REPUBLIC OF THE PHILIPPINES
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 SILAY CITY, NEGROS OCCIDENTAL
SECTION ID = S00027NR NET LENGTH = 3.41 KM WIDTH = 3.35 METERS THICKNESS = 0.28 METERS
INDEX OF SHEETS: NO.
SHEET CONTENTS
1
LAY OUT PLAN, VICINITY MAP & INDEX OF SHEETS
2
TYPICAL ROAD SECTION DETAIL
N
TYPICAL DETAIL OF CURB & GUTTER TYPICAL DETAIL OF OPEN LINED CANAL
W
E
PAVEMENT DESIGN PARAMETER 3
TYPICAL GROUTED RIPRAP DETAIL
S
ELEVATION DETAIL OF WEEPHOLES THERMOPLASTIC PAVEMENT MARKINGS DETAIL SUMMARY OF QUANTITIES GENERAL NOTES SPECIFICATIONS 4
SCHEDULE OF ITEMS
5
STANDARD PLAN OF PORTLAND CEMENT CONCRETE PAVEMENT
6
STANDARD PLAN OF METAL GUARDRAIL
7
STANDARD PLAN OF CHEVRON SIGNS
8
STANDARD REINFORCED CONCRETE PIPE CULVERT DETAILS
9
STANDARD CURB INLET DETAIL
END OF SECTION 1 STA. 15+009.57 ( K0015+266.50 ) ( BEG. OF EXISTING WIDENING )
BEGINNING OF PROJECT BEGINNING OF SECTION 1 STA. 14+208.00 ( K0015+(-792) )
COMBINATION CURB INLET & MANHOLE DETAIL BAR GRATE DETAIL PULLING IRON DETAIL MANHOLE COVER DETAIL LADDER RUNG DETAIL PLAN AND PROFILE
SCALE
CROSS - SECTION
LOCATION MAP BEGINNING OF SECTION 2 STA. 20+400.00 ( K0020+400 ) ( END OF EXISTING WIDENING )
END OF SECTION 2 STA. 22+740.93 ( K0022+551 ) ( EXT. BR. APP. "A" )
The Site
Cadiz City
Manapla
Sagay City
Victorias City Silay City Talisay City
Escalante City
Negros Occidental 1st DEO Toboso
Bacolod City
Bacolod City DEO Murcia
Bago City
Calatrava Salvador Benedicto
Pulupandan
San Carlos City
Valladolid
Negros Occidental 4th DEO
San Enrique Pontevedra
La Carlota La Castellana Hinigaran
Binalbagan
Canlaon
Vallehermoso
Moises Padilla (Magallon)
Isabela
Negros Occidental 2nd DEO Guihulngan City
Himamaylan
Negros Oriental 1st DEO La Libertad
Ilog
Kabankalan City
L A Y - O U T P L A N ( SECTION 2 ) BEGINNING OF SECTION 3
SCALE
Jimalalud
Cauayan
END OF PROJECT END OF SECTION 3
1 : 5,000 M.
STA. 22+800.00 ( K0022+621.50 ) ( EXT. BR. APP. "B" )
Candoni
STA. 23+071.33 ( K0022+892.50 )
Sipalay City
Tayasan Ayungon Bindoy (Payabon) Mabinay
Negros Occidental 3rd DEO
Manjuyod Hinoba-an (Asia) Bais City
N OR EGR IEN OS TA L
17 - 32
1 : 3,000 M.
OC NEG CI RO DE S NT AL
10 - 16
Project Site
L A Y - O U T P L A N ( SECTION 1 )
Kalumboyan
Tanjay City
Pamplona
Basay
Amlan (Ayuquitan) San Jose
Negros Oriental 2nd DEO
Bayawan City (Tulong)
Sibulan
Santa Catalina
Dumaguete City
Valencia (Luzurriaga)
Bacong
Negros Oriental 3rd DEO
L A Y - O U T P L A N ( SECTION 3 ) SCALE
Siaton
Dauin
Zamboanguita
1 : 1,000 M.
VICINITY MAP
REPUBLIC OF THE PHILIPPINES
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
DESIGNED:
LAYOUT PLAN & VICINITY MAP
1
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
0.50
0.01 0.16
0.50
0.17
20.00 ROAD RIGHT OF WAY
R0 .0 8
17.74
EXISTING PAVEMENT
1.50%
1.50%
1.50%
100mm THK. SIDEWALK
0.67 C&G
3.35
1.50 SIDEWALK
1.50%
TOP OF PAVEMENT
SLOPE=8.00%
0.22
3.35
0.35
0.67 C&G
0.15
1.50 SIDEWALK
SLOPE=8.00%
0.15
TOP OF PAVEMENT
CURB & GUTTER / DROP CURB & GUTTER ( SEE DETAIL )
1070mm MANHOLE @ 20.00m. INT. ( SEE DETAIL )
1070mm dia. REINFORCED CONCRETE PIPE CULVERT
CURB & GUTTER DETAIL
DROP CURB & GUTTER DETAIL
SCALE
SCALE
1 : 10 M.
1 : 10 M.
300mm THK. PORTLAND CEMENT CONCRETE PAVEMENT 200mm THK. AGGREGATE SUBBASE COURSE
TYPICAL ROAD SECTION DETAIL ( SECTION 1 ) SCALE
1 : 50 M.
20.00 ROAD RIGHT OF WAY
0.30
16.40 1.50 SHOULDER
3.35
-3.00%
1.50%
EXISTING PAVEMENT
1.50%
1.50%
3.35
1.50 SHOULDER
1.50%
-3.00%
0.20
SHOULDER
0.80
2:1
OPEN LINED CANAL ( SEE DETAIL )
1.00
FILL
300mm THK. PORTLAND CEMENT CONCRETE PAVEMENT
0.20
200mm THK. AGGREGATE SUBBASE COURSE
TYPICAL ROAD SECTION DETAIL ( NORMAL SECTION ) SCALE
1 : 50 M.
TYPICAL DETAIL OF OPEN LINED CANAL SCALE
1 : 20 M.
20.00 ROAD RIGHT OF WAY
16.40 1.50 SHOULDER
3.35
-3.00%
+s%
EXISTING PAVEMENT +s%
-s%
3.35
1.50 SHOULDER
-s%
-3.00% GROUTED RIPRAP ( SEE DETAIL )
FILL
300mm THK. PORTLAND CEMENT CONCRETE PAVEMENT 200mm THK. AGGREGATE SUBBASE COURSE
TYPICAL ROAD SECTION DETAIL ( SUPERELEVATED SECTION ) SCALE
REPUBLIC OF THE PHILIPPINES
1 : 50 M.
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
DESIGNED:
TYPICAL ROAD SECTION DETAIL TYPICAL DETAIL OF CURB & GUTTER TYPICAL DETAIL OF OPEN LINED CANAL PAVEMENT DESIGN PARAMETER
2
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
SHOULDER
SHOULDER
0 0.3
0.50
4.00
3.00
2.00
1
1.5
1 3
3.00
2.00
DRAIN OR WEEP HOLES PVC SPACED @ 2.00M HOR AND 1.00M VERT STAGGERED WITH FILTER CLOTH @ INNER END VAR.
1.00 1.00
DRAIN OR WEEP HOLES PVC SPACED @ 2.00M HOR AND 1.00M VERT STAGGERED WITH FILTER CLOTH @ INNER END
FILL 0.60 1.5
FILL
1.00
1
2.00
PVC WEEPHOLES STAGGERED @ 2000 HOR. & 1000 VERT. WITH 0.60m OF 20mm GRAVEL BAGGED IN POLYESTER NON-WOOVEN FILTER CLOTH ON EACH HOLE.
0.50
1.00
3.00 1.00
1.00
3.00
3
1
ROCK BACKING
ROCK BACKING
0.60 0.40
DRAIN OR WEEP HOLES SHALL BE PROVIDED IN SLOPE OF EMBANKMENT AT THE LOCATIONS SHOWN ON THE PLANS, NOT LESS THAN TWO CUBIC FEET OF ROCKS. BACKING SHALL BE PROVIDED AT EACH DRAIN OR WEEP HOLES TO ENSURE PROPER OPERATION OF THE DRAIN. ROCK BACKING SHALL BE EXTENDED TO AT LEAST ONE FOOT ABOVE THE DRAIN OF WEEP HOLES.
TYPICAL GROUTED RIPRAP DETAIL ( TYPE - 1 )
TYPICAL GROUTED RIPRAP DETAIL ( TYPE - 2 )
SCALE
SCALE
1 : 50 M.
1 : 50 M.
0 0.1
0.10 6.00
3.00
6.00
3.00
0.1
0.15
0
3.00
REFLECTORIZED PAVEMENT MARKINGS ( YELLOW ) 150mm WIDTH FOR HORIZONTAL CURVE
0.10
REFLECTORIZED PAVEMENT MARKINGS ( WHITE ) 150mm WIDTH
WIDTH AS SHOWN ON PLANS
0
EDGE OF PAVEMENT
0.1
WI DT
0.10
5 0.1
5 0.1
REFLECTORIZED PAVEMENT MARKINGS ( WHITE ) 100mm WIDTH
HA
SS
HO W
NO NP
LA
NS
0.1 0
1 : 50 M.
EXISTING GROUND
0.50
EXISTING GROUND
ELEVATION DETAILS OF WEEPHOLES SCALE
NOTE:
0.60
0.60
0.60
0.60
EXISTING GROUND
SPECIFICATION : 1.
0.10
TYPICAL THERMOPLASTIC PAVEMENT MARKINGS DETAIL SCALE
N.T.S.
GENERAL NOTES 1.
ALL DIMENSION SHOWN IN PLAN ARE IN METERS EXCEPT AS NOTED.
2.
HORIZONTAL AND VERTICAL CONTROL ESTABLISHED DURING THE SURVEY.
3.
4.
ARE
ALL
ASSUMED
NOTE:
A.
HINDRANCES TO THE TRAFFIC FLOW, IF NEEDED THE SHOULDER SHOULD BE USED SO THAT TWO WAY TRAFFIC CAN BE MAINTAINED.
B.
LACK OF TRAFFIC CONTROL ( STOP / GO BOARD )
C.
INADEQUATE WARNING SIGNS FOR THE ROAD USERS
D.
IMPROPER USE OF EQUIPMENT THAT POSE DANGER
E.
EXCAVATION THAT IS NOT PROPERLY BARRICADED AND LIGHTED DURING NIGHT TIME.
F.
THE CONTRACTOR IS RESPONSIBLE FOR ALL ROAD SAFETY DEVICES / ARRANGEMENT ON THE JOB SITE, THIS INCLUDES SIGNAGES, LIGHTING AND OTHER ROAD SAFETY DEVICES REQUIRED TO WARN AND PROTECT ROAD USERS.
7.
AND 2.
CURVED COMPUTATION ARE BASED ON HORIZONTAL AND VERTICAL GEOMETRY. THE ORIGINAL GROUND AND FINISHED GRADE ELEVATION REFERS TO THE EXISTING AND PROPOSED ELEVATION OF THE ROAD CENTERLINE PROFILE. THE FINISHED GRADE IS ALSO THE ELEVATION OF THE CENTERLINE AS SHOWN IN THE TYPICAL CROSS SECTION. FOR SUPER ELEVATION, CURVE WIDENING OR HORIZONTAL TRANSITION REFER TO TABLE FOR SUPER ELEVATION DEVELOPMENT FOR ROAD SAFETY DESIGN MANUAL.
6.
SLOPE PROTECTION SHALL BE PROVIDED IN AREAS INDICATED ON THE PLANS IN ACCORDANCE WITH DETAILS SHOWN IN THE DRAWING.
7.
ALL WORKS SHALL COMPLY WITH DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORTS, 2013 EDITION.
8.
DESIGN WAS BASED ON THE DATA SUBMITTED BY THE SURVEY TEAM OF PLANNING AND DESIGN DIVISION OF DPWH, NEGROS ISLAND REGION (NIR), REGIONAL OFFICE.
9.
THE IMPLEMENTING OFFICE SHALL IDENTIFY THE LOCATIONS AND PROVIDE ACCESSIBILITY FACILITIES FOR PERSONS WITH DISABILITY IN ACCORDANCE WITH D.O. 37 SERIES OF 2009.
QUALITY CONTROL
SUBSTANDARD MATERIALS WILL RESULT IN SUB STANDARD WORK. THE RESPONSIBILITY FOR TESTING AND ACCEPTANCE LIES FULLY WITH THE CONTRACTOR, AND IT IS THE RESPONSIBILITY OF THE MATERIALS ENGINEER TO OVERSEE ALL TESTING AND TO ENSURE THAT THE TESTS COMPLY WITH THE SPECIFICATIONS AND PROCEDURES. 3.
5.
6.
IF THE ENGINEER ASSIGNED IN THE PROJECT NOTICES ANYTHING ON THE SITE THAT IS CONSIDERED UNSAFE, A SITE INSTRUCTION SHOULD IMMEDIATELY BE GIVEN TO THE CONTRACTOR REGARDING THIS MATTER THAT COULD CAUSE SAFETY PROBLEMS, SUCH AS:
EDGE OF PAVEMENT REFLECTORIZED PAVEMENT MARKINGS ( WHITE ) 100mm WIDTH
SAFETY ON THE PROJECT
LOCATION OF PUBLIC UTILITIES
BEFORE THE CONTRACTOR BEGINS ANY EXCAVATION BELOW EXISTING GROUND PARTICULARLY ADJACENT TO THE EXISTING ROAD AND PROPERTIES. THE UTILITY AUTHORITIES SHOULD BE GIVEN ADVANCED NOTICES AND SITE INSPECTION SHOULD BE ARRANGED AND THE SAME APPLIES TO HEAVY EQUIPMENT CROSSING THE ROAD. 4.
RIPRAP AND GROUTED RIPRAP A.
FOOTING SHALL BE CARRIED DOWN TO A FIRM FOUNDATION AS DIRECTED BY THE ENGINEER.
B.
CLASS "A" CONCRETE SHALL BE USED.
C.
MORTAR TO BE ONE (1) PART CEMENT AND THREE (3) PARTS SAND.
D.
MORTAR JOINTS 2 1/2 CM TO 4 CM.
E.
THE STONES SHALL NOT BE LESS THAN 15 KGS. IN WEIGHT AND LAID OFF TO THE LINES AND DIMENSION REQUIRED.
ROAD MARKINGS ( THERMOPLASTIC ) A.
THE PROJECT ENGINEER SHOULD VERIFY FROM THE BILL OF QUANTITIES THE TYPE OF ROAD MARKINGS THAT IS REQUIRED WHETHER CONTINUOUS OR BROKEN. THE DIMENSIONS, COLORS AND MATERIALS TYPE SHOULD CONFORM TO THE SPECIFICATION PRESCRIBED IN THE BLUE BOOK 2004 EDITION.
B.
THE PROJECT ENGINEER SHOULD CHECK WITH THE LABORATORY TO ENSURE THAT THE TYPE OF MATERIALS IS CORRECT AND HAS BEEN APPROVED.
C.
PRE - MARKING SHOULD BE CAREFULLY CARRIED OUT BY THE CONTRACTOR AND CHECKED AND APPROVED BY THE PROJECT ENGINEER BEFORE LAYING ON THE ROAD MARKINGS TO START.
D.
PRE - MARKING IS NORMALLY CARRIED OUT BY SURVEY INSTRUMENT ON STRAIGHT SECTIONS AND BY A ROPE LINE ON A CURVE. THE PROPOSED ALIGNMENT SHOULD BE MARKED W/ PAINTS SPOTS ON THE PAVEMENT SURFACE FOR THE MACHINE TO FOLLOW.
EXCAVATION
UNSUITABLE MATERIALS THAT MAY BE ENCOUNTERED DURING THE EXCAVATION. SHOULD BE REMOVED TO THE SATISFACTION OF THE PROJECT ENGINEER. PHOTOGRAPHS SHOULD BE TAKEN BEFORE REPLACEMENT OF EXCAVATION MATERIALS AND SHALL BE MEASURED AND AGREED BY BOTH PARTIES. THE CONTRACTOR AND THE PROJECT ENGINEER. THE VOLUME SHOULD BE RECORDED IN A LOG BOOK FOR RECORD PURPOSES. EXCAVATED MATERIALS SHOULD BE REMOVED FROM THE CONSTRUCTION SITE. THE HAULING AND THE DISPOSAL IS WITHIN THE AUTHORITY OF THE PROJECT ENGINEER.
QUANTITIES ARE SUBJECT TO INCREASE / DECREASE, DEPENDING UPON THE RESULT OF JOINT FINAL INSTRUMENT SURVEY.
5.
PAVEMENT
ANY ITEM OF WORK REFLECTED ON THE PLANS / CONTRACT SUCH AS CLEARING & GRUBBING, SUB - GRADE PREPARATION, BASE MATERIALS PREPARATION. PCCP AND RIPRAP SHOULD CONFORM WITH THE 2004 DPWH STANDARD SPECIFICATION WHICH IS THE BASES OF REFERENCE IN ANY CONSTRUCTION ACTIVITIES.
REPUBLIC OF THE PHILIPPINES
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
TYPICAL GROUTED RIPRAP DETAIL ELEVATION DETAIL OF WEEPHOLES THERMOPLASTIC PAVEMENT MARKINGS DETAIL SUMMARY OF QUANTITIES GENERAL NOTES SPECIFICATION
DESIGNED:
3
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
REPUBLIC OF THE PHILIPPINES
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50
DESIGNED:
ENGINEER III CHECKED:
LOCATION: SILAY CITY, NEGROS OCCIDENTAL
4
STEPHEN B. ABASTILLAS
SCHEDULE OF ITEMS
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
1D
1F
1B
1C
NOTE: 1L
1K
1F
NOTE:
PLAN 1J
( SHOWING FLARING OF EXISTING CONCRETE PAVEMENT ) SCALE
1 : 50 M
TYPICAL PLAN OF A TWO LANE PAVEMENT
1A
NOT
1B
TO
SCALE
DETAIL "A" SCALE
1 : 10 M
SECTION I
1G
1L
S E C T I O N
WHERE:
DETAIL "B" SCALE
1 : 10 M
CONTRACTION JOINT
CONSTRUCTION JOINT
SECTION II
1H
SCALE
1D
S E C T I O N
1 : 40 M
SCALE
1C
1K
1 : 40 M
DETAIL OF EXPANSION JOINT (DOWELLED) AT CERTAIN INTERSECTIONS AND STRUCTURES
DETAIL "C" SCALE
1 : 10 M
GENERAL NOTES :
DETAIL OF BAR SPACING ALONG CURVES 1E
DETAIL "D" SCALE
WOODEN SIDE FORM
WOODEN/METAL SIDE FORM
METAL SIDE FORM
1 : 10 M
DETAIL OF SIDE FORMS
DETAILS OF JOINTS IN RIGID PAVEMENT
1I
SCALE
1F
S E C T I O N SCALE
NTS
STANDARD PLAN OF PORTLAND CEMENT CONCRETE PAVEMENT
1 : 10 M
REPUBLIC OF THE PHILIPPINES
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
DESIGNED:
STANDARD PLAN OF PORTLAND CEMENT CONCRETE PAVEMENT
5
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
REPUBLIC OF THE PHILIPPINES
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
DESIGNED:
STANDARD PLAN OF METAL GUARDRAIL
6
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
A
B
C
D
E
F
450
600
225
300
20
40
600
800
300
400
26
53
NOTE: WHITE RETRO-REFLECTIVE CHEVRON ON BLACK BACKGROUND OR RED CHEVRON ON RETRO-REFLECTIVE WHITE BACKGROUND.
7.4.2a Design
The chevron sign shall be a vertical rectangle. No border shall be used on the chevron sign. The point of the arrow in chevron shall indicate the direction of travel. They shall be visible for at least 150m to provide the road user with adequate time to react to change in alignment. The minimum lateral offset of the chevron sign shall be 1.8m from the edge of the pavement.
SHOWING THAT THE SPACING OF THE CHEVRON SIGNS ALLOW THE DRIVER TO SEE AT LEAST (3) SIGNS IN VIEW WHILE NEGOTIATING THE CURVE UNTIL THE CHANGE IN ALIGNMENT ELIMINATES THE NEEDS FOR THE SIGNS AS CONTAINED IN THE 4TH PARAGRAPH OF SECTION 620.2.2, DESIGN FOR ITEM 620 - CHEVRON SIGNS
The chevron signs shall be installed on the outside of the curve, set up aligned with the approaching traffic at right angle to a driver's line of sight. Two-sided chevron signs may be used on two-lane, two-way roads to guide driver's travelling in both directions. It is recommended that the spacing of the chevrons signs should allow the driver to see at least three (3) signs in view while negotiating the curve, until the change in alignment eliminates the need for the signs. Chevron signs shall be mounted clear of roadside vegetation and clearly visible under headlight illumination by night. Chevrons should be installed 1.5m above the ground in rural areas and 2.2m in urban areas. The recommended spacing for chevrons within a curve is shown below.
TABLE 7.2 : Recommended Spacing for Chevron Signs Advisory Speed Limit ( kph )
Chevron Spacing (m)
Radius
12 Speed Limit of 70 kph R = Radius of Curvature = 150 m
30 - 50
60 - 120
24
60 - 70
120 - 210
36
80 - 90
210 - 300
48
> 90
> 300
60
TABLE 7.2 : Types of Chevron Signs
Type
Typical Size
a.
HM - 1A
450mm x 600mm
b.
HM - 1B
600mm x 800mm
Application
> 60 kph design speed and/or with no visible problem ( e.g. fog )
THE RECOMMENDED SPACING DISTANCES FOR THE CHEVRON SIGNS WITHIN THE CURVE AND APPROACH / DEPARTURE OF THE ROAD AS SHOWN IN TABLE 7.2 - RECOMMENDED SPACING FOR CHEVRON SIGNS AND AS CONTAINED IN THE SIXTH PARAGRAPH OF SECTION 620.2.2, DESIGN FOR ITEM 620 - CHEVRON SIGNS.
REPUBLIC OF THE PHILIPPINES
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
DESIGNED:
STANDARD PLAN OF CHEVRON SIGNS
7
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
DESIGN REQUIREMENT OF REINFORCED CONCRETE PIPE CULVERT STANDARD STRENGTH REINFORCED CONCRETE PIPE CULVERTS
EXTRA STRENGTH REINFORCED CONCRETE PIPE CULVERTS
CONCRETE 317 kg/cm 2 (4,500 lb/in 2)
CONCRETE 247 kg/cm 2 (3,500 lb/in 2)
CONCRETE 317 kg/cm 2 (4,500 lb/in 2)
kg/m OF PIPE
kg/m OF PIPE
MINIMUM PIPE COVERING 1B
1C
ONE LINE OF CIRCULAR REINFORCEMENT
1A
LONGITUDINAL SECTION SCALE
1B
NTS
TWO LINES OF CIRCULAR REINFORCEMENT
SECTION SCALE
1
1C
NTS
ONE LINE OF ELLIPTICAL REINFORCEMENT
TONGUE END
SECTION SCALE
GROOVE END
1D
SECTION SCALE
NTS
NTS
STANDARD REINFORCED CONCRETE PIPE CULVERTS SCALE
NTS
METHOD A
CONCRETE CRADLE BEDDING
3
ORDINARY BEDDINGS
TYPICAL BEDDING FOR CONDUITS SCALE
4
NTS
DETAIL OF PIPE COLLAR SCALE
NTS
METHOD B 2
METHODS OF PIPE INSTALLATION SCALE
REPUBLIC OF THE PHILIPPINES
NTS
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
DESIGNED:
STANDARD REINFORCED CONCRETE PIPE CULVERT DETAILS
8
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR
32
TOP ELEV.
. I.D
120 120 80
REPUBLIC OF THE PHILIPPINES
120 120 80
SURVEYED & PREPARED:
PROJECT TITLE:
SHEET CONTENTS:
SUBMITTED:
RECOMMENDING APPROVAL:
APPROVED:
SET NO.:
SHEET NO.:
ANNIE P. MEJOGUE ENGINEER III
OFFICE OF THE REGIONAL DIRECTOR NEGROS ISLAND REGION ( NIR ) ( INTERIM - OFFICE ) CANGMATING, SIBULAN, NEGROS ORIENTAL
IMPROVEMENT / WIDENING OF SILAY - LANTAWAN ROAD K0015+(-792) - K0015+266.50; K0020+400 - K0022+551; K0022+621.50 - K0022+892.50 LOCATION: SILAY CITY, NEGROS OCCIDENTAL
DESIGNED:
STANDARD CURB INLET DET., COMBINATION CURB INLET & MANHOLE DET., BAR GRATE DET. PULLING IRON DET., MANHOLE COVER DET., & LADDER RUNG DET.
9
STEPHEN B. ABASTILLAS ENGINEER III CHECKED:
JOSE ROY H. LAGON ASST. CHIEF, PLANNING & DESIGN DIVISION
AILEN S. JULIT
ERIC A. AYAPANA
LEA N. DELFINADO, CESO IV
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
OIC - REGIONAL DIRECTOR