ORGANIZACIJA GRAĐENJA

1.

DOKAZNICA MJERA

1. ZEMLJANI RADOVI

ZEMLJANI RADOVI

1.1. ČIŠĆENJE TERENA NA MJESTU OBJEKTA, TE 15 m OKO OBJEKATA SA SJEĆENJEM ŠIBLJA, PORAVNAVANJEM TERENA ITD.

66,45 x 50,65 = 3365,69 m

2

3365,69

m2

3365,69

1.2. SKIDANJE HUMUSA BULDOZEROM U SLOJU 20 cm S GURANJEM NA 20 m UDALJENU DEPONIJU 66,45 x 50,65 = 3365,69

1.3. ŠIROKI ISKOP ZEMLJE U TLU III. KATEGORIJE BAGEROM

46,19 ⋅ 30,39 + 36,45 ⋅ 20,65 ⋅ 3,82 = 4118 ,74 2

m3

VLAD

4118,74

1

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

1. ZEMLJANI RADOVI

1.4. PLANIRANJE ISKOPA 36,45 x 20,65= 752,69 2

m

752,69

1.5. NASIPAVANJE OKO TRAKASTIH TEMELJA I TEMELJA STUPA

→ koeficjent rastresitosti za zemlju = 1,30 (34,35 x 18,55) x 0,65 - 15 x (0,55 x 0,55) x 0,65 = 414,18 - 2,9 5= 411,23 3

411,23

3

283,95

m 1.6. NASIPAVANJE OKO TRAKASTIH TEMELJA I TEMELJA STUPA

→ koeficjent rastresitosti za zemlju = 1,30 (35,10 x 19,30) x 0,42 - 15 x (0,30 x 0,30) x 0,42= 284,52 - 0,52 = 283,95 m

VLAD

2

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

1. ZEMLJANI RADOVI

1.7. NASIPAVANJE ŠLJUNKA ZA TAMPONSKI SLOJ DEBLJINE d=15 cm → koeficjent rastresitosti za šljunak = 1,25 (35,10 x 19,30) x 0,15 - 15 x (0,30 x 0,30) x 0,15= 101,61 - 0,20 = 101,41 m3

101,41

1.8. RAZASTIRANJE I NABIJANJE ŠLJUNKA (35,10 x 19,30) - 15 x (0,30 x 0,30)= 677,43 - 1,35 = 675,88 2

m

675,88

3

1482,04

m3

33,87

1.9. ZATRPAVANJE OKO GRAĐEVINE → volumen pruzet iz stavke 1.3. V=4118,74 4118,74 - {(35,10 x 19,30 x 3,17) + (36,45 x 20,65 x 0,65)}= 4118,74 (2147,45 + 489,25)= 1482,04 m

1.10. NASIPAVANJE ŠLJUNKA KAO POKROVA RAVNOG KROVA DEBLJINE d=5 cm 35,10 x 19,30 x 0,05 =33,87

VLAD

3

ORGANIZACIJA GRAĐENJA

2.

DOKAZNICA MJERA

2. BETONSKI RADOVI

BETONSKI RADOVI

2.1. BETONIRANJE TRAKASTIH TEMELJA BETONOM MB 20, BETON SPRAVLJEN U CENTRALNOM POGONU (36,45 x 1,05 x 0,65) x 2 + (18,55 x 1,05 x 0,65) x 2 = 49,75 + 25,32= 75,07 m3

75,07

m3

2,95

m3

27,24

m3

0,92

2.2. BETONIRANJE TEMELJA SAMACA BETONOM MB 20, BETON SPRAVLJEN U CENTRALNOM POGONU (0,55 X 0,55 X 0,65) X 15 = 2,95

2.3. BETONIRANJE NADTEMELJNOG ZIDA TRAKASTIH TEMELJA BETONOM MB 20, BETON SPRAVLJEN U CENTRALNOM (35,86 x 0,38 x 0,65) x 2 + (19,30 x 0,38 x 0,65) x 2 = 17,71+ 9,53 = 27,24

2.4. BETONIRANJE NADTEMELJNOG ZIDA TEMELJA SAMCA BETONOM MB 20, BETON SPRAVLJEN U CENTRALNOM POGONU (0,30 x 0,30 x 0,65) x 15 = 0,92

VLAD

4

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

2. BETONSKI RADOVI

2.5. BETONIRANJE DONJE BETONSKE PODLOGE DEBLJINE d=8 cm, BETONOM MB 10, BETON SPRAVLJEN U CENTRALNOM POGONU [(35,10 x 19,30) - 15 x (0,30 x 0,30)] x 0,08 = [677,43-1,35] x 0,08 = 54,09 m3

54,09

m3

47,33

3

28,64

2.6. BETONIRANJE GORNJE BETONSKE PODLOGE DEBLJINE d=7 cm, BETONOM MB 10, BETON SPRAVLJEN U CENTRALNOM POGONU [(35,10 x 19,30) - 15 x (0,30 x 0,30)] x 0,07 = [677,43-1,35] x 0,07 = 47,33

2.7. BETONIRANJE BETONSKOG ZIDA U PODRUMU ZGRADE DEBLJINE d=30 cm, BETONOM MB 20, BETON SPRAVLJEN U CENTRALNOM POGONU

35,10 x 0,30 x 2,72 =28,64 m

VLAD

5

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

2. BETONSKI RADOVI

2.8. BETONIRANJE BETONSKE PLOČE U PADU BETONOM MB 20, BETON SPRAVLJEN U CENTRALNOM POGONU

(19,30 ⋅ 35,10 ⋅ 0,05 ) +

19,30 ⋅ 35,10 ⋅ 0,05 = 2

33,87+16,94=50,81 3

m

VLAD

50,81

6

ORGANIZACIJA GRAĐENJA

3.

DOKAZNICA MJERA

3. AB RADOVI

ARMIRANO BETONSKI RADOVI PODRUM:

3.1. BETONIRANJE AB ZIDOVA PODRUMA BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU

(35,7 x 2,92 x 0,30) + (19,60 x 2,92 x m3

65,61

3

5,49

3.2. BETONIRANJE AB STUPOVA DIMENZIJE 30 x 30 BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU

(0,30 x 0,30 x 3,05) x 20 = 5,49 m

VLAD

7

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

3. AB RADOVI

3.3. BETONIRANJE AB GREDA BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU

(35,7 x 0,30 x 0,25) x 5 + (4,60 x 0,30 x 0,25) x 28 = 13,39 + 9,66 = 23,05 3

23,05

3

184,63

m

3.4. BETONIRANJE AB PLOČE I KONZOLE BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU

(35,70 x 19,90 x 0,25) + (23,9 x 1,5 x 0,25) + (6,0 x 1,5 x 0,25) x 2 - (5,60 x 4,60 x 0,25) = 184,63 m

VLAD

8

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

3. AB RADOVI

PRIZEMLJE: 3.5. BETONIRANJE AB ZIDOVA PRIZEMLJA BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (19,90 x 0,30 x 3,05) x 2 = 36,42 3

36,42

3

6,86

3

15,48

m

3

8,19

m3

0,84

m

3.6. BETONIRANJE AB STUPOVA DIMENZIJE 30 x 30 BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (0,30 x 0,30 x 3,05) x 25 = 6,86 m

3.7. BETONIRANJE AB GREDA ŠIRINE 30 cm BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (35,70 x 0,30 x 0,25) x 2 + (19,30 x 0,30 x 0,25) x 7 = 5,35 + 10,13 = 15,48 m

3.8. BETONIRANJE AB GREDA ŠIRINE 15 cm BETONOM MB 30, BETON (5,60 x 0,15 x 0,25) x 39 = 8,19

3.9. BETONIRANJE AB HORIZONTALNIH SERKLAŽA U OTVORU LIFTA BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (5,60 x 0,0,30 x 0,25) x 2 = 0,84

VLAD

9

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

3. AB RADOVI

3.10. BETONIRANJE AB PLOČE BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU

(35,70 x 19,90 x 0,25) - (5,60 x 4,60 x 0,25) = 177,61 - 6,44 = 171,17

3

171,17

3

36,42

3

6,86

m

PRVI KAT: 3.11. BETONIRANJE AB ZIDOVA PODRUMA BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (19,90 x 3,05 x 0,30) x 2 = 36,42 m

3.12. BETONIRANJE AB STUPOVA DIMENZIJE 30 x 30 BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (0,30 x 0,30 x 3,05) x 25 = 6,86

m

VLAD

10

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

3. AB RADOVI

3.13. BETONIRANJE AB GREDA ŠIRINE 30 cm BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (35,70 x 0,30 x 0,25) x 2 + (19,30 x 0,30 x 0,25) x 7 = 5,35 + 10,13 = 15,48 m3

15,48

3

0,84

3

226,33

3

13,20

3.14. BETONIRANJE AB HORIZONTALNIH SERKLAŽA U OTVORU LIFTA BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (5,60 x 0,0,30 x 0,25) x 2 = 0,84 m

3.15. BETONIRANJE AB SITNOREBRIČASTE PLOČE DEBLJINE d=25 cm, SA AB REBRIMA ŠIRINE 15 cm, BETONOM MB 30, BETON SPRAVLJEN U CENTRALNOM POGONU (35,70 x 19,90 x 0,25) + (5,60 x 0,15 x 0,25) x 39 x 6 - {(5,60 x 0,15 x 0,25) x 2} = 177,61 + 49,14 - 0,42 = 226,33 m

3.16. BETONIRANJE AB VIJENCA NA KROVU, BETONOM MB 20, BETON SPRAVLJEN U CENTRALNOM POGONU (35,70 x 0,30 x 0,40) x 2 + (19,30 x 0,30 x 0,40) x 2 = 8,57 + 4,63 = 13,20 m

VLAD

11

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

4. ARMIRAČKI RADOVI

4. ARMIRAČKI RADOVI PODRUM: 4.1. ARMIRANJE AB ZIDOVA PODRUMA St. 3.1. x 100 65,61 x 100 = 6561 60 % D SS = 0,6 x 6561 = 3936,6 40 % T SS = 0,4 x 6561 = 2624,4

kg kg

3936,3 2624,4

kg kg

329,4 219,6

kg kg

1613,5 691,5

kg kg

9231,5 9231,5

4.2. ARMIRANJE AB STUPOVA St. 3.2. x 100 5,49 x 100 = 549 60 % D SS = 0,6 x 549 = 329,4 40 % T SS = 0,4 x 549 = 219,6

4.3. ARMIRANJE AB GREDA PODRUMA St. 3.3. x 100 23,05 x 100 = 2305 70 % D SS = 0,7 x 2305 = 1613,5 30 % T SS = 0,3 x2305 = 691,5

4.4. ARMIRANJE AB PLOČE PODRUMA St. 3.4. x 100 184,63 x 100 = 18463 50 % D SL = 0,5 x 18463 = 9231,5 50 % T SL = 0,5 x 18463 = 9231,5

VLAD

12

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

4. ARMIRAČKI RADOVI

PRIZEMLJE: 4.5. ARMIRANJE AB ZIDOVA PRIZEMLJA St. 3.5. x 100 36,42 x 100 = 3642 60 % D SS = 0,6 x 3642 = 2185,2 40 % T SS = 0,4 x 3642 = 1456,8

kg kg

2185,2 1456,8

kg kg

411,6 274,4

kg kg

1083,6 464,4

kg kg

409,5 409,5

kg kg

58,8 25,2

4.6. ARMIRANJE AB STUPOVA PRIZEMLJA St. 3.6. x 100 6,86 x 100 = 686 60 % D SS = 0,6 x 686 = 411,60 40 % T SS = 0,4 x 686 = 274,40

4.7. ARMIRANJE AB GREDA PRIZEMLJA ŠIRINE 30 cm St. 3.7. x 100 15,48 x 100 = 1548 70 % D SS = 0,7 x 1548 = 1083,6 30 % T SS = 0,3 x 1548 = 464,4

4.8. ARMIRANJE AB GREDA PRIZEMLJA ŠIRINE 15 cm St. 3.8. x 100 8,19 x 100 = 819 50 % D SL = 0,5 x 819 = 409,5 50 % T SL = 0,5 x 819 = 409,5

4.9. ARMIRANJE AB HORIZONTALNIH SERKLAŽA U OTVORU LIFTA St. 3.9. x 100 0,84 x 100 = 84 70 % D SS = 0,7 x 84 = 58,8 30 % T SS = 0,3 x 84 = 25,2

VLAD

13

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

4. ARMIRAČKI RADOVI

4.10. ARMIRANJE AB PLOČE PRIZEMLJA St. 3.10. x 100 171,17 x 100 = 17117 50 % D SL = 0,5 x 17117 = 8558,5 50 % T SL = 0,5 x 17117 = 8558,5

kg kg

8558,5 8558,5

kg kg

2185,2 1456,8

kg kg

411,6 274,4

kg kg

1083,6 464,4

kg kg

58,8 25,2

PRVI KAT:

4.11. ARMIRANJE AB ZIDOVA PRVOG KATA St. 3.11. x 100 36,42 x 100 = 3642 60 % D SS = 0,6 x 3642 = 2185,2 40 % T SS = 0,4 x 3642 = 1456,8

4.12. ARMIRANJE AB STUPOVA PRVOG KATA St. 3.12. x 100 6,86 x 100 = 686 60 % D SS = 0,6 x 686 = 411,60 40 % T SS = 0,4 x 686 = 274,40

4.13. ARMIRANJE AB GREDA PRVOG KATA ŠIRINE 30 cm St. 3.13. x 100 15,48 x 100 = 1548 70 % D SS = 0,7 x 1548 = 1083,6 30 % T SS = 0,3 x 1548 = 464,4

4.14. ARMIRANJE AB HORIZONTALNIH SERKLAŽA U OTVORU LIFTA St. 3.14. x 100 0,84 x 100 = 84 70 % D SS = 0,7 x 84 = 58,8 30 % T SS = 0,3 x 84 = 25,2

VLAD

14

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

4. ARMIRAČKI RADOVI

4.15. ARMIRANJE AB PLOČE PRVOG KATA St. 3.15. x 100 226,33 x 100 = 22633 50 % D SL = 0,5 x 22633 = 11316,5 50 % T SL = 0,5 x 22633 = 11316,5

kg kg

11316,5 11316,5

kg kg

792,0 528,0

4.16. ARMIRANJE AB VIJENCA NA KROVU St. 3.16. x 100 13,2 x 100 = 1320 60 % D SS = 0,6 x 1320 = 792 40 % T SS = 0,4 x 1320 = 528

VLAD

15

ORGANIZACIJA GRAĐENJA

5. TESARSKI RADOVI

DOKAZNICA MJERA

5. TESARSKI RADOVI PODRUM: 5.1. OPLATA TRAKASTOG TEMELJA (36,45 x 0,65) x 2 + (34,35 x 0,65) x 2+ (20,65 x 0,65) x 2 +(18,55 x 0,65) x 2 = 47,39 + 44,66 + 26,85 + 24,12 = 143,02 m2

143,02

m2

21,45

m2

143,42

m2

11,7

2

465,5

5.2. OPLATA TEMELJA SAMCA (4 x 0,55 x 0,65) x 15 = 21,45

5.3. OPLATA NADTEMELJNOG ZIDA (35,86 x 0,65) x 2 + (35,10 x 0,65) x 2 + (20,06 x 0,65) x 2 + (19,30 x 0,65) x 2 = 46,62 + 45,63 + 26,08 + 25,09 = 143,42

5.4. OPLATA NADTEMELJNOG ZIDA TEMELJA SAMCA (4 x 0,30 x 0,65) x 15 = 11,70

5.5. OPLATA AB ZIDOVA PODRUMA (35,70 x 3,12) + (35,10 x 3,12) + (19,90 x 3,12) x 2 + (19,30 x 3,12) x 2 = 465,50 m

VLAD

16

ORGANIZACIJA GRAĐENJA

5. TESARSKI RADOVI

DOKAZNICA MJERA

5.6. OPLATA BETONSKOG ZIDA PODRUMA (35,70 x 2,72) + (35,10 x 2,72) = 192,58 m2

192,58

2

73,2

m2

213,38

m2

646,33

m2

246,44

m2

91,5

5.7. OPLATA AB STUPA PODRUMA (0,30 x 4 x 3,05) x 20 = 73,20 m

5.8. OPLATA AB GREDA PODRUMA (35,70 x 0,25) x 2 + (19,90 x 0,25) x 2 + (5,60 x 0,25) x 48 + (4,60 x 0,25) x 48 + (5,60 x 0,30) x 22 + (4,60 x 0,30) x 19 = 17,85 + 9,95 + 67,2 + 55,20 + 36,96 + 26,22 =213,38

5.9. OPLATA AB PLOČE PODRUMA (5,60 x 4,60) x 23 + (23,9 x 1,5) + (6,0x 1,5) x 2 = 592,48 + 35,85 + 18 = 646,33

PRIZEMLJE

5.10. OPLATA AB ZIDOVA PRIZEMLJA (19,90 x 3,05) x 4 + (0,30 x 3,05) x 4 = 242,78 + 3,66 = 246,44

5.11. OPLATA AB STUPA PRIZEMLJA (0,30 x 4 x 3,05) x 25 = 91,5

VLAD

17

ORGANIZACIJA GRAĐENJA

5. TESARSKI RADOVI

DOKAZNICA MJERA

5.12. OPLATA AB GREDA PRIZEMLJA ŠIRINE 30 cm (35,70 x 0,25) x 2 + (19,90 x 0,25) x 2 + (5,60 x 0,25) x 16 + (4,60 x 0,25) + (2,3 x 0,25) x 64 + (2,23 x 0,25) x 24 + (2,30 x 0,30) x 28 + (2,23 x 0,30) x 10 = 17,85 + 9,95 + 22,4 + 1,15 + 36,8 + 13,38 +19,32 + 6,69 = 127,54 m2

127,54

2

141,96

2

5,6

m

2

587,78

m2

239,12

5.13. OPLATA AB GREDA PRIZEMLJA ŠIRINE 15 cm (5,60 x 0,25) x 2 x 39 + (5,60 x 0,15) x 39 = 109,2 + 32,76 = 141,96 m

5.14. OPLATA AB HORIZONTALNIH SERKLAŽA U OTVORU LIFTA (5,60 x 0,25) x 4 = 5,60 m

5.15. OPLATA AB PLOČE PRIZEMLJA (2,23 x 5,60) x 12 + (2,3 x 5,60) x 34 = 149,86 + 437,92 = 587,78

PRVI KAT: 5.16. OPLATA AB ZIDA PRVOG KATA (19,90 x 3,05) x 2 + (19,30 X 3,05) x 2 = 121,39 + 117,73 = 239,12

VLAD

18

ORGANIZACIJA GRAĐENJA

5. TESARSKI RADOVI

DOKAZNICA MJERA

5.17. OPLATA AB STUPA PRVOG KATA (0,30 x 4 x 3,05) x 25 = 91,5 m2

91,5

2

123,75

2

5,6

m2

1236,48

m2

89,44

5.18. OPLATA AB GREDA PRVOG KATA ŠIRINE 30 cm (35,70 x 0,25) x 2 + (19,90 x 0,25) x 2 + (5,60 x 0,25) x 12 + (19,30 x 0,25) x 10 + (4,60 x 0,25) x 4 + (0,30 x 0,25) + (4,60 x 0,30) x 19 = 17,85 +9,95 + 16,8 + 48,25 + 4,6 + 0,08 + 26,22 = 123,75 m

5.19. OPLATA AB HORIZONTALNIH SERKLAŽA U OTVORU LIFTA (5,60 x 0,25) x 4 = 5,60 m

5.20. OPLATA AB SITNOREBRIČASTE PLOČE {(9 x 5,60 x 0,15) + (20 x 5,60 x 0,25) + (5,60 x 0,2875 x 4) + (5,60 x 0,35 x 6)} x 23 = (7,56 + 28 + 6,44 + 11,76) x 23= 1236,48

5.21. OPLATA AB VIJENCA NA KROVU (35,70 x 0,40) x 2 + (35,10 x 0,40) x 2 + (19,90 x 0,40) x 2 + (19,30 x 0,40) x 2 = 30 + 28,08 + 15,92 + 15,44= 89,44

VLAD

19

ORGANIZACIJA GRAĐENJA

6.

DOKAZNICA MJERA

6. ZIDARSKI RADOVI

ZIDARSKI RADOVI

6.1. ZIDANJE KANT ZIDA ZA ZAŠTITU H.I. NF OPEKOM DEBLJIN d = 6,5 cm PRODUŽNIM CEMENTNIM MORTOM 1:3:9

(35,86 x 2,52) x 2 + (19,90 x 2,52) x 2 = 180,73+100,30=281,03 m

2

281,03

m2

144,57

6.2. ZIDANJE ZIDA OKNA LIFTA NF OPEKOM DEBLJINE ZIDA d = 12 cm PRODUŽNIM CEMENTNIM MORTOM 1:3:9 (5,60 x 3,05 x 6) + (4,60 x 3,05 x 3)= 102,48 + 42,09 = 144,57

6.3. ZIDANJE PARAPETNOG ZIDA NF OPEKOM DEBLJINE ZIDA d = 30 cm PRODUŽNIM CEMENTNIM MORTOM 1:3:9 (5,60 x 1,10 x 6) x 3 x 0,30= 110,88 m³

VLAD

33,26

20

ORGANIZACIJA GRAĐENJA

DOKAZNICA MJERA

6. ZIDARSKI RADOVI

6.4. POSTAVLJANJE HIDROIZOLACIJE 6.4.1. POSTAVLJANJE HORIZONTALNE HIDROIZOLACIJE PODRUMA, SA PRETHODNIM NANOŠENJEM BITUMENSKE EMULZIJE.1 LJEPENKA + 2 BITUMENSKA PREMAZA (36,45 x 20,65) -15 x (0,30 x 0,30) = 752,69 - 1,35 = 751,34 m2

751,34

2

281,03

m

2

677,43



24,86

6.4.2. POSTAVLJANJE VERTIKALNE HIDROIZOLACIJE PODRUMA. 1 LJEPENKA + 2 BITUMENSKA PREMAZA → površina preuzeta iz stavke 6.1. P=281,03 m 6.4.3. POSTAVLJANJE KROVNE HORIZONTALNE HIDROIZOLACIJE, SA PRETHODNIM NANOŠENJEM BITUMENSKE EMULZIJE.2 LJEPENKA + 3 BITUMENSKA 35,10 x 19,30 = 677,43

6.5.

VLAD

IZRADA PRODUŽNOG CEMENTNOG MORTA 1:3:9

21

I. ZEMLJANI RADOVI REDNI BROJ BROJ STAVKE

OPIS

KOLIČINA

JEDINIČNA MJERA

BROJ GRAĐ. NORME

ŠLJUNAK Jedinično

1.

1.7.

2.

1.8.

3.

1.10.

NASIPAVANJE ŠLJUNKA ZA TAMPONSKI SLOJ DEBLJINE d=15 cm RAZASTIRANJE I NABIJANJE ŠLJUNKA NASIPAVANJE ŠLJUNKA KAO POKROVA RAVNOG KROVA DEBLJINE d=5 cm

101,41

m3

-

1,25

126,7625

675,88

m

3

-

1,25

844,85

33,87

m

3

-

1,25

42,3375

UKUPNO

VLAD

Ukupno

1013,95

1

II. BETONSKI RADOVI PODRUM REDNI BR. BROJ STAVK

BETON MB 20 OPIS

KOLIČINA

JEDINIČNA MJERA

BROJ GRAĐ. NORME

BETON Jedinično

VLAD

1.

2.1.

2.

2.2.

3.

2.3.

4.

2.4.

5.

2.7.

BETONIRANJE TRAKASTIH TEMELJA BETONOM MB 20 BETONIRANJE TEMELJA SAMACA BETONOM MB 20 BETONIRANJE NADTEMELJNOG ZIDA TRAKASTIH TEMELJA BETONOM MB 20 BETONIRANJE NADTEMELJNOG ZIDA TEMELJA SAMCA BETONOM MB 20 BETONIRANJE BETONSKOG ZIDA U PODRUMU ZGRADE DEBLJINE d=30 cm, BETONOM MB 20

Ukupno

75,07

m

3

-

1

75,07

2,95

m3

-

1

2,95

27,24

m3

-

1

27,24

0,92

m

3

-

1

0,92

28,64

m

3

-

1

28,64

BETON MB 20 UKUPNO PODRUM

134,82

2

II. BETONSKI RADOVI PODRUM

BETON MB 10

REDNI BR. BROJ STAV

OPIS

KOLIČINA

JEDINIČNA MJERA

BROJ GRAĐ. NORME

BETON Jedinično

2.5.

2.6.

PRVI KAT REDNI

VLAD

BETONIRANJE DONJE BETONSKE PODLOGE DEBLJINE d=8 cm, BETONOM MB 10 BETONIRANJE GORNJE BETONSKE PODLOGE DEBLJINE d=7 cm, BETONOM MB 10

Ukupno

54,09

m

3

-

1

54,09

47,33

m3

-

1

47,33

BETON MB 10 UKUPNO PODRUM

101,42

BETON MB 10

BR.

OPIS

2.8.

BETONIRANJE BETONSKE PLOČE U PADU BETONOM MB 20

BROJ GRAĐ.

BETON Jedinično Ukupno

-

1

50,81

BETON MB 10 UKUPNO PRVI KAT

50,81

KOLIČINA JEDINIČNA 50,81

m3

3

III. ARMIRANO BETONSKI RADOVI PODRUM REDNI BROJ BROJ STAVKE

OPIS

KOLIČINA

JEDINIČNA MJERA

BROJ GRAĐ. NORME

BETON Jedinično

VLAD

1.

3.1.

2.

3.2.

3.

3.3.

4.

3.4.

BETONIRANJE AB ZIDOVA PODRUMA BETONOM MB 30 BETONIRANJE AB STUPOVA DIMENZIJE 30 x 30 BETONIRANJE AB GREDA BETONOM MB 30 BETONIRANJE AB PLOČE I KONZOLE BETONOM MB 30

Ukupno

3

-

1

65,61

3

-

1

5,49

m

3

-

1

23,05

m3

-

1

184,63

BETON MB 30 UKUPNO PODRUM

278,78

65,61

m

5,49

m

23,05 184,63

4

III. ARMIRANO BETONSKI RADOVI PRIZEMLJE

VLAD

5.

3.5.

6.

3.6.

7.

3.7.

8.

3.8.

9.

3.9.

10.

3.10.

BETONIRANJE AB ZIDOVA PRIZEMLJA BETONOM MB 30 BETONIRANJE AB STUPOVA BETONOM MB 30 BETONIRANJE AB GREDA ŠIR. 30 cm BETONOM MB 30 BETONIRANJE AB GREDA ŠIR. 15 cm BETONOM MB 30 BETONIRANJE AB HOR. SERKLAŽA BETONOM MB 30 BETONIRANJE AB PLOČE BETONOM MB 30

36,42

m3

-

1

36,42

6,86

m3

-

1

6,86

15,48

m3

-

1

15,48

8,19

m3

-

1

8,19

0,84

m3

-

1

0,84

171,17

m3

-

1

171,17

BETON MB 30 UKUPNO PRIZEMLJE

238,96

5

III. ARMIRANO BETONSKI RADOVI PRVI KAT REDNI BROJ BROJ STAVKE

OPIS

KOLIČINA

JEDINIČNA MJERA

BROJ GRAĐ. NORME

BETON Jedinično

11.

3.11.

12.

3.12.

13.

3.13.

14.

3.14.

15.

3.15.

16.

VLAD

3.16.

BETONIRANJE AB ZIDOVA PODRUMA BETONOM MB 30 BETONIRANJE AB STUPOVA BETONOM MB 30 BETONIRANJE AB GREDA ŠIR. 30 cm BETONOM MB 30 BETONIRANJE AB HOR. SERKLAŽA BETONOM MB 30 BETONIRANJE AB SITNORE. PLOČE BETONOM MB 30,

BETONIRANJE AB VIJENCA KROVA, BETONOM MB 20

Ukupno

36,42

m3

-

1

36,42

6,86

m

3

-

1

6,86

15,48

m3

-

1

15,48

0,84

m3

-

1

0,84

3

-

1

226,33

BETON MB 30 UKUPNO PRVO KAT

285,93

226,33

13,2

m

3

m

-

1

13,2

BETON MB 20 UKUPNO PRVO KAT

13,2

6

ORGANIZACIJA GRAĐENJA

IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI PODRUM RED. BROJ BR STAVK

OPIS

KOLIČINA

JED. BR. GRAĐ. MJ. NORME

BET. ČELIK Č 37 Jedinično

1.

2.

3.

4.

VLAD

4.1.

4.2.

4.3.

4.4.

ARMIRANJE AB ZIDOVA PODRUMA DEBELA TANKA ARMIRANJE AB STUPOVA PODRUMA DEBELA TANKA ARMIRANJE AB GREDA PODRUMA DEBELA TANKA ARMIRANJE AB PLOČE PODRUMA DEBELA TANKA

Ukupno

ŽICA ZA VEZANJE Jedinično

Ukupno

3936,3 2624,4

kg kg

400,201-5 400,201-2

1,080 1,080

4251,20 2834,35

0,0035 0,0035

13,78 9,19

329,4 219,6

kg kg

400,201-5 400,201-2

1,080 1,080

355,75 237,17

0,0035 0,0035

1,15 0,77

1613,5 691,5

kg kg

400,201-5 400,201-2

1,080 1,080

1742,58 746,82

0,0035 0,0035

5,65 2,42

9231,5 9231,5

kg kg

400,201-6 400,201-3

1,100 1,100

10154,65 10154,65

0,004 0,004

36,93 36,93

DEBELA PODRUM UKUPNO TANKA PODRUM UKUPNO

57,50 49,30

7

ORGANIZACIJA GRAĐENJA

IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI PRIZEMLJE RED. BROJ BR STAVK

OPIS

KOLIČINA

JED. BR. GRAĐ. MJ. NORME

BET. ČELIK Č 37 Jedinično

5.

6.

7.

8.

9.

10.

VLAD

4.5.

4.6.

4.7.

4.8.

4.9.

4.10.

ARMIRANJE AB ZIDOVA DEBELA TANKA ARMIRANJE AB STUPOVA PRIZEMLJA DEBELA TANKA ARMIRANJE AB GREDA PRIZEMLJA ŠIRINE 30 cm DEBELA TANKA ARMIRANJE AB GREDA PRIZEMLJA ŠIRINE 15 cm DEBELA TANKA ARMIRANJE AB HORIZONTALNIH SERKLAŽA DEBELA TANKA ARMIRANJE AB PLOČE PRIZEMLJA DEBELA TANKA

2185,2 kg 1456,8 1457

Ukupno

ŽICA ZA VEZANJE Jedinično

Ukupno

400,201-5 400,201-2

1,080 1,080

2360,02 1573,34

0,0035 0,0035

7,65 5,10

411,6 274,4

kg kg

400,201-5 400,201-2

1,080 1,080

444,53 296,35

0,0035 0,0035

1,44 0,96

1083,6 464,4

kg kg

400,201-5 400,201-2

1,080 1,080

1170,29 501,55

0,0035 0,0035

3,79 1,63

409,5 409,5

kg kg

400,201-6 400,201-3

1,100 1,100

450,45 450,45

0,004 0,004

1,64 1,64

58,8 25,2

kg kg

400,201-5 400,201-2

1,080 1,080

63,50 27,22

0,0035 0,0035

0,21 0,09

8558,5 8558,5

kg kg

400,201-6 400,201-3

1,100 9414,35 0,004 1,100 0,004 9414,35 DEBELA PRIZEMLJE UKUPNO TANKA PRIZEMLJE UKUPNO

34,23 34,23 48,96 43,64 8

ORGANIZACIJA GRAĐENJA

IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI PRVI KAT RED. BROJ STAVK E BR

JED. BR. GRAĐ. OPIS

BET. ČELIK Č 37

KOLIČINA MJ.

NORME Jedinično

11.

12.

13.

14.

15.

16.

VLAD

4.11.

4.12.

4.13.

4.14.

4.15.

4.16.

ARMIRANJE AB ZIDOVA DEBELA TANKA ARMIRANJE AB STUPOVA PRVOG KATA DEBELA TANKA ARMIRANJE AB GREDA PRVOG KATA ŠIRINE 30 cm DEBELA TANKA ARMIRANJE AB HORI. SERKLAŽA U OTVORU LIFTA DEBELA TANKA ARMIRANJE AB PLOČE PRVOG KATA DEBELA TANKA ARMIRANJE AB VIJENCA NA KROVU DEBELA TANKA

2185,2 kg 1456,8 1457

ŽICA ZA VEZANJE

Ukupno

Jedinično

Ukupno

400,201-5 400,201-2

1,080 1,080

2360,02 1573,34

0,0035 0,0035

7,65 5,10

411,6 274,4

kg kg

400,201-5 400,201-2

1,080 1,080

444,53 296,35

0,0035 0,0035

1,44 0,96

1083,6 464,4

kg kg

400,201-5 400,201-2

1,080 1,080

1170,29 501,55

0,0035 0,0035

3,79 1,63

58,8 25,2

kg kg

400,201-5 400,201-2

1,080 1,080

63,50 27,22

0,0035 0,0035

0,21 0,09

11316,5 11316,5

kg kg

400,201-6 400,201-3

1,100 1,100

12448,15 12448,15

0,004 0,004

45,27 45,27

792,0 528,0

kg kg

400,201-5 400,201-2

1,080 855,36 0,0035 1,080 0,0035 570,24 DEBELA PRVI KAT UKUPNO TANKA PRVI KAT UKUPNO

2,77 1,85 61,13 54,89 9

ORGANIZACIJA GRAĐENJA

IV. ARMIRAČKI RADOVI

IV. ARMIRAČKI RADOVI DEBELA UKUPNO TANKA UKUPNO

VLAD

167,59 147,83

10

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

V. TESARSKI RADOVI PODRUM RED.

JED. POZ

OPIS

KOL

BR

BR. G. N.

DASKA m³ Jed.

5.

5.1.

5.3.

5.5. 5.6. 5.9.

OPLATA TRAKASTOG TEMELJA OPLATA NADTEMELJNOG ZIDA TRAKASTOG TEMELJA OPLATA AB ZIDOVA PODRUMA OPLATA AB ZIDOVA PODRUMA OPLATA AB PLOČE PODRUMA PODUPIRANJE

Ukup.

ČAVLI kg

ŽICA kg

KLAMFI kg

Jed.

Ukup.

Jed.

Ukup.

Jed.

Ukup.

Jed.

Ukup.

143,02 m2

601,201-2

0,033

4,72

0,035

5,01

0,15

21,5

0,20

28,6

0,50

71,51

143,42 m2

601,201-2

0,033

4,733

0,035

5,02

0,15

21,51

0,20

28,68

0,50

71,71

465,50 m2

601,201-2

0,033

15,36

0,035

16,29

0,15

69,83

0,20

93,1

0,50

232,8

192,58 m2

601,201-2

0,033

6,355

0,035

6,74

0,15

28,89

0,20

38,52

0,50

96,29

646,33 m2

601,203-2

0,033

21,33

0,035

22,62

0,15

96,95

0,20

129,3

0,50

323,2

0,015

9,824

0,061

39,43

0,092

59,46

0

0

0

0

ZA 3,05 m VISINE

DASKA m³ UKUPNO

VLAD

GREDICA m³

MJ.

62,32

GREDICA m³ 95,11

ČAVLI kg 298,1

ŽICA kg 318,17

KLAMFI kg 795,43

11

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

V. TESARSKI RADOVI PODRUM RED. BR

5.

POZ

5.2. 5.4. 5.7.

5.8.

OPIS

KOL

OPLATA TEMELJA SAMCA OPLATA NADTEMELJNOG ZIDA TEMELJA SAMCA OPLATA AB STUPA PODRUMA PODUPIRANJE OPLATA AB GREDA PODRUMA PODUPIRANJE

JED. BR. G. N. MJ.

DASKA m³

LETVA 3x5 m³

Jed.

Jed.

Ukup.

Ukup.

Jed.

Ukup.

ČAVLI kg Jed.

Ukup.

ŽICA kg Jed.

Ukup.

21,45 m2

601,210-1

0,04

0,86

0,005

0,11

0,002

0,04

0,25

5,36

0,15

3,218

11,70 m2

601,210-1

0,04

0,47

0,005

0,06

0,002

0,02

0,25

2,93

0,15

1,755

73,20 m2

601,210-1

0,04

2,93

0,005

0,37

0,002

0,15

0,25

18,30

0,15

10,98

0,015

1,10

0

0

0,122

8,93

0,092

6,73

0

0

0,04

8,54

0,005

1,07

0,002

0,43

0,25

53,35

0,15

1,755

0,015

3,20

0

0

0,122

26,03

0,092

19,63

0

0

ZA 3,05 m VISINE 213,38 m2

601,210-1

ZA 3,05 m VISINE

DASKA m³ UKUPNO

17,09 DASKA m³

UKUPNO PODRUM

VLAD

GREDICA m³

79,41

LETVA 3x5 m³ 1,60

LETVA 3x5 m³ 1,60 GREDICA m³ 130,7

GREDICA m³ 35,6 ČAVLI kg 404,39

ČAVLI kg 106,30

ŽICA kg 17,71

ŽICA kg

KLAMFI kg

335,88

795,43

12

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

V. TESARSKI RADOVI PRIZEMLJE RED. BR

POZ

OPIS

KOL

JED. MJ.

BR. G. N.

DASKA m³ Jed.

5.

5.10. 5.14. 5.15.

OPLATA AB ZIDOVA PRIZEMLJA OPLATA AB HORIZONTALNIH OPLATA AB PLOČE PODRUMA PODUPIRANJE

Ukup.

Jed.

Ukup.

ČAVLI kg Jed.

Ukup.

KLAMFI kg

ŽICA kg Jed.

Ukup.

Jed.

Ukup.

246,44 m2

601,201-2

0,033

8,133

0,035

8,63

0,15

37,0

0,20

49,29

0,50

5,60 m2

601,201-2

0,033

0,185

0,035

0,20

0,15

0,84

0,20

1,12

0,50

2,8

587,78 m2

601,203-2

0,033

19,4

0,035

20,57

0,15

88,17

0,20

117,6

0,50

293,9

0,015

8,817

0,061

35,85

0,092

54,08

0

0

0

0

ZA 3,05 m VISINE

DASKA m³ UKUPNO

VLAD

GREDICA m³

36,53

GREDICA m³ 65,25

ČAVLI kg 180,0

ŽICA kg 167,96

123,2

KLAMFI kg 419,91

13

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

V. TESARSKI RADOVI PRIZEMLJE RED.

POZ 5.11.

OPIS

KOL

OPLATA AB STUPA PODRUMA PODUPIRANJE

JED. BR. G. N.

91,50 m2

601,210-1

ZA 3,05 m VISINE

OPLATA AB GREDA 5.12. PRIZEMLJA ŠIRINE 30 cm PODUPIRANJE OPLATA AB GREDA 5.13. PRIZEMLJA ŠIRINE 15 cm PODUPIRANJE

127,54 m2

601,210-1

ZA 3,05 m VISINE 141,96 m2

601,210-1

ZA 3,05 m VISINE

DASKA m³ Jed. Ukup.

DASKA m³ UKUPNO PRIZEMLJE

VLAD

56,39

ČAVLI kg Jed. Ukup.

ŽICA kg Jed. Ukup.

0,04

3,66

0,005

0,46

0,002

0,18

0,25

22,88

0,15

19,13

0,015

1,37

0

0

0,122

11,16

0,092

8,42

0

0

0,04

5,10

0,005

0,64

0,002

0,26

0,25

31,89

0,15

19,13

0,015

1,91

0

0

0,122

15,56

0,092

11,73

0

0

0,04

5,68

0,005

0,71

0,002

0,28

0,25

35,49

0,15

21,29

0,015

2,13

0

0

0,122

17,32

0,03

4,26

0

21,29

DASKA m³ UKUPNO

LETVA 3x5 GREDICA m³ Jed. Ukup. Jed. Ukup.

LETVA 3x5 m³

19,86 1,81 LETVA 3x5 GREDICA m³ m³ 1,81 110,0

GREDICA m³ 44,8 ČAVLI kg 294,71

ČAVLI kg 114,66

ŽICA kg 80,85

ŽICA kg

KLAMFI kg

248,81

419,91

14

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

V. TESARSKI RADOVI PRVI KAT RED. BR

POZ

OPIS

KOL

JED. BR. G. N. MJ.

DASKA m³ Jed.

5.

OPLATA AB ZIDOVA 5.16. PRVOG KATA OPLATA AB 5.19. HORIZONTALNIH SERKLAŽA OTVORU OPLATA ABUVIJENCA 5.21. NA KROVU

Ukup.

Jed.

Ukup.

ČAVLI kg Jed.

Ukup.

ŽICA kg Jed.

Ukup.

KLAMFI kg Jed.

Ukup.

2

601,201-2

0,033

7,891

0,035

8,37

0,15

35,9

0,20

47,82

0,50

119,6

5,60 m2

601,201-2

0,033

0,185

0,035

0,20

0,15

0,84

0,20

1,12

0,50

2,8

89,44 m2

601,201-2

0,033

2,952

0,035

3,13

0,15

13,42

0,20

17,89

0,50

44,72

239,12 m

DASKA m³ UKUPNO

VLAD

GREDICA m³

11,03

GREDICA m³ 11,70

ČAVLI kg 50,1

ŽICA kg 66,83

KLAMFI kg 167,08

15

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

V. TESARSKI RADOVI PRVI KAT

RED. BR

POZ

OPIS

KOL

JED. BR. G. N. MJ.

DASKA m³ Jed.

5.17.

OPLATA AB STUPA PRVOG KATA

91,50 m2

ZA 3,05 m VISINE

PODUPIRANJE OPLATA AB GREDA 5.18. PRVOG KATA ŠIRINE 30 cm PODUPIRANJE OPLATA AB 5.20. SITNOREBRIČASTE PLOČE PODUPIRANJE

601,210-1

123,75 m2

601,210-1

ZA 3,05 m VISINE 1236,48 m2

601,204-1

ZA 3,05 m VISINE

UKUPNO PRVI KAT

VLAD

87,21

Jed.

Ukup.

ČAVLI kg Jed.

Ukup.

ŽICA kg Jed.

Ukup.

0,04

3,66

0,005

0,46

0,002

0,18

0,25

22,88

0,15

13,73

0,015

1,37

0

0

0,122

11,16

0,092

8,42

0

0

0,04

4,95

0,005

0,62

0,002

0,25

0,25

30,94

0,15

18,56

0,015

1,86

0

0

0,122

15,10

0,092

11,39

0

0

0,04

49,46

0,000

0,00

0,002

2,47

0,07

86,55

0,00

0

0,015

18,55

0

0

0,025

30,91

0,092 113,76

0

0

76,19 DASKA m³

GREDICA m³

Ukup.

DASKA m³ UKUPNO

LETVA 3x5 m³

LETVA 3x5 m³ 0,62

LETVA 3x5 m³ 0,62 GREDICA m³ 71,6

GREDICA m³ 59,9 ČAVLI kg 301,17

ČAVLI kg 251,05

ŽICA kg 18,56

ŽICA kg

KLAMFI kg

85,39

167,08

16

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

VI. ZIDARSKI RADOVI RED. POZ BR 6.

OPIS

KOL

6.1. ZIDANJE KANT ZIDA ZA ZAŠTITU H.I. NF OPEKOM DEBLJIN d = 6,5 cm 281,03 PRODUŽNIM CEMENTNIM MORTOM 1:3:9 ZIDANJE ZIDA OKNA LIFTA NF 144,57 6.2. OPEKOM DEBLJINE ZIDA d = 12 cm PRODUŽNIM ZIDANJE PARAPETNOG ZIDA NF OPEKOM DEBLJINE ZIDA d 33,26 6.3. = 30 cm PRODUŽNIM CEMENTNIM MORTOM 1:3:9

JED. BR. G. N. OPEKA kom MJ. Jed. Ukup.

Jed.

Ukup.

2

301,206-6

34

9555

0,03

8,43

m2

301,206-1

50

7229

0,04

5,78



301,201- 3

385 12805

0,32

10,64

m

UKUPNO

VLAD

MORT m³

OPEKA kom

MORT m³

29589

24,86

17

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

VI. ZIDARSKI RADOVI

RED. BR

POZ

OPIS

KOL

JED. MJ.

BR. G. N.

LJEP m² Jed.

6.4. 6.4.1. POSTAVLJANJE HORIZONTALNE HIDROIZOLACIJE PODRUMA, SA PRETHODNIM 751,34 NANOŠENJEM BITUMENSKE EMULZIJE.1 LJEPENKA + 2 BITUMENSKA PREMAZA 6.4.2. POSTAVLJANJE VERTIKALNE HIDROIZOLACIJE PODRUMA. 281,03 1 LJEPENKA + 2 BITUMENSKA PREMAZA 6.4.3. POSTAVLJANJE KROVNE HORIZONTALNE HIDROIZOLACIJE, SA PRETHODNIM NANOŠENJEM 677,43 BITUMENSKE EMULZIJE.2 LJEPENKA + 3 BITUMENSKA PREMAZA

2

301,501-3

1,15

864

m2

301,501-3

1,15

m2

301,501-5

2,30

m

UKUPNO

VLAD

Ukup.

BITUMEN kg Jed.

Ukup.

BITUMEN RASTVOR kg GORIVO kg Jed. Ukup. Jed. Ukup.

3,50 2629,69

0,60

450,80 8,00

6912,33

323,2

3,50

983,61

0,60

168,62 8,00

2585,48

1558

2,80 1896,80

0,60

406,46 9,00

14022,80

LJEP m²

BITUMEN kg

2745,31

5510,10

BITUMEN RASTVOR kg

GORIVO kg

1025,88

23520,61

18

ORGANIZACIJA GRAĐENJA

V. TESARSKI RADOVI

VI. ZIDARSKI RADOVI RED.

JED. POZ

OPIS

KOL

BR

BR. G. N.

CEMENT kg

6.5. IZRADA PRODUŽNOG CEMENTNOG MORTA 1:3:9

24,86



301,103-5

UKUPNO

VLAD

PIJESAK m³

VODA m³

MJ. Jed.

6.

VAPNO m³

Ukup.

146

3630

Jed.

Ukup.

0,31

7,71

Jed. 0,93

Ukup.

Jed.

Ukup.

23,12 0,24

5,97

CEMENT kg

VAPNO m³

PIJESAK m³

VODA m³

3630

7,71

23,12

5,97

19

View more...