T

R

F O RC E

NO I A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

APPROVED FOR ACCREDITATION :

CONCURRED :

E

ER

IN G

,

A S SE S

SM

E

ALBERT Z. DE BELEN

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

N

CHIEF, ARCHITECTURAL DIVISION

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

P-3 P-4

WATER SYSTEM ISOMETRIC DIAGRAM

P-5

SEPTIC TANK, CATCH BASIN & COVER DETAILS, NOTES, LEGEND, DESIGN CRITERIA

PROJECT TITLE :

A

TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

F T

I TO R I NG

I

ON

IL

M

t he PH

&

f

RECOMMENDING APPROVAL :

T

o

REVIEWED BY:

M

IC

P P

RE PU B L

CONSULTANT / DESIGNER

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING LOCATION :

MECHANICAL

WATER SYSTEM LAYOUT

PROJECT NO:

01-002

DESIGNED BY: AZB

OWNER :

DEPARTMENT OF EDUCATION

DepED

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

DATE :

01 03

NOTE:

SHEET NO:

PERSPECTIVE VIEW TABLE OF CONTENTS

PERSPECTIVE VIEW, TABLE OF CONTENTS

A-1 A-1 9 8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

6

5

4

3

2

1

8

7

9

10

12

11

13

54000 4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

200x200mm VITRIFIED

FLOOR

TILES (UNGLAZED)

10 425 955

960

960

3

A-8

1200

PIPE CHASE

W 1

W 1

WF1

W 1

WF1

WC

URINAL

HE

D-2

D-2

FL1 WF1

W 2

1

B

DN

D

1

W 2

1

FL1

D

W 2

9

WF1

D

1

W 2

1

FL1

D

1

W 2

1

7000

10

WF1

D

W 2

FL1 WF1

D

W 2

LANDING

D

1

W 2

1

D

W 2

1

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

C FL1

O

R

R

I

D

O

R

FL1

FL1

C

O

R

R

I

D

WF2

WF2

O

R

COUNTER

CLASSROOM

DEP

2500

1500

FL1 WF1

D

W 2

8

D-4

FL1

9500

7

CLASSROOM

SINK

CHASE

DN 1500 2500

9500

6

CLASSROOM

D-4

PIPE

BLACKBOARD BASE

LANDING

CLASSROOM

BLACKBOARD BASE

CLASSROOM

BLACKBOARD BASE

COUNTER

WC

UNGLAZED

TILES

1400

W 1

WF1

FLOOR

600

W 1

D-2

D

FL1

WF2

1200

C

W 1

WF1

2000

W 1

163

SINK

W 1

WF1

D-4

SHE

7000

A-4

D-4

W 1

BLACKBOARD BASE

4

W 1

BLACKBOARD BASE

600 1090

D-4

VITRIFIED

W 3

STO

A-7

200x200mm

W 4

1400

1

1000 425

1000

CONCRETE SUNBREAKER

W 3

A

2075

A-4

2

4

A-6

A-6 LINE OF ROOF FOR FLOOR

TYPICAL 2nd & 3rd

2 A-2

3150

A-7

WF3

HCR

W 1

W 1

W 1

WF1

4500

W 1

W 1

WF1

W 1

W 1

WF1

PIPE

4500

773

CHASE

W 1

WF1

WC

LAV

850 425

SCHEDULE OF FINISHES

W 3

FLOORS :

URINAL WC

NCR HE

W 2

1

D

W 2

1

W 2

D

1

W 2

1

FL1

- PLAIN

FL2

- PLAIN

W 2

D

1

W 2

1

CEMENT FLOOR FINISH

D

W 2

1

D 1

W 2

7000

D-3a

25mm

25mm

25mm

25mm

25mm

25mm

25mm

25mm

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

DEP

FL1

FL1

C

O

R

R

I

D

FL1

O

1200

UP

I TO R I NG

ON

ALBERT Z. DE BELEN

M

MCMXCIX

:

RECOMMENDING APPROVAL :

1

: 100

METERS

APPROVED FOR ACCREDITATION :

CONCURRED :

PROJECT TITLE :

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

T

G

&

EN

T

IN

SCALE

M

F O RC E

NO I A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

E

ER

IN G

,

A S SE S

SM

E

N

CHIEF, ARCHITECTURAL DIVISION

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

A-6

1700

GROUND FLOOR PLAN

A

TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

VITRIFIED WALL TILES

(GLAZED) 3600

F

- 100 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT)

3

3600

T

WF2

WF3 - 200X200

RAMP UP

9000

REVIEWED BY:

- 150 MM THK. CHB W/ PLAIN CEMENT PLASTER FIN (PAINT)

50mm G.I. PIPE FOR HANDRAIL

1525

1200

WF2

UP

WF1 UP

FL1

R

WF2

WF2

1500

2500

25mm

FL1

1700

( UNGLAZED )

1

25mm

2500

UP

VITRIFIED FLR TILES

WALLS :

D-3a

1500

ROUGH

STO

D

W 2

CEMENT FLOOR GROOVES

- 200X200

3850

FL1 WF1

WITH

FL3

BASE

FL1 WF1

D

LANDING

5 BASE

BASE

WF1

D

CLASSROOM

4

FL1

BLACKBOARD

FL1 WF1

COUNTER

BLACKBOARD

3 BASE

BASE

W 2

1

D

CLASSROOM

CLASSROOM

2

BLACKBOARD

3850

D

REPUBLIC OF THE PHILIPPINES P P

RE PU B L

W 1

BLACKBOARD

CLASSROOM

1

CONSULTANT / DESIGNER

D

W 1

WF1

BLACKBOARD

CLASSROOM

A-2

PE

4500

SINK

1

A

4500

COUNTER

3625

1750

650

SD

FL1

A-6

R

4500

D-2 SINK

1

I

4500

4500

D-3

RAMP UP

IL

13

54000

D-3

SHE

C

t he PH

12

11

D-4

WF1

B

f

10

W 4

STO

o

9

W 4

LANDING

IC

8

7

D-4

A-4

9500

4500

METERS

1700

SS

D-4

4500

100

LINE OF SUNBREAKER

1750

W 3 1400

1

850

4500

:

2000

650 850

CHASE

A 4

425

2000

(UNGLAZED) PIPE

4500

4500

TILES

1

3 A-4

200x200mm VITRIFIED FLOOR

SCALE :

6

5

4

3

2

1

FLOOR PLAN

3150

THIRD

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

PROJECT NO:

01-002

DESIGNED BY: AZB

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

DepED

A-1 A-2

PERSPECTIVE VIEW

9

OF CONTENTS GROUND, 2nd &TABLE 3rd TYPICAL FLOOR PLAN, FINISHES LOCATION :

DATE :

01 03

NOTE:

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

12

13

9

10

11

8

6

7

5

4

3

1

2

APEX

LINE OF TRUSS

2985

GA#26 PL. G.I. GUTTER ON 12x300mm FIBER

CEMENT

FASCIA BD. (PAINT FINISH)

TOP

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

W 3

PLAIN CEMENT PLASTER FINISH

W 4 W 1

CONCRETE

F

W 1

W 1

W 1

W 1

W 1

W 1

W 1

W 1

OF ROOF BEAM

3200

F

PAINT

2500

GA#26 CORR. G.I. ROOFING SHEET (PAINT FIN.)

W 3

W 1

THIRD

FLOOR

LEVEL

SUN BREAKER

(SEE DETAIL) F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

W 3

W 4 W 1

F

F

W 1

F

F

F

F

W 1

F

F

F

F

W 1

F

F

F

F

W 1

F

F

F

F

W 1

F

F

F

F

W 1

F

F

F

F

W 1

F

F

F

F

W 1

F

F

F

F

W 1

F

F

F

F

SECOND

F

W 4 W 1

W 1

W 1

W 1

W 1

W 1

W 1

W 1

W 1

FLOOR

W 3

W 1

GROUND

FLOOR LEVEL NAT. GRD.

A-3

SCALE :

1

: 100

METERS

8

7

9

10

12

11

13

OF TRUSS

GA. #26 CORR. G.I. ROOFING SHEET (PAINT FINISH)

C A

TOP OF ROOF BEAM

E S

G M A

R

2500

815

APEX LINE

6

5

4

3

2

LN.

REAR ELEVATION

2

1

LEVEL

F

W 4

W 3

W 3

9925

F

3200

F

3200

F

325

F

GA. #26 PLAIN G.I. GUTTER ON

12x300mm FIBER FASCIA BD.

CEMENT

3200

(PAINT FINISH) D-2

D-1

D-1 W-2

THIRD

D-1

D-1 W-2

W-2

D-1

W-2

D-1 W-2

D-1

D-1 W-2

W-2

D-1

W-2

D-1 W-2

D-2

W-2

100

FLOOR LEVEL

3200

G.I.

9925

MM

THK. CHB

RAILING W/50mm

D-2

D-1

D-1 W-2

W-2

W-2

W-2

D-1

D-1 W-2

W-2

W-2

W-2

D-1

D-1 W-2

W-2

W-2

W-2

D-1

D-1 W-2

W-2

W-2

W-2

D-1 W-2

W-2

W-2

W-2

D-1

D-2

D-1

D-2

PIPE RAILING

3200

SECOND FLOOR LEVEL

D-3A

D-2

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-1

D-3A

32mm

G.I. PIPE

HANDRAIL WITH VERT.

SUPPORT

32mm @ 600mm

325

O.C. (PAINT FINISH) GROUND FLOOR LEVEL NAT.

GRD. LN.

1 A-3

REPUBLIC OF THE PHILIPPINES

D PE

IN

MCMXCIX

G

A

EN

T

R

F O RC E

NO I A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

100

METERS

APPROVED FOR ACCREDITATION :

CONCURRED :

PROJECT TITLE :

A

TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

F T

I TO R I NG

I

ALBERT Z. DE BELEN

ON

IL

M

t he PH

&

f

RECOMMENDING APPROVAL :

1 :

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

T

o

REVIEWED BY:

SCALE :

M

IC

P P

RE PU B L

CONSULTANT / DESIGNER

FRONT ELEVATION

E

ER

IN G

,

A S SE S

SM

E

N

CHIEF, ARCHITECTURAL DIVISION

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING LOCATION :

PROJECT NO:

01-002

DESIGNED BY: AZB

OWNER :

DEPARTMENT OF EDUCATION

DepED

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

DATE :

01 03

NOTE:

SHEET NO:

PERSPECTIVE VIEW TABLE OF CONTENTS

FRONT, REAR ELEVATIONS

A-1 A-3 9

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

1

6

5

4

3

2

9

8

7

10

12

11

13

600

600 OF TRUSS

2500

APEX

SEE

DETAIL

TOP OF ROOF BEAM

OF ROOF BEAM

W 4

W 3

W 3

3200

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

3225

TOP

STRUCTURAL

F

200x200mm FEMALE

VITRIFIED WALL

TOILET

FLOOR

LEVEL

STORAGE

12425

THIRD

W 1

W 1

CLASSROOM 11

W 1

W 1

CLASSROOM 12

W 1

W 1

CLASSROOM 13

W 1

W 1

CLASSROOM 14

W 1

W 1

CLASSROOM 15

TILES (GLAZED)

MALE

3rd FLOOR TOILET LEVEL

TOILET

W 3 W 3

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

MALE

W 1

STORAGE

W 1

CLASSROOM 6

W 1

CLASSROOM

W 1

7

W 1

CLASSROOM

W 1

8

W 1

CLASSROOM

W 1

9

W 1

TOILET

W 1

CLASSROOM 10

2nd FLOOR

PLYWOOD

3mm THK.

ON W 3

@600mm ON CENTER

3200

F

TOILET

50x50mm CEILING JOIST

F

W 4

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

MIRROR

F

W 4

NAT.

TOILET

FEMALE

EMBEDDED ON CONC.

GROUND

MALE

@1200mm OC.

LAV

TOILET

W 1

SLAB

FLOOR LEVEL

GRD.

CLASSROOM

W 1

1

W 1

CLASSROOM

W 1

2

W 1

CLASSROOM

3

W 1

W 1

W 1

CLASSROOM 4

W 1

CLASSROOM

W 1

5

CS

WC

WC

LN.

EXPOSED SLAB

CEILING

SCALE :

:

100

C

B

A

2500

ROOFING

1100

200

CEMENT

FIBER

FASCIA BOARD

PAINT

SHEET

(PAINT FIN.)

SEE TRUSS TOP

DETAIL

OF ROOF BEAM

CEMENT

(PAINT FIN.)

3200

3200

WALL

OF TRUSS

FASCIA BOARD

(PAINT FIN.) PLAIN CEMENT

ROOFING

ON 12x300mm

ON 12x300mm FIBER

TOP

GA#26 CORR. G.I.

GA#26 G.I. GUTTER

TOP OF ROOF BEAM

GA#26 PLAIN G.I. GUTTER

SHEET

(PAINT FIN.)

2500

2500

GA#26 CORR. G.I.

1000

SHEET

(PAINT FIN.)

OF ROOF BEAM

840

TOP OF TRUSS

2500

ROOFING

FLR.

7000

PLASTER

PLAIN CEMENT PLASTER WALL

FIN.

LVL.

3200

815

OF TRUSS

1000

THIRD

9500

200

1100

GA#26 CORR. G.I.

TOP

C

B

1000

LINE

TOILET

METERS

A

A

B

1

1100

APEX

FLOOR

LONGITUDINAL SECTION

A-4

200

GROUND LEVEL

UNDER

PAINT FIN.

4

C

FASCIAL

ON AL.

300

HANGER

TOILET LEVEL

FRAME

W 3

BOTHWAYS w/10mm BAR BOTHWAYS

325

F

F

THIRD

PAINT

W-1

D-1

FIN.

FLOOR LEVEL

THIRD FLOOR

CLASSROOM

LEVEL

10

CORRIDOR

900

MARINE

F

FEMALE

LEVEL

FOR ALL TOILET

CEILING

F

CORRIDOR

900

6mm THK.

F

CORRIDOR

900

FLOOR

F

WALL

TILES (GLAZED) SECOND

F

3200

VITRIFIED

W 4

F

3200

3200

200x200mm

F

SECOND

FLR.

LVL.

RAILING

CONCRETE

SUNBREAKER (SEE DETAIL) SECOND

9925

50mm G.I. PIPE

3200

9925

9925

3200

SUNBREAKER (SEE DETAIL)

PAINT FIN.

10 A-8

3200

CONCRETE

CONCRETE SUNBREAKER

W-1

D-1

(SEE DETAIL)

FLOOR LEVEL

SECOND FLOOR

CLASSROOM

LEVEL

6

38mm G.I. PIPE HANDRAIL

HANDRAIL

NAT. GRD.

LN.

1 A-4

SUPPORT @600mm

O.C. (PAINT FIN.)

GROUND FLOOR LEVEL NAT.

GRD.

LN.

RIGHT SIDE ELEVATION SCALE :

1

:

100

3200

w/32mm VERT.

3200

GROUND FLR. LVL.

325

325

3200

w/32mm VERT. SUPPORT @600mm O.C. (PAINT FIN.)

325

32mm GI PIPE

2 A-4

METERS

SCALE :

1 :

100

REPUBLIC OF THE PHILIPPINES

EXPOSED

I TO R I NG

ALBERT Z. DE BELEN

ON

D PE

IN

MCMXCIX

G

A

EN

R

F O RC E

T A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

CONCURRED :

E

ER

IN G

,

A S SE S

SM

E

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

N

CHIEF, ARCHITECTURAL DIVISION

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

CLASSROOM

LEVEL

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

CEILING

PAINT

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

1

GRD. LN.

UNDER

CROSS SECTION

A-4

FIN.

PROJECT TITLE :

A

TA SK

NO I

DEPARTMENT OF EDUCATION (DepED)

E

F T

M

I

APPROVED FOR ACCREDITATION :

M

IL

&

t he PH

RECOMMENDING APPROVAL :

NAT.

FLOOR

3

METERS

T

f

ES IN

RE PU B L

o

P P

IC

REVIEWED BY:

GROUND

D-1

LEFT SIDE ELEVATION SLAB

CONSULTANT / DESIGNER

W-1

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

PROJECT NO:

01-002

DESIGNED BY: AZB

SCALE :

1

:

100

METERS

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

DepED

A-1 A-4

PERSPECTIVE VIEW

9

TABLE CONTENTS RIGHT & LEFT SIDE ELEV.,OF LONGITUDINAL & CROSS LOCATION :

DATE :

01 03

NOTE:

SECTION

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

1 600

4

3

2 4500

5 9000

9000 4500

4500

4500

13

9000

4500

4500

12

11

10

9000

9000

4500

4500

9

8

7

6

4500

4500

4500

4500

GA#26 CORR. G.I. SHEET ROOFING (PAINT FIN.)

GA#26 G.I. GUTTER ON

12x300mm FIBER

CEMENT

FASCIA BOARD (PAINT FIN.) RD

7000

A

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

RD

1000

RD

600

SLOPE

SLOPE

SLOPE

SLOPE

LN. OF STRUCTURE

200

C

1000

2500

B

RD

RD

RD

RD

RD

RD

RD

RD

ROOF

A-5

SCALE :

1

PLAN :

100

GA#26 G.I. GUTTER ON

GA#26 PLAIN G.I. RIDGE ROLL (PAINT FIN.)

CONCRETE PARAPET

2

RD

12x300mm FIBER

GA#26 PLAIN G.I. FLASHING (PAINT FIN.)

CEMENT

FASCIA BOARD (PAINT FIN.)

METERS

6mm THK.

ORD. PLYWOOD

50x50mm CEILING

CEILING

ON

JOIST @600mm OC

BOTH WAYS (PAINT FIN.)

4500

4500

9000

4500

4500

9

8

7

9000

9000 600

6

5

4

3

2

1

4500

10

9000

4500

4500

4500

LIGHTING

9000 4500

4500

13

12

11

FIXTURES

4500

4500

600

7

A

1000

A-7

MANHOLE 7000

MANHOLE

c

1000

2500

b

1 A-5

REPUBLIC OF THE PHILIPPINES

D PE

IN

MCMXCIX

G

A

EN

T

R

F O RC E

NO I A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

RECOMMENDING APPROVAL :

1

:

100

APPROVED FOR ACCREDITATION :

E

ER

IN G

,

A S SE S

SM

E

ALBERT Z. DE BELEN

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

BOTH WAYS

GA#26 PLAIN GI GUTTER ON

CEILING VENTILATION (SEE DETAIL)

12x300mm FIBER

CEMENT

FASCIA

BOARD (PAINT FIN.)

METERS

CONCURRED :

PROJECT TITLE :

RAMON C. BACANI

N

CHIEF, ARCHITECTURAL DIVISION

PLYWOOD

(PAINT FIN.)

A

TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

F T

I TO R I NG

I

ON

IL

M

t he PH

&

f

THIRD FLOOR REFLECTED CEILING PLAN SCALE :

MARINE

ON 50x50mm CEILING

JOIST @600mm OC

T

o

REVIEWED BY:

CEILING

M

IC

P P

RE PU B L

CONSULTANT / DESIGNER

6mm THK.

CONCRETE PARAPET

A-8

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

PROJECT NO:

01-002

DESIGNED BY: AZB

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

DepED

A-1 A-5

PERSPECTIVE VIEW

9

TABLE OF CONTENTS THIRD REFLECTED CEILING, ROOF PLAN LOCATION :

DATE :

01 03

NOTE:

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

HANDRAIL

VERT. SUPPORT @

O.C. (PAINT FINISH)

FINISH W/ GROOVE LINES

100

A-6

A-6

700

200

6mm

6mm

MEMNT OOR CE MENT FL PLAIN CE ID SK ON

VERT.

12

5b1 A-6

FINISH

32mm

SUPPORT

@600mm

100X100

O.C. (PAINT FINISH)

A-8

N

300

700

TYPICAL

6mm

900

100

100

PIPE

32

mm

G.I

VERTICAL

CONCRETE

SKIRTING

PIPE

SUPPORT

@600mm ON CENTER PROVIDE 12mm STEEL

DOWELS (PAINT FIN.)

100

5b

5a

200

FLOOR

700

CEMENT

G.I.

HANDRAIL WITH

900

PLAIN

1200

NONSKID

32mm

200

600mm

PIPE

150

G.I.

WITH 32mm

900

32mm

32

mm

VERTICAL

G.I

PIPE

SUPPORT

@

600mm ON CENTER PROVIDE 12mm STEEL

RAMP 1:50

1

A-6

M

SCALE

1:50

5b1 5b A-6

4500 1725

SCALE

1:10

STEEL

W 3 WC

960

1400

WF3 D-4

W 4

WC

38mm STAINLESS GRAB

BAR

1090

D-4

D-3

1025

1700

WC

STO D-4

W 3

W 4

VITRIFIED

COUNTER

SINK

LAV

FLOOR TILES

URINAL

D-2

HE

COUNTER

7000

VITRIFIED UNGLAZED FLOOR TILES

WC

URINAL

WC

D-4

D-4

HE

D-3 SINK

COUNTER

D-2

COUNTER

SINK

9

7000

A-8

1337

1337

5

200x200mm

WC

NCR

D-2

A-8

1300

W 3

UNGLAZED

D-2

600

600

SINK SD

1000

200x200mm

D-4 D-2

2100

888

WC

D-4

SHE

4500

4500

CLEAR WC

13

12

1200

STEEL

D-4

SHE

960

W 3

A

WC

LAV

1750

955

W 4

WC

3150

425

TILES (UNGLAZED)

BAR

1400

A

GRAB

M

12

13

1500

VITRIFIED FLOOR

38mm STAINLESS

425

1:5

M

200x200mm

2000

850

2000

(UNGLAZED)

850

2000

1075

DETAIL

SCALE

DETAIL SECTION

200x200mm VITRIFIED FLOOR TILES

SPOT

A-6

2

4500

LINES

M

1

2

GROOVE

7000

SCALE

SPOT DETAIL

FLOOR FINISH W/

1400

A-6

ELEVATION OF

5a

DOWELS (PAINT FIN.)

PLAIN CEMENT

600

DET.

NONSKID

3150

5

1700 100

3600

10

B

12

12

7

13

7

13

6

14

6

14

5

15

5

15

4

16

16

3

17

STO.

2

18

D-3a

11

9

12

8

13

7

6

14

6

15

5

15

5

16

4

16

4

3

17

2

18

1

19

11

9

12

8

13

7

14

STO.

B

1

19

10

10

9500

11

8

8

3850

9

5000

9500

11

8-STEPS@300mm = 2400

9-STEPS@300mm =

2700

9

3850

9500

10

DN

UP

1

1

A-8

A-8

2500 1359

1500

UP

DN

1574

1500

1500

3000 2500

1360

1500

2500

2500

D-3a

C

TYP. 2nd & 3rd FLOOR FEMALE TOILET PLAN

1700

3600

2 A-6

1200

RAMP UP

1200

C

RAMP UP

TYP. 2nd & 3rd FLOOR

DETAIL SCALE :

4 3600

1:50 M

A-6

1700

MALE TOILET PLAN DETAIL SCALE :

1:50 M

GROUND FLOOR

FEMALE TOILET PLAN DETAIL

1 A-6

GROUND FLOOR

SCALE

:

3 A-6

1:50 M

REPUBLIC OF THE PHILIPPINES

D PE

IN

MCMXCIX

G

A

EN

T

R

F O RC E

NO I A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

APPROVED FOR ACCREDITATION :

1:50 M

CONCURRED :

PROJECT TITLE :

A

TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

F T

I TO R I NG

I

ALBERT Z. DE BELEN

ON

IL

M

t he PH

&

f

RECOMMENDING APPROVAL :

:

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

T

o

REVIEWED BY:

SCALE

M

IC

P P

RE PU B L

CONSULTANT / DESIGNER

MALE TOILET PLAN DETAIL

E

ER

IN G

,

A S SE S

SM

E

N

CHIEF, ARCHITECTURAL DIVISION

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

PROJECT NO:

01-002

DESIGNED BY: AZB

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

DepED

A-1 A-6

PERSPECTIVE VIEW

9

TABLE OF CONTENTS TOILETS, STAIR & RAMP PLAN AND LOCATION :

DATE :

01 03

NOTE:

RAMP DETAIL

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

PLAIN CEM. PLASTERED PAINT

PLAIN CEM. PLASTER

FIN. 3mm THK. MIRROR ON AL.

1900 450

500

500

PAINT

FASCIAL

12

FIN.

13

FRAMING 4549

450

200

1000

200x200mm GLAZED

200

WALL

PLAIN CEMENT PLASTER PAINT

TILES

200x200mm VITRIFIED

200x200mm VITRIFIED

GLAZED TILES

2ND

WALL TILES (GLAZED)

FLR.

FINISH

LVL.

6

FFL

SCALE

2

1

4500

A-7

SCALE

1:20

65

G

654 802

150

6

74

3225

R

1452

300

3200

200 50

M A

392

W 3

WC

WC

STORAGE

3RD FLR.

3rd FLOOR

DET.

A-7

LVL.

LVL.

SECTION

SCALE

1:20

A-7

150mm CHB

M

7b A-7

STAINLESS BAR

WC

300

TOILET LVL.

SECTION

SCALE

CORRIDOR

50

CLASSROOM LVL.

50

FLOOR

DET.

A-7

900

GRAB

7

7b

STEEL

1:20

M

1:50

A-7

M

DET.

SCALE

1:50

M

7a A-7

DET. SCALE

SECTION OF MALE

650

TOILETS

SCALE

1:50

M

FFL

REPUBLIC OF THE PHILIPPINES

I TO R I NG

ALBERT Z. DE BELEN

ON

D PE

IN

MCMXCIX

G

A

EN

R

F O RC E

T A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

CONCURRED :

PROJECT TITLE :

A

TA SK

NO I

DEPARTMENT OF EDUCATION (DepED)

E

F T

M

I

APPROVED FOR ACCREDITATION :

M

IL

&

t he PH

RECOMMENDING APPROVAL :

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

T

f

ES IN

RE PU B L

o

P P

IC

REVIEWED BY:

E

ER

IN G

,

A S SE S

SM

E

N

CHIEF, ARCHITECTURAL DIVISION

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

1:50

M

1525

9000

CONSULTANT / DESIGNER

SECTION

300

TOILETS

PEDIMENT

1000

SECTION OF FEMALE

SCALE

FACADE

300

A-7

DET.

OF

40

A-8

2

A-7

DET.

LVL.

TOILET LVL. FIN. GRD. LN.

8

1

1000

650

3200

TILES

1000

W 3

300

1625

38

3200

MALE TOILET

1000

3200

3200

200x200mm VITRIFIED

BW.

PAINT FIN.

1000

W 3

@1200mm OC. BW.

(PROVIDE MANHOLE)

TOILET

@1040mm OC &

@600mm OC.

EMBEDDED ON SLAB

LAV

GROOVE

10mm REINF. BAR PLASTERED

1000

W 4

CHB 1000

BW.

w/10mm BAR HANGER

FEMALE

300

1000

JOIST

THK.

PLASTER FIN. w/40mm

1000

W 3

ON

325

1525

@600mm OC

GLAZED WALL

GROUND

150mM 1000

CEILING

50x50mm CEILING

TOILET LVL. FIN. GRD. LN.

CHB

PAINT FIN.

PLASTERED

6mm THK. MARINE PLYWOOD

3200

150mm THK.

LVL.

40

FLR.

9425

2ND

100

TOILET LVL.

CHASE

WC

STORAGE FLOOR

PIPE

TOILET

1525

WC

WC

MALE

1600

1625

TOILET

1000

FEMALE

1000

COLUMN

1000

3200

CONCRETE

13195

150

W 3

3200

PIPE CHASE

1000

350

W 4

1000

650

W 3

2nd

1600 300

7a

1000

TOILET

6a

TOILET

TOP OF ROOF BEAM

1000

1600

1600

WC

MALE

1000

FEMALE TOILET

CEM. PLASTERED FIN.

80

E S

W 4

6" THK CHB PEDIMENT

650

80

LVL.

URINAL W 3

C A R

TOP OF BEAM

200

M

4500

OF ROOF BEAM

M

A-7

4175

DETAIL SECTION

650

TOP

3250

1800

1:20 M

5

1:50

6a

3200

A-7

2

1

DETAIL SECTION

SCALE

3315

M

A-7

TOILET

783

1:20

MOUNTING FIXTURES OF MALE

LVL.

TOILET LVL. FIN. GRADE LN.

3919

SCALE

4

0

A-7

COUNTER SINK

CORRIDOR

654

DETAIL OF

100

150

TOILET LVL.

FFL

3

2695

3200 183 100

100

284

1500

CLASSROOM LVL.

15

WC

WALL

TILES ( GLAZED )

500 268

PLAN

WC

50

DET.

100 600

SINK

URINAL

800

800

COUNTER

1600

COUNTER

70

300

CONC.

60 200

200

100

200x200mm VITRIFIED

200

1500

600

SD

150

1650

W 3

±780

600

25

600

PIPE CHASE

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

PROJECT NO:

01-002

DESIGNED BY: AZB

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

PERSPECTIVE VIEW CONTENTS

TABLE OF TOILET SECTION DETAILS LOCATION :

DATE :

01 03

NOTE:

A-1 A-7 9

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

CONCRETE SLAB GA 26 POLYETHYLENE SHEET DAMP PROOFING GRAVEL

BEDDING

TOP

CHORD

PLYWOOD

SEE

10mm @250mm

A-8

NOT

TO

SCALE

BEAM REBARS

SCHED. 40

STRUCTURAL

PLYWOOD

DETAIL

C

12x12mm GROOVE

6mm THK. ORD.

PLYWOOD CEILING W/

RAILING

W/ 25mm SQ. BAR STEEL BRACKET

6mm GROOVE ON

0

5

1

@

50x50mm CEILING

200

100mm CHB

PAINT

FLOOR LEVEL

SPOT

SCALE

M

DET.

1:20

AS

GI

STRAP GUTTER

FOR

FRAME

CLG.

A-4

SCALE

1

:

20

SCALE :

BEAM

BW

QUARTER ROUND MOULDING

PRIMER STRAINER 6mm THK. MARINE PLYWD.

STRAINER

CEILING (PAINT) ON 50x50mm CLG.

JST.

@600mm OC

BW

PAINT

FINISH

75mm PVC

CEILING VENT (SEE DETAIL)

DOWNSPOUT

PAINT

SPOT DETAIL

12

FINISH

A-8

EAVES SECTION

5

CONC.

@600mm

WITH

SCALE

1

25x25 WOOD

50

mm

B

C

7000

SCREEN

FR. 25x75mm WD.FRAME

2500

S4S

BEAM

SCHEDULE 50mm G.G.

PIPE

SCH.

19mm SQUARE @150mm O.C.

4 WC

=1512mm

W

CORRIDOR

1

: 10

SPOT DETAIL

M

(CEILING VENT.)

A-8

40

SCALE

:

1

:

10

M

175

19mm SQUARE WELDED

TO G.I.

HANDRAIL

50

BAR PIPE

50mm G.I.

@150mm O.C.

SCHEDULE

PIPE 40

PAINT FINISH

100

16 50

15 14 5

W-4

12

LANDING

A-8

11

ANCHORED

10

200x200mm VITRIFIED WALL

9

TILES

50mm % G.I. PIPE SCHEDULE 40 PAIN. FIN.

8 7 6 4

4

5

@

R.C.

SCALE

1:20

1

SECOND FLOOR

50mm G.I.

CORRIDOR

19

LINE

BAR

W-4

A-8

(PAINT FINISH)

JOIST @600mm 0N CENTER

19mm SQUARE

11

O.C. 9 7

PIPE

40

50 2

A-8

1

STORAGE

FEMALE

LINE

ANCHORED LANDING

CORRIDOR

19mm SQUARE

ANCHORED

25x25x2mm THK.

GRADE LINE

ANGULAR 1200

3800

TO THE

WALL (PAINT FIN.)

F.F.L.

50 300

2000

G.I.

(PAINT FINISH)

WELDED

168

WC

50mm%

SCHEDULE

19 mm SQUARE BAR

3

950

900

FINISHED

CS

PIPE 40

(PAINT FINISH)

PIPE

4

2

3

TO G.I.

5

D LAV

GROUND FLOOR TOILET FIN.

6

1125

TILES 1625

WALL

SCHEDULE

BAR @150mm

WELDED

HANDRAIL (PAINT FIN.)

50mm % G.I. PIPE SCHEDULE 40 PAIN. FIN.

200x200mm VITRIFIED

50mm G.I.

50

10

BW.

M

175

13

12

LANDING

BOTHWAYS W/ 10mm BAR

1:5

3 A-8

8

GLAZED

SCALE

14

ON 50x50mm CEILING

DETAIL

(CRASH RAILING)

15

PLYWOOD

HANGER @1200mm OC.

SPOT

M

900

GRAB

1:20

7

16

STL.

SCALE

SCHEDULE 40

18

38mm STAINLESS

A-8

M

PIPE

17

CEILING

SPOT DETAIL

2

WC

6mm THK. MARINE

6

3

CS

TO THE

150

STAIR

CRASH RAILING

A-8

5

D

TOILET FIN.

ANCHORED

WALL (PAINT FIN.)

@

R.C.

STAIR

TO G.I.

HANDRAIL

BAR PIPE

@150mm O.C.

168

GLAZED

19 mm SQUARE BAR

13

168

9-RISERS@168mm

HANDRAIL

18

=1680mm

10-RISERS@168mm

PIPE

BAR

WELDED

(PAINT FIN.)

19

LINE

:

17

=1512mm

9-RISERS@168mm

3200

THIRD FLOOR

3200

TO G.I.

900

CS

JOISTS @600mm O.C. B/W (PAINT FIN.)

FIN. 150 150 150

PAIN.

900

40

PLYWOOD

(PAINT FINISH)

L

SCHEDULE

TO G.I. PIPE

VENT SCREEN

50mm G.I. PIPE

G.I. PIPE

A L

3200

50mm

RAILING @150mm O.C.

D

TOILET FIN.

SCALE

SCHEDULE

19mm SQUARE BAR

TILES

INSECT

MARINE

ON 50x50mm CEILING.

14

50

40 (PAINT FIN.) 200x200mm VITRIFIED

WELDED

325

A-8

40

(PAINT FINISH)

PROVIDE

CEILING

CEILING VENT DETAIL

13

200

50mm G.I. PIPE

25x25mm WOOD

PLAN

14

W-4

275

KD

TANG.

A-8

WALL

50

VENT

6mm THK.

GLAZED

325

PROVIDE INSECT

SHOWN

ROOF

10 M

575

1:20 M

A TOP OF

:

1150

M 575

A-8

JST.

OC

FASCIA BOARD

COATED

ORD.

CEILING

(PAINT) ON 50x50mm

GUTTER

75mm PVC

SUN BREAKER DETAIL

10

M

TYPICAL DETAIL OF BALCONY RAILING SCALE

GA 26

20x20X2mm ANGULAR

BASKET

PLYWD.

FINISH PAINT FIN.

GI

6mm THK.

FRAME PAINT

GA 26

DOWNSPOUT

FIN.

CEMENT

275

PLASTER

ON STL.

BASKET

50

700

ON

PAINT FIN.

675

CONC.

SECTION

A-8

A-4

STRAP

RIVET

JOIST @600mm BW

GA 26 GI

RAILING W/ PLAIN CEM. THIRD

9

SCREW

BAR

BEAM

(PAINT FIN.)

PAINT FINISH

1:50

MARINE

CEILING

GI

FASCIA BOARD FIX W/METAL

ROOF

5A

ON

12x300mm FIBER

JOIST @600mm BW

EVERY 1200mm

SCALE

GA 26

ROD SEE

6mm THK.

SEE

CEILING

@600mm BW

COPPER

50x50mm CEILING

50mm B.I. PIPE

C

JOIST

STRUCTURAL DETAIL

100100

DAMP PROOFING DET.

SEE TRUSS DET.

38mm TEKSCREW

C-PURLIN (SEE STRUC'L DETAIL) SAG

PAINT FIN.

MARINE

50x50mm CEILING

38mm TEKSCREW

ON CENTER

G.I.

SHT.

6mm THK.

1000 STRUCTURAL DETAIL

8

CORR.

ROOFING

BAR

NOSING

7000 50

1

SECTION OF

A-8

STAIR

SCALE

1:50

REPUBLIC OF THE PHILIPPINES

D PE

I TO R I NG

IN

MCMXCIX

G

A

EN

T

R

F O RC E

NO I A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

REVIEWED BY:

RECOMMENDING APPROVAL :

APPROVED FOR ACCREDITATION :

1:20

M

E

ER

IN G

,

A S SE S

SM

E

ALBERT Z. DE BELEN

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

CONCURRED :

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

ANGULAR NOSING

BAR

3

HANDRAIL SCALE

PROJECT TITLE :

RAMON C. BACANI

N

CHIEF, ARCHITECTURAL DIVISION

25x25x2mm THK.

A-8

A

TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

F T

ON

I

A-8

M

SCALE

SECTION

M

IL

M

t he PH

&

f

DETAIL

T

o

P P

RE PU B L

CONSULTANT / DESIGNER

IC

2

300

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

4

DETAIL 1:5

SPOT

A-8

M

PROJECT NO:

01-002

DESIGNED BY: AZB

SCALE

OWNER :

DEPARTMENT OF EDUCATION

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

DATE :

M

DepED

A-1 A-8

PERSPECTIVE VIEW

9

01 03

NOTE:

1:5

SHEET NO:

CONTENTS STAIR, HANDRAILTABLE & MISC. OF DETAILS LOCATION :

DETAIL

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

900 800

900

20

300

800

600

PVC

COMPLETE W/ HARDWARE AND

COMPLETE W/ HARDWARE AND

AND

ORDINARY OUTSIDE

INSIDE

ACCESSORIES

FLUSH TYPE

LOUVER

SWING

ORDINARY OUTSIDE PROVIDE

KICK

300

DOOR

ON 50X100

SWING

DOOR ON 50X100

YACAL/GUIJO DOOR JAMB

COMPLETE

ACCESSORIES

ACCESSORIES

WITH HARDWARE

BEAM

±950

2000

F

5

4

600

F

SEALANT

6

7

A-9

SCALE :

1

:

20

METERS

CLEAR

STEEL

RQD: 30 SETS

JALOUSIE

LOC:

BLADES

REAR ELEVATION

WINDOWS

W-3 TOILET

WITH CLEAR

GLASS

ON STANDARD ALUMINUM

STEEL AWNING

CASING

COMPLETE WITH HARDWARE ACCESSORIES & STEEL FROM

WINDOW

STEEL AWNING

SCALE

WINDOW

AND

GRILLS

1.6x35mm CONT.

ON 300mm 60

FLOOR FIN.

SCHEDULE OF DOORS & WINDOWS

A-9

GLASS

W-4 TOILET

ON 50X150mm YACAL/GUIJO JAMB

CASEMENT WINDOW

WITH FIX GLASS

1

FRAME

PUTTY

TYP. STEEL CASEMENT TYPE (W-1)

2

W-2 CLASSROOM

9

3x25mm Z-BAR

LOCK

2400

1800

2400

1100

2000

300 400

2400

900

2400

1200

MANUAL

W-1 CLASSROOM

SEALANT

PLATE

3 EQUAL PARTS = 2000 2 EQUAL PARTS =

F

10mm BAR

8

TOILET (CUBICLE)

COMPLETE WITH HARDWARE

4000

F

3 60

D-4

YACAL/GUIJO DOOR JAMB

600

300

AND

ACCESSORIES

4EQ. PARTS 1000

F

20

ACCESSORIES

ON 50x50mm YACAL

F

2

20

DOOR ON 50x150mm GUIJO/YACAL JAMB w/MARINE PLYWOOD FACING

INSIDE

AND

COMPLETE

F

1000

300

GUIJO

JAMB W/ MARINE PLYWOOD FACING

WITH HARDWARE

TRANSOM

CORE

D-3a

HOLLOW

DOOR

GLASS

FLUSH TYPE

TOILET (DISABLED)

SWING

mm YACAL/GUIJO JAMB W/ FIXED

CORE

F

1

1000

9

PIPE

2

ON 50X150 HOLLOW

D-3

1500

DOOR

1000

600

TANGUILE PANEL

TOILET

D-2

1000

4000

1200

D-1 CLASSROOM

1200

STL.

PLATE

1500

KICKING

300

FFL

CLEAR

STAINLESS

800

2100

2100

2100

2100

2400

4EQ. PARTS=

:

1

: 50

20

WEATHERING

25

ANGLE

METERS

PIN

HINGES Z-BAR

Z-BAR

TRANSOM

SEALANT

FRAME

BAR

I-BAR MULLION

GLAZING 25

GROUT

CHB

2

3 WINDOW JAMB

8

3x25mm Z-BAR

PUTTY

1 CLEAR

SPOT WELD

25

PIN

GLASS

FULL WELD

PVC

PIPE

CLEAR

GLASS

PUTTY 20

2

10mm BAR

20

WINDOW JAMB

60

20

16

3x35mm Z-BAR

25

7

PUTTY SPOT

FRAME MEETING

WELD CLEAR

RAIL

GLASS

MULLION

7

VENT HINGE

6

5

4

25

3

35

10

PVC

HINGE 25

1.

FULL

6

ANGLE PIN

SCALE

:

1

: 10

REPUBLIC OF THE PHILIPPINES

20

WINDOW JAMB

HORIZONTAL DETAIL SECTION

REVIEWED BY:

RECOMMENDING APPROVAL :

SCALE

:

APPROVED FOR ACCREDITATION :

1

:

10

METERS

CONCURRED :

PROJECT TITLE :

I TO R I NG

M

ON

ALBERT Z. DE BELEN

&

MCMXCIX

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

T

D PE

IN

G

A

EN

T

R

F O RC E

NO I A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

E

ER

IN G

,

A S SE S

SM

20 CHB

METERS

A

T TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

F

2

M

I P P

RE PU B L

CONSULTANT / DESIGNER

IL

SILL

32

A-9

t he PH

WINDOW

PIN

10mm BAR

VERTICAL DETAIL SECTION

3

4

f

GROUT

SEALANT

A-9

o

WELD

PIPE ANGLE

WELD

35

GLAZING CLIP

IC

FRAME

E

N

CHIEF, ARCHITECTURAL DIVISION

ARCHITECT IV

MERALCO AVENUE, PASIG CITY

PRC NO. : PTR NO. :

0010990

TIN : DATE :

149 460 161 27 OCT. 2002

BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

PROJECT NO:

01-002

DESIGNED BY: AZB

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED

A-1 A-9

PERSPECTIVE VIEW

9

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

TABLE OF DETAIL CONTENTS DOOR & WINDOW SCHEDULE, LOCATION :

DATE :

01 03

NOTE:

OF STEEL CASEMENT

8

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

F O

TN E

M T

SYMBOL

1. ALL ELECTRICAL WORKS SHALL COMPLY IN ACCORDANCE WITH

AND THE REQUIREMENTS OF THE LOCAL POWER COMPANY. THE ELECTRICAL WORKS SHALL BE DONE UNDER THE IMMEDIATE SUPERVISION OF A DULY REGISTERED ELECTRICAL ENGINEER.

2. THE ELECTRICAL SERVICE POWER IS 1-PHASE, 2-WIRE, 230 V AC, 60 Hz. 3. WIRING METHOD SHALL BE AS FOLLOWS : -

INTERMEDIATE METALLIC CONDUIT

2

-

2 x 40 WATTS FLUORESCENT LAMP



-

CEILING FAN OUTLET

230

2

20

50

3-3.5mm THW IN 15mm

Scde

-

THREE GANG DEVICE SWITCH

2

LIGHTING

OUTLET

1500

230

2

20

50

3-3.5mm THW IN 15mm

S 3W

-

THREE WAY DEVICE SWITCH

3

LIGHTING

OUTLET

1000

230

2

20

50

3-3.5mm THW IN 15mm

Sf

-

FAN CONTROL SWITCH

4

CONVENIENCE OUTLET

1260

230

2

20

50

3-3.5mm THW IN 15mm

S EF

-

EXHAUST FAN SWITCH

5

CONVENIENCE OUTLET

1260

230

2

20

50

3-3.5mm THW IN 15mm

-

RACEWAY CONDUIT CONCEALED IN CEILING

6

LIGHTING

OUTLET

1760

230

2

20

50

3-3.5mm THW IN 15mm

-

RACEWAY CONDUIT CONCEALED UNDER FLOOR

7

LIGHTING

OUTLET

1500

230

2

20

50

3-3.5mm THW IN 15mm

8

LIGHTING

OUTLET

1000

230

2

20

50

3-3.5mm THW IN 15mm

9

CONVENIENCE OUTLET

1260

230

2

20

50

3-3.5mm THW IN 15mm

10

CONVENIENCE OUTLET

1260

230

2

20

50

3-3.5mm THW IN 15mm

11

LIGHTING

OUTLET

1760

230

2

20

50

3-3.5mm THW IN 15mm

12

LIGHTING

OUTLET

1500

230

2

20

50

3-3.5mm THW IN 15mm

10 AMPS, 250 VOLT WITH MODERN PLATE COVER

13

LIGHTING

OUTLET

1000

230

2

20

50

3-3.5mm THW IN 15mm

-

HOMERUN DIRECT TO PANELBOARD

14

CONVENIENCE OUTLET

1260

230

2

20

50

3-3.5mm THW IN 15mm

-

PUSH BUTTON

15

CONVENIENCE OUTLET

1260

230

2

20

50

3-3.5mm THW IN 15mm

-

ENCLOSED AIR CIRCUIT BREAKER

16

S

1500

230

2

20

50

FA

-

FIRE ALARM CONTROL PANEL

F

-

FIRE ALARM STATION OUTLET

-

VIBRATING BELL OUTLET

B

-

FIRE ALARM BELL

M

-

SERVICE METER

-

SERVICE ENTRANCE

LP

1.20 M ABOVE FINISH FLOOR

-

1.50 M ABOVE FINISH FLOOR

d. FIRE ALARM STATION OUTLET -

e. PUSH BUTTON OUTLET

B

1.50 M. ABOVE FINISH FLOOR

-

f. FIRE ALARM & VIBRATING BELL -

-

PANELBOARD

-

CKT. BREAKER, RATING AS INDICATED

-

DUPLEX CONVENIENCE OUTLET, GROUNDING TYPE

-

EXHAUST FAN OUTLET, SINGLE, GROUNDING TYPE

P

A

R

E

TOTAL

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

2

C

21940

IL @ 80% D.F. = 21940 x 80%

x 1.25

=

95.4 A

2

FEEDER: 2-50mm THW IN 40mm

C

PROTECTION: 150 AT, 225 AF, 2P, 230 V

230 V

OVERHEAD SERVICE ENTRANCE

CONNECTED TO 220V AC, 1O, 2 WIRE, 60 Hz FITTED WITH 40mm O TYPE "F" CONDULET

BUILDING WALL

1.20 M ABOVE FINISH FLOOR

TO SIMILAR OUTLET @ SECOND FLOOR & THIRD FLOOR

2ND FLOOR LINE

0.30 M BELOW CEILING LINE

PANEL LP 150AT, 225AF, 2P, 230V AC 1

TO LINE SIDE OF LP

20

20

20

B

2-2.0mm 2 TW IN 15MMOC

2 20

B

B

2-50mm 2 THW IN 40MMORSC

3

WIRE & CONDUIT SIZE

1860

POWER CIRCUIT AS PER PHILIPPINE ELECTRICAL CODE REQUIREMENT.

c. PANELBOARD

AF

OUTLET

7. GROUNDING SYSTEM SHALL BE PROVIDED TO ALL LIGHTING AND

0.30 M ABOVE FINISH FLOOR.

AT

LIGHTING

EF

-

POLE

1

10 AMPS, 250 VOLT WITH MODERN PLATE COVER

b. CONVENIENCE OUTLET

VOLT

TWO GANG DEVICE SWITCH

5. ALL OUTLET BOXES SHALL BE GALVANIZED GAGE NO. 16 DEEP TYPE WITH FACTORY KNOCKOUTS.

-

CIRCUIT BREAKER

-

SIZE.

8. MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS :

VA LOAD

S ab

SIZE OF WIRE FOR POWER AND LIGHTING CIRCUIT HOMERUN SHALL BE 3.5mm 2AND INSULATED FOR 600 VOLTS. SMALLEST RACEWAY SHALL

a. LIGHT SWITCH

CKT. NO. DESCRIPTION

MAIN : 150AT, 225AF, 2P, 230V

ONE GANG DEVICE SWITCH

"THW" UNLESS OTHERWISE INDICATED IN THE PLAN. THE MINIMUM

6. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND APPROVED TYPE FOR THE PARTICULAR LOCATION AND PURPOSE OF USAGE.

TYPE: BOLT-ON

-

4. ALL WIRES SHALL BE COPPER AND THERMOPLASTIC INSULATED TYPE

O I TRADE/NOMINAL

MOUNTING: FLUSH

S/S a

b. LIGHTING, POWER RECEPTACLE - POLYVINYL CHLORIDE CONDUIT SCH. 40 BRANCH CKT., & AUXILIARY

BE 15mm

PANELBOARD: LP

CEILING LIGHT OUTLET

OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC). THE RULES AND REGULATION OF THE LOCAL ENFORCING AUTHORITY

DESCRIPTION -

THESE PLANS AND SPECIFICATIONS. THE APPLICABLE PROVISIONS

a. FEEDERS AND RISERS

LOAD SCHEDULE



GENERAL NOTES

F

4

F

METERING CONDUIT

4-2.0mm TW IN 15MMOC

3-3.5mm THW IN 15MMORSC 2

5

20

20

20

20

20

20

20

9

10

13

15

FA

8

20

20

20

14

16

GROUND TERMINAL

ELECTRICAL

GROUND FLOOR LINE

#14mm

2

BARE COPPER WIRE

REPUBLIC OF THE PHILIPPINES

N ITO R I NG

ENGINEER III

MO

MCMXCIX

EE

RI N

G , A S SE S S

ME

THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT

APPROVED FOR ACCREDITATION :

TO

SCALE

CONCURRED :

PROJECT TITLE :

FE M. BARRIENTOS

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

N

MERALCO AVENUE, PASIG CITY

FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE OF THE SAME DUE TO FAULTY DESIGN.

NOT

RECOMMENDING APPROVAL :

&

N

IO

IN

G

T

EN

R

A

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

SCALE

RISER DIAGRAM

VENERANDO D. SAHAGUN

A

TA SK

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

PRC NO. :

TIN :

PTR NO. :

DATE :

CHIEF, ELECTRICAL DIVISION BUREAU OF DESIGN, DPWH

FIRE ALARM

16MMO x 240MM LENGTH GROUNDING ROD COPPERWELD

T

LI

M

t he PH I

NES

REP UB L

of

I PP

IC

REVIEWED BY:

VIBRATING BELL

2

I

CONSULTANT / DESIGNER

FIRE ALARM

1-8.0mm BARE COPPER WIRE IN 15mmO C

SINGLE LINE DIAGRAM TO

TO NEAREST C.O.

FIN. GRADE LINE

16mm O x 2.40m COPPERWELD GROUND ROD

NOT

RATING: 20AT, 50AF, 230V, 2P

12

20

2-2.0mm 2 TW IN 15MMOC

ENCLOSED ACB

1500 mm

11

KWHR METER

6

1800 mm

7

20

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

PROJECT NO: 01-002

DepED

BNA SHEET CONTENTS :

CHECKED BY: DATE :

SHEET NO:

DEPARTMENT OF EDUCATION

DESIGNED BY: BNA ENCODED BY:

OWNER :

01 03 NOTE:

LOAD SCHEDULE GENERAL NOTES LEGEND SINGLE LINE DIAGRAM RISER DIAGRAM

E-1 3

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545





 4500

9000 4500











9000 4500



9000

4500

4500

4500







9000 4500

4500





9000 4500

4500

4500

4500

SEF

EF

SEF STO

2

2

S

SINK COUNTER

b

c

S

SHE

a

c

2

2

2

CLASSROOM

b

a

b

c

2

2

2

a

c

2

2

2

b

a

c

2

2

2

b

a 2

HE

S

CLASSROOM

2

b

c 2

 a

2

2



c

CHALKBOARD

9500

S

CHALKBOARD

2



EF

3.0000

2

Shi

i 2

a

1

b

c

2

2

Sab Sabc

DN

i

b

2

a

b

c

2

2

2

a

b

c

2

2

2

a



h

Sabc

h 1

g

1

g

1

Sabc SF

Sfg

f

1

S



2



Sabc

S

2



Sabc

f 1



e 1



Sde

e 1

DN

d

1

1

S d 2

  1 : 100

SCALE :







METERS





9000 4500



4500

9000 4500

SEF

EF



 4500

4500

F





9000

4500

F





9000 4500

4500



9000 4500

F

 4500

4500

4500

F

SEF

F

EF

NCR c

S

SHE

2

2

S

b

c

a 2

2

2

CLASSROOM

SD

S S

2

a

c 2

2

2

CLASSROOM

b

c

b

2

2

2

a



1500

UP

i

i

2

a

2

Sabc SF

1

2

b

c 2

2

b

a

c 2

2

2

2

2

2

a

a

S

2

b

c 2

2

h

Sabc

F

h

1

g

1

1

g

Sabc

1

S

S

a

2

2



F

Sfg

HE

S

2

CLASSROOM

b

c

a

b



F

Shi

2

CLASSROOM



Sabc

c 2

CLASSROOM

b

c

a

b

f

f

1

Sabc

F

1

e

e

1

F



Sde

d

1

d

1

UP

2

 UP

RAMP UP

UP

RAMP UP

 1 : 100

SCALE :

REPUBLIC OF THE PHILIPPINES

N ITO R I NG MCMXCIX

EE

ENGINEER III

MO

IO

IN

G

T

EN

R

A

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

RI N

G , A S SE S S

ME

THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT

CONCURRED :

PROJECT TITLE :

FE M. BARRIENTOS

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

N

MERALCO AVENUE, PASIG CITY

FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE OF THE SAME DUE TO FAULTY DESIGN.

APPROVED FOR ACCREDITATION :

VENERANDO D. SAHAGUN

A

TA SK

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

RECOMMENDING APPROVAL :

&

LI

REVIEWED BY:

T

t he PH I

N

of

M

IC

I PP

REP UB L

CONSULTANT / DESIGNER

METERS

PRC NO. :

TIN :

PTR NO. :

DATE :

CHIEF, ELECTRICAL DIVISION BUREAU OF DESIGN, DPWH

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

PROJECT NO: 01-002

DepED

BNA SHEET CONTENTS :

CHECKED BY: DATE :

SHEET NO:

DEPARTMENT OF EDUCATION

DESIGNED BY: BNA ENCODED BY:

OWNER :

01 03 NOTE:

LIGHTING LAYOUT

E-2 3

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545





 4500





9000

9000

4500

4500



Sf





4500

Sf

4500

Sf



9000

4500

F





9000 4500

F

 4500

Sf



9000 4500

F



4500

4500

Sf

F

4500

F

STO

HE

SHE SINK COUNTER

 

9500



Sf



Sf

F

Sf

F

Sf

F

Sf

F

DPB/DBC



F

DN

DN TO C.O.

O

R

R

I

D

O

R

C

B

R

R

I

D

O

R B

B

TO FA



O

TO FA

C

TO FA

 1 : 100

SCALE :







METERS





9000 4500

4500

9000 4500



Sf





4500

4500

Sf



9000

4500

F





9000 4500

Sf

F

 4500

Sf



9000 4500

F



4500

4500

Sf

F

4500

M F



NCR HE SHE SD

 



DPA



ENCLOSED AIR CIRCUIT BREAKER

Sf

Sf

F

Sf

F

Sf

F

RATING: 220 V, 2P, 20AT, 50AF F

TO LINE SIDE OF DP

FA

1500

UP

UP

TO C.O.

B



B

B

TO FA

TO FA



Sf

F

TO FA

M

UP

RAMP UP

UP

RAMP UP ECNARTNE ECIVRES DAEHREVO MARGAID RESIR OT REFER

 1 : 100

SCALE :

REPUBLIC OF THE PHILIPPINES

N ITO R I NG MCMXCIX

EE

ENGINEER III

MO

IO

IN

G

T

EN

R

A

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

RI N

G , A S SE S S

ME

THE REVIEW & APPROVAL OF THIS PLANS BY THE DPWH DOES NOT RELIEVE THE DESIGNER/CONSULTANT

CONCURRED :

PROJECT TITLE :

FE M. BARRIENTOS

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

N

MERALCO AVENUE, PASIG CITY

FROM RESPONSIBILTY FOR THE SAFETY OF THE COMPLETED FACILITIES AS WELL AS FOR THE FAILURE OF THE SAME DUE TO FAULTY DESIGN.

APPROVED FOR ACCREDITATION :

VENERANDO D. SAHAGUN

A

TA SK

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

RECOMMENDING APPROVAL :

&

LI

REVIEWED BY:

T

t he PH I

N

of

M

IC

I PP

REP UB L

CONSULTANT / DESIGNER

METERS

PRC NO. :

TIN :

PTR NO. :

DATE :

CHIEF, ELECTRICAL DIVISION BUREAU OF DESIGN, DPWH

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

PROJECT NO: 01-002

DepED

BNA SHEET CONTENTS :

CHECKED BY: DATE :

SHEET NO:

DEPARTMENT OF EDUCATION

DESIGNED BY: BNA ENCODED BY:

OWNER :

01 03 NOTE:

POWER LAYOUT

E-3 3

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

FD

WC

FD CO

WC

100mmØ PVCSP

CO

CO

DN

DN



2 P-1

CO

100mmØ CO

150 mmØ CDP sloped @ 2%

CB

CB

150 mmØ CDP sloped @ 2%

CB

100mmØ PVCSP

100mmØ PVCSP

WC

FD

WC

FD

LAV

100mmØ PVCSP

100mmØ PVCSP

CB

100mmØ PVCWP

CO

CO

OC

FD WC

WC

FD

UR

LAV FD

NCR

FD WC

HE FD

75mmØ PVCWP CO CSF

CSF

CSF

CO

CSF CO

SD

100mmØ PVC MAIN SOIL STACK PIPE 75mmØ PVC MAIN VENT STACK 100mmØ PVC MAIN WASTE STACK PIPE

CB

CB

150 mmØ CDP sloped @ 2%

CO

UP

UP

C

UP

RAMP UP

150 mmØ CDP sloped @ 2%

I

D

O

R

RAMP UP

150 mmØ CDP sloped @ 2%

CB

200 mmØ CDP sloped @ 2%

R

UP

150 mmØ CDP sloped @ 2%

CB

R

CB

1 P-1

150 mmØ CDP sloped @ 2%

CB

CB

150 mmØ CDP sloped @ 2%

CB

CB 200 mmØ CDP sloped @ 2%

150 mmØ CDP sloped @ 2%

CB

O

150 mmØ CDP sloped @ 2%

100mmØ PVCWP

150 mmØ CDP sloped @ 2%

SS

150 mmØ CDP sloped @ 2%

CO CO

CO

CB

150 mmØ CDP sloped @ 2%

150 mmØ CDP sloped @ 2% CB

CO

METERS

TANK

100mmØ CO

150 mmØ CDP sloped @ 2%

100mmØ PVCWP

1 : 100

100mmØ CO SEPTIC

8850

CB

SCALE :

100mmØ PVCSP

TO SEWER LINE

CO

100mmØ PVC MAIN WASTE STACK

100mmØ PVCWP

75mmØ PVCWP

CSF CSF

FD CO 75mmØ PVCWP CSF CSF CSF

CO CSF

75mmØ PVC MAIN VENT STACK

75mmØ PVCWP

SHE

FD 75mmØ PVCWP

FD

100mmØ PVCSP

CO

CO

75mmØ PVCWP

FD WC

WC

CO

100mmØ PVC MAIN SOIL STACK

75mmØ PVCWP

FD

WC 75mmØ PVC MAIN VENT PIPE

UR

 SCALE :

1 : 100

METERS

TO MAIN DRAIN SYSTEM

TO MAIN DRAIN SYSTEM

REPUBLIC OF THE PHILIPPINES

N ITO R I NG MO

IO

IN

G

T

EN

R

A

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

MCMXCIX

EE

RECOMMENDING APPROVAL :

APPROVED FOR ACCREDITATION :

CONCURRED :

PROJECT TITLE :

A

TA SK

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

&

LI

N

T

t he PH I

N

of

REVIEWED BY:

M

IC

I PP

REP UB L

CONSULTANT / DESIGNER

RI N

G , A S SE S S

ME

ELIAS MELQUIADES EMEL B. CUBA II SANITARY ENGINEER

MERALCO AVENUE, PASIG CITY

PRC NO. :

TIN :

PTR NO. :

DATE :

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

CHIEF, ARCHITECTURAL DIVISION BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

PROJECT NO: 01-002 DESIGNED BY: mmC

OWNER :

DEPARTMENT OF EDUCATION

DepED

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY: DATE :

SHEET NO:

01 03 NOTE:

DRAINAGE AND SANITARY SYSTEM LAYOUT

P-1 5

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

MO

N ITO R I NG

0

1

O

C

R

C

N

FD

C

DESIGNED BY: AZB

ENCODED BY: Max C

CHECKED BY: 01 03

B

FD

O

C

S

C

S

C

U R

0

Ø

P

V

B

C

V

P

W

C

IS ER

R

m

m

V

P

5

m m Ø P

D

C

O

C

O

C

75mmØ PVCDS

S

C

C

Ø

W

m

FD

m V

LA

%

2

0

@

0

1

pe d

sl o

0

5

1

ed

op

sl @

C O

%

2

C

C O

FD

B

O

C

7

S

C

m

5

m m

P

Ø

P

5

0

V

m Ø

B V

C

ER

IS

m

Ø

m

m

5

7

0

5

1

P

R

Ø

m

m

P

P

W C V

S

C

C

W

R A U MP P

V P

W

C

S

C

V

P

Ø

m

m

0

C

W

Ø

0

1

B

m

5

7

R

U

C

B

C

C O

P

D

C sl

O

C

C

P[

E

W C

FD

O

EC

AS

O

C

FD

B

I

Ø m

P

P

W

5

N

C

W

FD

V

ed

B

C

ER

V

P

I

B

C

F NP KV D CC OW U NP T E R

P

W

C

V

ER

IS

R

E

AS

H

C

P

Ø m m 5 775 m m SØ

V

B

C

V

P

PE

PI

@

%

2

m

0

5

E

P[

PI

P

S

E

AS

H

C

V

B

C

V

P

B

V

P

P

S

C

E

H

SS

C

Ø

m

m

0

0

1

O

C

C CB S V

P

C

C

V

W P

W

C

V

P

V

P

Ø

m

FD Ø

m

m

0

0

1

R

FL

m

5

7

D

3R

C mØ S

C

Ø

m

m

0

5

75mmØ PVCDS

O FD C O

C

Ø

m

m

0

5

O

C

op

sl

IS

R

P

D

C

D

Ø

m

m

0

W

P

P

S

C

V

P

C

W

m

m

Ø

E

H

SS

C

0

5

1

S VC

C m

O

C

C CB S V

P

P

S

C

V

P

W

C

V

P

V

P

Ø

m

Ø

m

m

0

5

Ø

C

V

P

5 7

S

C

Ø

m

m

m

C

W 0

0

1 m

C

W

5

7

R

FD

O

C

FD Ø

m

m

0

0

1

R

FL

m

5

7

D

2N

F C NP KV D S CC L OW A U NP V T E R

Ø m m 5 775 m m SØ

D

H

C

V

ER

IS

R

E

AS

H

C

P

PE

PI

V

B

C

V

P

U

Ø

m

m

0

5

C FD O

C

H

V

C

B

C

V

PI

P

C

O

W

B

V

Ø

m

%

2

m

0

@

5

d

S

C

B

C

C Ø S P V

D

S

SS

m

m

ER

0

5

C O

op e

FD P

W

C

V

P

C O

R IS

C O

C

DS

C

D N

P

IN

D

P C O

Ø

m m

S

C

0

5

V

P

C

W

Ø

m

m

0

1

M

S AI Y N S D T R E A M

T O

C B

V

B

NOTE:

C

V

&

V B

C

P

PROJECT NO: 01-002

Ø

T

V

P

CO

m

m

N

V

B

Ø

m

IO

C

W

FD

O

C

U

Ø

m

m

P

0

5

1

O

C

FD

Ø

m

m

0

5

P

D

C ed

op

sl

V

B

C

V

P

@

FD

B

C

P

U

75mmØ PVCDS

%

2

S LI EW N E E R

TO

B

C

C O

0

5

1

Ø

m

m

P

ed

op

ed

sl

op

sl

R

P

D

C

D

C

Ø

m

m

P

S

C

PV

R

0

5

1

Ø

m

m

0

0

1

75mmØ PVCDS

@

B

C

@

%

2

I D O

75mmØ PVCDS

%

2

m C m O Ø

0

0

1

B

C

R

O

C

0

5

1

0 0 m C m O Ø

1

Ø

m

m

0

5

1

Ø

m

m

P

D

C

P

D

C

@

%

2

ed

op

sl

ed

op

sl

75mmØ PVCDS

S T EP A T N IC K

0 m C m O Ø

0

1

B

C

O

C

@

%

2

75mmØ PVCDS

R A U MP P

M S AI Y N S D T R E A M

O

T

C B

FD P

W

P V C

B

C

Ø

m

m

5

7

O

C

IN

0

V

B

C S

S P V C

C O

Ø

m

m

0

1

0

ed

sl op

@

%

2

P V

C

ed

sl op

Ø

m

m

P

D

C

0

Ø

m

m

P

D

C

5

1

P

S

@

%

2

C

W

B

C

75mmØ PVCDS

D

S

SS

m m C Ø

0

5

C O

5

1

ER

R IS

%

2

C

V

P

CO

m

T

@

Ø

m

m

A

ed

op sl

DATE :

P

0

LOCATION :

D

3 P-2

0

UNDERSECRETARY

0

DEPATMENT OF EDUCATION (DepED)

5

RAMON C. BACANI

  

5

PROJECT TITLE :

5

NOT TO SCALE

1 ISOMETRIC PLUMBING LAYOUT P-2

C

FD

Ø

DS

m

CO

m

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

0

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

0

CHIEF, ARCHITECTURAL DIVISION BUREAU OF DESIGN, DPWH

C

W

FD

C B

C FD O

m m Ø

0

5

C B

75mmØ PVCDS

FD

2

GILBERTO S. REYES

%

%

2

SOFIA T. SANTIAGO

2

@

A

@

FD

ed op

ed

op sl

EMMANUEL P. CUNTAPAY CONCURRED :

FD

sl

P D

C

REP UB L

P

D

C

FD

1

0

0

C

D

P V

P V

FD m m Ø

0

R

0

1

FL

m m Ø

5

7

2N

P

C

FD

V C

O

R

C

C

N

W

Ø

C B

N

D

P

D

C

P C O

m m Ø

S

0

5

1

O

S

C

C

1

op ed

FD

sl

S

R

C

U

V

FD

C

S

W

C

Ø

m

m

%

2

0 LA

0

@

O

75mmØ PVCDS

m

m

C

W

C

R

IS ER

D H

R

AS E

C

H

S

C

FD

IS E

R

V C B

P

W P

Ø

V

C

O C

O

75mmØ PVCDS

R

m

V C

5 0 m

P

E

H

SS

C

N

D

C P W O 50 P m I F C m NP KV D S Ø P C C L V OW A U C NP V C T S BV E m m SØ

Ø m m

C

V P

PI PE

B V

C

5 775

P V

DS

Ø m m

Ø

APPROVED FOR ACCREDITATION :

0

m

m

DATE : RECOMMENDING APPROVAL :

5

FD

DS

1

0

0

2

PTR NO. : CO

V

%

2

REVIEWED BY: FD

B C V

@

TIN : DS CO

C

O

C

O

R

W

C

C

C

m

S m 5 7

S

Ø

P

5 0 m

P W C V

m

Ø

IS E

R

V C B

P

R

V

I

C

IS ER

Ø

O

m

C

5 0 m

O

PI P[ E

H

V

C

P V C B

C

AS

O

R

W

C

0

O

1

C

0

C

IS E

R

P V C B

R

V

Ø

m

m

Ø

PI P[ E

AS

E

C

C

W

FD

H

V

C

P V C B

S P

m

C

5 0 m

P V

P

S

C

E

H

SS

C

P V

C

W

W P

C

C CB S V

P C CW S V P Ø 5 0 m m m m 5 Ø 7

S

P V

P V

m m Ø

FD m m Ø

0

R

0

1

FL

m C mØ S

0

5

D

5

7

3R

1 0 0 7 m 5 m W m Ø C m P Ø V C P V S C P W P

U O

EC

FD

C

C B

F NP KV D C C OW U NP T E R

P W

R

AS E

C

H

V P

m m SØ

Ø m m

B V

C

5 775

P V

PI PE

75mmØ PVCDS

O

O FD C O

C

1 0 0 7 m 5 m W m Ø C m P Ø V C P V S C P W P

U O

FD

C B

C

C

C

W

FD

m m Ø

0

5

V

ed

op

sl

PRC NO. :

V

P

P

D

C

SANITARY ENGINEER FD

FD

Ø

Ø

m

MERALCO AVENUE, PASIG CITY FD

CO

m

m

ELIAS MELQUIADES EMEL B. CUBA II CO FD

B C V P

0

5

1

CONSULTANT / DESIGNER CO

Ø

%

2

N

CO

B C V P

@

M

G

ME

DS

Ø

d

e op

EN

G , A S SE S S

P

sl

F O RC E

MCMXCIX

W C

V

P

D

C

TA SK

RI N

P

Ø m

R

EE

E

CO m 0 5

m

IN

Ø

m

0

5 m

0 0 1

1

F

DS m

%

2

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

DEPARTMENT OF EDUCATION (DepED) T

CO m 0 5

@

ISOMETRIC PLUMBING LAYOUT - FEMALE TOILET DS

m

ed

REPUBLIC OF THE PHILIPPINES

CO m 0 5

P

W

C

NES

DE

TM UC EN T O F ED

V

op

sl

I PP

LI

P

P

t he PH I

Ø

D

C

of

m

Ø

m

m

IC

m 0 0 1

0

5

1

2 P-2

DS

DS

DS

ISOMETRIC PLUMBING LAYOUT - MALE TOILET

DS

FD

DS OWNER : SHEET NO:

DEPARTMENT OF EDUCATION

DepED

SHEET CONTENTS :

DRANAIGE & SANITARY SYSTEM ISOMETRIC VIEW

P-2 5

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION,

ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE. REP. ACT 545

O

O

FD

1 5 0

C

Ø

m

m

m m Ø

0

5

P

ed

sl op

B V

C

C D

P V

@

2 %

25mmØ GICWL

19mmØ GICWL

19mmØ GICWL SS

WC

2

7

5

25mmØ GICWL

25mmØ GICWL

GV

1

LAV

WC

19mmØ GICWL

WC

WC

RISER

LAV

NCR

WC

UR

RISER

HE

CV GV

CS F

UP

GV CV UP

19mmØ GICWL

SD

GROUND FLOOR FEMALE TOILET 2

GROUND FLOOR MALE TOILET

3 P-3

3

8

1

2

3

3

19mmØ GICWL

SINK COUNTER

F

1

6

GV

WC

WC

WC

UR 19mmØ GICWL WC

STO

RISER

2

1

WC

SHE F

SINK COUNTER

RISER

CS

F F 19mmØ GICWL

19mmØ GICWL

WC

WC

 SCALE :

1 : 20

SEC. & 3RD FEMALE TOILET

19mmØ GICWL RISER

2

19mmØ GATE VALVE

3

19mmØ GICWL

4

25mmØ GICWL

5

STAINLESS WATER TANK (125 GAL CAPACITY)

6

64 GAL CAP. STAINLESS PRESSURE TANK

7

1.5 HP BOOSTER PUMP

8

IMAGINARY LINE OF PUMP HOUSING

SEC. & 3RD MALE TOILET

METERS

3

2

1

UR 19mmØ GICWL WC

STO

RISER

1

19mmØ GICWL

19mmØ GICWL WC

SCHEDULE OF FINISHES

WC

SHE F

SINK COUNTER

19mmØ GICWL

3

19mmØ GICWL

4

19mmØ GICWL

4

FROM WATER SOURCE

3

25mmØ GICWL

2

19mmØ GICWL

1

RISER

CS

F F 19mmØ GICWL

19mmØ GICWL

DN

DN

2 P-3

 SCALE :

1 : 100

METERS

4 4

4

3

25mmØ GICWL

19mmØ GICWL

25mmØ GICWL

SS

WC

2

7

25mmØ GICWL

19mmØ GICWL GV

1

LAV

WC

19mmØ GICWL

WC

WC

RISER

LAV

NCR

WC

UR

RISER

HE CS F

F

UP

1 P-3

REPUBLIC OF THE PHILIPPINES

N ITO R I NG MO

&

MCMXCIX

EE

N

T

N

IO T

G

R

A

EN

IN

R

R

I

D

O

GV

R

UP

RAMP UP

 SCALE :

RECOMMENDING APPROVAL :

1 : 100

APPROVED FOR ACCREDITATION :

METERS

CONCURRED :

PROJECT TITLE :

A

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

REVIEWED BY:

O

M

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

TA SK

I PP

REP UB L

CONSULTANT / DESIGNER LI

GV

GV CV UP

8

UP

RAMP UP

t he PH I

CV

UP

19mmØ GICWL

C

of

6

SINK COUNTER SD

UP

IC

5

FROM WATER SOURCE

3

25mmØ GICWL

2

19mmØ GICWL

1

RI N

G , A S SE S S

ME

ELIAS MELQUIADES EMEL B. CUBA II SANITARY ENGINEER

MERALCO AVENUE, PASIG CITY

PRC NO. :

TIN :

PTR NO. :

DATE :

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

CHIEF, ARCHITECTURAL DIVISION BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

PROJECT NO: 01-002

OWNER :

DEPARTMENT OF EDUCATION

DESIGNED BY: AZB

DepED

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY: DATE :

SHEET NO:

01 03 NOTE:

WATER SYSTEM LAYOUT

 

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

Ø mm 19 L CW GI R U L CW GI

C W

O

T

F

OM FR

GI CW L

GI CW L

W

C

R

SE

CW

L

RI

GI

CS

Ø

UP

CV

GV

GV

L

CV

CW

GI

P M A R UP

R

E

Ø

T

N

U

O

C

mm

19

K

N

I

S

mm

C

N

W

F

25

V

NK TA

LA

F

Ø

L

C

CW

W

RE SU ES PR

GI

D S

F

mm

Ø

C

mm

19 mm Ø

F

F

19

GI CW L Ø

F

19

mm

25 mm Ø

L CW GI C C W W Ø L mm CW L 25 GI CW Ø GI UR mm Ø R 19 mm SE 19 RI E L H CW GI V Ø LA R mm C 19

L CW GI W

R

19

O

T

Ø mm 25

SS

SE

RI

F

F

S

E H S GV

GI CW L

R

E

L T N U O CW C GI

F

C W

C W

K

N

I

S

Ø mm 19

F

L

19mmØ GICWL

C W

19 mm Ø

L CW GI

GI CW L

1

L CW GI

C W

F

Ø mm 19

F

S

E H S

ER

19 mm Ø

Ø mm 19 L CW R GI U

R

E

L T N U O CW C GI

RIS

CW

19mmØ GICWL

F

GI

GI CW L

19 mm Ø

C W

K

N

I

S

Ø mm 19

Ø mm 19

L CW GI

C W

F

Ø mm 19

F

C W

F

RIS

ER

C W

Ø mm 19

F

UP

GV

FEMALE TOILET ISOMETRIC WATERLINE DIAG. 2 P-4

SO

UR

CE

NOT TO SCALE

4

C

GI

W

GI

Ø

CW

L

mm

FR

19

OM

WA

ER

Ø

L

mm

F

W

NOT TO SCALE

C

F

C

W

K

N

I

S C

R

E

T

GI

N

U

O

Ø

mm

19

19mmØ GICWL

19

MALE TOILET ISOMETRIC WATERLINE DIAG. 2 P-4

CW

F

TE

R

RIS

Ø L

CW

GI

O Ø

GI Ø mm 19 Ø L

CW

GI L

CW

GI Ø

mm

19

L CW

Ø

Ø

GI

GI

R

SE

CW

L

RI

CS R

mm

E

Ø

T

N

U

mm

O

C

19

K

N

I

S

F

UP

CV CV

GV

GV

L

OM FR V

N TA

LA

FR OM

WA

TE

R

RE SU

L

C

SO UR

P M A R UP

W

CW

ES PR

GI

CE

UP

GV

Ø

C

mm

W

CW

GI

25

F

mm

F

19

L CW

H

NOT TO SCALE

F

L

GI

R

C

L CW GI C W Ø mm L 25 CW GI UR Ø R mm SE 19 RI E L

CW

GI

ISOMETRIC WATERLINE DIAGRAM

N

CW 19

Ø

C

W L CW GI

Ø

C

GI

GI CW L

C

W Ø mm 19

V LA W

Ø mm 25

SS

R

SE

RI

F

mm

19

O

E

T

H GV

1 P-4

F

F

F

S

S

L mm

L

19mmØ GICWL

mm 19 L CW R GI U

R

R

CW Ø

CW

Ø

Ø

mm

19

O

F

E

GI

T N U

O

mm

C

L

W

CW

D

C

C

Ø 19

GI

F

I

L W

K

N

25

C

W

Ø

R

CW C

F

I S

mm

19

F

mm

19

GI

R

GI

mm

L

R

U

CW

O

L

GI

P

CW

mm

U

Ø

F

W

F

25

C

1

mm C

19

mm

P

T

E 19 W

F

19

U

S

H

ER

S

L

CW

RIS

K

C

W

D

S

REPUBLIC OF THE PHILIPPINES

N ITO R I NG MO

IO

IN

G

T

EN

R

A

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

MCMXCIX

EE

RECOMMENDING APPROVAL :

APPROVED FOR ACCREDITATION :

CONCURRED :

PROJECT TITLE :

A

TA SK

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

&

LI

N

T

t he PH I

N

of

REVIEWED BY:

M

IC

I PP

REP UB L

CONSULTANT / DESIGNER

RI N

G , A S SE S S

ME

ELIAS MELQUIADES EMEL B. CUBA II SANITARY ENGINEER

MERALCO AVENUE, PASIG CITY

PRC NO. :

TIN :

PTR NO. :

DATE :

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

CHIEF, ARCHITECTURAL DIVISION BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

PROJECT NO: 01-002

OWNER :

DEPARTMENT OF EDUCATION

DESIGNED BY: AZB

DepED

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY: DATE :

SHEET NO:

01 03 NOTE:

WATER SYSTEM ISOMETRIC DIAGRAM

 

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

LEGEND:

100mm THK. + FIN. SLAB W/

10mm REBARS AT 200mm

O.C.

CB

BENT UP 2 OUT OF 3 AT L/4

FROM

FACE

100mm THK CHB W/ 10mm VERT/HOR BAR

SUPPORT. BOTH WAYS

150X300mm RC BEAM W/2-16mm

600

TOP

AND

BOT. REBARS

CDP

100mm THK. + FIN. SLAB W/ 10mm BENT UP 2 OUT OF 3 AT L/4 FROM

@600mm O.C. EW

& 10mm STIRRUPS

FACE SUPPORT

1@50,3@100, REST @300mm O.C. AIR

SPACE

LEVEL

150

700

150

WALLS

@200mm OC GRAVEL

FACE

REINFORCEMENT

10mm VERT. &

WATER

LEVEL

PLASTERED W/WATERPROOFING COMPOUND OR APPLY ONE

APPLY ONE

FACE BITUMEN

TAR

HOR. BAR

BW

BED

DIGESTIVE CHAMBER

10mm REINF. VERT @200mm

O.C

& HOR.

BWAYS

150

150

1SLOPE

150

1000

150

5000

150

150

10mm

REBARS @300mm

O.C. BW

300mm BOTH WAYS

1

:

40

CROSS SECTION DETAIL

3

LONGTUDINAL SECTION DETAIL :

P-3

SCALE

1

:

: 40

400

150

@

300mm O.C.

400

REBARS

DRAINAGE

PIPE

OF

SUPPORT

1.

2. 600

GALVANIZED IRON COLD WATER RISER (SCH. 40)

GV

GATE VALVE

MH

MANHOLE

PVCDS

POLYVINYL CHLORIDE

DOWNSPOUT

PVCDP

POLYVINYL CHLORIDE

DRAIN PIPE

PVCDS

POLYVINYL CHLORIDE

DOWNSPOUT

PVCSP

POLYVINYL CHLORIDE

SOIL PIPE

POLYVINYL

CHLORIDE

PVCVP

POLYVINYL

PVCVS

POLYVINYL CHLORIDE

CHLORIDE

VENT. ACROSS CEILING

VENT. PIPE

VENT

STACK

POLYVINYL

CHLORIDE

POLYVINYL

RD

ROOF DRAIN

UD

URINAL

DRAIN

WC

WATER

CLOSET

LAV

LAVATORY

COUNTER

WASTE PIPE

WASTE

CHLORIDE

STACK

SOIL

PIPE

RISER

SINK

GRADES

OF

HORIZONTAL

PIPINGS

150

150

200

GICWR

RUN ALL HORIZONTAL PIPINGS IN PERPECT ALIGNMENT AND AT A FORM GRADE NOT LESS THAN TWO PERCENT (2

5000

150

GALVANIZED IRON COLD WATER LINE (SCH. 40)

PLUMBING NOTES:

B.W.

6450 1000

GICWL

CS

150

FACE

UNION PATENTE

DRAIN

OUTLET

INLET

BENT UP 2 OUT OF 3 AT L/4 FROM

UP

PVCSPR

150 10mm

700

TOP/BOT. ON TWO PARALLEL

FLOOR

PVCWS POLYVINYL CHLORIDE

METERS

S-1a 100mm THK. + FIN. SLAB W/

SIDE

FD

PVCWP

METERS

150

BARS

HOSE BIBB

PVCVTR/W POLYVINYL CHLORIDE VENT TROUGH ROOF/WALL

700

2-10mm EXTRA

HB

VALVE

150mm THK. + FIM. SLAB W/

10mm REBARS @

SCALE

CHECK

PVCVAC

2800

150mm THK. SLAB W/

P-2

CV

150

2500

6450

2

CLEAN OUT

BITUMEN TAR 1900

1600

LEACHING CHAMBER

OR

CO

MH

PLASTERED W/ WATERPROOFING COMPOUND

2150

100

50

WATER

SPACE

INLET

300

NGL

300

NGL

AIR

VAR.

INLET

SPACE

100

AIR

CONCRETE DRAIN PIPE

BW

1000

MH

MH

CATCH BASIN

200

150

2000

700

150

2000

CHANGE

IN DIRECTION

ALL CHANGE IN DIRECTION SHALL BE MADE BY APPROPRIATE USE OF FORTY-FIVE DEGREES (45°) WYES, LONG SWEEP

QUARTER BEND, SIXTH-EIIGHT OR SIXTEENTH BEND. WHEN THE CHANGE OF FLOW IS FROM HORIZONTAL TO VERTICAL A

SINGLE 1/8 BEND COMBINATION MAYBE USED ON VERTICAL STACKS AND SHORT QUARTER BENDS MAYBE USED ON WASTE

150

LINE, TEE AND CROSSES MAYBE USED IN BENT PIPES. 3. 900

700

VERT.

150

1. 4.

75

a) b) c) d)

75mm

100

S-1a

3-10mm (E.W.)

2SLOPE CDP

INLET 2SLOPE

50

250

250

100

OUTLET

100

150

600

S2 100mm THK. + FIN. SLAB W/ REBARS @ 300mm O.C. AND

TEMP

SHORT

SPAN AND

BARS @300mm E.W.

100

SUPPORT

EVERY CHANGE OF HORIZONTAL DIRECTION EXCEEDING TWENTY TWOAND ONE-HALF DEGREES (22 1/2°). ONE AND ONE-HALF METERS (1.50m.) INSIDE THE PROPERTY LINES BEFORE THE HOUSE DRAINAGE CONNECTION. EVERY FIFTEEN METERS (15.00m) IN HORIZONTAL RUN OF PIPES. AT THE END OF ANY HORIZONTAL PIPE LINES.

5.

THE DIGESTION CHAMBER

6.

NOT LESS VAULT

7. 8.

SEPTIC

VAULT

METER

OF AIR

SPACE

MUST

BE

WATERPROOFED.

MUST BE

LEFT

BETWEEN THE

TOP

OF

THE

SEWAGE AND

THE

UNDER

PART

OF

ROOF SLAB.

NO SEPTIC ALL

THAN 0.30

OF

VAULT SHALL

PLUMBING

WORKS

BE

SHALL

CONSTRUCTED BE

UNDER

UNDER

THE

THE

BUILDING.

SUPRVISION OF

A

LICENSED

MASTER

PLUMBER

AND

A LICENCED

PLUMBING

CONTRACTOR.

INLET

BENT UP 2/3 OUT AT L/4

10mm

(VARIABLE)

HANDLE

600

900

50

10mm BAR

10mm

CLEAN-OUTS

CDP

2

min.

MH

S-1a

100

600

PVCDS MH

PIPE

CLEAN-OUTS ARE REQUIRED UNDER THE F0LLOWING CONDITIONS:

P-3

FACE

EVERY 2-LAYERS

@600mm O.C.

INLET

50

2500

2800

400

150

FITTINGS

NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL AND WASTE LINES, THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES AND USED OF SADDLE HUB AND BEND ARE PROHIBITED.

150MM THK. CHB W/ 10mm REBARS HOR.

50 (TYP.)

50

OUTLET

PROHIBITED

3

5

P-3

50

50 50

50

P-2

CATCH BASIN DETAIL SCALE

:

1

: 20

METERS

DESIGN CRITERIA i. LIVE LOAD_________________ 1000Pa ii ALLOWABLE

STRESSES

1. CONCRETE

1 P-2

PLAN DET. OF SEPTIC TANK SCALE

1

:

: 40

4 P-2

METERS

a. FOR FOOTING, BEAMS AND SLABS fc'' = 20 MPa

COVER DETAIL SCALE

:

1 : 10

2. CONCRETE MASONRY UNITS (LOAD BEARING CHB) fm' =6.90 MPa, fm = 2.41 MPa

METERS

3. REINFORCING FOR

BARS

STEEL BARS

SMALLER

THAN

16mm

fy = 230 MPa 4. ASSUMED ALLOWABLE BEARING

CAPACITY Y

=

100KPa

NOTE: WATER TABLE

REPUBLIC OF THE PHILIPPINES

D

PE

I TO R I NG

IN

MCMXCIX

G

A

EN

T

R

F O RC E

NO I

A

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

E

RECOMMENDING APPROVAL :

APPROVED FOR ACCREDITATION :

CONCURRED :

ER

IN G

,

A S SE S

SM

E

ELIAS MELQUIADES EMEL B. CUBA II

EMMANUEL P. CUNTAPAY

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

N

SANITARY ENGINEER

MERALCO AVENUE, PASIG CITY

PRC NO. :

TIN :

PTR NO. :

DATE :

CHIEF, ARCHITECTURAL DIVISION BUREAU OF DESIGN, DPWH

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

1500

BELOW GROUND

PROJECT TITLE :

A

TA SK

ES IN

DEPARTMENT OF EDUCATION (DepED)

E

F

T

ON

I

M

IL

&

f the PH

T

o

REVIEWED BY:

M

IC

P P

RE PU B L

CONSULTANT / DESIGNER

IS

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

THREE STOREY FIFTEEN CLASSROOM SCHOOL BUILDING

LEVEL.

PROJECT NO:

01-002

DESIGNED BY:

mmc

OWNER :

SHEET NO:

DEPARTMENT OF EDUCATION

DepED

ENCODED BY: Max C SHEET CONTENTS :

CHECKED BY:

SEPTIC TANK, CATCH BASIN & COVER DETAIL, LEGEND, LOCATION :

DATE :

01 03

NOTE:

P-5 5

NOTES & DESIGN CRITERIA

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

C

U

DE

FO

TN

E

M T







2950 4500

4500

F-3 C-3



4500

F-3 C-3

4500

F-3 C-3

TG-3

4500

F-3 C-3

TG-3



 4500

F-3 C-3

TG-3

 4500

F-3 C-3

TG-3

 4500

F-3 C-3

TG-3

 4500

F-3 C-3

TG-3

 4500

F-3 C-3

TG-3

 4500

F-3 C-3

TG-3

F-3 C-3

TG-3

F-3 C-3

TG-3

F-3 C-3

TG-3 WF

N ITO R I NG MO

BERNADETTE N. AQUINO

& N

T

IO

G

T

EN

R

A

F O RC E

N

REP UB L

ME

3800

TG-2

WF

TG-2

1525

TG-1

TG-1

TG-1

(W)

(D)

F-1

1500

1500

1500

F-2

2600

2600

1500

1300

Thickness

150mm TO CENTER

2400

1500

RECOMMENDING APPROVAL :

REMARKS

BAR Y

250

8 - 16mmØ

8 - 16mmØ

SQUARE FOOTING

350

11 - 20mmØ

11 - 20mmØ

SQUARE FOOTING

300

11 - 20mmØ

11 - 20mmØ

APPROVED FOR ACCREDITATION :

SQUARE FOOTING

ENGINEER III PRC NO. : 0074495

TIN :

PTR NO. :

DATE :

199-674-196

WILFREDO S. LOPEZ OIC, STRUCTURAL DIVISION BUREAU OF DESIGN, DPWH

350

RAMON C. BACANI

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

350

MAIN BAR: 12-Ø20mm

MAIN BAR: 12-Ø20mm

TIES : Ø10 mm

TIES : Ø10 mm

TIES : Ø10 mm

1@50, 8@75, REST @

1@50, 8@75, REST @

150mm TO CENTER

1@50, 8@75, REST @

150mm TO CENTER

150mm TO CENTER

350

350

MAIN BAR: 8-Ø16mm

MAIN BAR: 14-Ø20mm

MAIN BAR: 12-Ø20mm

TIES : Ø10 mm

TIES : Ø10 mm

TIES : Ø10 mm

1@50, 8@75, REST @

150mm TO CENTER PROJECT TITLE :

GILBERTO S. REYES

150mm TO CENTER

MAIN BAR: 6-Ø16mm

CONCURRED :

SOFIA T. SANTIAGO

1@50, 8@75, REST @

150mm TO CENTER

400

REINFORCEMENT BAR X

(t)

350 TIES : Ø10 mm

1@50, 8@75, REST @

350

(mm)

350

350

TIES : Ø10 mm

1@50, 8@75, REST @

350

2ND FLOOR LEVEL

(L)

REVIEWED BY:

TIES : Ø10 mm

NSCP 2001, ACI 318-89, AISC ((th Edition)



2400

MAIN BAR: 8-Ø20mm

M

NES

PA

MERALCO AVENUE, PASIG CITY

G , A S SE S S

350

MAIN BAR: 8-Ø20mm

A

MCMXCIX

RI N

350

350

SBP = 95.706 Kpa (2000psf) was used in the design for all footings.

F-3

EE

TG-2

WF

C. FOUNDATION

1 : 25 M

SCALE :

IN

C-3

350

fy = 275.8 Mpa (40,000 psi), minimum yield strength of reinforcing bars unless otherwise specified.

No footing shall rest on fill.



TA SK

I PP

DE

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

TG-3 RAMP

C-2

350

B. REBAR

3RD FLOOR LEVEL

f'c = 20.685 Mpa (3000psi), minimum compresive strength of concrete a 28 days unless otherwise specified.

FOOTING DIMENSIONS FOOTING MARK LENGTH WIDTH DEPTH

C-4

CONSULTANT / DESIGNER

TM UC EN T O F ED

F-1 C-1

MAIN BAR: 6-Ø16mm

NTS

SCALE

FOUNDATION LEVEL TO

BOTTOM BARS

C-3

DEPARTMENT OF EDUCATION (DepED)

F-1 C-1

TG-3

350

A. CONCRETE

300

LENGTH SEE DEV'T

G-5/G-7

NOTE: SEE SCHEDULE FOR REINFORCEMENT OF MEMBERS.

E

F-1 C-1

TG-3

F-2 C-2

TG-3

C-1



2ND FLOOR LEVEL TO

2ND FLOOR LEVEL

SEE DEV'T G-5/G-7 LENGTH

F

TG-1

TG-1

100 mm THICK GRAVEL BEDDING

ROOF DECKLEVEL

3RD FLOOR LEVEL TO

t 100

L



REFERENCES

T

TG-3

400

M



REPUBLIC OF THE PHILIPPINES

TG-2

TG-2

TG-2 Y-BARS X-BARS

SECTION

B S-1

1@50, 6@100, REST@200

LI

F-1 C-1

TG-3

LEVEL

W

X-BARS

10mmØ STIRRUPS

t he PH I

F-1 C-1

TG-3

F-2 C-2

5301

D

1500 250

1:25

2ND FLOOR LEVEL

of

TG-3

TG-3

TOP BARS

IC

TG-3

F-2 C-2

350



D S-1

PC-1

PC-1

NGL



G-4/G-6

WF



PLAN

SCALE

TG-1

TG-3

1:100 M.

SCALE :

Y-BARS

C S-1

F-1 C-1

F-2 C-2

WF

TG-3

TG-3

L

1150

500

100

NGL

300

F-1 C-1

F-2 C-2



A S-1

TIE BEAM

F-1 C-1

TG-3

F-2 C-2

TG-3

WF

TG-3

F-2 C-2

TG-3

F-1 C-1

5301

(SEE SCHEDULE)

TG-2

TG-2

TG-3

F-1 C-1

TG-3

1300

TG-3

RAMP

TG-3

F-2 C-2

TG-1

F-1 C-1

F-2 C-2

TG-1

F-1 C-1

TG-3

F-2 C-2

TG-3 TG-1

F-1 C-1

TG-2

F-2 C-2

TG-3 TG-1

TG-1

TG-2

F-2 C-2

TG-1

F-2 C-2

TG-2

100mm THICK SLAB ON FILL WITH Ø10mm SPACED AT 400 BOTHWAYS

TG-1

WF

PC-1

TG-3

1525 2500



TG-2

PC-1 TG-3

WF

TG-2

9500 7000

WF





2950 4500

WF

TG-3 WF

WF

1400





DEPATMENT OF EDUCATION (DepED)

   LOCATION :

1@50, 10@75, REST @

1@50, 10@75, REST @

150mm TO CENTER PROJECT NO: 01-002

SHEET NO:

DepED

BNA SHEET CONTENTS :

CHECKED BY: DATE :

OWNER :

DEPARTMENT OF EDUCATION

DESIGNED BY: BNA ENCODED BY:

150mm TO CENTER

FOUNDATION PLAN, DET. OF FOOTING, TIE BEAM, 01 03

NOTE:

ELEV. OF COL. SCH. FOOTING & COLUMN

 

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

S-1

S-1

S-1

G-1

G-1

SCALE :

3500

L3/3

2D2

2D2

LAP SPLICES ARE ALLOWED ONLY IN THIS PORTION

L3/3

2D2

b

440

2-12mm∅ STIFFENER

L2/5

L3/5

L3/5

300

6-20mm∅

6-20mm∅

2-12mm∅

2-12mm∅

4-20mm∅

4-20mm∅

END

MID



B S-2

L1

L1/3

L2

L1/3

TOP BAR

L2/3

TOP BAR

3RD FLOOR LEVEL

300

L2/5

b

2ND FLOOR LEVEL

L3

h

L2/3

LAP SPLICES ARE ALLOWED ONLY IN THIS PORTION

FLOOR LEVEL

6-20mm∅

L1/6

C S-2



REPUBLIC OF THE PHILIPPINES

TOP

BOTT.

MIDSPAN TOP

BOTT.

RIGHT SUPPORT BOTT.

TOP

REBAR SIZE

LEFT SUPPORT TOP

BOTT.

mm

MIDSPAN TOP

BOTT.

RIGHT SUPPORT TOP

REMARKS

BOTT.

100

10Ø

200

300

-

300

200

300

10Ø

250

300

-

300

250

300

TWO-WAY

S-2

100

10Ø

300

300

-

300

300

300

10Ø

300

300

-

300

300

300

TWO-WAY

S-3

100

10Ø

200

200

-

200

200

200

10Ø

300

300

-

300

300

300

ONE-WAY

REVIEWED BY:

N ITO R I NG

BERNADETTE N. AQUINO

MO

MCMXCIX

EE

&

N

IO T

IN

G

A

EN

R

MERALCO AVENUE, PASIG CITY

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

RI N

G , A S SE S S

ME

N

ENGINEER III PRC NO. : 0074495

TIN :

PTR NO. :

DATE :

G-1

RECOMMENDING APPROVAL :

APPROVED FOR ACCREDITATION :

199-674-196

WILFREDO S. LOPEZ OIC, STRUCTURAL DIVISION BUREAU OF DESIGN, DPWH

BEAM DIMENSIONS

( in / mm ) b

h

S-2

G-1

G-1

G-1

200

400

G-2

200

G-3

E

A

M

S T E E L

C

H

E

D

U

L

R E I N F O R C E M E N T S

LEFT

REBAR

(mm Ø)

S

MID SPAN

S T I R R U P S

RIGHT

Ø20mm

3

2

2

2

3

2

1@50, 6@100, REST@200

400

Ø20mm

4

3

2

2

4

3

1@50, 6@100, REST@200

200

400

Ø20mm

3

3

2

2

3

3

1@50, 6@100, REST@200

G-4

200

400

Ø20mm

3

2

2

2

6

4

1@50, 6@100, REST@200

G-5

250

500

Ø20mm

6

4

2

4

6

4

1@50, 8@100, REST@200

G-6

200

400

Ø20mm

4

3

2

2

6

4

1@50, 6@100, REST@200

G-7

250

500

Ø20mm

6

4

2

6

6

4

1@50, 8@100, REST@200

CG-1

200

400

Ø20mm

4

3

4

3

4

3

1@50, 6@100, REST@200

B-1

200

400

Ø16mm

4

2

2

2

4

2

1@50, 6@100, REST@200

B-2

200

400

Ø16mm

2

2

2

5

2

2

1@50, 6@100, REST@200

B-3

200

400

Ø16mm

2

2

2

4

2

2

1@50, 6@100, REST@200

G-1

200

400

Ø20mm

2

2

2

2

2

2

1@50, 6@100, REST@200

G-2

200

400

Ø20mm

3

2

2

2

3

2

1@50, 6@100, REST@200

G-3

200

400

Ø20mm

3

2

2

2

3

2

1@50, 6@100, REST@200

G-4

200

400

Ø20mm

3

2

2

2

5

3

1@50, 6@100, REST@200

G-5

250

500

Ø20mm

5

3

2

4

5

3

1@50, 8@100, REST@200

G-6

200

400

Ø20mm

3

2

2

2

6

4

1@50, 6@100, REST@200

G-7

250

500

Ø20mm

6

4

2

6

6

4

1@50, 8@100, REST@200

CG-1

200

400

Ø20mm

3

2

3

2

3

2

1@50, 6@100, REST@200

B-1

200

400

Ø16mm

4

2

2

2

4

2

1@50, 6@100, REST@200

B-2

200

400

Ø16mm

3

3

3

5

3

3

1@50, 6@100, REST@200

B-3

200

400

Ø16mm

2

2

2

3

2

2

1@50, 6@100, REST@200

RG-1

200

400

Ø16mm

2

2

2

2

2

2

1@50, 6@100, REST@200

RG-2

200

500

Ø16mm

3

3

3 2

3

3

3

1@50, 8@100, REST@200

RCG-1

200

500

Ø16mm

2

2

2

2

2

2

1@50, 8@100, REST@200

RB-1

200

400

Ø16mm

2

2

2

3

3

2

1@50, 8@100, REST@200

TG-1

300

500

Ø20mm

5

4

2

2

6

4

1@50, 8@100, REST@200

TG-2

300

500

Ø20mm

6

4

2

3

6

4

1@50, 8@100, REST@200

TG-3

300

500

Ø20mm

3

3

2

2

3

3

1@50, 6@100, REST@200

LB-1

200

400

Ø16mm

2

2

2

4

2

2

1@50, 6@100, REST@200

PROJECT TITLE :

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

BOTTOM

PROJECT NO: 01-002

OWNER :

SHEET NO:

DepED

BNA SHEET CONTENTS :

CHECKED BY: DATE :

BOTTOM

DEPARTMENT OF EDUCATION

DESIGNED BY: BNA ENCODED BY:

TOP

Ø10mm

(UNLESS NOTED OTHERWISE)

BOTTOM

CONCURRED :

TOP

E

TOP

A

TA SK

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

T

LI

mm

LEFT SUPPORT

in

BEAM MARK

M

t he PH I

I PP

REP UB L

of

in

REBAR SIZE

REBAR SPACING ALONG LONG DIRECTION

S-1

CONSULTANT / DESIGNER IC

THICKNESS

mm

TIE BEAM

SECOND LEVEL

SLAB MARK

in

STAIR BEAM

REBAR SPACING ALONG SHORT DIRECTION

ROOF LEVEL

 FLOOR LEVEL

G-2

S-2

B

500

2D2

MID

G-1

PC-1

STAIR WELL

G-2

S-2

1:100 M.

L2

L2/3

2D1

G-2

S-2

S-3

S-1

B-2

PC-1

 3500

L1/3

G-1

S-1

G-2

S-2

B-1

G-6

G-1

S-2

2-20mm∅ 2-12mm∅

4-20mm∅

END

G-1

S-2

G-2

CG-1

G-1

S-2

G-2

S-1

B-1

G-6

S-2

G-2

S-1

G-6

S-2

G-2

S-1

B-1

G-6

G-2

S-1

B-1

S-1

CG-1

G-2

S-1

B-1

G-6

S-1

B-1

G-6

S-1

B-1

D1

h

2-12mm∅

B-1

G-3

3800

S-1

4500 2950

G-5

S-1

G - 7

S-1

G - 7

S-1

G - 7

S-1

G - 7

S-1

G - 7

S-1

G - 7

G-3

G-6

G-6

G-4

G-3

B-1



4500

G-3

G-1

2D1

b

4500

G-3

S-2

L1

4500



G-3

2500

6-20mm∅

4500



G-3

A S-2

b

4500



G-3

G-6

925 2500

G-1

4500



G-3

G-2

S-2

4500



G-3

S-1

G-2



G-3

B-1

S-3

4500

G - 7

G - 7

B-3

3800

STAIR WELL





PC-1

B-2

G-5

7000

PC-1



G-6

S-1

4500

G - 7

G-3





G-4

4500

G - 7

4525 2950



B-3



G - 7



G-6



01 03 NOTE:

2nd & 3RD FLOOR FRAMING PLAN, TYP. DET. OF BEAM & SLAB, SCH. OF BEAMS & SLABS

 

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545



Ø10 @250 CUT BARS

Ø10 SPACED MAIN BARS

350

Ø10 @250

150mm TO CENTER

PC-1

Ø10mm

4-Ø10 CONT. BARS

(FROM TIE BEAM UP TO LANDING LEVEL/ FROM 2ND FLR BEAM UP TO LANDING LEVEL)

Ø10 @250 CUT BARS



C S-3

1 : 25 M

SCALE

500

100

400

1@50, 8@75, REST @

300

5 12

125

125

200

BARS BOTHWAYS

125

TIES : Ø10 mm



D S-3

 A

B

C

7000 

4500

1550

1600

Ø10 300mm TEMP

MAIN BAR: 4-Ø16mm

B S-3

 3543

125125

200

1-Ø10 NOSING BAR

2500



2950

 G-3 1-Ø10 NOSING BAR

3200

THIRD FLOOR LINE S-1

B-2

1

G-5

B-2

3200

G-7

3RD FLOOR LEVEL

SEE SCHEDULE OF S-1 (2ND/3RD LVL) FOR DETAIL OF REIN. Ø10 @300 Ø16 @ 150 MAIN BAR

LANDING LB-1

PC-1

PC-1

Ø10 @300

SECOND FLOOR LINE

3200

Ø16 @ 150 LANDING Ø10 @300

 SCALE

Ø16 @ 150 MAIN BAR

GROUND FLOOR LINE NATURAL GRADE LINE

REVIEWED BY:

N ITO R I NG MO

BERNADETTE N. AQUINO

&

MCMXCIX

EE

N

T

N

IO T

G

A

EN

R

MERALCO AVENUE, PASIG CITY

IN

RI N

G , A S SE S S

ME

ENGINEER III PRC NO. : 0074495

TIN :

PTR NO. :

DATE :

199-674-196

Ø10 @250

7000

RECOMMENDING APPROVAL :

SECTION OF STAIR

APPROVED FOR ACCREDITATION :

SCALE

1:50 M

CONCURRED :

PROJECT TITLE :

A

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

GROUND FLOOR LEVEL

TG-3

M

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

TA SK

I PP

REP UB L

REPUBLIC OF THE PHILIPPINES

LI

150mm

Ø10 @300

1:50 M

CONSULTANT / DESIGNER t he PH I

Ø16 @ 150

Ø10 @300

1 S-3

of

1-Ø10 NOSING BAR

LB-1

325



IC

G-1

G-2

B-2

B-3

3800

S-3

2ND FLOOR LEVEL

G-2

A S-3

G-1

G-2

Ø10 @300 Ø16 @ 150

S-3

7000

Ø16 @ 150

WILFREDO S. LOPEZ OIC, STRUCTURAL DIVISION BUREAU OF DESIGN, DPWH

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

   LOCATION :

PROJECT NO: 01-002

DepED

BNA SHEET CONTENTS :

CHECKED BY: DATE :

SHEET NO:

DEPARTMENT OF EDUCATION

DESIGNED BY: BNA ENCODED BY:

OWNER :

01 03 NOTE:

STAIR PLAN & SECTION DETAIL, DETAIL OF RAMP & STAIR ON GRADE, MISC. DETAILS

 

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545

RG-1

RB-1

RG-1

RG-1

50

D

OR

OR

D

CH

OP

T

6mm GUSSET

100

6mm GUSSET PLATE (TYP.)

CH

4-Ø12x300mm LONG BENT ANCHOR BOLTS 250x200x10mm BASE PLATE

50

P

C

PLATE (TYP.)

PLAN 250

W-2

2L-2x2x1/4 STRUT

29 30 25 38

KING POST

38 25 30 29 6mm GUSSET PLATE BOTTOM CHORD

C S-4

W-2



D S-4

1 : 50 M

SCALE

(FULLY WELDED TO BASE PLATE)

 SCALE

1 : 50 M

4-Ø12x300mm LONG BENT ANCHOR BOLTS 250x200x10mm BASE PLATE



SEE TRUSS ANCHORAGE DETAIL

1 : 25 M

W-

150x50x15x2.0mm STEEL C-PURLINS ±750mm O.C.

PURLINS

COLUMN OR BEAM

10mmØ SAG ROD WITH STANDARD NUTS & ±75WASHERS @ EACH END 0

W-2

150

1

LC-150x50x15x2.0

6-Ø10x200mm LONG 150

1-Ø10mm A-307 MACHINEBOLT

50 25 30 29

BOTTOM CHORD

200

TO

W-2

2

W-2

2

W-

4 SPANS @ 1187.5 = 4750 1000

SCALE

2"x2"x3/16"

FULL WELD

G S-4

9500 B S-4

2L

1:100 M.

1

W

F S-4

2 SPANS @ 1125 = 2250

WEB MEMBERS

6mm GUSSET PLATE

W-

W-2

W-

2

W-2

W-2

W-2

W-2

2

2 SPANS @ 1250 = 2500

W-2

RG-1

FULL WELD

2

W-2

W-

2500

P TO

W-1

2"x2"x1/4"

250

SCALE :

D

-

1000

2

W

W-2

W-

2L

T-1

RG-2

T-1

RG-2

T-1

RG-1

4862

R HO

SIZE

TOP & BOT. CHORDS



D S-4

QTY

RG-1

C S-4

1

DESCRIPTION

W-1

29 30 25 50

A S-4

W-

MARK

RG-1

RG-1 RG-1

RG-1

RG-1

RG-1

4500

RG-1

RG-2

T-1

T-1

RG-2

RG-1

RG-1 RG-1

4862

RG-1

RG-1

4500





RCG-1

RB-1

RG-1



4500

RG-1

RG-2

T-1

RG-2

T-1

T-1

RG-2 RG-1

HT-1 RG-1

4862

LC-150x50x15x2.0 PURLINS SPACED @ 750 mm O.C WITH Ø10 SAGRODS @ MIDSPAN

Ø12mm CROSS BRACINGS

RG-1 HT-1



 4500

RG-1

RG-1

RCG-1

RCG-1

RG-1

4500

RG-1

RG-1 RG-1

RG-1

RG-1

RG-1

RG-1



4500

RG-1

RG-2

T-1

RG-2

T-1

RG-2

RG-2

T-1

RG-2

RG-1

RG-1

RG-1

4500

RG-1

RG-1





4500

RG-1

RG-1

RG-1



4500

RG-1

RG-1

RG-1



4500

RG-1

RG-1

1200 2500



4500

T-1

RG-2





T-1

1200

4500



RG-1

7000





RG-1



L-2.5x2.5x1/4 FULL WELD

W-2

6mm GUSSET PLATE (TYP.)

SECTION

BOTTOM CHORD

E S-4



F S-4

1 : 50 M

SCALE



REPUBLIC OF THE PHILIPPINES

N ITO R I NG

BERNADETTE N. AQUINO

MO

MCMXCIX

EE

&

IO T

IN

G

A

EN

R

MERALCO AVENUE, PASIG CITY

F O RC E

PA

TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING

RECOMMENDING APPROVAL :

1 : 10 M

APPROVED FOR ACCREDITATION :

CONCURRED :

RI N

G , A S SE S S

ME

N

ENGINEER III PRC NO. : 0074495

TIN :

PTR NO. :

DATE :

199-674-196

WILFREDO S. LOPEZ

PROJECT TITLE :

OIC, STRUCTURAL DIVISION BUREAU OF DESIGN, DPWH

SOFIA T. SANTIAGO

GILBERTO S. REYES

RAMON C. BACANI

OIC, DIRECTOR III BUREAU OF DESIGN, DPWH

OIC, DIRECTOR IV BUREAU OF DESIGN, DPWH

UNDERSECRETARY

DEPATMENT OF EDUCATION (DepED)

I S-4

1 : 10 M

SCALE

A

TA SK

NES

DE TM UC EN T O F ED

DEPARTMENT OF EDUCATION (DepED)

E

F T

T

LI

REVIEWED BY:

SCALE



H S-4

M

t he PH I

N

of

I PP

REP UB L

CONSULTANT / DESIGNER IC

1 : 50 M

SCALE

G S-4

 

   LOCATION :

PROJECT NO: 01-002

1:5 M

OWNER :

SHEET NO:

DepED

BNA SHEET CONTENTS :

CHECKED BY: DATE :

SCALE

DEPARTMENT OF EDUCATION

DESIGNED BY: BNA ENCODED BY:

 

01 03 NOTE:

TRUSS DIAGRAM DETAILS OF STEEL CONNECTION

 

THIS DRAWING, AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF TASK FORCE ENGINEERING, ASSESSMENT AND MONITORING AND AS SUCH MUST NOT BE REPRODUCED OR COPIED IN PART OR IN WHOLE WITHOUT THEIR PERMISSION, ALL DRAWINGS ARE TO BE RETURNED WHEN NO LONGER IN USE.

REP. ACT 545