Documents to be elaborated in order to meet ISO 22716:2007 standard requirements Below you´ll find all the documentation that it is needed to meet ISO 22716:2007, Cosmetics: Good Manufacturing Practices, requirements. Section
Requirement
Required documentation Description
Personnel
3
4
Responsibilities of personnel Training
3.5.1 3.5.2 3.6
Personnel Hygiene and Health
Premises Equipment Raw Materials and Packaging Materials
7
Job Descriptions Personnel and Training Initial Orientation Program Gowning, Hand Washing and Conduct Response Plan for Incidents Involving Biohazards Initial Orientation Program
Record SOP Program SOP SOP Program
Premises Cleaning and Sanitation
SOP
Premises Maintenance Program
Program
4.11
Visitors and Untrained Personnel Premises Cleaning and Sanitation Maintenance
4.13
Pest Control
Pest Control
SOP
5.3 5.4 5.6
Equipment Installation Qualification Control of Measuring and Test Instruments Equipment Cleaning and Sanitation
SOP SOP SOP
5.6
Installation Calibration Equipment Cleaning and Sanitation Maintenance
6.2
Purchasing
SOP Form Form Form Form Form SOP SOP SOP SOP
6.3
Receipt
6.4
Identification and Status
Equipment Maintenance Equipment Technical Data Sheet Equipment Maintenance Checklist Equipment Maintenance Request Equipment Maintenance Work Order Equipment Maintenance Record Purchasing and Assessment of Suppliers Supplier Audits Supplier Corrective Action Request (SCAR) Performance Evaluation of Suppliers of Significant Materials and Services Incoming Inspection Raw materials specifications Identification & Traceability of Raw Materials, Manufactured, and Packaged Products Production and Process Control of Chemical Process Production and Process Control of Machining Process Product Specifications Product Bill of Materials (BOM) Production Work Order Work Instructions for the use of specific equipment (boiler, reactors, filters, drillers, CNC´s, and so on) In-Process Inspection (for chemical and machining process) Production Line Clearance Procedure Production and Process Control of Packaging Process Packaging Product Specifications Packaging Product Bill of Materials Packaging Work Order
4.10
5
6
3.3.2 3.4
Type
Manufacturing operations: Availability of relevant documents
Production
7.2.1 7.2.3 7.2.4 7.2.5 7.2.6 7.2.7
7.2.2 7.3.1 7.3.3 7.3.4 7.3.5
Start-up Checks Packaging Operations
SOP Specs SOP SOP SOP Specs BOM Form WI WI SOP SOP Specs BOM Form
Section
Requirement
Required documentation
8
Finished Product
7
Production
Description
Quality Control Laboratory
9
7.3.1 7.3.2 7.3.6 8.1 8.2 8.3
9.2
Shipment Returns Test Methods
9.3
Acceptance criteria
9.4
Results
9.5
Out-of-Specification Results Reagents, solutions, reference standards, culture media
8.4 8.5
9.6
9.7 9.8
10
15
16
Deviations Complaints and Recalls
14
Sampling Retain Sample Rejected finished products, bulk products, raw materials and packaging materials Reprocessed finished products and bulk products Wastes
Work Instruction for the use of specific equipment (as sealers) Packaging Line Clearance Procedure Packaging In-Process Inspection Final product specification Final Inspection Product Release Shipping Procedure Customer Returns Analysis Procedures (for those not included in the EU Pharmacopoeia) Raw material, in process or final product specifications, establishing the acceptance criteria. Raw material, in process or final testing results forms (indicating the acceptance criteria) OOS Procedure Receipt and Storage of Chemicals Preparation and Standardization of Solutions Cleaning and washing of laboratory glassware Laboratory Basic Safety Rules Sampling Procedure Retains Control of Non-Conforming Product Non-Conforming Event Procedure Root Cause Analysis (RCA) Procedure Rework Procedure
WI
Handling, Storage, Treatment and Disposal of Wastes
SOP
SOP WI Spec WI Form SOP SOP PA Specs Forms SOP SOP SOP SOP SOP SOP SOP SOP SOP SOP SOP
13.1 13.2
Deviations
To be determined Deviation Procedure
SOP
14.2
Product Complaints
Customer Complaints Management
SOP
14.3
Product Recalls
Recall Procedure
SOP
Change Control
Creating and Changing Specifications
SOP
Risk Assessment Procedure
SOP
Corrective and Preventive Action System Procedure
SOP
Internal Audits Procedure
SOP
Subcontracting
Change Control
12 13
10.2
Wastes
OOS product Treatment
10.1
Internal Audits
11
Packaging Operations (continued) Start-up checks In process Control Finished Products
Type
Internal Audits
Section
Requirement
Required documentation
17
Documentation
Description
Documentation
Document Control and Data Control Procedure Signature Authority for Controlled Documents Document Retention Storage and Disposition Good Documentation Practices
Type
SOP SOP SOP SOP
This is the required documentation to be generated in order to meet ISO 22716:2007 requirements. Section 12 is left open because it is not clear if the company will made use of subcontractors in order to perform some specific activities (like dispensing and repackaging). PD:
It is important to take in mind that according to ISO 22716:2007 3.2.11 requirement, the company should ensure that there are adequate staffing levels in the different scope of activity, according to the diversity of production”. That is, the company must ensure that in every key area the personnel who made decisions and perform key activities have the required competences. Thus, it is important to proceed to perform an organizational assessment to verify this point. Sections 4.2 to 4.9 are related to premises design, materials of construction, ventilation, lighting, floors, walls, windows, pipework, drains and ducts. The way to meet these requirements is to perform a diagnostic of the current state of the premises, in order to identify the type of action to be taken, and proceed to establish a Premises Adjustment Plan.
View more...
Comments